ML17279A476: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 35: Line 35:
: 27. IF    CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE!                              June 4, 1987 8708190339 870430 PDR R
: 27. IF    CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE!                              June 4, 1987 8708190339 870430 PDR R
ADOCK  05000~7 PDR
ADOCK  05000~7 PDR
                                    '


e) v' rt r~        ~
e) v' rt r~        ~

Latest revision as of 08:20, 4 February 2020

Monthly Operating Rept for Apr 1987.W/870508 Ltr
ML17279A476
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/30/1987
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC
References
NUDOCS 8708190338
Download: ML17279A476 (6)


Text

OPERATING DATA REPORT WNP-2 01-May-87

1. DOCKET) 50-397
2. REPORTING PERIODR OUTAGE + ON-LINE HOURS 719 3 UTILITY CONTACT'pr-87 LEONARD HUTCHISON (509> 377-2486 4 LICENSED THERMAL POWER (MNt) e 5 NAMEPLATE RATING (GROSS MWe) z 1200.9
6. DESIGN ELECTRICAL RATING (NET MWe) x 1100
7. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe>: 1140 B. MAXIMUM DEPENDABLE CAPACITY (NET MWe> a REASONS'323 1095 9 IF CHANGES OCCUR ABOVE SINCE LAST REPORTS GIVE
10. POWER TO WHICH RESTRICTED, IF ANY (NET MWe) x 788.

ff REASONS FOR RESTRICTIONS IF ANY lA RRC PumP InoPerable MONTH YEAR CUMULATIVE 12 REPORT PERIOD HOURS 719 2879 20839.2

13. HOURS REACTOR CRITICAL 230 6 2248.1 15955.5
14. RX RESERVE SHTDWN HRS 0 0 0.0 340.4 15 HRS GENERATOR ON LINE 223 7 2198.5 15359.4 ib. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 381.7 17 GROSS THERMAL ENERGY (MWH) 508800 5104872 38786052
18. GROSS ELECTRICAL ENERGY (MWH) 169930 1710530 12929800
19. NET ELECTRICAL ENERGY (MNH) 164018 1651917 12421888
20. UNIT SERVICE FACTOR 31. 1/ 76. 4X 73. 7/
21. UNIT AVAILABILITYFACTOR 31 ~ 1% 76.4% 75.5X
22. UNIT CAPACITY FACTOR (MDC NET) 20 BX 52.4/ 54.4X
23. UNIT CAPACITY FACTOR (DER NET) INDURATION)s 20.7X 52 2% 54.2%
24. UNIT FORCED OUTAGE RATE O.OX 7.8% 7.6X
25. FORCED OUTAGE HOURS 0 0 185.2 1260.5 26 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE~DATE NONE
27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE! June 4, 1987 8708190339 870430 PDR R

ADOCK 05000~7 PDR

e) v' rt r~ ~

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.

WNP-2 5/1 F87 L. B. Hutehison 377-2486 TELEPHONE (509)

APRIL 1987 DAY AVH&GEDAILYPOWER LEVEL DAY AVERAGE DAILYPOWER:(.EVEL (Meet) (MWe-Net) 1 759 0 762 18 722 761 729 758 752

?52 756 83 13 14 15 PiSTRUCTIONS On this form, Bst the amma daily unit power level in MN'e~Xet for each day in the reporthg month. Compute to the nearest whole megawatt.

These Ggures will be used to plot a graph for each reporting month. Note that when maximum dependable mpacity h used for the net electrical tathg of the unit, them may be occasions when. the daily avenge power!evel exceeds the

. l00% Hne (or the restricted power level Hne). In such cases, the average daily unit power output sheet should be

, . '..footnoted to eq8ah the apparent anomaly.

P~

i

DOCKET NO.

mlT Nex WNP-2 DATE 5/1/87 NIT SIUTKNNS / AEOUCTIONS COMPLETED 8Y L. B. Hutchison AEHAT PEAICO April 19 87 TELEP)QNE (509) 377-2486 m~mm, year H5. DAAE Wii'GIE 1EltKH g~lgJ BICKMll TIEIBI i'd%'llZlft 86-14P 11/10/86 F CB PUMP XX ~ limited to 72K due to incurability of lA RRC Pup 87-04 4/10/87 S 495.3 C NA Plant shut down as scheduled for refueling outage SQffAAY WNP-2 operated at reduced power level unti 1 shutdown for refueling outage.

SYSTEM k COMPOM.:NT lF-Forced A-Equi p Failure F-Admfn 1-Manual Exhibit F h H QScl'IQd 0-Haint or Test ~ G-Oper Error 2-Manual Scram Instructions for C-Aef ue ling H-Other 3-Auto Scram Preparation 0-Aegulatory Restriction 4-Continued Entry Sheet of'ata E-Operator Trafning 5-Aeduced Load Licensee Event Aepnrt h License Examination 9-Other (LEA) File (NUAEG-0161)

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 June 5, 1987 Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Sir:

Subject:

NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for May 1987 as required by our Technical Specifications 6.9.1.6.

Very truly yours, c"ri f C. M. Powers (M/D 927M)

WNP-2 Plant Manager CMP/lc Enclosure cc: Mr. John B. Martin- NRC, Region V Mr. Robert T. Dodds- NRC Site Representative Ms. Dottie Sherman- ANI, Farmington CT Mr. J. T. Wheelock- INPO Mr. Phil Ross NRC, Washington D.C.

1

'(t I