Letter Sequence Other |
|---|
EPID:L-2024-CRS-0000, Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule (Open) |
Results
Other: DCL-23-118, License Renewal Application, ML24088A238, ML24136A162, ML24198A105, ML24205A066, ML24205A067, ML24235A203, ML24262A246, ML24281A106, ML24302A148, ML24302A153, ML24302A154, ML24317A038, ML24317A039, ML24338A147, ML25093A060, ML25113A183, ML25113A184, ML25136A355, ML25160A123, ML25160A125, ML25161A264
|
MONTHYEARDCL-23-038, Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule2023-05-15015 May 2023 Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule Project stage: Request ML23257A3022023-09-14014 September 2023 San Luis Obispo Mothers for Peace and Friends of the Earth Corrected Request for Hearing on NRC Staff Decision Effectively Amending Diablo Canyon 1 License, Request for Emergency Order Requiring Shutdown, and Errata Project stage: Request DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application Project stage: Other ML24065A4342024-03-0505 March 2024 Exhibit 2 to Hearing Request Project stage: Request ML24067A0662024-03-0707 March 2024 Petition by San Luis Obispo Mothers for Peace, Friends of the Earth and Environmental Working Group for Shutdown of Diablo Canyon Nuclear Power Plant Due to Unacceptable Risk of Seismic Core Damage Accident Project stage: Request ML24088A2382024-03-28028 March 2024 10 CFR 2.206 - Diablo Canyon Units 1 and 2 OEDO-24-00083 - Screen-in e-mail L-2024-CRS-0000 Project stage: Other ML24136A1622024-05-15015 May 2024 OEDO-24-00083 (E-Mail) 10 CFR 2.206 - Diablo Canyon Power Plant, Unit Nos. 1 and 2 Seismic - Initial Assessment Project stage: Other ML24162A0792024-06-0707 June 2024 OEDO-24-00083 - 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic CDF - Supplemental Declaration 6-7-2024 - Project stage: Supplement ML24198A1052024-07-17017 July 2024 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic CDF - Petitioner Presentation 7-16-2024 - L-2024-CRS-0000 OEDO-24-00083 Project stage: Other ML24218A1642024-07-17017 July 2024 OEDO-24-00083 - 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic CDF - 7-17-2024 Petitioner Public Meeting Transcript - Project stage: Meeting ML24235A2032024-08-22022 August 2024 OEDO-24-00083 - 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Final Determination e-mail - EPID L-2024-CRS-0000 Project stage: Other ML24205A0662024-08-27027 August 2024 OEDO-24-00083 - 10 CFR 2.206 - Ack Letter - Diablo Canyon Units 1 and 2 Seismic Core Damage Frequency - Project stage: Other ML24205A0672024-08-27027 August 2024 OEDO-24-00083 - 10 CFR 2.206 - FRN Diablo Canyon Units 1 and 2 Seismic Core Damage Frequency - (EPID L-2024-CRS-0000) - Federal Register Notice Project stage: Other ML24262A2462024-09-11011 September 2024 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Petitioner Response to Acknowledgement Letter - Project stage: Other ML24281A1062024-10-0202 October 2024 NRR E-mail Capture - (External_Sender) Public Letter to Petition Review Board Regarding the Diablo Canyon Seismic Core Damage Frequency 10 CFR 2.206 Petition - OEDO-24-00083 Project stage: Other DCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024 Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 Project stage: Request ML24305A1872024-10-31031 October 2024 OEDO-24-00083 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic CDF - Petition Supplement 10-30-2024 Project stage: Supplement ML24338A1472024-11-27027 November 2024 NRR E-mail Capture - Status Update to Petitioner - Diablo Canyon Seismic Core Damage Frequency 10 CFR 2.206 Petition - OEDO-24-00083 Project stage: Other ML24317A0382024-12-0505 December 2024 OEDO-24-00083 - 2.206 Petition Regarding Seismic Core Damage Frequency for Diablo Canyon Nuclear Power Plant, Units 1 and 2, Supplemental Acknowledgment Letter (EPID L-2024-CRS-0000) (Letter) Project stage: Other ML24317A0392024-12-0505 December 2024 OEDO-24-00083 - 2.206 Petition Regarding Seismic Core Damage Frequency for Diablo Canyon Nuclear Power Plant, Units 1 and 2, Supplemental Acknowledgment Letter (EPID L-2024-CRS-0000) (FRN) Project stage: Other ML25093A0602025-04-10010 April 2025 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Proposed Directors Decision - L-2024-CRS-0000 OEDO-24-00083 - Attachment Project stage: Other ML24302A1542025-04-10010 April 2025 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Proposed Directors Decision Letter to Licensee - L-2024-CRS-0000 OEDO-24-00083 Project stage: Other ML24302A1532025-04-10010 April 2025 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Proposed Directors Decision Letter to Petitioners - L-2024-CRS-0000 OEDO-24-00083 Project stage: Other ML24302A1482025-04-10010 