N-AVERAGE DAILY UNIT POWER LEVEL l
N-AVERAGE DAILY UNIT POWER LEVEL l
1
1 DOCKET NO.      50-285 UNIT Fort Calhoun #1 DATE March 10, 1980 COMPLET ED BY        B. J. Hickle TELEPil0NE 402-536-4413 MONTil      Februarv. 1980 DAY        AVERAGE DAILY ' POWER LEVEL                        DAY      AVER AGE DAILY POWER LEVEL (MWe Net)                                                  (SIWE-Net) 1                        0.0                                17                      0.0 2                        0.0                                is                      0.0 3                        0.0                                39                      0.0 4                        0.0                                20                      0.0 5                        0.0                                21                      0.0 6                        0.0                                22                      0.0 7j                      0.0                                23                      0.0 8                        0.0                                24                      0.0 9                        0.0                                25                      0.0
                                                                        '
DOCKET NO.      50-285 UNIT Fort Calhoun #1 DATE March 10, 1980 COMPLET ED BY        B. J. Hickle TELEPil0NE 402-536-4413 MONTil      Februarv. 1980 DAY        AVERAGE DAILY ' POWER LEVEL                        DAY      AVER AGE DAILY POWER LEVEL (MWe Net)                                                  (SIWE-Net) 1                        0.0                                17                      0.0 2                        0.0                                is                      0.0 3                        0.0                                39                      0.0 4                        0.0                                20                      0.0 5                        0.0                                21                      0.0 6                        0.0                                22                      0.0 7j                      0.0                                23                      0.0
* 8                        0.0                                24                      0.0 9                        0.0                                25                      0.0
             -10                        0.0                                26                      0.0 11                        0.0                                27                      0.0 12                        0.0                                28                      0.0 13                        0.0                                29                      0.0 14                        0.0                                39 15                        0.0                                3, 16                        0.0
             -10                        0.0                                26                      0.0 11                        0.0                                27                      0.0 12                        0.0                                28                      0.0 13                        0.0                                29                      0.0 14                        0.0                                39 15                        0.0                                3, 16                        0.0
             . INSTRUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the reporting inonth. Coinpute o the nearest whole megawatt.
             . INSTRUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the reporting inonth. Coinpute o the nearest whole megawatt.
(9/77 )
(9/77 )
                                                           .                                                    8003180h y
                                                           .                                                    8003180h y 9
                                                                                                                                      ..-,
9


  ,    .
OPERATING DATA REPORT DOCKET NO. 50-285 DATE March 10, 1980
OPERATING DATA REPORT
'
DOCKET NO. 50-285 DATE March 10, 1980
* COMPLETED BY      B. J. Hickle TELEPilONE 40Z-536-4413 OPERATING STATUS Notes
* COMPLETED BY      B. J. Hickle TELEPilONE 40Z-536-4413 OPERATING STATUS Notes
: 1. Unit Named        Fort Calhnun      Statinn linit No. 1
: 1. Unit Named        Fort Calhnun      Statinn linit No. 1
Line 43: Line 35:
: 4. Nameplate Rating (Gross MWe):        502
: 4. Nameplate Rating (Gross MWe):        502
: 5. Design Electrical Rating (Net MWe):  407 4          6. Mnimum Dependable Capacity (Gross MWe):        481
: 5. Design Electrical Rating (Net MWe):  407 4          6. Mnimum Dependable Capacity (Gross MWe):        481
'
: 7. Maximum Dependable Capacity (Net MWe):
: 7. Maximum Dependable Capacity (Net MWe):
457
457
Line 49: Line 40:
N/A
N/A
: 9. Power Level To Which Restricted. If Any (Net MWe):. N/A
: 9. Power Level To Which Restricted. If Any (Net MWe):. N/A
: 10. Reasons For Restrictions. lf Any:    N/A'
: 10. Reasons For Restrictions. lf Any:    N/A' This Month            Yr.-to Date          Cumulative
                  .
This Month            Yr.-to Date          Cumulative
: 11. Ilours in Reporting Period                      696.0                    1.440.0                56.377.0
: 11. Ilours in Reporting Period                      696.0                    1.440.0                56.377.0
: 12. Number Of flours Reactor Was Critical                0.0                    432.9                44,834.5
: 12. Number Of flours Reactor Was Critical                0.0                    432.9                44,834.5
Line 67: Line 56:
None
None
: 25. If Shur Down At End Of Report Period. Estimated Date of Startup:      March 15. 1980
: 25. If Shur Down At End Of Report Period. Estimated Date of Startup:      March 15. 1980
: 26. Units in Test Status IPrior to Commercial Operationi:                      Forecast            Achiesed
: 26. Units in Test Status IPrior to Commercial Operationi:                      Forecast            Achiesed INITIAL CRITICALil Y INillA L ELLCIRICIf Y COMMERCI \L OPER ATION -
    .
(9/77) c                                          r                          ,,
INITIAL CRITICALil Y INillA L ELLCIRICIf Y COMMERCI \L OPER ATION -
(9/77)
                                                      .
c                                          r                          ,,


