ML20132A442: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 30: Line 30:
==Dear Dr. Keller:==
==Dear Dr. Keller:==


This letter acknowledges receipt of your letter dated August 29,1996, which transmitted changes to the physical security plan for the Oregon State University TRIGA Reactor.
This letter acknowledges receipt of your {{letter dated|date=August 29, 1996|text=letter dated August 29,1996}}, which transmitted changes to the physical security plan for the Oregon State University TRIGA Reactor.
Based on your determination that the changes do not decrease the overall effectiveness of your security plan and after limited review of the changes, no formal approvalis required in accordance with 10 CFR 50.54(p). Implementation of these changes will be subject to inspection to confirm that the changes have not decreased the overall effectiveness of your security plan.
Based on your determination that the changes do not decrease the overall effectiveness of your security plan and after limited review of the changes, no formal approvalis required in accordance with 10 CFR 50.54(p). Implementation of these changes will be subject to inspection to confirm that the changes have not decreased the overall effectiveness of your security plan.
The enclosures to your letter contain safeguards information of a type specified in 10 CFR 73.21 and will be withheld from public disclosure.
The enclosures to your letter contain safeguards information of a type specified in 10 CFR 73.21 and will be withheld from public disclosure.

Latest revision as of 06:48, 10 August 2022

Advises That 960829 Rev 0 to Physical Security Plan Does Not Require Formal Review Per 10CFR50.54(p)
ML20132A442
Person / Time
Site: Oregon State University
Issue date: 12/04/1996
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Keller G
OHIO STATE UNIV., COLUMBUS, OH
References
NUDOCS 9612160083
Download: ML20132A442 (4)


Text

'1 a.

-( p" "',G % UNITED STATES

$* It NUCLEAR REGULATORY COMMISSION

{ 3 g }i S

REoioNiv V

f 611 RY AN PLAZA DRIVE, SulTE 400

$9

+..../ AR LINGToN, TEXAS 760118064 DEC - 4 jggs Oregon State University ATTN: Dr. George H. Keller, Vice Provost Research and International Programs Administrative Services Building, Room A-312 Corvallis, Oregon 97331-5903

SUBJECT:

PHYSICAL SECURITY PLAN CHANGE, REVISION O

Dear Dr. Keller:

This letter acknowledges receipt of your letter dated August 29,1996, which transmitted changes to the physical security plan for the Oregon State University TRIGA Reactor.

Based on your determination that the changes do not decrease the overall effectiveness of your security plan and after limited review of the changes, no formal approvalis required in accordance with 10 CFR 50.54(p). Implementation of these changes will be subject to inspection to confirm that the changes have not decreased the overall effectiveness of your security plan.

The enclosures to your letter contain safeguards information of a type specified in 10 CFR 73.21 and will be withheld from public disclosure.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter, I without the enclosures, will be placed in the NRC Public Document Room.

Sincerely, I l

s te? -

/ T 1omas P'. G nn,pirector

/ D)ivision of Reactor Safety i

Docket No.: 50-243 i 0

License No.: R-105 i

\

cc: {

Oregon State University l 1i ATTN: Dr. Bryan Dodd, Director Radiation Center, A100 k Corvallis, Oregon 97331-5904 h 9612160083 961204 PDR ADOCK 05000243 F PDR

t , ..

Oregon State University 1 1

l Oregon State University ATTN: Dr. Jack Higginbotham Reactor Administrator Radiation Center, A100 Corvallis, Oregon 97331-5904 j 1

Oregon State University l ATTN: D. S. Pratt, Senior Health Physicist Radiation Center, A100 Corvallis, Oregon 97331-5904 Oregon State University ATTN: Dr. S. E. Binney, Chairman l Reactor Operations Committee Radiation Center, Room A100 Corvallis, Oregon 97331-5903 Oregon State University ATTN: A. D. Hall, Reactor Supervisor Radiation Center, Room A100 Corvallis, Oregon 97331-5903 Test, Research and Trt.ining Reactor Newsletter 202 Nuclear Sciences Center University of Florida Gainesville, FL 32611 Oregon Radiation Control Program Director

g .*

Oregon State University bec distrib. by RIV:

L. J. Callan, RA DRS/PSB File (Goines)

RIV File DMB (EE!DJ NRR Project Manager (OWFN-MS 11-B20)

Elaine Koup (NRR/DRPM/SGB, MS: 9D24)

Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

MIS System RITS Coordinator (Elko)

DRS Al 96-S-0047 DOCUMENT NAME: G:\DRSLTRS\OSUA1645.REV To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:PSB lE C:PSB KE AD:DRS l N_ l l ,

4MkhaeferMggreR. BMurray T) TPGwynn d'//// I 12/ y/96 "Y 12b( /96 ~ 12/t/ /96 ' U l OFFICIAL / RECORD COPY l 1

j l

]

a

+.

p Oregon State University 00 S \

/ b>&

bec distrib. by RIV-L. J. Callan, RA I

DRS/PSB File (Goines)

RIV File (DMB N' "1 NRR Project Manager (OWFN-MS11-820)

Elaine Koup (NRR/DRPM/SGB, MS: 9D24)

Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

MIS System RITS Coordinator (Elko)

PDL ,

DRS Al 96-S-0047 130.107 DOCUMENT NAME: G:\DRSLTRS\OSUA1645.REV To receive copy of document. Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:PSB lE C:PSB dE AD:DRS l N_ l l 9 .'S e r fe rT %b 6f o t BMurray [ ] IPGwynn M///;

12/ y/96 "Y 12b( /96 ~ 12/t/ /96 ' U OFFICIAL l RECORD COPY

.m