|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20212L0711999-10-0505 October 1999 Ack Receipt of ,Which Transmitted Changes to Oregan State Univ Triga Reactor Physical Secuirty Plan.Based on Determination That Changes Do Not Decrease Effectiveness of Security Plan,Nrc Approval Not Required ML20211B2711999-08-17017 August 1999 Forwards Revs & Updates to OSTR Physical Security Plan,Iaw Provisions of 10CFR50.54(p).Safeguards Effectiveness of Plan Is Not Reduced by Adoption of Changes.Encl Withheld,Per 10CFR2.790(d) ML20210S1501999-08-12012 August 1999 Ack Receipt of Which Transmitted Changes to Oregon State University Triga Reactor Physical Security Plan Submitted Under Provisions of 10CFR50.54(p) ML20210G3491999-07-28028 July 1999 Forwards Copy of Results of Operator Initial Exam Conducted at Oregon State Univ on 990628 ML20212J0381999-06-21021 June 1999 Informs That SA Crail,License OP-70160,will Resign Position on 990630.Termination of License Requested ML20207H1151999-06-0909 June 1999 Ack Receipt of ,Which Transmitted Changes to Oregon State Univ Triga Reactor Physical Security Plan Submitted Under Provisions of 10CFR50.54(p) ML20207F6071999-06-0707 June 1999 Forwards Insp Rept 50-243/99-201 on 990510-13.No Violations Noted.Insp Consisted of Selective Exams of Procedures & Representative Records,Interviews with Personnel & Observations of Activities in Progress ML20207F6201999-06-0202 June 1999 Sixth Partial Response to FOIA Request for Documents.Records in App J Encl & Will Be Available in Pdr.App K Records Withheld in Part (Ref FOIA Exemptions 7) & App L Records Completely Withheld (Ref FOIA Exemption 7) ML20206F3051999-04-29029 April 1999 Forwards De/Nrc Forms 742, Matl Balance Rept & 742C, Physical Inventory Listing for Special Nuclear Matl for Reporting Period 981001-990331.DOE/NRC Form 241, Nuclear Transmission Rept Also Encl.Without Encls ML20206B6621999-04-20020 April 1999 Informs of Violation of Provisions of OSTR Physical Security Plan.Revs & Updates to Licensee Physical Security Plan,Encl Per 10CFR50.54(p).Details of Violation & Revs to Plan, Withheld IAW 10CFR2.790(d) ML20205Q6671999-04-16016 April 1999 Informs That Written & Operating Exams Scheduled for Wk of 990628.Matls Listed in Encl 1 Requested in Order to Meet Schedule ML20205K4211999-04-0606 April 1999 Informs That Federal Government Funding for Conversion of OSTR from HEU to LEU Cannot Be Certified & No Further Action to Be Taken at Present Time ML20205D7971999-03-30030 March 1999 Ack Receipt of ,Which Transmitted Changes to Oregon State Univ Triga Reactor Emergency Response Plan Submitted Under Provisions of 10CFR50.54(q).Based on Info Provided,Nrc Approval Not Required ML20204F4181999-03-0505 March 1999 Reports Recent Incident in Which Violation of 10CFR74.13(a)(1),occurred.Failure to Submit Matl Balance Rept by Deadline of Oct 30.Importance & Specific Details of Regulatory Deadlines Emphasized,Reviewed & Clarified ML20206R9601999-01-20020 January 1999 Ack Receipt of Which Transmitted Changes to Osu Triga Reactor Physical Security Plan,Per Provisions of 10CFR50.54(p).No NRC Approval Is Required Since Changes Do Not Decrease Effectiveness of Plan ML20199E8581999-01-12012 January 1999 Informs That SRO License SOP-50284-1,of Jf Higginbotham, Became Inactive on 981231 Due to Individual Not Meeting Operational Requirements of OSTR Requalification Plan During 1998 ML20202E1501999-01-11011 January 1999 Forwards Revised Osu Radiation Ctr & Triga Reactor Emergency Response Plan, Per 10CFR50.54(q).Changes Do Not Reduce Emergency Response Effectiveness,Based on Evaluations ML20206R6871999-01-0808 January 1999 Ack Receipt of ,Which Transmitted Changes to Oregan State Univ Triga Reactor Emergency Response Plan. NRC Approval Not Required,Based on Determination That Changes Do Not Decrease Effectiveness of EP ML20198Q8121999-01-0404 January 1999 Forwards Insp Rept 50-243/98-202 on 981130-1203.No Violations Noted.Various Aspects of Safety Program Were Inspected Including Selective Exams of Procedures & Representative Records & Interview with Personnel ML20195B6471998-11-10010 November 1998 Forwards Amend 17 to License R-106 & Safety Evaluation. Amend Clarifies TS 3.8.e Requirements on Quantity & Type of Radioactive Matl Allowed in Experiments ML20155E8011998-10-23023 October 1998 Forwards Annual Rept of or State Univ Radiation Ctr & Triga Reactor for 970701-980630 ML20154G8391998-10-0707 October 1998 Requests That Mailing Address Be Corrected as Listed ML20154B6441998-10-0101 October 1998 Ack Receipt of Ltr Dtd 980807,which Transmitted Changes to Oregon State Univ Triga Reactor Physical Security Plan Submitted Under Provisions of 10CFR50.54(p).NRC Approval Not Required in Accordance with 10CFR50.54(p) ML20154D4321998-09-30030 September 1998 Responds to RAI on 980727 Application for Proposed Amend to TS 3.8.e.Notification of Changes to Personnel Shown in Organization Chart of TS 6.7.c.3,also Provided ML20153C5421998-09-18018 September 1998 Ack Receipt of ,Which Transmitted Changes to Oregon State Univ Triga Reactor Physical Security Plan Submitted Under Provisions of 10CFR50.54(p) ML20151X9571998-09-15015 September 1998 Forwards RAI Re Amend Request for Amended License R-106 for Oregon State Univ Triga Research Reactor,Submitted on 980727.Response Requested within 30 Days of Ltr Date ML20237D1891998-08-0707 August 1998 Forwards Revs & Updates to OSTR Physical Security Plan IAW 10CFR50.54(p).Licensee Concludes That Effectiveness of OSTR Program Is Not Reduced by Adoption of Changes.Encl Withheld Per 10CFR2.790 ML20236X7401998-07-31031 July 1998 Discusses Insp Rept 50-243/98-201 on 980218-20,0506 & 11-13 & Forwards Nov.Insp Was follow-up on 980217 Event Involving Operation of Triga Mark-II Reactor W/O TS Required Scrams Being Operable ML20249C4561998-06-24024 June 1998 Responds to NRC Re Violations Noted in Insp Rept 50-243/98-201.Licensee Requests That NRC Refrain from Issuing Civil Penalty & NOV Due to Noted Reasons ML20249C7691998-06-19019 June 1998 Informs of Discovery of Error in Analyzer Efficiency Calculation in Gaseous Effluent Data in 1996-97 OSTR Annual Rept.Corrected Data Will Be Reported in 1997-98 OSTR Annual Rept.Corrected Table V.B.2 Encl ML20249B8041998-06-19019 June 1998 Forwards Insp Rept 50-243/98-201 on 980218-20 & 0506 & 11-13.Two Apparant Violations Identified & Being Considered for Escalated Enforcement Action ML20216F5101998-04-0808 April 1998 Forwards Certificates to Na Carstens & Gm Wachs,New Licensed Individuals at Oregon State Univ ML20216F2821998-04-0808 April 1998 Forwards License Certificates for Na Carstens & Gm Wachs. W/O Encl ML20217E9601998-03-24024 March 1998 Forwards Copy of Results of Operator Initial Exam Conducted at Oregon State Univ on 980303-04.W/o Encl ML20217Q3481998-03-0606 March 1998 Submits Formal Comments on Written Exam Conducted at Facility on 980303 for G Wachs & N Carstens ML20217P2571998-03-0303 March 1998 Informs That Federal Government Funding for Conversion of OSTR from HEU to LEU Cannot Be Certified.No Further Action Towards Conversion Will Be Taken at This Time.Ltr from DOE, Encl ML20203D5631998-02-20020 February 1998 Forwards Revisions & Updates to OSTR Physical Security Plan IAW 10CFR50.54(p).Encl Withheld ML20236K7071998-02-17017 February 1998 Responds to 980217 Telcon Re Licensee Performing Full Investigation to Find Most Basic Root Cause of Failure to Scram on Demand Which Occurred on 980217 ML20199F9671998-01-28028 January 1998 Forwards Amend 16 to License R-106 & Safety Evaluation. Amend Removes gender-specific Wording from TS 6.1a,updates Organizational Titles in