              .                                    . .        -
                                                                                                                                                            -
                                                                                                                                                              .
                .
                                                                                                                                                              -
UNIT SilUTDOWNS AND POWER REDUCTIONS                  DOCKET NO. 50-285 UNIT NAME Fort Calhoun #1 DATE March 10, 1980 REPORT MONTil February, 1980                COMPLETED 8Y B. J. Hickle TELEPIIONE 402-536-4413 n.
UNIT SilUTDOWNS AND POWER REDUCTIONS                  DOCKET NO. 50-285 UNIT NAME Fort Calhoun #1 DATE March 10, 1980 REPORT MONTil February, 1980                COMPLETED 8Y B. J. Hickle TELEPIIONE 402-536-4413 n.
: b.                                    C
: b.                                    C
                                         -,      .53        3y    * $ Ii
                                         -,      .53        3y    * $ Ii
                                                                     .          Licensee    Eg          j%                Cause & Corrective No.        Date    g      3g              _g 5 5        Event      3, y        g3'                      Action to j=                                                      O H                  5  3@g
                                                                     .          Licensee    Eg          j%                Cause & Corrective No.        Date    g      3g              _g 5 5        Event      3, y        g3'                      Action to j=                                                      O H                  5  3@g Report 2    mU o
                                                                -
o                  Prevent Recurrence C                                                                                        ,
Report 2    mU o
o                  Prevent Recurrence
                                                                        ,
C                                                                                        ,
                                                                                                                                                            .
80-01      800118    S    1009.5        C      1        N/A                            Reactor shutdown for annual refueling and maintenance outage.
80-01      800118    S    1009.5        C      1        N/A                            Reactor shutdown for annual refueling and maintenance outage.
I                  2                                                3                              4 F: Forced          Reason:                                          Method:                          Exhibit G Instructions S Scheduled        A Equipment Failure (Explain)                    141anual                          for Preparation of Data B41aintenance or Test                            2 Manual Scram.                  Entry Sheets for Licensee C-Refueling                                      3-Automatic Scram.                Event Report (LER) File iNUREG-D Regulatory Restriction                          4-Ot her ( Explain)              0161)
I                  2                                                3                              4 F: Forced          Reason:                                          Method:                          Exhibit G Instructions S Scheduled        A Equipment Failure (Explain)                    141anual                          for Preparation of Data B41aintenance or Test                            2 Manual Scram.                  Entry Sheets for Licensee C-Refueling                                      3-Automatic Scram.                Event Report (LER) File iNUREG-D Regulatory Restriction                          4-Ot her ( Explain)              0161)
E-Operator Training & License Examination F Administrative                                                                5 G-Operational Error (Explain)                                                      Exhibit I - Same Source (9/77)                11-01he r (Explain)
E-Operator Training & License Examination F Administrative                                                                5 G-Operational Error (Explain)                                                      Exhibit I - Same Source (9/77)                11-01he r (Explain)
_ _ - . _ - _