April 2025 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Proposed Directors Decision - L-2024-CRS-0000 OEDO-24-00083 Project stage: Other ML25107A2562025-04-16016 April 2025 Request for Extension of Time to Comment on Proposed Director’S Decision Regarding Seismic Core Damage Frequency for Diablo Canyon Nuclear Power Plant, Units 1 and 2 (EPID L-2024-CRS-0000) (Redacted) Project stage: Request ML25113A1842025-04-17017 April 2025 Seismic Core Damage 2.206 Petition - Approval of Comment Period Extension Request to May 15, 2025 - Email to Petitioners Project stage: Other ML25113A1832025-04-17017 April 2025 Seismic Core Damage 2.206 Petition - Approval of Comment Period Extension Request to May 15, 2025 - Email to Licensee Project stage: Other ML25136A3552025-05-15015 May 2025 Comments on Proposed Directors Decision Regarding Seismic Core Damage Frequency for Diablo Canyon Nuclear Power Plant, Units 1 and 2 Project stage: Other ML25161A2642025-06-26026 June 2025 OEDO-24-00083 - Directors Decision Regarding Seismic Core Damage Frequency for Diablo Canyon Nuclear Power Plant, Units 1 and 2 (EPID L-2024-CRS-0000) - Attachment Project stage: Other ML25160A1252025-06-26026 June 2025 OEDO-24-00083 - Directors Decision Regarding Seismic Core Damage Frequency for Diablo Canyon Nuclear Power Plant, Units 1 and 2 (EPID L-2024-CRS-0000) - Directors Decision Project stage: Other ML25160A1232025-06-30030 June 2025 OEDO-24-00083 - Directors Decision Regarding Seismic Core Damage Frequency for Diablo Canyon Nuclear Power Plant, Units 1 and 2 (EPID L-2024-CRS-0000) - Federal Register Notice Project stage: Other 2024-05-15
[Table View] |
Text
From:
Perry Buckberg To:
Diane Curran Cc:
htempleton@foe.org; cleary@ewg.org
Subject:
Diablo Canyon Seismic Core Damage 2.206 petition - Accepted Date:
Thursday, August 22, 2024 7:37:00 AM Good morning Diane,
The Office of Nuclear Reactor Regulation has concurred with the Petition Review Boards (PRB) recommendation to accept your March 4, 2024, petition, as supplemented, regarding the risk of seismic induced core damage at Diablo Canyon. Specifically, the concerns below are being accepted into the 2.206 process in accordance with MD 8.11 (ML18296A043), sections III.C.1(a) and (b) and the concerns will be reviewed by the PRB in accordance with MD 8.11, section IV.
In addition, on March 28, 2024 (ML24088A238) I informed you of the staff determination that immediate closure of Diablo Canyon was not necessary. The NRC staff position regarding immediate closure remains the same.
The PRB has prepared a formal Acknowledgement Letter describing this acceptance determination which will be issued shortly. Once the PRB staff has completed its review of the concerns below, the PRB will consider whether enforcement action is warranted. This decision by the PRB will be documented in Proposed Directors Decision which will be sent to you for comment before issuance of a Final Directors Decision.
If you have any questions regarding this e-mail, please feel free to contact me at Perry.Buckberg@nrc.gov.
- Thanks, Perry Buckberg Senior Project Manager / Agency 2.206 Petition Coordinator U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation office: (301)415-1383 perry.buckberg@nrc.gov Mail StopO-8B1a, Washington, DC, 20555-0001
Accepted Concerns from the March 4, 2024, Petition, as Supplemented
- 1. Thrust faulting is neglected by Pacific Gas & Electric Companys (PG&E) 2012 Seismic Source Characterization (SSC) model because the model assumes that a majority of large earthquakes affecting Diablo Canyon are strike-slip and disregards the significant contribution of thrust faulting earthquake sources under the Diablo Canyon site and the adjacent Irish Hills. In addition, PG&E did not use a hanging-wall term for the modeling of potential ground motions from the Los Osos and San Luis Bay thrust faults.
- 2. The January 2024 magnitude 7.5 (moment magnitude) earthquake centered in the Noto Peninsula (Japan), with an average slip of 2 meters on the fault, is analogous to future potential thrust mechanism earthquakes beneath Diablo Canyon. Based on the slip rate
of the Irish Hills adjacent to Diablo Canyon and the slip of the Noto earthquake, large thrust fault earthquakes will occur, on average, every 715 years near the Diablo Canyon site.
- 3. PG&Es 2012 SSC model does not account for an inferred offshore thrust fault that has a slip rate of 2.8 millimeters per year (mm/yr) and the potential for producing a magnitude 7.5 earthquake.
- 4. Seismic core damage frequency, estimated by PG&E in 2018 to be 3x10-5, should be 1.4x10-3 per year (about once every 715 years) based on this higher recurrence rate for thrust earthquakes.