MONTHYEARML24297A2702024-10-23023 October 2024 Notification of NRC Baseline Inspection and Request for Information: Inspection Report 05000455/2025002 RS-24-098, Units 1 and 2 - Supplement to License Amendment Request to Revise Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Storage, 4.3.1, Fuel Storage, Criticality2024-10-23023 October 2024 Units 1 and 2 - Supplement to License Amendment Request to Revise Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Storage, 4.3.1, Fuel Storage, Criticality ML24291A0012024-10-17017 October 2024 Submittal of Core Operating Limits Report, Cycle 25 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-095, Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals2024-10-10010 October 2024 Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals ML24281A1502024-10-0707 October 2024 Request for Information for NRC Commercial Grade Dedication Inspection Report 05000454/2025010 and 05000455/2025010 ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24263A1272024-09-23023 September 2024 – Request for Additional Information (EPID 2023-LLA-0136) - Non-Proprietary BYRON 2024-0046, Cycle 27 Core Operating Limits Report2024-09-19019 September 2024 Cycle 27 Core Operating Limits Report RS-24-088, Relief Requests Associated with the Fifth Inservice Inspection Interval2024-09-13013 September 2024 Relief Requests Associated with the Fifth Inservice Inspection Interval IR 05000456/20240112024-09-12012 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000456/2024011 and 05000457/2024011 ML24164A0032024-09-10010 September 2024 Issuance of Amendment Nos. 235 and 235 Revision of Technical Specifications for the Ultimate Heat Sink ML24250A1182024-09-0606 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information 05000454/LER-2024-001, Both Trains of Control Room Ventilation Temperature Control System Inoperable2024-09-0505 September 2024 Both Trains of Control Room Ventilation Temperature Control System Inoperable ML24227A0522024-08-29029 August 2024 Audit Plan for LAR to Remove ATWS Mtc Limit IR 05000456/20240052024-08-29029 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Braidwood Station, Units 1 and 2 (Report 05000456/2024005 and 05000457/2024005) IR 05000454/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Byron Station, Units 1 and 2 (Report 05000455/2024005 and 05000454/2024005) ML24225A1112024-08-13013 August 2024 Notification of NRC Fire Protection Team Inspection Request for Information ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000454/20240112024-08-0808 August 2024 Phase 2 Post- Approval License Renewal Report 05000454/2024011 IR 05000456/20240022024-08-0808 August 2024 Integrated Inspection Report 05000456/2024002 and 05000457/2024002 ML24172A1252024-07-26026 July 2024 Environmental Assessment and Finding of No Significant Impact Related to a Requested Increase in Ultimate Heat Sink Temperature (EPID L-2024-LLA-0075) - Transmittal Letter IR 05000454/20240022024-07-26026 July 2024 Integrated Inspection Report 05000454/2024002 and 05000455/2024002, and Exercise of Enforcement Discretion ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) RS-24-064, Nuclear Radiological Emergency Plan Document Revisions2024-06-28028 June 2024 Nuclear Radiological Emergency Plan Document Revisions RS-24-066, Inservice Testing Interval Extension for Essential Service Water Valves Due to Required Use of Containment Chiller2024-06-25025 June 2024 Inservice Testing Interval Extension for Essential Service Water Valves Due to Required Use of Containment Chiller ML24163A3922024-06-25025 June 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, & Opportunity for a Hearing (EPID L-2024-LLA-0075)- Letter ML24170A7652024-06-19019 June 2024 Confirmation of Initial License Examination RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24164A2132024-06-13013 June 2024 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Braidwood Nuclear Plant RS-24-057, License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink2024-06-0404 June 2024 License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink IR 05000456/20240102024-05-31031 May 2024 License Renewal Phase 1 Report 05000456/2024010 RS-24-044, License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed2024-05-28028 May 2024 License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed RS-24-043, Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications2024-05-24024 May 2024 Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report BYRON 2024-0031, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2024-05-16016 May 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation ML24136A0132024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report ML24136A2452024-05-15015 May 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000457/2024004 IR 05000454/20240012024-05-10010 May 2024 Integrated Inspection Report 05000454/2024001; 05000455/2024001 and 07200068/2024001 BYRON 2024-0028, Annual Radiological Environmental Operating Report (AREOR)2024-05-0909 May 2024 Annual Radiological Environmental Operating Report (AREOR) ML24128A1212024-05-0707 May 2024 Response to Braidwood and Dresden FOF Dates Change Request (2025) BYRON 2024-0022, 2023 Regulatory Commitment Change Summary Report2024-05-0202 May 2024 2023 Regulatory Commitment Change Summary Report ML24122A6522024-05-0101 May 2024 Submittal of 2023 Annual Radioactive Effluent Release Report RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000456/20243012024-04-29029 April 2024 NRC Initial License Examination Report 05000456/2024301; 05000457/2024301 ML24116A0052024-04-25025 April 2024 Transmittal of Braidwood Station, Unit 1, Core Operating Limits Report, Braidwood Unit 1 Cycle 25 RS-24-026, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR)2024-04-25025 April 2024 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML24116A1192024-04-25025 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) 2024-09-06
[Table view] Category:Proprietary Information Review
MONTHYEARML21279A0062021-10-13013 October 2021 Request for Withholding Information from Public Disclosure ML21201A3852021-07-23023 July 2021 Request for Withholding Information Regarding Proposed Alternative to Use ASME Code Case N-893 (EPIDs L-2020-LLR-0147 and -0148) ML21084A1352021-04-0505 April 2021 Request for Withholding Information from Public Disclosure ML21028A7122021-02-0303 February 2021 Request for Withholding Information Regarding Proposed Alternative to Use ASME Code Case N-893 (Epids L-2020-LLR-0147 and -0148) ML20317A1342020-11-12012 November 2020 Request for Withholding Information from Public Disclosure; Guarantees of Payment of Deferred Premiums ML19336A0192019-12-0303 December 2019 Request for Withholding Information Regarding Guarantees of Payment of Deferred Premiums ML18225A2292018-08-16016 August 2018 Request for Withholding Information from Public Disclosure ML18019A0112018-01-29029 January 2018 Request for Withholding Information from Public Disclosure ML18012A0122018-01-17017 January 2018 Request for Withholding Information from Public Disclosure ML17320A1452017-11-20020 November 2017 Request for Withholding Information Regarding Guarantees of Payment of Deferred Premiums ML17201Q1302017-08-0707 August 2017 Request for Withholding Information from Public Disclosure for Braidwood Station, Unit 1, and Byron Station, Unit Nos. 1 and 2 ML17201Q1342017-08-0707 August 2017 Request for Withholding Information from Public Disclosure for Braidwood Station, Unit No. 1 ML17023A2312017-01-26026 January 2017 Request for Withholding Information from Public Disclosure for Byron Station, Unit No. 2 ML17013A6052017-01-19019 January 2017 Request for Withholding Information from Public Disclosure for Byron Station, Unit Nos. 1 and 2 ML16337A2762016-12-0909 December 2016 Calvert; Clinton; Dresden; LaSalle; Limerick; Nine Mile Point; Oyster Creek; Peach Bottom; Quad Cities; R.E. Ginna; Three Mile Island - Request for Withholding Information Regarding; Guarantees of Payment of Deferred Premiums ML16098A3222016-04-27027 April 2016 Request to Withhold Emergency Preparedness Documents from Public Disclosure (CAC Nos. MF7504-MF7525) ML16039A3382016-02-18018 February 2016 Request for Withholding Information from Public Disclosure for Byron Station, Unit Nos. 1 and 2, and Braidwood Station, Units 1 and 2 ML16007A1852016-01-21021 January 2016 Relief from the Requirements of the ASME Code(Cac Nos. MF4809, MF4810, MF4811, and MF4812) ML15007A5532015-01-15015 January 2015 Request for Withholding Information from Public Disclosure ML14238A6912014-09-0303 September 2014 Bbs Proprietary Denial Letter ML14129A3392014-05-14014 May 2014 Request for Withholding Information from Public Disclosure ML13016A5002013-01-30030 January 2013 Request for Withholding Information from Public Disclosure for Braidwood Station, Units 1 & 2; Byron Station, Units 