|
|
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:March 14, 2007Mr. Christopher M. CranePresident and Chief Nuclear Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 | | {{#Wiki_filter:March 14, 2007 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| WESTINGHOUSE ELECTRIC COMPANY, REQUEST FOR WITHHOLDINGINFORMATION FROM PUBLIC DISCLOSURE FOR BYRON STATION, UNIT NOS. 1 AND 2, AND BRAIDWOOD STATION, UNITS 1 AND 2 (TAC NOS. | | WESTINGHOUSE ELECTRIC COMPANY, REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR BYRON STATION, UNIT NOS. 1 AND 2, AND BRAIDWOOD STATION, UNITS 1 AND 2 (TAC NOS. |
| MD4009 THROUGH MD4012) | | MD4009 THROUGH MD4012) |
|
| |
|
| ==Dear Mr. Crane:== | | ==Dear Mr. Crane:== |
|
| |
|
| By letter dated January 8, 2007, Exelon Generation Company, LLC (the licensee), submitted anaffidavit dated November 20, 2006, executed by Mr. J. A. Gresham, requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:WCAP-15376-P-A, Rev. 1, "WCAP-15376 Implementation Guideline Approachto Address the Conditions and Limitations in the NRC's Safety Evaluation"A nonproprietary copy of this document has been placed in the Nuclear RegulatoryCommission's (NRC's) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.The affidavit stated that the submitted information should be considered exempt frommandatory public disclosure for the following reasons: (i)The information sought to be withheld from public disclosure is ownedand has been held in confidence by Westinghouse.(ii)The information is of a type customarily held in confidence byWestinghouse and not customarily disclosed to the public.(a)The information reveals the distinguishing aspects of a process(or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.(c)Its use by a competitor would reduce his expenditure of resourcesor improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product. | | By letter dated January 8, 2007, Exelon Generation Company, LLC (the licensee), submitted an affidavit dated November 20, 2006, executed by Mr. J. A. Gresham, requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390: |
| C. Crane- 2 -We have reviewed your application and the material in accordance with the requirements of10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the version of the submitted information marked as proprietary will be withheld frompublic disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.Withholding from public inspection shall not affect the right, if any, of persons properly anddirectly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.If the basis for withholding this information from public inspection should change in the futuresuch that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.If you have any questions regarding this matter, I may be reached at 301-415-1055. Sincerely,/RA/Christopher Gratton, Senior Project ManagerPlant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket Nos. STN 50-454, STN 50-455, STN 50-456, and STN 50-457cc: See next page C. Crane- 2 -We have reviewed your application and the material in accordance with the requirements of10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the version of the submitted information marked as proprietary will be withheld frompublic disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.Withholding from public inspection shall not affect the right, if any, of persons properly anddirectly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.If the basis for withholding this information from public inspection should change in the futuresuch that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.If you have any questions regarding this matter, I may be reached at 301-415-1055. Sincerely,/RA/Christopher Gratton, Senior Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket Nos. STN 50-454, STN 50-455, STN 50-456, and STN 50-457cc: See next page DISTRIBUTION | | WCAP-15376-P-A, Rev. 1, WCAP-15376 Implementation Guideline Approach to Address the Conditions and Limitations in the NRCs Safety Evaluation A nonproprietary copy of this document has been placed in the Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room. |
