Letter Sequence Acceptance Review |
---|
|
|
|
|
---|
Category:Acceptance Review Letter
MONTHYEARML24149A0832024-05-28028 May 2024 Acceptance Review: Diablo Canyon Request for Alternative Security Measures and Exemption for the Early Warning System ML14122A3622014-05-0202 May 2014 Acceptance Review of LAR Regarding Revision to Technical Specification 3.8.1 ML13281A4952013-10-30030 October 2013 Acceptance of Application Following Supplement, Adopt National Fire Protection Association NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition) ML13214A0202013-08-0101 August 2013 Acceptance Review Email, Relief Request NDE-PNS-U2, Requirements for Examination Coverage of ASME Class 1 Pressurizer Nozzle-to-Head Welds, Third 10-Year Inservice Inspection Interval ML13123A0412013-05-0202 May 2013 Acceptance Review Email, Relief Request NDE-RCS-SE-1R18 - Alternative to Requirements to ASME Code, Section XI, Appendix Viii, Suppl. 2 and 10 as Modified by CC N-695 and CC N-696 to Allow Use of Alternative Depth-Sizing Criteria ML13022A0132013-01-22022 January 2013 Acceptance Review Email, Relief Request RVFLNG-INT3 - Alternative to ASME Code Pressure Test Requirements for Class 1 Reactor Vessel Flange Leakoff Lines, Third 10-Year Inservice Inspection Interval (TAC MF0408-MF0409) ML1206501312012-03-0505 March 2012 Acceptance Review Email, License Amendment Request, Revise Updated Final Safety Analysis Report Section 4.3.2.2 to Allow Use of Beacon Power Distribution Monitoring System ML1202406872012-01-24024 January 2012 Acceptance Review Email, License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power DG Start Instrumentation and Fsaru ML1201902312012-01-19019 January 2012 Acceptance Review Email, Request for Stand-alone Preemption Authority Pursuant to 42 U.S.C.. 2201a ML1120300652011-07-21021 July 2011 Acceptance Review Email, Request to Revise Technical Specifications Related to Auxiliary Feedwater System to Adopt TSTF-245, Rev. 1, TSTF-340, Rev. 3, TSTF-412, Rev. 3, and TSTF-439, Rev. 2 ML1111804492011-04-28028 April 2011 Acceptance Review Email, Request for Exemption from Specific 10 CFR Part 73 Requirements, Extension of Deadline for Implementation ML1110104912011-04-11011 April 2011 Acceptance Review E-mail, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources Operating and TSTF 163, Revision 2, Minimum Vs. Steady State Voltage and Frequency. ML1109002252011-03-31031 March 2011 Acceptance Review Email, Request for Exemption from Specific 10 CFR Part 73 Requirements, Extension of Deadline for Implementation ML1108706822011-03-28028 March 2011 Acceptance Review E-mail, License Amendment Request to Revise Technical Specification (TS) 3.7.1, Main Steam Safety Valves (Mssvs), to Remove a One-time Note from TS Table 3.7.1-1 ML1013700552010-05-24024 May 2010 License Amendment Request for Approval of the Cyber Security Plan (TACs ME2667 and ME2668) ML1013904452010-05-19019 May 2010 Acceptance Review Email, Relief Request NDE-RCS-SE-1R16, Relief from ASME Section XI Requirements to Allow Use of Alternate Sizing Qualification Criteria, Third 10-Year Inservice Inspection Interval ML1013704512010-05-17017 May 2010 Acceptance Review Email, Review of the Topical Report, Process Protection System Replacement Diversity and Defense-in-Depth Assessment, Rev. 0, Related to License Amendment Request for Digital Upgrade (TAC ME3722-ME3733) ML1000604412010-01-0606 January 2010 Acceptance Review Email, Acceptance of Part 73 Exemption ML0914601842009-05-26026 May 2009 Acceptance Review Email, License Amendment Request to Modify Technical Specifications to Adopt TSTF-511, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 ML0907002112009-03-11011 March 2009 Acceptance Review Email, Re License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, to Delete High-Negative Rate Trip Function ML0834002822008-12-0404 December 2008 Acceptance Review E-mail ML0820407482008-08-0101 August 2008 Acceptance Review of Proposed Amendments Revision to Technical Specifications 3.7.5, 'Auxiliary Feedwater System,' & 3.7.6, 'Condensate Storage Tank & Fire Water Storage Tank (Tac Nos. MD8471 and MD8472) 2024-05-28