                          .-_
  .        -
               ~
               ~
    .          .
Refueling Inforration Ibrt Calhoun - Unit No. l-                              - .
Refueling Inforration Ibrt Calhoun - Unit No. l-                              - .
Report for' the nonth ending                Febr. 29,' 1980 .-
Report for' the nonth ending                Febr. 29,' 1980 .-
                                                                                                                              .
: l. .Schedul'cd date for'next refueling shutdown.                                                      March 15, 1981
: l. .Schedul'cd date for'next refueling shutdown.                                                      March 15, 1981
                                                                                                     ~
                                                                                                     ~
                                                                                                -
: 2. . Scheduled date for restart following refueling.                                                  May 15, 1981
: 2. . Scheduled date for restart following refueling.                                                  May 15, 1981
               -3.      Will refueling or resumption 'of operation thereafter require a technical specification change 'or other.
               -3.      Will refueling or resumption 'of operation thereafter require a technical specification change 'or other.
Line 111: Line 80:
                   ,  a..
                   ,  a..
these be? :
these be? :
                                                                                              .
: b. If answer is no, has the reload fuel design arrl core configuration been reviewed by your Plant Safety Review Comnittee to deter-mine whether any unrevieced safety questions
: b. If answer is no, has the reload fuel design arrl core configuration been reviewed by your Plant Safety Review Comnittee to deter-mine whether any unrevieced safety questions
                             -are associated with the core reload.                                                          No
                             -are associated with the core reload.                                                          No
Line 119: Line 87:
                       . action and support infor: ration.
                       . action and support infor: ration.
               ' 5. Inportant licensing considerations associated with refueling, e.g. , new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, ncy operating procedures.
               ' 5. Inportant licensing considerations associated with refueling, e.g. , new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, ncy operating procedures.
                                                                                                  .
                 ~ 6. The number of fuel assemblies: a) in the core                                                    133                          assemblics b) in the spent fuel pool                          197 c) spent fuel pool storage capacity                        483 d) planned spent fuel t rol            *                                          '"
                 ~ 6. The number of fuel assemblies: a) in the core                                                    133                          assemblics
                                                                                                                                                          "
b) in the spent fuel pool                          197 c) spent fuel pool
                                                                                                                                                          "
storage capacity                        483
.
d) planned spent fuel t rol            *                                          '"
'
storage capacity                        483
storage capacity                        483
: 7. : The projected date of the last refueling that can be 4                    . discharged to the spent fuel pool assunting the present                                          1985
: 7. : The projected date of the last refueling that can be 4                    . discharged to the spent fuel pool assunting the present                                          1985
                                                                                                                                                                               ;
                                                                                                                                                                               ;
                                                                                                                                                                              '
licensed capacity.                                                                                                                                    !
licensed capacity.                                                                                                                                    !
l-                Prepared by-                /    -
l-                Prepared by-                /    -
('6xP/lb                            Date                March 3. 1980 f
('6xP/lb                            Date                March 3. 1980 f
                                              -
u                                                                  V
u                                                                  V
                                                                    .    - .                .                  .                            -                            _
       =w<v  >                      -n  -,-e    - + -
       =w<v  >                      -n  -,-e    - + -
4  ,,.e <pya        -w.--    -- , , -          'n-m-g,              ,    r-vy - , + ,y  ---c--      -e-- - --r---  g
4  ,,.e <pya        -w.--    -- , , -          'n-m-g,              ,    r-vy - , + ,y  ---c--      -e-- - --r---  g


