ML20237D189
| ML20237D189 | |
| Person / Time | |
|---|---|
| Site: | Oregon State University |
| Issue date: | 08/07/1998 |
| From: | Dodd B Oregon State University, CORVALLIS, OR |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GL-82-39, GL-84-18, NUDOCS 9808250126 | |
| Download: ML20237D189 (3) | |
Text
_
'"la RADIATION CENTER OREGON STATE UmvEastry 100 Ruliation Center. Corvallis, oregon 973315903 Telepinne 541737-1341 Fax 541-737 0480 August 7,1998 l
t U. S. Nuclear Regulatory Commission Document Control Desk Washington, D C. 20555 l
Reference:
Oregon State University TRIGA Reactor (OSTR)
License No. R-106, Docket No. 50-243
Subject:
Revisions and Jpdates to the OSTR Physical Security Plan Submitted Under the Provisions of 10 CFR 50.54(p)
Gentlemen:
Oregon State University wishes to submit revisions and updates to the OSTR Physical Security Plan in accordance with the provisions of 10 CFR 50.54(p).
In keeping with the instructions in USNRC generic letters 84-18 and 82-39, specific information regarding the security plan changes and the 10 CFR 50.54(p) changes are included as a separate enclosure (Enclosure 1) to this letter. Enclosure 2 provides the necessary replacement pages for your copy of the plan.
All changes and updates to the plan have been review'ed by the OSTR physical security staff and approved by the Reactor Operations Committee. It was concluded by both groups that the safeguards effectiveness of the OSTR physical security program is not reduced by adoption of the changes.
If there are any questions regarding the information we have submitted, please let me know. In accordance with Section 2.790(d) ofthe NRC's " Rules ofPractice," Part 2, Title 10, Code of Federal Regulations, and in accordance with any other applicable parts of the NRC's regulations, we hereby l
request tha+. Enclosure 1 and Enclosure 2, and this letter when it is attached to either or both of these enclosures, be withheld from public disclosure.
l l
f WHEN SEPARATED FROM ENCLOSURES, HANDLE THIS DOCUMENT AS DECONTROLLED l
9008250126 980807 PDR ADOCK 05000243 1 1 F
PDR v
U.S. Nuclear Regulatory Commission Page 2 August 7,1998 Thank you for your consideration of these matters.
1 Yours
- cerely,
(
/
1 i
l Brian Dodd, Ph.D.
j Director
Enclosures:
2 c:
' A. X. Adams, Jr,. Senior Project Manager, Non-Power Reactors and Decommissioning Projects Directorate, U.S. Nuclear Regulatory Commission, M.S. 0-11-B-20, Washington, D.C. 20555 Oregon Department of Energy, Attn: Mary Lou Blazek (one copy w/o enclosures)
R. L. Brown, Manager Security Services (one copy w/ enclosures)
S. E. Binney, Chairman, Reactor Operations Committee (w/o enclosures)
J. F. Higginbotham, Reactor Administrator (w/o enclosures)
. A. D. Hall, Reactor Supervisor (w/ enclosures)
D. S. Pratt. Senior Health Physicist (w/o enclosures) l I
I l
i-1 i
WHEN SEPARATED FROM ENCLOSURES, HANDLE THIS DOCUMENT AS DECONTROLLED I
i l
l U.S. Nuclear Regulatory Commission l
Page 3 i
August 7,1998 State of Oregon
)
) ss County of Benton
)
Brian Dodd, being first duly sworn on oath, deposes and says that he has affixed his signature to the letter above in his official capacity as Director of the Oregon State University Radiation Center; that he has signed this letter supplying information as required by 10 CFR 50.4b(5)(ii); that in accordance with the provisions of 10 CFR 50.30(b), he is attaching this affidavit; that the facts set forth in the letter are true to his best information and belief.
cmcw.sse.
1 9"" CONS 90NNO.304648 anuncersat
{
J unerruuc.cnexas s
Ifrian Dodd Director Oregon, this 7# day of M, a Notary Public, in and for the County of Benton, S Subscribed and sworn to before me
. A.D.,1998.
u G
Jul 9h/0 /
Notary Public f
'regon C
My C6mnGssion Expires l
l WHEN SEPARATED FROM ENCLOSURES, HANDLE THIS DOCUMENT AS DECONTROLLED I
-__--_---.-.----_-_____a