TS 6.1 & Removes References to Region V from TS Reporting Requirements ML20199A5651998-01-21021 January 1998 Forwards Original & 3 Copies of Summary of Paper Regulatory View of Non-Power Reactor License Renewal, to Be Presented at 1998 ANS Annual Meeting.W/O Encl ML20198K3081997-12-29029 December 1997 Submits Formal Rept of Changes IAW 10CFR50.54(q),as Result of Annual Review of OSTR Emergency Response Plan Completed on 971219 ML20198G3751997-12-24024 December 1997 Informs That Written & Operating Exams Are Scheduled for 980223.Matls Listed in Encl Requested to Be Furnished in Order to Meet Schedule ML20197H9001997-12-19019 December 1997 Responds to RAI Re Proposed Amends to OSTR Ts.Replacement Pages to Amends Proposed in ,Encl.Changes to Personnel Shown in Encl Organization Chart of OSTR Ts,Per TS 6.7.c.3,noted ML20197K0111997-12-10010 December 1997 Forwards RAI Re Amend Request for License R-106 for Oregon State Univ Research Reactor,Submitted on 971125 ML20212D4491997-10-27027 October 1997 Forwards Annual Rept of Oregon State Univ Radiation Ctr & Triga Reactor,960701-970630 ML20212B0161997-10-16016 October 1997 Forwards Corrections Made in Pen & Ink on Attached NRC Form 741 for 970912 Submittal ML20217N4691997-08-20020 August 1997 Submits Revs & Updates to or State Univ Triga Physical Security Plan,Iaw Provisions of 10CFR50.54(p).Plan Withheld ML20149D5341997-07-11011 July 1997 Provides Notification of Changes to Personnel Shown in Organizational Chart of OSTR Triga Reactor TS as Required by T.S.6.7.c.3 ML20149E8241997-07-10010 July 1997 Ack Receipt of Transmitting Changes to OSTR Emergency Response Plan Submitted Under 10CFR50.54(q).NRC Approval Not Required ML20138H5981997-05-0202 May 1997 Forwards Insp Rept 50-243/97-01 on 970317-20.No Violations Noted 1999-08-17
[Table view] Category:EXTERNAL CORRESPONDENCE
MONTHYEARML20206F3051999-04-29029 April 1999 Forwards De/Nrc Forms 742, Matl Balance Rept & 742C, Physical Inventory Listing for Special Nuclear Matl for Reporting Period 981001-990331.DOE/NRC Form 241, Nuclear Transmission Rept Also Encl.Without Encls ML20212B0161997-10-16016 October 1997 Forwards Corrections Made in Pen & Ink on Attached NRC Form 741 for 970912 Submittal ML20076H5391994-10-10010 October 1994 Forwards Status of Matl Leased Forms for DOE Owned Matl Type 20 for Period Apr-Sept 1994,as Requested in DOE 1999-04-29
[Table view] |
Text
}
RADIATION CFNrER OREGON STATE UNIVERSITY 100 Radiation Center, Corvallis, oregon 97331 5903 ;
Telephone 541-737-2341 Fax 541-737-0480 1 Anril 29,1999 NAC International NMMSS Program ATTN: Program Administrator P.O. Box 922088 Norcross, GA 30010
Reference:
Oregon State University, RIS:ZRH USNRC License No. R-106, Docket No. 50-243 Gentlemen:
Enclosed are DE/NRC Forms 742, Material Balance Report, and 742C, Physical Inventory Listing, for our special nuclear material for the reporting period October 1,1998 through March 31,1999. These forms are submitted in accordance with the requirements specified in 10 CRF 74.13(a)(1). Also enclosed is a DOE /NRC form 741, Nuclear Material Transaction Report for the production of 23'Pu in the reactor fuel, for the burnup of 235U in the reactor fuel and for rounding (
differences (if any). The data are also submitted in a computer readable form on the enclosed 3.5 inch diskette.
If you have any questions or need further information, please give me a call at 541-737-7046. (
Sincerely, k
Steven R. Reese Reactor Administrator Enclosures i cc: USNRC, Document Control Desk, Washington, D.C. (w/o enclosures) j Oregon Department of Energy, Salem, OR (w/o enclosures) l R. Farmer, OSU Radiation Safety Committee (w/o enclosures) ,
B. Denning, LMITCO, Idaho Falls, ID p ^>'J _~)
S. Binney, Director, Radiation Center l' 1
l 9905060072 990429 PDR ADOCK 05000243 P
PDR _ \ Q
_