| :PUBLICLPL3-2 R/FRidsAcrsAcnwMailCenter RidsNrrDorlLpl3-2RidsNrrPMCGrattonRidsNrrLAEWhitt RidsOgcMailCenterADAMS ACCESSION NO.: ML070610060NRR-084OFFICELPL3-2/PMLPL3-2/LADE/EICA/BC*LPL3-2/BCNAMECGratton:mwEWhittAHoweRGibbs DATE3/14/2007 3/13/20072/28/2007 3/14/2007 OFFICIAL RECORD COPY Byron/Braidwood Stations cc:
| | The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: |
| Dwain W. Alexander, Project ManagerWestinghouse Electric Corporation Energy Systems Business Unit Post Office Box 355 Pittsburgh, PA 15230-0355Howard A. LearnerEnvironmental Law and Policy Center of the Midwest 35 East Wacker Dr., Suite 1300 Chicago, IL 60601-2110U.S. Nuclear Regulatory CommissionByron Resident Inspectors Office 4448 N. German Church Road Byron, IL 61010-9750Regional Administrator, Region IIIU.S. Nuclear Regulatory Commission Suite 210 2443 Warrenville Road Lisle, IL 60532-4351Ms. Lorraine CreekRR 1, Box 182 Manteno, IL 60950Chairman, Ogle County BoardPost Office Box 357 Oregon, IL 61061Mrs. Phillip B. Johnson1907 Stratford Lane Rockford, IL 61107Attorney General500 S. Second Street Springfield, IL 62701Illinois Emergency Management Agency Division of Disaster Assistance & | | (i) The information sought to be withheld from public disclosure is owned and has been held in confidence by Westinghouse. |
| Preparedness 110 East Adams Street Springfield, IL 62701-1109Plant Manager - Byron StationExelon Generation Company, LLC 4450 N. German Church Road Byron, IL 61010-9794Site Vice President - ByronExelon Generation Company, LLC 4450 N. German Church Road Byron, IL 61010-9794U.S. Nuclear Regulatory CommissionBraidwood Resident Inspectors Office 35100 S. Rt. 53, Suite 79 Braceville, IL 60407County Executive Will County Office Building 302 N. Chicago Street Joliet, IL 60432Plant Manager - Braidwood Station Exelon Generation Company, LLC 35100 S. Rt. 53, Suite 84 Braceville, IL 60407-9619Ms. Bridget Little RoremAppleseed Coordinator 117 N. Linden Street Essex, IL 60935Document Control Desk - LicensingExelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555Site Vice President - BraidwoodExelon Generation Company, LLC 35100 S. Rt. 53, Suite 84 Braceville, IL 60407-9619Senior Vice President - Operations SupportExelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Byron/Braidwood Stations Director - Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555Manager Regulatory Assurance - BraidwoodExelon Generation Company, LLC 35100 S. Rt. 53, Suite 84 Braceville, IL 60407-9619Manager Regulatory Assurance - ByronExelon Generation Company, LLC 4450 N. German Church Road Byron, IL 61010-9794Associate General CounselExelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555Vice President - Regulatory AffairsExelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555Manager Licensing - Braidwood/ByronExelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555Senior Vice President - Midwest OperationsExelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555J. A. Gresham, ManagerRegulatory Compliance and Plant Licensing Westinghouse Electric Company P.O. Box 355 Pittsburgh, PA 15230-0355}}
| | (ii) The information is of a type customarily held in confidence by Westinghouse and not customarily disclosed to the public. |
| | (a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies. |
| | (c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product. |
| | |
| | C. Crane We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. |
| | Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. |
| | Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. |
| | If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. |
| | If you have any questions regarding this matter, I may be reached at 301-415-1055. |
| | Sincerely, |
| | /RA/ |
| | Christopher Gratton, Senior Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-454, STN 50-455, STN 50-456, and STN 50-457 cc: See next page |
| | |
| | C. Crane We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. |
| | Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. |
| | Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. |
| | If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. |
| | If you have any questions regarding this matter, I may be reached at 301-415-1055. |
| | Sincerely, |
| | /RA/ |
| | Christopher Gratton, Senior Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-454, STN 50-455, STN 50-456, and STN 50-457 cc: See next page DISTRIBUTION: |
| | PUBLIC LPL3-2 R/F RidsAcrsAcnwMailCenter RidsNrrDorlLpl3-2 RidsNrrPMCGratton RidsNrrLAEWhitt RidsOgcMailCenter ADAMS ACCESSION NO.: ML070610060 NRR-084 OFFICE LPL3-2/PM LPL3-2/LA DE/EICA/BC* LPL3-2/BC NAME CGratton:mw EWhitt AHowe RGibbs DATE 3/14/2007 3/13/2007 2/28/2007 3/14/2007 OFFICIAL RECORD COPY |
| | |
| | Byron/Braidwood Stations cc: |
| | Dwain W. Alexander, Project Manager Plant Manager - Byron Station Westinghouse Electric Corporation Exelon Generation Company, LLC Energy Systems Business Unit 4450 N. German Church Road Post Office Box 355 Byron, IL 61010-9794 Pittsburgh, PA 15230-0355 Site Vice President - Byron Howard A. Learner Exelon Generation Company, LLC Environmental Law and Policy 4450 N. German Church Road Center of the Midwest Byron, IL 61010-9794 35 East Wacker Dr., Suite 1300 Chicago, IL 60601-2110 U.S. Nuclear Regulatory Commission Braidwood Resident Inspectors Office U.S. Nuclear Regulatory Commission 35100 S. Rt. 53, Suite 79 Byron Resident Inspectors Office Braceville, IL 60407 4448 N. German Church Road Byron, IL 61010-9750 County Executive Will County Office Building Regional Administrator, Region III 302 N. Chicago Street U.S. Nuclear Regulatory Commission Joliet, IL 60432 Suite 210 2443 Warrenville Road Plant Manager - Braidwood Station Lisle, IL 60532-4351 Exelon Generation Company, LLC 35100 S. Rt. 53, Suite 84 Ms. Lorraine Creek Braceville, IL 60407-9619 RR 1, Box 182 Manteno, IL 60950 Ms. Bridget Little Rorem Appleseed Coordinator Chairman, Ogle County Board 117 N. Linden Street Post Office Box 357 Essex, IL 60935 Oregon, IL 61061 Document Control Desk - Licensing Mrs. Phillip B. Johnson Exelon Generation Company, LLC 1907 Stratford Lane 4300 Winfield Road Rockford, IL 61107 Warrenville, IL 60555 Attorney General Site Vice President - Braidwood 500 S. Second Street Exelon Generation Company, LLC Springfield, IL 62701 35100 S. Rt. 53, Suite 84 Braceville, IL 60407-9619 Illinois Emergency Management Agency Senior Vice President - Operations Support Division of Disaster Assistance & Exelon Generation Company, LLC Preparedness 4300 Winfield Road 110 East Adams Street Warrenville, IL 60555 Springfield, IL 62701-1109 |
| | |
| | Byron/Braidwood Stations Director - Licensing and Regulatory J. A. Gresham, Manager Affairs Regulatory Compliance and Plant Licensing Exelon Generation Company, LLC Westinghouse Electric Company 4300 Winfield Road P.O. Box 355 Warrenville, IL 60555 Pittsburgh, PA 15230-0355 Manager Regulatory Assurance - Braidwood Exelon Generation Company, LLC 35100 S. Rt. 53, Suite 84 Braceville, IL 60407-9619 Manager Regulatory Assurance - Byron Exelon Generation Company, LLC 4450 N. German Church Road Byron, IL 61010-9794 Associate General Counsel Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President - Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Manager Licensing - Braidwood/Byron Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Senior Vice President - Midwest Operations Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555}} |
Letter Sequence Withholding Request Acceptance |
---|
|
|
|
|
---|
Category:Letter
MONTHYEARIR 05000456/20230042024-02-0202 February 2024 Integrated Inspection Report 05000456/2023004 and 05000457/2023004 IR 05000454/20230042024-02-0202 February 2024 Integrated Inspection Report 05000454/2023004 and 05000455/2023004 ML24025C7242024-01-29029 January 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000456/2024002; 05000457/2024002 IR 05000457/20230112024-01-25025 January 2024 2B Auxiliary Feedwater Pump Diesel Fuel Oil Dilution Report 05000457/2023011 and Preliminary Greater than Green Finding and Apparent Violation ML24022A2722024-01-23023 January 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000454/2024011 