1 & 2; Clinton Power Station, Unit 1; Dresden Nuclear Power Station, Units 2 & 3; LaSalle County Station, Units 1 & 2 ML12136A2672012-05-23023 May 2012 Request for Withholding Information from Public Disclosure ML1129203422011-11-0303 November 2011 Request for Withholding Information from Public Disclosure Affidavit CAW-11-3137 ML1129305492011-11-0303 November 2011 Request for Withholding Information from Public Disclosure Affidavit CAW-11-03 ML1113306882011-06-0303 June 2011 Request for Withholding Information from Public Disclosure ML1036400332011-01-21021 January 2011 Request for Withholding Information from Public Disclosure ML0919403202009-09-23023 September 2009 Withholding from Public Disclosure, CAW-09-2584, (TAC Nos. ME1613, ME1614, ME1615, and ME1616.) ML0925101482009-09-10010 September 2009 Withholding Information from Public Disclosure ML0923706472009-09-0202 September 2009 Request for Withholding Information from Public Disclosure ML0921603032009-08-0505 August 2009 Request for Withholding Information from Public Disclosure ML0907103302009-04-30030 April 2009 Corp., Request for Withholding Information from Public Disclosure ML0819801082008-08-0404 August 2008 Request for Withholding Information from Public Disclosure TS 5.5.9, SG Program - Us Iarc ML0809206882008-04-0404 April 2008 Request for Withholding Information from Public Disclosure. (Tacs. MD8158/MD8159) ML0800705362008-01-31031 January 2008 Byron Station Units 1 and 2, Withholding from Public Disclosure, LTR-CDME-07-212 P-Attachment, Supplemental Information Relating to the Application for TS Improvement Re Steam Generator Tube Integrity, (Proprietary) (Tacs. MD7479, MD7482) ML0712902492007-05-16016 May 2007 Westinghouse, Request for Withholding Information from Public Disclosure ML0706801162007-03-28028 March 2007 Request for Withholding Information from Public Disclosure from Westinghouse SG Amend RAI 21507 ML0707203002007-03-28028 March 2007 Westinghouse LLC, Request for Withholding Information from Public Disclosure for Byron, Unit 2 and Braidwood, Unit 2 - SG-CDME-07-02P ML0706602592007-03-26026 March 2007 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure for Byron Unit 2 and Braidwood, Unit 2 - Ltr. Dated 2/23/07 ML0706100602007-03-14014 March 2007 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure ML0627802872006-11-0808 November 2006 Withholding from Public Disclosure, Westinghouse Electric Company LLC, SG-SGDA-06-20-P-Attachment, Revision 1, MC8967 & MC8969 ML0620006702006-09-20020 September 2006 Westinghouse Request for Withholding Information from Public Disclosure by Letter Dated October 3, 2005, ML0624402462006-09-15015 September 2006 Westinghouse Request for Withholding Information from Public Disclosure for Byron Unit 1 and Braidwood Unit 2 by Letter Dated 03/31/2006 ML0610101122006-05-25025 May 2006 Westinghouse, Withholding from Public Disclosure, Request for Exemption from Provisions of 10 CFR 50.44, 10 CFR 50.46, & 10 CFR 50 Appendix K for Select Rods in Lead Test Assemblies (Ltas) with Axiomtm Clad Material & Supporting Justificati ML0522300992005-08-16016 August 2005 Westinghouse, Request for Withholding Information from Public Disclosure for Byron, Unit 2 and Braidwood, Unit 2 ML0404404252004-02-13013 February 2004 (Egc), Withholding Information from Public Disclosure, Jeffrey A. Benjamin 02/05/2004 Letter Addressing an Issue Related to EGC Plants ML0309008372003-04-24024 April 2003 Request for Withholding Information from Public Disclosure 2021-07-23
[Table view] |
Text
Charles G. Pardee January 31, 2008 Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR BYRON STATION, UNIT NOS. 1 AND 2 AND BRAIDWOOD STATION, UNIT NOS. 1 AND 2 (TAC NOS. MD7479, MD7480, MD7481, AND MD7482)
Dear Mr. Pardee:
By letter dated November 29, 2007 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML073450569) Exelon Generation Company, LLC (the licensee),
submitted an affidavit (CAW-07-2352) dated November 1, 2007, executed by Mr. J.A. Gresham of Westinghouse Electric Company, LLC, requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:
LTR-CDME-07-212 P-Attachment, Supplemental Information Relating to the Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity for Byron Units 1 and 2 and Braidwood Units 1 and 2 (Proprietary)
A nonproprietary copy of this document has been placed in the U.S. Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the ADAMS Public Electronic Reading Room.
