Letter Sequence Acceptance Review |
---|
|
|
|
|
---|
Category:Acceptance Review Letter
MONTHYEARML25038A1062025-02-0707 February 2025 Acceptance Review: Diablo Canyon Revision of Technical Specifications 1.1 and 5.5 to Use Online Monitoring Methodology ML25035A0042025-02-0303 February 2025 Acceptance Review: Diablo Canyon Revision to Technical Specifications to Adopt TSTF-541 ML24149A0832024-05-28028 May 2024 Acceptance Review: Diablo Canyon Request for Alternative Security Measures and Exemption for the Early Warning System ML14122A3622014-05-0202 May 2014 Acceptance Review of LAR Regarding Revision to Technical Specification 3.8.1 ML13281A4952013-10-30030 October 2013 Acceptance of Application Following Supplement, Adopt National Fire Protection Association NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition) ML13214A0202013-08-0101 August 2013 Acceptance Review Email, Relief Request NDE-PNS-U2, Requirements for Examination Coverage of ASME Class 1 Pressurizer Nozzle-to-Head Welds, Third 10-Year Inservice Inspection Interval ML13123A0412013-05-0202 May 2013 Acceptance Review Email, Relief Request NDE-RCS-SE-1R18 - Alternative to Requirements to ASME Code, Section XI, Appendix Viii, Suppl. 2 and 10 as Modified by CC N-695 and CC N-696 to Allow Use of Alternative Depth-Sizing Criteria ML13022A0132013-01-22022 January 2013 Acceptance Review Email, Relief Request RVFLNG-INT3 - Alternative to ASME Code Pressure Test Requirements for Class 1 Reactor Vessel Flange Leakoff Lines, Third 10-Year Inservice Inspection Interval (TAC MF0408-MF0409) ML1206501312012-03-0505 March 2012 Acceptance Review Email, License Amendment Request, Revise Updated Final Safety Analysis Report Section 4.3.2.2 to Allow Use of Beacon Power Distribution Monitoring System ML1202406872012-01-24024 January 2012 Acceptance Review Email, License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power DG Start Instrumentation and Fsaru ML1201902312012-01-19019 January 2012 Acceptance Review Email, Request for Stand-alone Preemption Authority Pursuant to 42 U.S.C.. 2201a ML1201200052012-01-13013 January 2012 Acceptance Review Letter, License Amendment Request to Replace Digital Process Protection System for Reactor Protection System and Engineered Safety Features Actuation System Functions ML1120300652011-07-21021 July 2011 Acceptance Review Email, Request to Revise Technical Specifications Related to Auxiliary Feedwater System to Adopt TSTF-245, Rev. 1, TSTF-340, Rev. 3, TSTF-412, Rev. 3, and TSTF-439, Rev. 2 ML1111804492011-04-28028 April 2011 Acceptance Review Email, Request for Exemption from Specific 10 CFR Part 73 Requirements, Extension of Deadline for Implementation ML1110104912011-04-11011 April 2011 Acceptance Review E-mail, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources Operating and TSTF 163, Revision 2, Minimum Vs. Steady State Voltage and Frequency ML1109002252011-03-31031 March 2011 Acceptance Review Email, Request for Exemption from Specific 10 CFR Part 73 Requirements, Extension of Deadline for Implementation ML1108706822011-03-28028 March 2011 Acceptance Review E-mail, License Amendment Request to Revise Technical Specification (TS) 3.7.1, Main Steam Safety Valves (Mssvs), to Remove a One-time Note from TS Table 3.7.1-1 ML1013700552010-05-24024 May 2010 License Amendment Request for Approval of the Cyber Security Plan (TACs ME2667 and ME2668) ML1013904452010-05-19019 May 2010 Acceptance Review Email, Relief Request NDE-RCS-SE-1R16, Relief from ASME Section XI Requirements to Allow Use of Alternate Sizing Qualification Criteria, Third 10-Year Inservice Inspection Interval ML1013704512010-05-17017 May 2010 Acceptance Review Email, Review of the Topical Report, Process Protection System Replacement Diversity and Defense-in-Depth Assessment, Rev. 0, Related to License Amendment Request for Digital Upgrade (TAC ME3722-ME3733) ML1003411112010-02-0303 February 2010 Acceptance Review Email, License Amendment Request to Revise Licensing Basis to Discuss Conformance of Delayed Access Offsite Power Circuit to GDC 17 ML1000604412010-01-0606 January 2010 Acceptance Review Email, Acceptance of Part 73 Exemption ML0914601842009-05-26026 May 2009 Acceptance Review Email, License Amendment Request to Modify Technical Specifications to Adopt TSTF-511, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 ML0907002112009-03-11011 March 2009 Acceptance Review Email, Re License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, to Delete High-Negative Rate Trip Function ML0834002822008-12-0404 December 2008 Acceptance Review E-mail ML0820407482008-08-0101 August 2008 Acceptance Review of Proposed Amendments Revision to Technical Specifications 3.7.5, Auxiliary Feedwater System, & 3.7.6, Condensate Storage Tank & Fire Water Storage Tank (Tac Nos. MD8471 and MD8472) 2025-02-07