          ..
[. <
[. <
           '.6''
           '.6''
  ,
OMAHA PUBLIC POWF3 DISTRICT Fort Calhoun Station Unit No. 1 February 1980
OMAHA PUBLIC POWF3 DISTRICT Fort Calhoun Station Unit No. 1 February 1980
                                                   ' Monthly Operations Report
                                                   ' Monthly Operations Report
Line 152: Line 107:
Several open maintenance requirements were completed during a combined rav vater / component cooling water / instrument air outage.
Several open maintenance requirements were completed during a combined rav vater / component cooling water / instrument air outage.
Operations support of refueling activities continued as normal.
Operations support of refueling activities continued as normal.
.
A. PERFORMANCE CHARACTERISTICS 4
A. PERFORMANCE CHARACTERISTICS 4
LER Humber                  Deficiency i
LER Humber                  Deficiency i
LER-020, Rev. 2          During continuing inspections of accessible
LER-020, Rev. 2          During continuing inspections of accessible piping being performed in accordance with IE Bulletin 79-02, two additional snubbers on the safety injection system piping vere found to be inoperable because of improper installa-tion of the anchor bolts. No significant occurrence took place. The probable consequences i                                                      vould have been the inability of the snubbers to perform their design functions during a seismic event.
'
LER-001                  On January 2,1980, while operating- at approxi-mately 98% power, the breaker feeding the con-tainment cooling fan motor (VA-33) tripped.
piping being performed in accordance with IE Bulletin 79-02, two additional snubbers on the safety injection system piping vere found to be inoperable because of improper installa-
i                                                      This trip was believed to have occurred due to faulty trip units in the breaker feeding VA-33.
,
tion of the anchor bolts. No significant occurrence took place. The probable consequences i                                                      vould have been the inability of the snubbers to perform their design functions during a seismic event.
LER-001                  On January 2,1980, while operating- at approxi-mately 98% power, the breaker feeding the con-
.
tainment cooling fan motor (VA-33) tripped.
i                                                      This trip was believed to have occurred due to
:
''
faulty trip units in the breaker feeding VA-33.
"
As a result of VA-33 being tag 6ed "out", redun-dant containment cooling units were tested for gg      y      g  - -
As a result of VA-33 being tag 6ed "out", redun-dant containment cooling units were tested for gg      y      g  - -
                                            !
operability in accordance with Technical Speci-D    )D                                fication 2.h(2) . Subsequently, HCV h033, which am'W U '  #
operability in accordance with Technical Speci-
                                 -                      upon opening allows ccmponent cooling water to flow through the cooling coil for the containment cooling unit, VA-7D would not open from the control room switch.
!
LER-002                  During power operations at approximately 90% and while performing surveillance test ST-SI/CS-1, the containment sump safety injection recircula-tion valve HCV-383-h failed to close from the control room switch. At the time of the failure,
D    )D                                fication 2.h(2) . Subsequently, HCV h033, which am'W
                                                ,
U '  #
                                 -                      upon opening allows ccmponent cooling water to flow through the cooling coil for the containment cooling unit, VA-7D would not open from the control
                            .
room switch.
LER-002                  During power operations at approximately 90% and while performing surveillance test ST-SI/CS-1,
'
the containment sump safety injection recircula-tion valve HCV-383-h failed to close from the control room switch. At the time of the failure,


            . -                - - - .                  -
                                                              - ,. .            . _    . .        ..              - _- ._-. .                                            .
                  .
i
i
      *,              .
                                      .                                                                                                                                          -
       ^
       ^
                            '
Monthly Operations Report February 1980 P2ge Two                                                                      D my)jg                              g-m e
Monthly Operations Report February 1980
-
P2ge Two                                                                      D my)jg                              g-m e
                                                                                                                                                    -
w w                              .  .u.
w w                              .  .u.
LA.      PERFORMANCE CHARACTERISTICS (Continued)
LA.      PERFORMANCE CHARACTERISTICS (Continued) 4 LER Number              Deficiency the redundant safety injection recirculation                                                        -
:
4
                                                    '
LER Number              Deficiency
                            ,
the redundant safety injection recirculation                                                        -
valve HCV-383-3 was found to be operable.
valve HCV-383-3 was found to be operable.
'
M.O..#3669 was written to investigate the problem.
M.O..#3669 was written to investigate the problem.
LER-003            While attempting to load the diesel generator,
LER-003            While attempting to load the diesel generator, DG-2, during the performance of a special e-                                                                          24-hour diesel generr. tor test required in i                                                                            response to IE Bulletin 79-23, the generator field vent to maximum excitation; therefore,
'
DG-2, during the performance of a special e-                                                                          24-hour diesel generr. tor test required in i                                                                            response to IE Bulletin 79-23, the generator field vent to maximum excitation; therefore,
'
       -                                                                    the diesel was shutdown to prevent generator i                                                        ,
       -                                                                    the diesel was shutdown to prevent generator i                                                        ,
damage. The failure was a result of a refer-
damage. The failure was a result of a refer-
Line 214: Line 130:
  ,                                                                          was repaired per =aintenance order and the 24-hour diesel test was restarted and satis-
  ,                                                                          was repaired per =aintenance order and the 24-hour diesel test was restarted and satis-
* factorily completed without further incident.
* factorily completed without further incident.
          ,
LER-00h            A fire barrier inside a empty breaker cubicle was degraded to pull in new cabling. A fire watch was established and a maintenance order
LER-00h            A fire barrier inside a empty breaker cubicle was degraded to pull in new cabling. A fire
                                                                        '
watch was established and a maintenance order
  ,                                                                            issued to temporarily fill the fire barrier.
  ,                                                                            issued to temporarily fill the fire barrier.
The fire watch was not maintained in a continu-ous manner as required b'/ Technical Specification
The fire watch was not maintained in a continu-ous manner as required b'/ Technical Specification
  ,                                                                          2.19
  ,                                                                          2.19 B.    - CHANGES IN OPERATING METHODS
        -
B.    - CHANGES IN OPERATING METHODS
    ,
                                             , .              None 1
                                             , .              None 1
,                                                C.      RESULTS OF SURVEILLANCE TESTS AND INSPECTIONS
,                                                C.      RESULTS OF SURVEILLANCE TESTS AND INSPECTIONS
:
!                                                            None
!                                                            None
                                    ,
                                                 'D.      CHANGES, TESTS A:iD EXPERIMENTS CARRIED CUT WITHOUT COMMISSION APPROVAL 1                                                                                                                                                                                ,
                                                 'D.      CHANGES, TESTS A:iD EXPERIMENTS CARRIED CUT WITHOUT COMMISSION
'
                        '
                                                '
APPROVAL 1                                                                                                                                                                                ,
Proc edure,                            Description SP-VA-80_          Hydrogen Purge System Test: Hydrogen Purge System fans, valves, and filters operated satisfactorily.
Proc edure,                            Description SP-VA-80_          Hydrogen Purge System Test: Hydrogen Purge System fans, valves, and filters operated satisfactorily.
                 .                                        SP-CHEM-3          Containment Atmosphere Sampling During
                 .                                        SP-CHEM-3          Containment Atmosphere Sampling During
            #
                                                                             - Containment Pressure Test ST-CONT-T. Samples taken and analysis. completed.                                                        .
                                                                             - Containment Pressure Test ST-CONT-T. Samples
<
taken and analysis. completed.                                                        .
                                                                                                ..
t'J  t'    %  =F    T'          W          -+**n  =    w  4  T-    =y        *"*-C    *T  -F    'PF##' TY+P"'T"*--~FF'    - * - - M 9  ^T''W '  -*
t'J  t'    %  =F    T'          W          -+**n  =    w  4  T-    =y        *"*-C    *T  -F    'PF##' TY+P"'T"*--~FF'    - * - - M 9  ^T''W '  -*


                                                    .                                  -          -_
    .
e,.  .
e,.  .
Monthly Operations Report                                                  ^ .  .  ,,
Monthly Operations Report                                                  ^ .  .  ,,
                                                                                '
Februar'/ 1980                                          D i        Ol ^
Februar'/ 1980                                          D i        Ol ^
Page Three Q        kJ, j          ;    5 E. RESULTS OF LEAK RATE TESTS Leak rate testing during the Refueling Outage continued for the conth of February. After the ccmpletion of all leak tests, a detailed report vill be written.
Page Three Q        kJ, j          ;    5 E. RESULTS OF LEAK RATE TESTS Leak rate testing during the Refueling Outage continued for the conth of February. After the ccmpletion of all leak tests, a detailed report vill be written.
Line 258: Line 155:
                                                             '\
                                                             '\
Approved :r  -'    A l- Ma'neger-Fort Calhoun utatien I
Approved :r  -'    A l- Ma'neger-Fort Calhoun utatien I
                                                          ,
l 1
l 1
l l
l l
1
1


