TAC:ME6360, Allow 7 Day Completion Time for a TURBINE-DRIVEN AFW Pump Inoperable, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO (Approved, Closed) TAC:ME6361, Allow 7 Day Completion Time for a TURBINE-DRIVEN AFW Pump Inoperable, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO (Approved, Closed) |
|
MONTHYEARML1115301142011-06-0101 June 2011 License Amendment Request 11-04, Revision to Technical Specification 3.6.6, Containment Spray and Cooling Systems, TS 3.7.5, Auxiliary Feedwater System, TS 3.8.1, AC Sources-Operating, TS 3.8.9, Distribution Systems.. Project stage: Request ML1120300652011-07-21021 July 2011 Acceptance Review Email, Request to Revise Technical Specifications Related to Auxiliary Feedwater System to Adopt TSTF-245, Rev. 1, TSTF-340, Rev. 3, TSTF-412, Rev. 3, and TSTF-439, Rev. 2 Project stage: Acceptance Review ML1200401172011-12-22022 December 2011 Request for Additional Information E-mail, Revise Technical Specifications Related to Auxiliary Feedwater System to Adopt TSTF-245, Rev. 1, TSTF 340, Rev. 3, TSTF-412, Rev. 3, and TSTF-439, Rev. 2 (TAC Nos. ME6360-ME6361) Project stage: RAI ML1200401222011-12-22022 December 2011 Request for Additional Information, Revise Technical Specifications Related to Auxiliary Feedwater System to Adopt TSTF-245, Rev. 1, TSTF 340, Rev. 3, TSTF-412, Rev. 3, and TSTF-439, Rev. 2 (TAC Nos. ME6360-ME6361) Project stage: RAI ML1200504882012-01-0505 January 2012 Request for Additional Information, Round 2, Revise Technical Specifications Related to Auxiliary Feedwater System to Adopt TSTF-245, Rev. 1, TSTF 340, Rev. 3, TSTF-412, Rev. 3, and TSTF-439, Rev. 2 (TAC ME6360-ME6361) Project stage: RAI ML1200504812012-01-0505 January 2012 Email, Request for Additional Information, Round 2, Revise Technical Specifications Related to Auxiliary Feedwater System to Adopt TSTF-245, Rev. 1, TSTF 340, Rev. 3, TSTF-412, Rev. 3, and TSTF-439, Rev. 2 Project stage: RAI DCL-11-059, Response to NRC Request for Additional Information Regarding PG&E Letter DCL-11-059, License Amendment Request 11-04, Revision to Technical Specification 3.6.6, Containment Spray and Cooling Systems, .2012-02-0606 February 2012 Response to NRC Request for Additional Information Regarding PG&E Letter DCL-11-059, License Amendment Request 11-04, Revision to Technical Specification 3.6.6, Containment Spray and Cooling Systems, . Project stage: Response to RAI ML1213607062012-05-21021 May 2012 Memo to File, Summary of 5/11/12 Telephone Conference Issues Associated TSTF-412, Rev. 3 and Effect on Staff Review of Request to Revise Technical Specifications Related to Auxiliary Feedwater System (TAC ME6360-ME6361) Project stage: Approval DCL-12-057, Supplement to PG&E Letter DCL-12-017, Response to NRC Request for Additional Information: NRC Question 12012-05-31031 May 2012 Supplement to PG&E Letter DCL-12-017, Response to NRC Request for Additional Information: NRC Question 1 Project stage: Supplement ML1217200982012-06-20020 June 2012 Request for Additional Information Email, Round 3, Revise Technical Specifications Related to Auxiliary Feedwater System to Adopt TSTF-245 Rev. 1, TSTF 340 Rev. 3, TSTF-412 Rev. 3, and TSTF-439 Rev. 2 (TAC ME6360-ME6361) Project stage: RAI DCL-12-076, Response to NRC Second Request for Additional Information Regarding PG&E Letter DCL-11-059, License Amendment Request 