[Table view] Category:E-Mail
MONTHYEARML25038A1062025-02-0707 February 2025 Acceptance Review: Diablo Canyon Revision of Technical Specifications 1.1 and 5.5 to Use Online Monitoring Methodology NUREG-1431, Revision of Technical Specification Completion Time to Be Consistent with NUREG-1431, Revision 52025-02-0707 February 2025 Revision of Technical Specification Completion Time to Be Consistent with NUREG-1431, Revision 5 ML25035A0032025-02-0303 February 2025 Acceptance Review_ Diablo Canyon Revision to Technical Specifications (Tss) to Adopt TSTF-505 for TS 3.3.1 and 3.3.2 ML25035A0042025-02-0303 February 2025 Acceptance Review: Diablo Canyon Revision to Technical Specifications to Adopt TSTF-541 ML25042A2382025-01-30030 January 2025 NRC to NMFS, Consideration of Black Abalone in the Diablo Canyon Intake Cove ML25028A0142025-01-27027 January 2025 LRA - Requests for Additional Information - Set 3 - Email from Brian Harris to Paula Gerfen ML25042A2362025-01-16016 January 2025 NRC to NMFS, Black Abalone in Diablo Lr ESA Consultation ML25014A3442025-01-14014 January 2025 (E-Mail) Diablo Canyon Nuclear Power Plant, Units 1 and 2 - Request for Additional Information Diablo Canyon Request to Revise Technical Specification 5.5.16 ML24365A0302024-12-30030 December 2024 NRR E-mail Capture - Acceptance Review Diablo Canyon Revision to Technical Specification 3.3.5 and 3.8.2 to Adopt TSTF-589 ML25042A2342024-12-17017 December 2024 NRC to NMFS, Responses to Requests for Additional Information for Diablo Canyon ESA Consultation ML25042A2452024-12-11011 December 2024 PG&E to Fws, Responses to Requests for Additional Information for ESA Consultation ML25042A2422024-12-10010 December 2024 NMFS to NRC, Requests for Additional Information for Diablo Canyon ESA Consultation with Attachment ML25042A2432024-12-10010 December 2024 NMFS to NRC, Requests for Additional Information for Diablo Canyon ESA Consultation ML24339B8832024-12-0404 December 2024 LRA - Requests for Additional Information - Set 2 - Email from Brian Harris to to Paula Gerfen ML25042A2412024-11-27027 November 2024 Fws to NRC, Requests for Additional Information for Diablo Canyon ESA Consultation ML24338A1472024-11-27027 November 2024 NRR E-mail Capture - Status Update to Petitioner - Diablo Canyon Seismic Core Damage Frequency 10 CFR 2.206 Petition - OEDO-24-00083 ML25042A2402024-11-26026 November 2024 Fws to NRC, Acknowledgement of Diablo ESA Section 7 Consultation Review ML24346A0272024-11-20020 November 2024 Printed Documents Provided to NRC Staff During Nov 20, 2024 Public Meeting ML25017A2422024-11-12012 November 2024 Email to PG&E Diablo Canyon ISFSI License Renewal EA and Fonsi ML25017A2432024-11-12012 November 2024 Email to SHPO and Tribes Diablo Canyon ISFSI EA and FRN ML24285A1902024-10-0808 October 2024 Email - Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Environmental Assessment ML24281A1062024-10-0202 October 2024 NRR E-mail Capture - (External_Sender) Public Letter to Petition Review Board Regarding the Diablo Canyon Seismic Core Damage Frequency 10 CFR 2.206 Petition - OEDO-24-00083 ML24250A0542024-09-0606 September 2024 LRA - Requests for Additional Information - Set 1 - Email from Brian Harris to Adam Peck ML24250A0502024-09-0606 September 2024 NRR E-mail Capture - Acceptance Review Diablo Canyon Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML24291A1322024-09-0505 September 2024 E-mail to California Department of Public Health for Diablo Canyon ISFSI License Renewal Environmental Assessment ML24235A2032024-08-22022 August 2024 OEDO-24-00083 - 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Final Determination e-mail - EPID L-2024-CRS-0000 ML24205A0622024-07-23023 July 2024 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request for Approval to Extend the Alternative for Use of Full Structural Weld Overlay ML24187A1382024-07-0202 July 2024 License Renewal Environmental Review: Summary of June 27 Clarification Call Regarding Pg&Es Response to RCI AQN-3 ML24184C0422024-07-0202 July 2024 NRR E-mail Capture - Request for Additional Information Diablo Canyon 50.69 risk-informed Categorization ML24149A0832024-05-28028 May 2024 Acceptance Review: Diablo Canyon Request for Alternative Security Measures and Exemption for the Early Warning System ML24145A0612024-05-22022 