NRR E-mail Capture - Acceptance Review - Diablo Canyon Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions
ML22241A114
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/29/2022
From: Samson Lee
NRC/NRR/DORL/LPL4
To: Richardson M
Pacific Gas & Electric Co
References
L-2022-LLA-0102
Download: ML22241A114 (3)


Text

From: Lee, Samson Sent: Monday, August 29, 2022 2:19 PM To: 'Richardson, Michael'

Subject:

Acceptance Review - Diablo Canyon application to revise Technical Specifications to adopt TSTF-569, Revision of Response Time Testing Definitions (EPID: L-2022-LLA-0102)

By letter dated July 26, 2022 (ADAMS Accession No. ML22208A135), Pacific Gas and Electric Company submitted a request for Diablo Canyon Power Plant, Units 1 and 2, for approval to adopt TSTF-569, Revise Response Time Testing Definition, which revises the Technical Specifications definitions for Engineered Safety Feature response time and Reactor Trip System response time. The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed change in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 170 hours0.00197 days <br />0.0472 hours <br />2.810847e-4 weeks <br />6.4685e-5 months <br /> to complete. The NRC staff expects to complete this review by February 28, 2023. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including complexity and uniqueness of the review, requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me.

Samson Lee Diablo Canyon Project Manager Plant Licensing Branch 4 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-3168

Docket Nos. 50-275 and 50-323 Hearing Identifier: NRR_DRMA Email Number: 1763 Mail Envelope Properties (SA1PR09MB8653142EA4EC21DDA1C5401E9A769)

Subject:

Acceptance Review - Diablo Canyon application to revise Technical Specifications to adopt TSTF-569, Revision of Response Time Testing Definitions (EPID:

L-2022-LLA-0102)

Sent Date: 8/29/2022 2:19:25 PM Received Date: 8/29/2022 2:19:00 PM From: Lee, Samson Created By: Samson.Lee@nrc.gov Recipients:

"'Richardson, Michael'" <MJRm@pge.com>

Tracking Status: None Post Office: SA1PR09MB8653.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2966 8/29/2022 2:19:00 PM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: