ML20198N039: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 14: Line 14:
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| page count = 3
| page count = 3
| project = TAC:M99034, TAC:M99035
| stage = Withdrawal
}}
}}


Line 33: Line 35:
==Dear Mr. Morey-:==
==Dear Mr. Morey-:==


                 ' By letter dated June 13,1997, you applied for amendments to Facility Operating License Nos.                                                                            l
                 ' By {{letter dated|date=June 13, 1997|text=letter dated June 13,1997}}, you applied for amendments to Facility Operating License Nos.                                                                            l
                 ~ NPF-2 and NPF-8 for the Joseph M. Farley Nuclear Plant, Units 1 and 2, respectively. The proposed change would have modified the Technical Specifications (TS) by: (" adding a note                                                                                '
                 ~ NPF-2 and NPF-8 for the Joseph M. Farley Nuclear Plant, Units 1 and 2, respectively. The proposed change would have modified the Technical Specifications (TS) by: (" adding a note                                                                                '
                   - to TS 3.9.13 to specifically indicate the normal or emergency power supply m6, ! e inoperable z in Modes 5 or 6 provided that the requirements of TS 3.8.1.2 are satisfied ; and (2) extending
                   - to TS 3.9.13 to specifically indicate the normal or emergency power supply m6, ! e inoperable z in Modes 5 or 6 provided that the requirements of TS 3.8.1.2 are satisfied ; and (2) extending
Line 39: Line 41:
                 ; filtration system from 48 hours to 7 days.- Subsequently, by lotter dated January <,1998, you                                                                            ;
                 ; filtration system from 48 hours to 7 days.- Subsequently, by lotter dated January <,1998, you                                                                            ;
submitted a revised amendment request which modified the original submittal by effectively L                                                                              i 4 eliminating part 2, mentioned above, from the origina! amendment application.' It is our .                                                                              q f understanding, confirmed by a telephone conversation with M. Ajiuni, Farley Licensing  .
submitted a revised amendment request which modified the original submittal by effectively L                                                                              i 4 eliminating part 2, mentioned above, from the origina! amendment application.' It is our .                                                                              q f understanding, confirmed by a telephone conversation with M. Ajiuni, Farley Licensing  .
Manager, that your January 7,1998, letter constitutes a withdrawal of part 2 of the original ,                                                                          j amendment appOption.
Manager, that your {{letter dated|date=January 7, 1998|text=January 7,1998, letter}} constitutes a withdrawal of part 2 of the original ,                                                                          j amendment appOption.
The Commission has filed the enclosed Notice of Withdrawal of Application for Amendments to Facility Operating Licenses, concoming part 2 of the original an.,sndment application with the 4
The Commission has filed the enclosed Notice of Withdrawal of Application for Amendments to Facility Operating Licenses, concoming part 2 of the original an.,sndment application with the 4
: Office of the Federal Register for publication.                                                                                                                            :
: Office of the Federal Register for publication.                                                                                                                            :
Line 82: Line 84:
     ;                      in Modes 5 or 6 provided that the requirements of TS 3.8.1.2 are satisfied; and (2) extending          ;
     ;                      in Modes 5 or 6 provided that the requirements of TS 3.8.1.2 are satisfied; and (2) extending          ;
;                          the _TS 3 9.13 completion time allowed for retuming one out of-service penetration room                '
;                          the _TS 3 9.13 completion time allowed for retuming one out of-service penetration room                '
filtration system from 48 hours to 7 days. Subsequently, by letter dated Januar/ 7,1998, you submitted a revised amendment request which modified the original submittal by effectively eliminating part 2, mentioned above, frorr. che original amendment application. It is our understanding, confirmed by a telephone conversation with M. Ajiuni, Farley Licensing Manager, that your January 7,1998, letter constitutes a withdratval of part 2 of the original amendment application.
filtration system from 48 hours to 7 days. Subsequently, by letter dated Januar/ 7,1998, you submitted a revised amendment request which modified the original submittal by effectively eliminating part 2, mentioned above, frorr. che original amendment application. It is our understanding, confirmed by a telephone conversation with M. Ajiuni, Farley Licensing Manager, that your {{letter dated|date=January 7, 1998|text=January 7,1998, letter}} constitutes a withdratval of part 2 of the original amendment application.
The Commission has filed the enclosed Notice of Withdrawal of Application for Amendments to Facility Operating Licenses, conceming part 2 of the original amendme7t application with the Office of the Federal Register for publication.
The Commission has filed the enclosed Notice of Withdrawal of Application for Amendments to Facility Operating Licenses, conceming part 2 of the original amendme7t application with the Office of the Federal Register for publication.
Sincerely, 1            N
Sincerely, 1            N

Latest revision as of 11:27, 8 December 2021

Forwards Notice of Withdrawal of Applications for Amend to Licenses NPF-2 & NPF-8.Proposed Change Would Have Modified TSs as Stated
ML20198N039
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 01/13/1998
From: Jacob Zimmerman
NRC (Affiliation Not Assigned)
To: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
Shared Package
ML20198N043 List:
References
TAC-M99034, TAC-M99035, NUDOCS 9801200233
Download: ML20198N039 (3)


Text

. .. - . . .- .. .

Januarys13,L1998' _

y L.[e1 4 Mr. D.~ N. Mor:y -

J Vee President- Fcrisy Project .

Southem Nuclear Operating -i

. . Company, Inc.

Post Office Box'1295 : ~

Birmingham, Alabama 35201-1295-

~

i

SUBJECT:

L JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 - WITHDRAWAL OF AN a AMENDMENT REQUEST (TAC NOS. M99034 AND M99035) .

Dear Mr. Morey-:

' By letter dated June 13,1997, you applied for amendments to Facility Operating License Nos. l

~ NPF-2 and NPF-8 for the Joseph M. Farley Nuclear Plant, Units 1 and 2, respectively. The proposed change would have modified the Technical Specifications (TS) by: (" adding a note '

- to TS 3.9.13 to specifically indicate the normal or emergency power supply m6, ! e inoperable z in Modes 5 or 6 provided that the requirements of TS 3.8.1.2 are satisfied ; and (2) extending

. the TS 3.9.13 completion time allowed for retuming one out-of-service penetratico room l

filtration system from 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> to 7 days.- Subsequently, by lotter dated January <,1998, you  ;

submitted a revised amendment request which modified the original submittal by effectively L i 4 eliminating part 2, mentioned above, from the origina! amendment application.' It is our . q f understanding, confirmed by a telephone conversation with M. Ajiuni, Farley Licensing .

Manager, that your January 7,1998, letter constitutes a withdrawal of part 2 of the original , j amendment appOption.

The Commission has filed the enclosed Notice of Withdrawal of Application for Amendments to Facility Operating Licenses, concoming part 2 of the original an.,sndment application with the 4

Office of the Federal Register for publication.  :

Sincerely, ORIGINAL SIGNED BY: -

Jacob is Zimmerman, Project Maneger Project Directorate ll-2 Division of Reactor Projects - l/11 Office of Nuclear Reactor Regulation Docket Nos.30-348 and 50-364 DISTRIBUTION ,

19519tWPPIFJ ACRb

Enclosure:

- Notice of Withdrawal PUBLIC OGC PDil-2 RF JJohnson,RI

' cc w/ encl: See next page PSkinner,RI BBoger l' SCoffin JZimmerman .

4 HBerkow DOCUMENT NAME: G:\FARLEY\M99034 WIL hhh h((hh {QQQpy

  • i To receive r1 opy of this document, indicate in the box: "C" = Copv without - -

attachment /encloswo "E" = Qopy with attachmept/ enclosure "N" = No copy

. { OFFICE ' PM:P,f)TQ ]G LA:PDil-2 : l6 D p Qlf% l' -l- .

' 4( h, iNAME- J2thf(AE#tMAN:en LBERR%f) H)fR@W s)

~

lDATE / // 1198

/ - 4 /ITU198 - i / d /98 - ,

i OFFICIAL RECORD COPY :

c ' '

1 9801200233 980113 'I

PDR -ADOCK 05000348 memm mamm )

P PDR lg glgl M ggg  ;

' ~

...s1<.

l

.- .L . . --

. ,n .n .- ,, _ . , , . , , , -, ,.w., . ~ .,....,.y

Uru 3* t UNITED STATES s* g NUCLEAR REPULATORY COMMISSION

't WASHINGTON, D.C. 2006H001 8 JanJary 13, 1998

%,.....io i

Mr. D. N. Morey i Vice President - Farley Project I Southern Nuclear Operating Company, Inc.-

Post Office Box 1295 Birmingham, Alabama 35201-1295 l

SUBJECT:

JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 -WITHDRAWAL OF AN l AMENDMENT REQUEST (TAC NOS. M99034 AND M99035) l

Dear Mr. Morey :

4 By let'er dated June 13,1997, you applied for amendments to Facility Operating License Nos.

NPF-2 and NPF-8 for the Joseph M. Farley Nuclear Plant, Units 1 and 2, respectively. The proposed change would have modified the Technical Specifications (TS) by: (1) adding a note j to TS 3.9.13 to specifically indicate the normal or emergency power supply may be inoperable l

in Modes 5 or 6 provided that the requirements of TS 3.8.1.2 are satisfied; and (2) extending  ;
the _TS 3 9.13 completion time allowed for retuming one out of-service penetration room '

filtration system from 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> to 7 days. Subsequently, by letter dated Januar/ 7,1998, you submitted a revised amendment request which modified the original submittal by effectively eliminating part 2, mentioned above, frorr. che original amendment application. It is our understanding, confirmed by a telephone conversation with M. Ajiuni, Farley Licensing Manager, that your January 7,1998, letter constitutes a withdratval of part 2 of the original amendment application.

The Commission has filed the enclosed Notice of Withdrawal of Application for Amendments to Facility Operating Licenses, conceming part 2 of the original amendme7t application with the Office of the Federal Register for publication.

Sincerely, 1 N

. acob1. merman, Project Manager Project Directorate ll-2 Division of Reactor Projects -1/11 Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364

Enclosure:

Notice of Withdrawal ec w/ encl: See next page 4

4 7

-- -,. - a - -------x-- - m v

Joseph M. Farle Nuclear Plant

- oc:

. - Mr. R. D. Hill, Jr.-

General Manager- -

Southem Nuclear Operating Company ,

Post Omco Box 470 Ashford, Alabama 36312

- Mr. Mark Alluni, Licensing Manager Southem Nuclear Operating Company Post Office Box 1295

- Binningham, Alabama 35201-1295.

Mr. M. Stanford Blanton

~ Balch and Bingham Law Firm ,

< Post Office Box 306 -

-1710 Sixth Avenue North t ~ Birmingham, Alabama 35201_

Mr. J. D. Woodard Executive Vice President j Southem Nuclear Operating Company-f Post Office Box 1295 Birmingham, Alabama 35201 4

s State Health 04icer-Alabama Department of Public Health 434 Monroe Street Montgomery, Alabama 36130-1701 ,

Chairman

Houston County Commission Post Office Box 6406 Dothan, Alabama 36302 Regional Administrator, Region ll U.S. Nuclear Regulatory Commission At:anta Federal Center 61 Forsyth Street, S.W., Suite 23T85

, Atlanta, Georgia 30303 -

Resident inspector .

U.S. Nuclear Regula'ory Commission A: 2 7388.N. State Highway g5 Columbia,- Alabama 3631g l -

9 -

i b

-I L-... -- -

- - - -