May 2024 Written Limited Appearance Statement of Doris Nassiry ML24136A1622024-05-15015 May 2024 OEDO-24-00083 (E-Mail) 10 CFR 2.206 - Diablo Canyon Power Plant, Unit Nos. 1 and 2 Seismic - Initial Assessment ML24135A1562024-05-13013 May 2024 July 2024 Emergency Preparedness Exercise Inspection - Request for Information ML24134A1902024-05-10010 May 2024 Written Limited Appearance Statement of Shelley Hamilton ML24134A1872024-05-10010 May 2024 Written Limited Appearance Statement of Charlene M. Woodcock ML24122C6702024-04-29029 April 2024 Request from NRC Review of a Draft EA for an Exemption for the Limerick Generating Station ML24095A3172024-04-0404 April 2024 NRR E-mail Capture - Acceptance Review Diablo Canyon Request to Revise Technical Specification 5.6.6 for Pressure and Temperature Limits Report ML24088A2382024-03-28028 March 2024 10 CFR 2.206 - Diablo Canyon Units 1 and 2 OEDO-24-00083 - Screen-in e-mail L-2024-CRS-0000 ML24058A1032024-03-0808 March 2024 OEDO-23-00350-NRR - Initial Assessment - 10 CFR 2.206 Petition from Mothers for Peace and Friends of the Earth Regarding Diablo Canyon ML24071A1762024-03-0707 March 2024 Email - (External Sender) NRC Proceeding on Diablo Canyon 50-275 and 50-323 LR-2 ML24067A0892024-03-0505 March 2024 Email Response from Diane Curran to Office of the Secretary, Assistant for Rulemaking and Adjudications, Russell Chazell ML24067A0902024-03-0505 March 2024 Email to Diane Curran from the Office of the Secretary, Assistant for Rulemaking and Adjudications, Russell Chazell ML24067A0882024-03-0404 March 2024 Email Hearing Request from San Luis Obispo Mothers for Peace, Friends of the Earth, and Environmental Working Group ML24060A0022024-02-28028 February 2024 (External Sender) Pre-Sub Mittal EWS Participants List E-mail ML24045A1972024-02-0606 February 2024 Tribal Consultation Request ML24033A3062024-02-0101 February 2024 Dcisc 2-1-2024 Email: Comments by Mr. Bruce Severance at This Mornings Public Meeting Re Scope of Review for DCPP License Extension ML23334A0912023-11-30030 November 2023 NRR E-mail Capture - Diablo Canyon 1 and 2 - Audit Questions for License Amendment Associated with TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23335A1012023-11-0606 November 2023 OEDO-23-00350-NRR - Screen-in Email - 10 CFR 2.206 Petition from Mothers for Peace and Change.Org Regarding Diablo Canyon ML23306A0422023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Diablo Canyon Request to Adopt 10 CFR 50.69, risk-informed Categorization and Treatment of SSCs ML23230A0702023-08-18018 August 2023 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b 2025-02-07
[Table view] |
Text
From:
Wang, Alan Sent:
Wednesday, May 19, 2010 11:10 AM To:
Larry Parker; Baldwin, Thomas (DCPP); Tom Grozan Cc:
Lent, Susan; Burkhardt, Janet
Subject:
Acceptance of NDE-RCS-SE-1R16 for the Diablo Canyon Power Plant, Unit 1 (ME3942)
By letter dated May 17, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML101380224), Pacific Gas and Electric Company (PG&E, the licensee) submitted a relief request NDE-RCS-SE-1R16 for the Diablo Canyon Power Plant, Unit 1 (DCPP). The proposed request for relief is associated with the use of an alternative to the requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, Appendix VIII, Supplement 10 as modified by Code Case N-695 "Qualification Requirements for Dissimilar Metal Piping Welds." The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request.
Pursuant to Section 50.55a(a)(3)(i) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed requests for relief in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
If you have any questions, please contact me at (301) 415-1445.
Alan Wang Project Manager (River Bend Station)
Nuclear Regulatory Commission Division of Operating Reactor Licensing Alan.Wang@NRC.gov Tel: (301) 415-1445 Fax: (301) 415-1222 E-mail Properties Mail Envelope Properties (C0A338EE37A11447B136119705BF9A3F6552349EBA)
Subject:
Acceptance of NDE-RCS-SE-1R16 for the Diablo Canyon Power Plant, Unit 1 (ME3942)
Sent Date: 5/19/2010 11:10:16 AM Received Date: 5/19/2010 11:10:16 AM From: Wang, Alan Created By: Alan.Wang@nrc.gov Recipients:
LMP1@pge.com (Larry Parker)
Tracking Status: None TRB1@pge.com (Baldwin, Thomas (DCPP))
Tracking Status: None TCG5@PGE.com (Tom Grozan)
Tracking Status: None Susan.Lent@nrc.gov (Lent, Susan)
Tracking Status: None Janet.Burkhardt@nrc.gov (Burkhardt, Janet)
Tracking Status: None Post Office:
HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 6233 5/19/2010 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: