,'4 i,
RADIATION CENTER g
s OREGON STATE UNIVERSITY 100 Radiation Center. Cavallis. oregon 97331 $903 Tekphone $41737 2341 rax $4173744s0 January 11,1999 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
Reference:
Oregon State University TRIGA Reactor (OSTR),
Docket No. 50-243, License No. R-106
Subject:
10 CFR 50.54(q) Report of Changes to the OSTR Emergency Response Plan Which Do Not Decrease the Effectiveness of the Plan Gentlemen:
As a result of our annual review of the OSTR Emergency Response Plan, certain changes to the plan were determined to be necessary. This letter represents our formal report of the changes in accordance with 10 CFR 50.54(q). Based on our evaluation of the revisions, which was conducted under the provisions of 10 CFR 50.59, we have concluded that none of the changes reduces the plan's emergency response effectiveness. A copy of this evaluation is enclosed.
All of the changes to the plan, and the 10 CFR 50.59 evaluation supporting the changes have been reviewed and approved by the OSTR Reactor Operations Committee. In addition to the plan itself, a numbe ofconforming changes were made to the Emergency Response Plan Implementing Proce&res (ERIPs)in order to keep them up to date.
To make it e sy to update your copy (s) of the plan, a complete new copy (s) accompanies this letter. Ifyou have any concerns or questions about the reported changes te the OSTR Emergency Response Plan, please let me know.
Yours sincerely,
(
h O *gG Stephen E. Binney
/
a Director cc:
Mr. Al Adams, Senior Project Manager, U.S. Nuclear Reguatory Commission, MS 011B20, Washington D.C. 20555 d
Regional Administrator, USNRC, Region IV
[()1 Dr. Lawrence Cohen, U.S. Nuclear Regulatory Commission, Emergency Preparedness Branch, Mailstop 9H15, Washington, D.C. 20555 Oregon Department of Energy, Salem, Oregon, ATTN: Mr. David Stewart-Smith Prof. J. F. Higginbotham, Chairman, Reactor Operations Committee Dr. S. R. Reese, Reactor Administrator Mr. D. S. Pratt, Senior Health Physicist 9902020268 990111 Y PDR ADOCK 05000243 F
PDR1
i STATE OF OREGON COUNTY OF BENTON Stephen E. Binney, being first duly sworn on oath, deposes and says that he has aflixed his signature to the letter above in his ollicial capacity as Director, Oregon State University Radiation Center; that he has signed this letter supplying information as required by 10 CFR 50.4b(5)(ii);
that in accordance with the provisions of 10 CFR 50.30(b), he is attaching this aflidavit; that the facts set forth in the within letter are true to his best information and belief.
@uronessmatwsustmasuistem Omansut SERLEYCMrBEL EigCREW
'St'eph(n E. Binney Director Subscribed and sworn to before me, a Notary Public, in and for the County of Benton, State of Oregon, this //6h day of Qw, A.D.,1999 d
f Asphl{
9 l9 lc)/
Notary P ofOregdn' My Comniission Expires
- n. ;,
\\
\\
~
L Changes, Tests and Experiments Evaluated Under the Provisions of 10 CFR 50.59 I
l l
Number:
98-8 l
j Date:
November 7,1998
Title:
Emergency Response Plan Revisions DESCRIPTION ne proposed revisions to the Emergency Response Plan are attached. He revisions represent typo corrections, changes in personnel that have occurred in the last year and changes in reporting contacts with the NRC.
1 SAFETY EVALUATION There are no safety implications associated with the proposed revisions. The intent of the I
plan willin no way be altered.
Extracted from 10 CFR 50.59(m)(2) i A proposed change, test or experiment shall be deemed to involve an unreviewed safety question:
(i) if the probability of occurrence or the consequence of an accident or malfunction of equipment important to safety previously evaluated in the safety analysis report may be increased; (ii) if a possibility for an accident or malfunction of a different type than any evaluated previously in the safety analysis report may be created; or (iii) if the margin of safety as defined in the basis for any technical specification is reduced.
APPROVALS The change described above was reviewed and approved by the Reactor Operations Committee (ROC) prior to being implemented. ROC approval included a review of this evaluation and the Conunittee's conclusion that the change does not require a change in the OSTR Technical Specifications and does not constitute an unreviewed safety
10 CFR 50.59 Safety Evaluation 98-8 I
questions as defined in 10 CFR 50.59(aX2). This evaluation also included a review of applicable radiation protection aspects and was found to be consistent with the Radiation Center's commitment of ALARA.
The following signatures indicate review and approval by the Reactor Operations Committee and review by licensed operators. If a ROC member does not completely concur with or understand the proposed change then that member should hold this form unsigned and notify the ROC Chairman. The matter will then be discussed at the next meeting of the Committee. If any individual ROC member is unable to sign the sheet due
' to absence or illness, this wil noted.
S. E. Binney*
D. S. Pratt*
N. Carstens S. R. Reese*
[M[-
S. A. Crail M
J. C. Ringle*
q 1
A. D. Hall
- W. J. Richards' j
j i//c) 4 8
&%L J. F. Higginbotham*
S. P. Smith lfe s v %
M. E. Magana*
G. M. Wachs A. C. Klein*
W. H. Warnes*
.A.,
/Jn
' Chairman, Reactor Operations Conunittee (Signs Last)
- Member, Reactor Operations Committee Licensed Operator 1
2
~.
-.. ~....
I ' ' of., _,..
g l
10 CFR $0.39Sqfety Evaluation 98-8 lq' L-Emergency Response Plan Revisions 11/7/98 i
L
. 1)-
Page 1: Delete space in 3.3.2.
- 2) '
Change " Oregon Department of Energy" to " Oregon Office of Energy"
- everywhere it appears in the text.
3)-
Change "ODOE" to "OOE" everywhere it appears in the text.
- 4).~
Figure 3.2: Change " Operations Committee Chairman" to " Reactor Operations Committee Chairman".-
5)-' Section 4.3.b: Change "... project..." with "... projected..." and ".. 20 mrem /hr" 8... with ".. 20 mrem /hr..."
6)
Change " APEX" to " APEX /ATHRL" everywhere it appears in the text.
7)
Section 6.0, change "... emergency planning zone..." to "... emergency planning zone (EPZ)..."
8)
Section 7, outline subtitles not currently outlined.
9)_
Change " Continuous-Air-Monitor" to " Continuous Air Monitor" everywhere it appears in the text.
3 10)
Section 7.2.2, change "... Ci/cm..." to "...pCi/cm " everywhere it appears.
I1)
Section 7.2.3, change " Campus Security" to " Security Services" and change "couse" to " course".
-12)
Section 7.3.1.d, change " Campus Security" to " Security Services" 13).
Section 7.3.3.c.ii, change "tnak" to " tank".
14)
' Section 7.4.3, change "persones" to " persons". Consider changing the outline nomenclature from "7.4.1" to just "l)".
15)
Section 8.2.1.a.ii, change "gama" to " gamma".
.16)
Section 8.2.1.b.iii, change " multi-channel" to " multichannel".
17)
Section 8.2.3.a.i-iii, change ". Normally in..." to ", normally in..."
18)-. Section R.2.5.c, change "Deminerlizer" to "Demineralizer".
3 I
10 CFR $0.59 Safety Evaluation 98-8 19)
Delete Section 8.3.4.a.iii.
l 20)
Section 10.3.c, change " Regional Administrator" to " Project Manager, Non-Power Reactors and Decommissioning Project Directorate" 21)
Section 10.4.3.b, replace with " Emergency equipment located in a cabinet at the Good Samaritan Hospital and with the Regional HAZMAT vehicle owned by the Corvallis Fire Department is inspected and inventoried semi-annually."
22)
Change figure A.2 to include the ATHRL facility.
4 23)
Section E-2-1, change footnote from "This value is 8.13X10 (0.0008) of the 15 j
d mrem action level..." to "This value is 1.63X10 (0.00016) of the 75 mrem action level..."
24)
Section E-5-6 needs to be updated to reflect personnel changes. The new one should read, Corridor Monitor Alternate A
E. G. Schutfort R. H. Farmer B
K. M. Brock D. C. Carver C
M. R. Conrady A.C. Klein D
A. D. Hall G. M. Wachs E
J. L. Robinson K. A. Higley APEX /ATHRL J. T. Groome M. Yundt 25)
Section E-5-8, change "(S. E. Binney)" to "(J. F. Higginbotham)".
26)
Section E-5-9, change "(J. F. Higginbotham)" to "(S. R. Reese)".
27)
ERIP 4 references RCHPP 3. It should reference RCHPP 34.
28)
Section E-5-16, change "(S. R. Smith)" to "(D. G. Carver)".
'29)
Section E-5-17.3, change " corridors" to " corridor".
30)
Section E-5-18, change the checklist table to:
Name Corridor E. G. Schutfort A
K. M. Brock B
M. R. Conrady C
A.D. Hall D
J. L. Robinson E
4
10 CFR 50.59Sqfety Evaluation 98.l 31)'
Section E-7-3, change the call list to:
1
' Gary Wachs 753-2749-Art Hall
.929-4592 Steve Reese - 758-0379 Dave Pratt-757-8914 Steve Smith 967-8691 Kathy Brock 754-8351
. Steve Binney 752-5848 32)
Replace Section E-7-4 with the latest version of the directory.
33)
Section E-7-5 needs to be updated to reflect the reporting contact numbers to the NRC. Specifically, change "USNRC - Region IV (CST working hours)" with the -
following:
"Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation... 9-1-301-415-2170-9934546" 34)
' Replace section E-7-6 with the following:
1 Emergency -
1" 2"
3" Position Choice Choice Choice Emergency Director S. E. Binney J. F. Higginbotham S. R. Reese Emergency Coordinator S. R. Reese A. D. Hall S. E. Binney Senior Health Physicist D. S. Pratt K. M. Brock R. H. Farmer APEX /ATHRL J. T. Groome M. Yundt J. N. Reyes Coonlinator Radiological K. M. Brock R. H. Farmer E. G. SchGtfort Assessment Team M. R. Conrady A. D. Hall S. P. Smith D. R. Carver D. L Harlan Public Information Designated Rep. From J. F. Higginbotham S. E. Binney Officer OSU News and Communication Services Recovery Operations S. R. Reese A. D. Hall S. E. Binney Coordinator Historian L M. James D. K. Dalton S. C. Campbell Chainnan of Reactor -
J. F. Higginbotham J. C. Ringle A. C. Klein Operations -
(or any available ROC Committee member First Aid Responders D. R. Carver K. M. Brock 35)_
Change section E-8-2 with the following:
Radiation Center Director-Steve Binney ROC Chairman-Jack Higginbotham Reactor Administrator-Steve Reese 5
10 CFR $0.39Sqfety Evaluation 98-8 i
- 36)-
Check section E-8-4 to ensure that the phone numbers are correct and current.
37)
Change section E-8-5.to reflected that Steve Binney is the current Radiation Center Director.
i
)
i I
t i
i ':
o l
l t
l l-8 4
5 6
i
10CFR$0.3954feyEvaluaHok 99-7 sa G l s
questions as defined in 10 CFR 50.59(a)(2). This evaluation also included c review cf g
applicable radiation protection aspects and was found to be consistent with the Radiation Center's commitment of ALARA.
The following signatures indicate review and approval by the Reactor Operations Committee and review by licensed operators. If a ROC member does not completely m*
concur with or understand the proposed change then that member should hold this form j
h unsigned and notify the ROC Chairman. The matter will then be discussed at the next meeting of the Committee. If any individual ROC member is unable to sign the sheet due to absence or illness, this will be noted.
S. E. Binney' D. S. Pratt' N. Carstens*
S. R. Reese*
S. A. Crail' J. C. Ringle*
A. D. Hall
- W. J. Richards' he.Mr,,.
J. F. Higginbotham*
S. P. Smith
- M. E. Magana' O. M. Wachs A. C. Klein' W. H. Wames'
' Chairman, Reactor Operations Committee (Signs Last)
' Member, Reactor Operations Committee
' Licensed Operator 2