11-04, Revision to Technical Specification (TS) 3.6.6, Containment Spray and Cooling Systems, Ts2012-08-0606 August 2012 Response to NRC Second Request for Additional Information Regarding PG&E Letter DCL-11-059, License Amendment Request 11-04, Revision to Technical Specification (TS) 3.6.6, Containment Spray and Cooling Systems, Ts Project stage: Request DCL-12-107, Supplement to PG&E Letter DCL-11-059, License Amendment Request 11-04, Revision to Technical Specification (TS) 3.6.6, Containment Spray and Cooling Systems, TS 3.7.5, Auxiliary Feedwater (AFW) System, TS 3.8.1, Ac...2012-11-0101 November 2012 Supplement to PG&E Letter DCL-11-059, License Amendment Request 11-04, Revision to Technical Specification (TS) 3.6.6, Containment Spray and Cooling Systems, TS 3.7.5, Auxiliary Feedwater (AFW) System, TS 3.8.1, Ac... Project stage: Supplement ML12352A0672013-01-31031 January 2013 Issuance of Amendment Nos. 215 and 217, Revise Technical Specifications Related to Auxilary Feedwater System to Adopt TSTF-245, Rev. 1, TSTF-340, Rev. 3, TSTF-412, Rev. 3, and TSTF-439, Rev. 2 Project stage: Approval 2012-02-06
[Table View] |
Acceptance Review Email, Request to Revise Technical Specifications Related to Auxiliary Feedwater System to Adopt TSTF-245, Rev. 1, TSTF-340, Rev. 3, TSTF-412, Rev. 3, and TSTF-439, Rev. 2| ML112030065 |
| Person / Time |
|---|
| Site: |
Diablo Canyon  |
|---|
| Issue date: |
07/21/2011 |
|---|
| From: |
Wang A Plant Licensing Branch IV |
|---|
| To: |
Soenen P, Baldwin T, Wang A Pacific Gas & Electric Co, Plant Licensing Branch IV |
|---|
| Wang, A B, NRR/DORL/LPLIV, 415-1445 |
| References |
|---|
| TAC ME6360, TAC ME6361 |
| Download: ML112030065 (2) |
|
Text
From:
Wang, Alan Sent:
Thursday, July 21, 2011 6:28 PM To:
Wang, Alan; 'Baldwin, Thomas (DCPP)'; Soenen, Philippe R Cc:
Lent, Susan; Burkhardt, Janet; Polickoski, James
Subject:
Acceptance of Diablo Canyon Power Plant (DCPP) License Amendment Reqest Regarding Auxiliary Feedwater System (TAC Nos ME6360 and ME6361)
Tom and Philippe, By "DCL-11-059, Diablo Canyon Units 1 & 2, License Amendment Request 11-04, Revision to Technical Specification 3.6.6, Containment Spray and Cooling Systems, TS 3.7.5, [[system" contains a listed "[" character as part of the property label and has therefore been classified as invalid. System, TS 3.8.1, AC Sources-Operating, TS 3.8.9, Distribution Sys|letter dated June 1, 2011]] (Agencywide Documents Access and Management System (ADAMS) Accession No. ML111530114), Pacific Gas and Electric Company. (PG&E, the licensee) requested an amendment to the Facility Operating License for the DCPP. The license amendment request (LAR) proposes to revise Technical Specification (TS) 3.7.5, "Auxiliary Feedwater (AFW) System," to incorporate changes consistent with the following NRC-approved Technical Specification Task Force (TSTF) Travelers:
- TSTF-412, Revision 3, "Provide Actions for One Steam Supply to Turbine Driven AFW/EFW Pump Inoperable," and
- TSTF-439, Revision 2, "Eliminate Second. Completion Times Limiting Time From Discovery of Failure To Meet an LCO."
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.
This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
If you have any questions, please contact me at (301) 415-1445.
Alan Wang Project Manager (Diablo Canyon Power Plant)
Nuclear Regulatory Commission