ML24018A0362024-01-17017 January 2024 Paragon Energy Solutions, Defect with Detroit Diesel/Mtu Fuel Injectors P/N R5229660 Cat Id 0001390618 RS-24-004, Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators2024-01-11011 January 2024 Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators ML23348A2162023-12-15015 December 2023 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0030 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000456/20200232023-12-15015 December 2023 Baseline Security Inspection Document; 05000456/2023/402; 05000457/2023/402 ML23320A1762023-12-13013 December 2023 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0027 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23277A0032023-12-11011 December 2023 Issuance of Amendments Regarding Adoption of TSTF-370 ML23339A0452023-12-0505 December 2023 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000546/2024010 ML23313A1552023-12-0101 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23318A5102023-12-0101 December 2023 Relief from the Requirements of the ASME Code IR 05000454/20233012023-11-27027 November 2023 NRC Initial License Examination Report 05000454/2023301 and 05000455/2023301 ML23331A8922023-11-22022 November 2023 Supplement - Braidwood Security Rule Exemption Request ISFSI Docket No. Reference 05000457/LER-2023-001, Submittal of LER 2023-001-00 for Braidwood Station, Unit 2, Train B Auxiliary Feedwater Pump Was Inoperable Due to Degraded Oil in the Crank Case2023-11-17017 November 2023 Submittal of LER 2023-001-00 for Braidwood Station, Unit 2, Train B Auxiliary Feedwater Pump Was Inoperable Due to Degraded Oil in the Crank Case ML23321A0442023-11-17017 November 2023 Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline BYRON 2023-0065, Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline2023-11-17017 November 2023 Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline BYRON 2023-0063, Day Inservice Inspection Report for Interval 4, Period 3, (B2R24)2023-11-16016 November 2023 Day Inservice Inspection Report for Interval 4, Period 3, (B2R24) IR 05000454/20230032023-11-13013 November 2023 Integrated Inspection Report 05000454/2023003 and 05000455/2023003 and Exercise of Enforcement Discretion RS-23-117, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums RS-23-118, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23313A0852023-11-0909 November 2023 Submittal of 2023-301 Byron Initial License Examination Post-Examination Comments RS-23-114, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2023-11-0101 November 2023 Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds ML23297A2352023-10-26026 October 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection IR 05000456/20234012023-10-18018 October 2023 Security Baseline Inspection Report 05000456/2023401 and 05000457/2023401 IR 05000456/20230102023-10-18018 October 2023 Functional Engineering Inspection Commercial Grade Dedication Report 05000456/2023010 and 05000457/2023010 RS-23-100, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-13013 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23278A0272023-10-0505 October 2023 Operator Licensing Examination Approval - Byron Station, October 2023 RS-23-094, Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 752023-09-29029 September 2023 Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 75 RS-23-093, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel.2023-09-29029 September 2023 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel. ML23251A1622023-09-29029 September 2023 Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements RS-23-091, Relief Request I4R-25, Alternative Requirements for Reactor Pressure Vessel Inservice Inspection Intervals2023-09-26026 September 2023 Relief Request I4R-25, Alternative Requirements for Reactor Pressure Vessel Inservice Inspection Intervals ML23226A0062023-09-19019 September 2023 Review of License Renewal Commitment Number 10 Submittal ML23180A1692023-09-11011 September 2023 Calvert Cliff Units 1 & 2, and R.E. Ginna Plant - Withdrawal of Proposed Alternatives to American Society of Mechanical Engineers (ASME) Requirements (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) ML23242A3282023-09-0101 September 2023 Amendment No. 233 Correction IR 05000454/20235012023-08-31031 August 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000454/2023501 and 05000455/2023501 IR 05000454/20230052023-08-30030 August 2023 Updated Inspection Plan for Byron Station (Report 05000454/2023005 and 05000455/2023005) IR 05000456/20230052023-08-30030 August 2023 Updated Inspection Plan for Braidwood Station Report 05000456/2023005 and 05000457/2023005 ML23234A2462023-08-25025 August 2023 Confirmation of Initial License Examination IR 05000456/20230022023-08-0303 August 2023 Integrated Inspection Report 05000456/2023002 and 05000457/2023002 IR 05000454/20230022023-08-0303 August 2023 Integrated Inspection Report 05000454/2023002 and 05000455/2023002 2024-02-02
[Table view] Category:Proprietary Information Review
MONTHYEARML21279A0062021-10-13013 October 2021 Request for Withholding Information from Public Disclosure ML21201A3852021-07-23023 July 2021 Request for Withholding Information Regarding Proposed Alternative to Use ASME Code Case N-893 (EPIDs L-2020-LLR-0147 and -0148) ML21084A1352021-04-0505 April 2021 Request for Withholding Information from Public Disclosure ML21028A7122021-02-0303 February 2021 Request for Withholding Information Regarding Proposed Alternative to Use ASME Code Case N-893 (Epids L-2020-LLR-0147 and -0148) ML20317A1342020-11-12012 November 2020 Request for Withholding Information from Public Disclosure; Guarantees of Payment of Deferred Premiums ML19336A0192019-12-0303 December 2019 Request for Withholding Information Regarding Guarantees of Payment of Deferred Premiums ML18225A2292018-08-16016 August 2018 Request for Withholding Information from Public Disclosure ML18019A0112018-01-29029 January 2018 Request for Withholding Information from Public Disclosure ML18012A0122018-01-17017 January 2018 Request for Withholding Information from Public Disclosure ML17320A1452017-11-20020 November 2017 Request for Withholding Information Regarding Guarantees of Payment of Deferred Premiums ML17201Q1302017-08-0707 August 2017 Request for Withholding Information from Public Disclosure for Braidwood Station, Unit 1, and Byron Station, Unit Nos. 1 and 2 ML17201Q1342017-08-0707 August 2017 Request for Withholding Information from Public Disclosure for Braidwood Station, Unit No. 1 ML17023A2312017-01-26026 January 2017 Request for Withholding Information from Public Disclosure for Byron Station, Unit No. 2 ML17013A6052017-01-19019 January 2017 Request for Withholding Information from Public Disclosure for Byron Station, Unit Nos. 1 and 2 ML16337A2762016-12-0909 December 2016 Calvert; Clinton; Dresden; LaSalle; Limerick; Nine Mile Point; Oyster Creek; Peach Bottom; Quad Cities; R.E. Ginna; Three Mile Island - Request for Withholding Information Regarding; Guarantees of Payment of Deferred Premiums ML16098A3222016-04-27027 April 2016 Request to Withhold Emergency Preparedness Documents from Public Disclosure (CAC Nos. MF7504-MF7525) ML16039A3382016-02-18018 February 2016 Request for Withholding Information from Public Disclosure for Byron Station, Unit Nos. 1 and 2, and Braidwood Station, Units 1 and 2 ML16007A1852016-01-21021 January 2016 Relief from the Requirements of the ASME Code(Cac Nos. MF4809, MF4810, MF4811, and MF4812) ML15007A5532015-01-15015 January 2015 Request for Withholding Information from Public Disclosure ML14238A6912014-09-0303 September 2014 Bbs Proprietary Denial Letter ML14129A3392014-05-14014 May 2014 Request for Withholding Information from Public Disclosure ML13016A5002013-01-30030 January 2013 Request for Withholding Information from Public Disclosure for Braidwood Station, Units 1 & 2; Byron Station, Units 1 & 2; Clinton Power Station, Unit 1; Dresden Nuclear Power Station, Units 2 & 3; LaSalle County Station, Units 1 & 2 ML12136A2672012-05-23023 May 2012 Request for Withholding Information from Public Disclosure ML1129203422011-11-0303 November 2011 Request for Withholding Information from Public Disclosure Affidavit CAW-11-3137 ML1129305492011-11-0303 November 2011 Request for Withholding Information from Public Disclosure Affidavit CAW-11-03 ML1113306882011-06-0303 June 2011 Request for Withholding Information from Public Disclosure ML1036400332011-01-21021 January 2011 Request for Withholding Information from Public Disclosure ML0919403202009-09-23023 September 2009 Withholding from Public Disclosure, CAW-09-2584, (TAC Nos. ME1613, ME1614, ME1615, and ME1616.) ML0925101482009-09-10010 September 2009 Withholding Information from Public Disclosure ML0923706472009-09-0202 September 2009 Request for Withholding Information from Public Disclosure ML0921603032009-08-0505 August 2009 Request for Withholding Information from Public Disclosure ML0907103302009-04-30030 April 2009 Corp., Request for Withholding Information from Public Disclosure ML0819801082008-08-0404 August 2008 Request for Withholding Information from Public Disclosure TS 5.5.9, SG Program - Us Iarc ML0809206882008-04-0404 April 2008 Request for Withholding Information from Public Disclosure. (Tacs. MD8158/MD8159) ML0800705362008-01-31031 January 2008 Byron Station Units 1 and 2, Withholding from Public Disclosure, LTR-CDME-07-212 P-Attachment, Supplemental Information Relating to the Application for TS Improvement Re Steam Generator Tube Integrity, (Proprietary) (Tacs. MD7479, MD7482) ML0712902492007-05-16016 May 2007 Westinghouse, Request for Withholding Information from Public Disclosure ML0706801162007-03-28028 March 2007 Request for Withholding Information from Public Disclosure from Westinghouse SG Amend RAI 21507 ML0707203002007-03-28028 March 2007 Westinghouse LLC, Request for Withholding Information from Public Disclosure for Byron, Unit 2 and Braidwood, Unit 2 - SG-CDME-07-02P ML0706602592007-03-26026 March 2007 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure for Byron Unit 2 and Braidwood, Unit 2 - Ltr. Dated 2/23/07 ML0706100602007-03-14014 March 2007 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure ML0627802872006-11-0808 November 2006 Withholding from Public Disclosure, Westinghouse Electric Company LLC, SG-SGDA-06-20-P-Attachment, Revision 1, MC8967 & MC8969 ML0620006702006-09-20020 September 2006 Westinghouse Request for Withholding Information from Public Disclosure by Letter Dated October 3, 2005, ML0624402462006-09-15015 September 2006 Westinghouse Request for Withholding Information from Public Disclosure for Byron Unit 1 and Braidwood Unit 2 by Letter Dated 03/31/2006 ML0610101122006-05-25025 May 2006 Westinghouse, Withholding from Public Disclosure, Request for Exemption from Provisions of 10 CFR 50.44, 10 CFR 50.46, & 10 CFR 50 Appendix K for Select Rods in Lead Test Assemblies (Ltas) with Axiomtm Clad Material & Supporting Justificati ML0522300992005-08-16016 August 2005 Westinghouse, Request for Withholding Information from Public Disclosure for Byron, Unit 2 and Braidwood, Unit 2 ML0404404252004-02-13013 February 2004 (Egc), Withholding Information from Public Disclosure, Jeffrey A. Benjamin 02/05/2004 Letter Addressing an Issue Related to EGC Plants ML0309008372003-04-24024 April 2003 Request for Withholding Information from Public Disclosure 2021-07-23
[Table view] |
Text
March 14, 2007 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
WESTINGHOUSE ELECTRIC COMPANY, REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR BYRON STATION, UNIT NOS. 1 AND 2, AND BRAIDWOOD STATION, UNITS 1 AND 2 (TAC NOS.
MD4009 THROUGH MD4012)
Dear Mr. Crane:
By letter dated January 8, 2007, Exelon Generation Company, LLC (the licensee), submitted an affidavit dated November 20, 2006, executed by Mr. J. A. Gresham, requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:
WCAP-15376-P-A, Rev. 1, WCAP-15376 Implementation Guideline Approach to Address the Conditions and Limitations in the NRCs Safety Evaluation A nonproprietary copy of this document has been placed in the Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(i) The information sought to be withheld from public disclosure is owned and has been held in confidence by Westinghouse.