[Table view] Category:E-Mail
MONTHYEARML24285A1902024-10-0808 October 2024 Email - Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Environmental Assessment ML24281A1062024-10-0202 October 2024 NRR E-mail Capture - (External_Sender) Public Letter to Petition Review Board Regarding the Diablo Canyon Seismic Core Damage Frequency 10 CFR 2.206 Petition - OEDO-24-00083 ML24250A0542024-09-0606 September 2024 LRA - Requests for Additional Information - Set 1 - Email from Brian Harris to Adam Peck ML24250A0502024-09-0606 September 2024 NRR E-mail Capture - Acceptance Review Diablo Canyon Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML24291A1322024-09-0505 September 2024 E-mail to California Department of Public Health for Diablo Canyon ISFSI License Renewal Environmental Assessment ML24235A2032024-08-22022 August 2024 OEDO-24-00083 - 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Final Determination e-mail - EPID L-2024-CRS-0000 ML24205A0622024-07-23023 July 2024 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request for Approval to Extend the Alternative for Use of Full Structural Weld Overlay ML24187A1382024-07-0202 July 2024 License Renewal Environmental Review: Summary of June 27 Clarification Call Regarding Pg&Es Response to RCI AQN-3 ML24184C0422024-07-0202 July 2024 NRR E-mail Capture - Request for Additional Information Diablo Canyon 50.69 risk-informed Categorization ML24149A0832024-05-28028 May 2024 Acceptance Review: Diablo Canyon Request for Alternative Security Measures and Exemption for the Early Warning System ML24145A0612024-05-22022 May 2024 Written Limited Appearance Statement of Doris Nassiry ML24136A1622024-05-15015 May 2024 OEDO-24-00083 (E-Mail) 10 CFR 2.206 - Diablo Canyon Power Plant, Unit Nos. 1 and 2 Seismic - Initial Assessment ML24135A1562024-05-13013 May 2024 July 2024 Emergency Preparedness Exercise Inspection - Request for Information ML24134A1902024-05-10010 May 2024 Written Limited Appearance Statement of Shelley Hamilton ML24134A1872024-05-10010 May 2024 Written Limited Appearance Statement of Charlene M. Woodcock ML24122C6702024-04-29029 April 2024 Request from NRC Review of a Draft EA for an Exemption for the Limerick Generating Station ML24095A3172024-04-0404 April 2024 NRR E-mail Capture - Acceptance Review Diablo Canyon Request to Revise Technical Specification 5.6.6 for Pressure and Temperature Limits Report ML24088A2382024-03-28028 March 2024 10 CFR 2.206 - Diablo Canyon Units 1 and 2 OEDO-24-00083 - Screen-in e-mail L-2024-CRS-0000 ML24058A1032024-03-0808 March 2024 OEDO-23-00350-NRR - Initial Assessment - 10 CFR 2.206 Petition from Mothers for Peace and Friends of the Earth Regarding Diablo Canyon ML24071A1762024-03-0707 March 2024 Email - (External Sender) NRC Proceeding on Diablo Canyon 50-275 and 50-323 LR-2 ML24067A0892024-03-0505 March 2024 Email Response from Diane Curran to Office of the Secretary, Assistant for Rulemaking and Adjudications, Russell Chazell ML24067A0902024-03-0505 March 2024 Email to Diane Curran from the Office of the Secretary, Assistant for Rulemaking and Adjudications, Russell Chazell ML24067A0882024-03-0404 March 2024 Email Hearing Request from San Luis Obispo Mothers for Peace, Friends of the Earth, and Environmental Working Group ML24060A0022024-02-28028 February 2024 (External Sender) Pre-Sub Mittal EWS Participants List E-mail ML24045A1972024-02-0606 February 2024 Tribal Consultation Request ML24033A3062024-02-0101 February 2024 Dcisc 2-1-2024 Email: Comments by Mr. Bruce Severance at This Mornings Public Meeting Re Scope of Review for DCPP License Extension ML23334A0912023-11-30030 November 2023 NRR E-mail Capture - Diablo Canyon 1 and 2 - Audit Questions for License Amendment Associated with TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23335A1012023-11-0606 November 2023 OEDO-23-00350-NRR - Screen-in Email - 10 CFR 2.206 Petition from Mothers for Peace and Change.Org Regarding Diablo Canyon ML23306A0422023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Diablo Canyon Request to Adopt 10 