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(i) The information sought to be withheld from public disclosure is owned and has been held in confidence by Westinghouse.
(ii) The information is of a type customarily held in confidence by Westinghouse and not customarily disclosed to the public. Westinghouse has a rational basis for determining the types of information customarily held in confidence by it and, in that connection, utilizes a system to determine when and whether to hold certain types of information in confidence. The application of that system and the substance of that system constitutes Westinghouse policy and provides the rational basis required.
(iii) The information is being transmitted to the Commission in confidence and, under the provision of 10 CFR Section 2.390, it is to be received in confidence by the Commission.
(iv) The information sought to be protected is not available in public sources or available information has not been previously employed in the same original manner or method to the best of our knowledge and belief.
C. G. Pardee We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-5735.
Sincerely,
/RA/
Meghan Thorpe-Kavanaugh Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-456, STN 50-457, STN 50-454, and STN 50-455 cc: See next page
ML080070536 NRR-084 OFFICE LPL3-2/PM LPL3-2/PM LPL3-2/LA DCI/CSGB/BC LPL3-2/BC NAME CGoodwin:sp MThorpe-Kavanaugh EWhitt AHiser RGibbs DATE 1/23/08 1/23/08 1/23/08 1/30/08 1/31/08 Byron/Braidwood Stations cc:
Corporate Distribution Illinois Emergency Management Agency Exelon Generation Company, LLC Division of Disaster Assistance &
via e-mail Preparedness via e-mail Braidwood Distribution Exelon Generation Company, LLC Braidwood Senior Resident Inspector via e-mail U.S. Nuclear Regulatory Commission via e-mail Byron Distribution Exelon Generation Company, LLC County Executive via e-mail via e-mail Dwain W. Alexander, Project Manager County Executive Secretary Westinghouse Electric Company via e-mail via e-mail Ms. Bridget Little Rorem Howard A. Learner Appleseed Coordinator Environmental Law and Policy via e-mail Center of the Midwest via e-mail Chairman Will County Board of Supervisors Byron Senior Resident Inspector Will County Board Courthouse U.S. Nuclear Regulatory Commission Joliet, IL 60434 via e-mail Mr. Barry Quigley Byron Resident Inspectors 3512 Louisiana U.S. Nuclear Regulatory Commission Rockford, IL 61108 via e-mail Ms. Lorraine Creek Westinghouse Electric Company, LLC RR 1, Box 182 Nuclear Services Manteno, IL 60950 P.O. Box 355 Pittsburgh, Pennsylvania 15230-0355 Chairman, Ogle County Board Post Office Box 357 Oregon, IL 61061 Mrs. Phillip B. Johnson 1907 Stratford Lane Rockford, IL 61107 Attorney General 500 S. Second Street Springfield, IL 62701