(ii) The information is of a type customarily held in confidence by Westinghouse and not customarily disclosed to the public.
(a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.
(c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.
C. Crane We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-1055.
Sincerely,
/RA/
Christopher Gratton, Senior Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-454, STN 50-455, STN 50-456, and STN 50-457 cc: See next page
C. Crane We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-1055.
Sincerely,
/RA/
Christopher Gratton, Senior Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-454, STN 50-455, STN 50-456, and STN 50-457 cc: See next page DISTRIBUTION:
PUBLIC LPL3-2 R/F RidsAcrsAcnwMailCenter RidsNrrDorlLpl3-2 RidsNrrPMCGratton RidsNrrLAEWhitt RidsOgcMailCenter ADAMS ACCESSION NO.: ML070610060 NRR-084 OFFICE LPL3-2/PM LPL3-2/LA DE/EICA/BC* LPL3-2/BC NAME CGratton:mw EWhitt AHowe RGibbs DATE 3/14/2007 3/13/2007 2/28/2007 3/14/2007 OFFICIAL RECORD COPY
Byron/Braidwood Stations cc:
Dwain W. Alexander, Project Manager Plant Manager - Byron Station Westinghouse Electric Corporation Exelon Generation Company, LLC Energy Systems Business Unit 4450 N. German Church Road Post Office Box 355 Byron, IL 61010-9794 Pittsburgh, PA 15230-0355 Site Vice President - Byron Howard A. Learner Exelon Generation Company, LLC Environmental Law and Policy 4450 N. German Church Road Center of the Midwest Byron, IL 61010-9794 35 East Wacker Dr., Suite 1300 Chicago, IL 60601-2110 U.S. Nuclear Regulatory Commission Braidwood Resident Inspectors Office U.S. Nuclear Regulatory Commission 35100 S. Rt. 53, Suite 79 Byron Resident Inspectors Office Braceville, IL 60407 4448 N. German Church Road Byron, IL 61010-9750 County Executive Will County Office Building Regional Administrator, Region III 302 N. Chicago Street U.S. Nuclear Regulatory Commission Joliet, IL 60432 Suite 210 2443 Warrenville Road Plant Manager - Braidwood Station Lisle, IL 60532-4351 Exelon Generation Company, LLC 35100 S. Rt. 53, Suite 84 Ms. Lorraine Creek Braceville, IL 60407-9619 RR 1, Box 182 Manteno, IL 60950 Ms. Bridget Little Rorem Appleseed Coordinator Chairman, Ogle County Board 117 N. Linden Street Post Office Box 357 Essex, IL 60935 Oregon, IL 61061 Document Control Desk - Licensing Mrs. Phillip B. Johnson Exelon Generation Company, LLC 1907 Stratford Lane 4300 Winfield Road Rockford, IL 61107 Warrenville, IL 60555 Attorney General Site Vice President - Braidwood 500 S. Second Street Exelon Generation Company, LLC Springfield, IL 62701 35100 S. Rt. 53, Suite 84 Braceville, IL 60407-9619 Illinois Emergency Management Agency Senior Vice President - Operations Support Division of Disaster Assistance & Exelon Generation Company, LLC Preparedness 4300 Winfield Road 110 East Adams Street Warrenville, IL 60555 Springfield, IL 62701-1109
Byron/Braidwood Stations Director - Licensing and Regulatory J. A. Gresham, Manager Affairs Regulatory Compliance and Plant Licensing Exelon Generation Company, LLC Westinghouse Electric Company 4300 Winfield Road P.O. Box 355 Warrenville, IL 60555 Pittsburgh, PA 15230-0355 Manager Regulatory Assurance - Braidwood Exelon Generation Company, LLC 35100 S. Rt. 53, Suite 84 Braceville, IL 60407-9619 Manager Regulatory Assurance - Byron Exelon Generation Company, LLC 4450 N. German Church Road Byron, IL 61010-9794 Associate General Counsel Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President - Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Manager Licensing - Braidwood/Byron Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Senior Vice President - Midwest Operations Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555