                        ,              -                            - .-,
  '
s
s
              , . '.
           .o  .-  e
           .o  .-  e
                                                                             !  %.!      W D Elk $
                                                                             !  %.!      W D Elk $
Menthly Operations Report February 1980 D
Menthly Operations Report February 1980 D
d        gi , Jgj\u L:::
d        gi , Jgj\u L:::
Page Four
Page Four II. MAI'iTE~iA! ICE (Significant Safety Related)
    ,
II. MAI'iTE~iA! ICE (Significant Safety Related)
M. O. #        d.a                        Description              Corree:1ve Action        i i
M. O. #        d.a                        Description              Corree:1ve Action        i i
i                                    None ii I I,
i                                    None ii I I,
$
     )
     )
t
t
.,
:}
:}
,6                            .
,6                            .
Line 285: Line 174:
l l
l l
l 4
l 4
                                                                                                            .
i  l 1
i  l 1
,
1 r                                                                                                          1
1 r                                                                                                          1
                      *
      .
        .-                                  -  -. . - .          -        -
                                                                                     .  .}}
                                                                                     .  .}}

Revision as of 13:59, 1 February 2020

Monthly Operating Rept for Feb 1980
ML19305A950
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 03/10/1980
From: Hickle B
OMAHA PUBLIC POWER DISTRICT
To:
Shared Package
ML19305A946 List:
References
NUDOCS 8003180607
Download: ML19305A950 (8)


Text

l

,, ~ x.

2

, a/

N-AVERAGE DAILY UNIT POWER LEVEL l

1 DOCKET NO. 50-285 UNIT Fort Calhoun #1 DATE March 10, 1980 COMPLET ED BY B. J. Hickle TELEPil0NE 402-536-4413 MONTil Februarv. 1980 DAY AVERAGE DAILY ' POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) (SIWE-Net) 1 0.0 17 0.0 2 0.0 is 0.0 3 0.0 39 0.0 4 0.0 20 0.0 5 0.0 21 0.0 6 0.0 22 0.0 7j 0.0 23 0.0 8 0.0 24 0.0 9 0.0 25 0.0

-10 0.0 26 0.0 11 0.0 27 0.0 12 0.0 28 0.0 13 0.0 29 0.0 14 0.0 39 15 0.0 3, 16 0.0

. INSTRUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the reporting inonth. Coinpute o the nearest whole megawatt.

(9/77 )

. 8003180h y 9

OPERATING DATA REPORT DOCKET NO. 50-285 DATE March 10, 1980

  • COMPLETED BY B. J. Hickle TELEPilONE 40Z-536-4413 OPERATING STATUS Notes
1. Unit Named Fort Calhnun Statinn linit No. 1
2. Reporting Period: February, 1980 1420
3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe): 502
5. Design Electrical Rating (Net MWe): 407 4 6. Mnimum Dependable Capacity (Gross MWe): 481
7. Maximum Dependable Capacity (Net MWe):

457

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:

N/A

9. Power Level To Which Restricted. If Any (Net MWe):. N/A
10. Reasons For Restrictions. lf Any: N/A' This Month Yr.-to Date Cumulative
11. Ilours in Reporting Period 696.0 1.440.0 56.377.0
12. Number Of flours Reactor Was Critical 0.0 432.9 44,834.5
13. Reactor Reserve Shutdown flours 0.0 0.0 1,309.5
14. Ilours Generator On.Line 0.0 430.5 43,881.6
15. Unit Reserve Shutdown flours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWil) 0.0 574,730.9 53,809,760.2 .
17. Gross Electrical Energy Generated (MWil) 0.0 190,604.0 17,850,833.6
18. Net Electrical Energy Generated (MWil) 0.0 _ _ . _ , 180,935.1 16,868,454.1
19. Unit Senice Factor 0.0 29.9 77.8 20.~ Unit Availability Factor 0.0 29.9 77.8

. 21. Unit Capacity Factor (Using MDC Net! 0.0 27.5 66.0

22. Unit Capacity Factor (Using DER Net) 0.0 27.5 65.5
23. Unit Forced Outage Rate 0.0 0.0 4.5
24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Eacht:

None

25. If Shur Down At End Of Report Period. Estimated Date of Startup: March 15. 1980
26. Units in Test Status IPrior to Commercial Operationi: Forecast Achiesed INITIAL CRITICALil Y INillA L ELLCIRICIf Y COMMERCI \L OPER ATION -

(9/77) c r ,,

UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-285 UNIT NAME Fort Calhoun #1 DATE March 10, 1980 REPORT MONTil February, 1980 COMPLETED 8Y B. J. Hickle TELEPIIONE 402-536-4413 n.

b. C

-, .53 3y * $ Ii

. Licensee Eg j% Cause & Corrective No. Date g 3g _g 5 5 Event 3, y g3' Action to j= O H 5 3@g Report 2 mU o

o Prevent Recurrence C ,

80-01 800118 S 1009.5 C 1 N/A Reactor shutdown for annual refueling and maintenance outage.

I 2 3 4 F: Forced Reason: Method: Exhibit G Instructions S Scheduled A Equipment Failure (Explain) 141anual for Preparation of Data B41aintenance or Test 2 Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File iNUREG-D Regulatory Restriction 4-Ot her ( Explain) 0161)

E-Operator Training & License Examination F Administrative 5 G-Operational Error (Explain) Exhibit I - Same Source (9/77) 11-01he r (Explain)

~

Refueling Inforration Ibrt Calhoun - Unit No. l- - .

Report for' the nonth ending Febr. 29,' 1980 .-

l. .Schedul'cd date for'next refueling shutdown. March 15, 1981

~

2. . Scheduled date for restart following refueling. May 15, 1981

-3. Will refueling or resumption 'of operation thereafter require a technical specification change 'or other.

No license amendment?

If answer is yes, what, in general, will

^

, a..

these be? :

b. If answer is no, has the reload fuel design arrl core configuration been reviewed by your Plant Safety Review Comnittee to deter-mine whether any unrevieced safety questions

-are associated with the core reload. No

c. If no such review has taken place, when is-Febr. 1, 1981

.it scheduled?

4. Scheduled date(s) for submitting proposed licensing

. action and support infor: ration.

' 5. Inportant licensing considerations associated with refueling, e.g. , new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, ncy operating procedures.

~ 6. The number of fuel assemblies: a) in the core 133 assemblics b) in the spent fuel pool 197 c) spent fuel pool storage capacity 483 d) planned spent fuel t rol * '"

storage capacity 483

7. : The projected date of the last refueling that can be 4 . discharged to the spent fuel pool assunting the present 1985

licensed capacity.  !

l- Prepared by- / -

('6xP/lb Date March 3. 1980 f

u V

=w<v > -n -,-e - + -

4 ,,.e <pya -w.-- -- , , - 'n-m-g, , r-vy - , + ,y ---c-- -e-- - --r--- g

[. <

'.6

OMAHA PUBLIC POWF3 DISTRICT Fort Calhoun Station Unit No. 1 February 1980

' Monthly Operations Report

'I. OPERATIONS SUIGfARY -

Fort Calhoun remained in a refueling operation condition for the month of_ February. The fuel shuffle was completed during February and no abnornalities were discovered.

Surveillance testing continued during the month including several major refueling tests such as the Energency Safeguards With Loss of Offsite Power test.

Several open maintenance requirements were completed during a combined rav vater / component cooling water / instrument air outage.

Operations support of refueling activities continued as normal.

A. PERFORMANCE CHARACTERISTICS 4

LER Humber Deficiency i

LER-020, Rev. 2 During continuing inspections of accessible piping being performed in accordance with IE Bulletin 79-02, two additional snubbers on the safety injection system piping vere found to be inoperable because of improper installa-tion of the anchor bolts. No significant occurrence took place. The probable consequences i vould have been the inability of the snubbers to perform their design functions during a seismic event.

LER-001 On January 2,1980, while operating- at approxi-mately 98% power, the breaker feeding the con-tainment cooling fan motor (VA-33) tripped.

i This trip was believed to have occurred due to faulty trip units in the breaker feeding VA-33.

As a result of VA-33 being tag 6ed "out", redun-dant containment cooling units were tested for gg y g - -

operability in accordance with Technical Speci-D )D fication 2.h(2) . Subsequently, HCV h033, which am'W U ' #

- upon opening allows ccmponent cooling water to flow through the cooling coil for the containment cooling unit, VA-7D would not open from the control room switch.

LER-002 During power operations at approximately 90% and while performing surveillance test ST-SI/CS-1, the containment sump safety injection recircula-tion valve HCV-383-h failed to close from the control room switch. At the time of the failure,

i

^

Monthly Operations Report February 1980 P2ge Two D my)jg g-m e

w w . .u.

LA. PERFORMANCE CHARACTERISTICS (Continued) 4 LER Number Deficiency the redundant safety injection recirculation -

valve HCV-383-3 was found to be operable.

M.O..#3669 was written to investigate the problem.

LER-003 While attempting to load the diesel generator, DG-2, during the performance of a special e- 24-hour diesel generr. tor test required in i response to IE Bulletin 79-23, the generator field vent to maximum excitation; therefore,

- the diesel was shutdown to prevent generator i ,

damage. The failure was a result of a refer-

! ence 7ener diode drift in the A-C regulator panel. The diode was replaced and the diesel generator testing was resumed. Subsequently i 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> later into the " resumed" test, a radiator tube leak was discovered. This leak

, was repaired per =aintenance order and the 24-hour diesel test was restarted and satis-

  • factorily completed without further incident.

LER-00h A fire barrier inside a empty breaker cubicle was degraded to pull in new cabling. A fire watch was established and a maintenance order

, issued to temporarily fill the fire barrier.

The fire watch was not maintained in a continu-ous manner as required b'/ Technical Specification , 2.19 B. - CHANGES IN OPERATING METHODS

, . None 1

, C. RESULTS OF SURVEILLANCE TESTS AND INSPECTIONS

! None

'D. CHANGES, TESTS A:iD EXPERIMENTS CARRIED CUT WITHOUT COMMISSION APPROVAL 1 ,

Proc edure, Description SP-VA-80_ Hydrogen Purge System Test: Hydrogen Purge System fans, valves, and filters operated satisfactorily.

. SP-CHEM-3 Containment Atmosphere Sampling During

- Containment Pressure Test ST-CONT-T. Samples taken and analysis. completed. .

t'J t'  % =F T' W -+**n = w 4 T- =y *"*-C *T -F 'PF##' TY+P"'T"*--~FF' - * - - M 9 ^TW ' -*

e,. .

Monthly Operations Report ^ . . ,,

Februar'/ 1980 D i Ol ^

Page Three Q kJ, j  ; 5 E. RESULTS OF LEAK RATE TESTS Leak rate testing during the Refueling Outage continued for the conth of February. After the ccmpletion of all leak tests, a detailed report vill be written.

F. CHAIIGES IN PLAliT OPERATI:lG STAFF None G. TRAINING Training in February consisted of radiation protection for OPPD and contractors personnel, requalification exams for NRC licensed personnel and training for operators en the Cycle VI changes in the plant.

H. CHANGES, TESTS AND EXPERDEITS REQUIRING NUCLEAR REGULATORY COMMISSION AUTHORIZATION PURSUAIIT TO 10CFR50.59.

None 6

i

\\\ \0,^

~

'\

Approved :r -' A l- Ma'neger-Fort Calhoun utatien I

l 1

l l

1

s

.o .- e

!  %.! W D Elk $

Menthly Operations Report February 1980 D

d gi , Jgj\u L:::

Page Four II. MAI'iTE~iA! ICE (Significant Safety Related)

M. O. # d.a Description Corree:1ve Action i i

i None ii I I,

)

t

}

,6 .

-l, I

l l

l 4

i l 1

1 r 1

. .