Acceptance Review of Proposed Amendments Revision to Technical Specifications 3.7.5, 'Auxiliary Feedwater System,' & 3.7.6, 'Condensate Storage Tank & Fire Water Storage Tank (Tac Nos. MD8471 and MD8472)
ML082040748
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/01/2008
From: Wang A
NRC/NRR/ADRO/DORL/LPLIV
To: Conway J
Pacific Gas & Electric Co
Wang, A B, NRR/DORL/LPLIV, 415-1445
References
TAC MD8471, TAC MD8472
Download: ML082040748 (4)


Text

August 1, 2008 Mr. John Conway Senior Vice President - Station Generation and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 770000 San Francisco, CA 94177-0001

SUBJECT:

DIABLO CANYON POWER PLANT, UNIT NOS. 1 AND 2 - ACCEPTENCE REVIEW OF PROPOSED AMENDMENTS RE: REVISION TO TECHNICAL SPECIFICATIONS 3.7.5, AUXILIARY FEEDWATER SYSTEM, AND 3.7.6, CONDENSATE STORAGE TANK AND FIRE WATER STORAGE TANK (TAC NOS. MD8471 AND MD8472)

Dear Mr. Conway:

By letter dated April 3, 2008 (Agencywide Document Access and Management System (ADAMS) Accession No. ML081010207), Pacific Gas and Electric Company (PG&E, the licensee) submitted a license amendment for the Diablo Canyon Power Plant, Unit Nos. 1 and 2 (DCPP). The proposed amendment would revise Technical Specification (TS) 3.7.5, Auxiliary Feedwater System, to remove Surveillance Requirement 3.7.5.6, and revise TS 3.7.6, Condensate Storage Tank (CST) and Fire Water Storage Tank (FWST), to remove the FWST level requirements, revise the CST level requirements, and revise TS 3.7.6 to be consistent with the NUREG-1431, Standard Technical Specifications. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.

This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff reviewed your application and by letter dated June 4, 2008 (ADAMS Accession No. ML081540540), issued an insufficient information letter. By letter dated June 20, 2008 (ADAMS Accession No. ML081820180), PG&E supplemented the license amendment request.

The NRC staff reviewed your application and its supplement and concluded that it does provide technical information in sufficient detail to enable the NRC staff to proceed with its detailed

J. Conway technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence.

If you have any questions, please contact me at (301) 415-1445.

Sincerely,

/RA/

Alan Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323 cc: See next page

ML082040748 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC (A) NRR/LPL4/PM NAME AWang J Donohew for GLappert MThadani AWang JDonohew for DATE 8/01/08 8/01/08 8/01/08 8/01/08 Diablo Canyon Power Plant, Units 1 and 2 (3/10/2008 2007) cc:

NRC Resident Inspector Regional Administrator, Region IV Diablo Canyon Power Plant U.S. Nuclear Regulatory Commission c/o U.S. Nuclear Regulatory Commission 612 E.Lamar Blvd., Suite 400 P.O. Box 369 Arlington, TX 76011-4125 Avila Beach, CA 93424 Jennifer Post, Esq.

Sierra Club San Lucia Chapter Pacific Gas & Electric Company ATTN: Andrew Christie P.O. Box 7442 P.O. Box 15755 San Francisco, CA 94120 San Luis Obispo, CA 93406 City Editor Ms. Nancy Culver The Tribune San Luis Obispo 3825 South Higuera Street Mothers for Peace P.O. Box 112 P.O. Box 164 San Luis, Obispo, CA 94306-0112 Pismo Beach, CA 93448 Director, Radiologic Health Branch Chairman State Department of Health Services San Luis Obispo County P.O. Box 997414, MS 7610 Board of Supervisors Sacramento, CA 95899-7414 1055 Monterey Street, Suite D430 San Luis Obispo, CA 93408 Mr. James Boyd, Commissioner California Energy Commission Mr. Truman Burns 1516 Ninth Street MS (31)

Mr. Robert Kinosian Sacramento, CA 95831 California Public Utilities Commission 505 Van Ness, Room 4102 Mr. James R. Becker San Francisco, CA 94102 Site Vice President Diablo Canyon Power Plant Diablo Canyon Independent Safety P.O. Box 56 Committee Avila Beach, CA 93424 Attn: Robert R. Wellington, Esq.

Legal Counsel Jennifer Tang 857 Cass Street, Suite D Field Representative Monterey, CA 93940 United States Senator Barbara Boxer 1700 Montgomery Street, Suite 240 San Francisco, CA 94111