CFR 50.69, risk-informed Categorization and Treatment of SSCs ML23230A0702023-08-18018 August 2023 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b ML23165A2702023-06-14014 June 2023 NRR E-mail Capture - Acceptance Review - Diablo Canyon Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule ML23157A2392023-06-0505 June 2023 Limited Appearance Statement from Nina Babiarz in the Matter of the Diablo Canyon ISFSI License Renewal Application ML23096A1792023-04-0606 April 2023 NRR E-mail Capture - Request for Additional Information Diablo Canyon Exemption Request Regarding Senior Reactor Operator License Application ML23094A1032023-04-0404 April 2023 NRR E-mail Capture - Acceptance Review - Diablo Canyon Exemption Request Regarding Senior Reactor Operator License Application ML23076A0932023-03-16016 March 2023 16-2023 Email - Estimate of Spent Nuclear Fuel in Tons ML23067A0202023-03-0808 March 2023 NRR E-mail Capture - Diablo Canyon Nuclear Power Plant Evacuation Time Estimate Analysis Review ML23046A1042023-02-13013 February 2023 Transmittal Email, Diane Curran to Gibson, 2/13/23, Filing of Formal Opposition to PG&E Exemption Request ML23046A1132023-02-13013 February 2023 Transmittal Email, Paul Bessette to Gibson, 2/13/23, Filing of Formal Opposition to PG&E Exemption Request ML23052A2042023-01-10010 January 2023 E-mail from Paul Bessette Dated 01/10/2023 Regarding Diablo Canyon ML22326A1632022-11-21021 November 2022 Licensee Comment Email on Post-Shutdown Emergency Plan Amendment ML22266A0012022-09-22022 September 2022 (External Sender) E-Mail Diablo Canyon Power Plant, Unit Nos. 1 and 2 - Total Amount of Spent Nuclear Fuel Stored in Tons ML22241A1142022-08-29029 August 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions ML22194A8872022-07-11011 July 2022 September 2022 Emergency Preparedness Exercise Inspection - Request for Information Email ML22187A2652022-07-0606 July 2022 NRR E-mail Capture - Request for Additional Information: Diablo Canyon Exemption Request for Part 73 force-on-force Training Due to COVID-19 ML22105A0702022-04-15015 April 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections ML22090A0832022-03-31031 March 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request for Approval of a Certified Fuel Handler Training and Retraining Program ML22089A1672022-03-29029 March 2022 Email - Acknowledgement of NRC Receipt of Diablo Canyon ISFSI Renewal Application ML22087A0412022-03-25025 March 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request for Approval of Alternative Security Measures for Early Warning System ML22061A2192022-03-0202 March 2022 NRR E-mail Capture - Request for Additional Information - Diablo Canyon Proposed Changes to Emergency Plan for post-shutdown and Permanently Defueled Condition ML21323A0652021-11-19019 November 2021 NRR E-mail Capture - Acceptance Review - Diablo Canyon Revision of Emergency Plan for post-shutdown Condition 2024-09-06
[Table view] |
Text
From: Wang, Alan Sent: Thursday, January 19, 2012 10:31 AM To: Soenen, Philippe R; Baldwin, Thomas (DCPP)
Cc: Burkhardt, Janet; Lent, Susan; Lynch, Steven; Sebrosky, Joseph
Subject:
Acceptance of Diablo Canyon Preemption Request (ME7792 and ME7793)
Tom and Philippe, By letter dated December 22, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML113610556), Pacific Gas and Electric Company, (PG&E, the licensee) submitted an application to the U.S. Nuclear Regulatory Commission (NRC) for stand-alone preemption authority pursuant under 42 U.S.C.. 2201a for the Diablo Canyon Power Plant.
The purpose of this letter is to provide the results of the NRC staff's acceptance review of this stand-alone preemption request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed stand-alone preemption in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
If you have any questions, please contact me at (301) 415-1445 or Steven Lynch at (301) 415-1524.
Alan Wang Project Manager (Diablo Canyon Power Plant)
Nuclear Regulatory Commission Division of Operating Reactor Licensing Alan.Wang@NRC.gov Tel: (301) 415-1445 Fax: (301) 415-1222