Letter Sequence Withholding Request Acceptance |
---|
|
|
MONTHYEARML17201Q1302017-08-0707 August 2017 Request for Withholding Information from Public Disclosure for Braidwood Station, Unit 1, and Byron Station, Unit Nos. 1 and 2 Project stage: Withholding Request Acceptance ML17201Q1342017-08-0707 August 2017 Request for Withholding Information from Public Disclosure for Braidwood Station, Unit No. 1 Project stage: Withholding Request Acceptance ML17249A2982017-11-13013 November 2017 Relief from the Requirements of the ASME Code (CAC No. MF9597; EPID L-2017-LLR-0021) Project stage: Approval 2017-11-13
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000456/20230042024-02-0202 February 2024 Integrated Inspection Report 05000456/2023004 and 05000457/2023004 ML24025C7242024-01-29029 January 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000456/2024002; 05000457/2024002 IR 05000457/20230112024-01-25025 January 2024 2B Auxiliary Feedwater Pump Diesel Fuel Oil Dilution Report 05000457/2023011 and Preliminary Greater than Green Finding and Apparent Violation ML24018A0362024-01-17017 January 2024 Paragon Energy Solutions, Defect with Detroit Diesel/Mtu Fuel Injectors P/N R5229660 Cat Id 0001390618 RS-24-004, Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators2024-01-11011 January 2024 Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators ML23348A2162023-12-15015 December 2023 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0030 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000456/20200232023-12-15015 December 2023 Baseline Security Inspection Document; 05000456/2023/402; 05000457/2023/402 ML23277A0032023-12-11011 December 2023 Issuance of Amendments Regarding Adoption of TSTF-370 ML23339A0452023-12-0505 December 2023 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000546/2024010 ML23313A1552023-12-0101 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23331A8922023-11-22022 November 2023 Supplement - Braidwood Security Rule Exemption Request ISFSI Docket No. Reference 05000457/LER-2023-001, Submittal of LER 2023-001-00 for Braidwood Station, Unit 2, Train B Auxiliary Feedwater Pump Was Inoperable Due to Degraded Oil in the Crank Case2023-11-17017 November 2023 Submittal of LER 2023-001-00 for Braidwood Station, Unit 2, Train B Auxiliary Feedwater Pump Was Inoperable Due to Degraded Oil in the Crank Case ML23321A0442023-11-17017 November 2023 Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline RS-23-118, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums RS-23-114, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2023-11-0101 November 2023 Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds IR 05000456/20234012023-10-18018 October 2023 Security Baseline Inspection Report 05000456/2023401 and 05000457/2023401 IR 05000456/20230102023-10-18018 October 2023 Functional Engineering Inspection Commercial Grade Dedication Report 05000456/2023010 and 05000457/2023010 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections RS-23-093, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel.2023-09-29029 September 2023 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel. ML23226A0062023-09-19019 September 2023 Review of License Renewal Commitment Number 10 Submittal ML23180A1692023-09-11011 September 2023 Calvert Cliff Units 1 & 2, and R.E. Ginna Plant - Withdrawal of Proposed Alternatives to American Society of Mechanical Engineers (ASME) Requirements (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) IR 05000456/20230052023-08-30030 August 2023 Updated Inspection Plan for Braidwood Station Report 05000456/2023005 and 05000457/2023005 ML23234A2462023-08-25025 August 2023 Confirmation of Initial License Examination IR 05000456/20230022023-08-0303 August 2023 Integrated Inspection Report 05000456/2023002 and 05000457/2023002 ML23188A1292023-07-26026 July 2023 Issuance of Amendment Nos. 233 and 233 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML23087A0762023-07-13013 July 2023 Issuance of Amendment Nos. 232 and 232 Revision of Technical Specifications for the Ultimate Heat Sink ML23191A8442023-07-10010 July 2023 05000456; 05000457 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23110A1152023-06-12012 June 2023 Environmental Assessment and Finding of No Significant Impact Related to a Requested Increase in Ultimate Heat Sink Temperature (EPID L-2023-LLA-0042) (Letter) RS-23-074, Supplement to Application for License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink2023-06-0909 June 2023 Supplement to Application for License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink RS-23-075, Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process2023-06-0707 June 2023 Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. ML23138A1342023-05-18018 May 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Braidwood Station and Byron Station ML23132A0472023-05-12012 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report ML23130A0072023-05-10010 May 2023 Submittal of Core Operating Limits Report Cycle 24, Rev. 16 IR 05000456/20230012023-05-0808 May 2023 Integrated Inspection Report 05000456/2023001 and 05000457/2023001 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML23118A0202023-04-28028 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection RS-23-056, Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 102023-04-20020 April 2023 Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 10 RS-23-055, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2023-04-10010 April 2023 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML23095A1292023-04-0505 April 2023 Steam Generator Tube Inspection Report for Refueling Outage 23 ML23094A1352023-04-0404 April 2023 Request for Information for Nrc Commercial Grade Dedication Inspection Inspection Report 05000456/2023010 05000457/2023010 RS-23-052, License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink2023-03-24024 March 2023 License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations 2024-02-02
[Table view] Category:Proprietary Information Review
MONTHYEARML21279A0062021-10-13013 October 2021 Request for Withholding Information from Public Disclosure ML21201A3852021-07-23023 July 2021 Request for Withholding Information Regarding Proposed Alternative to Use ASME Code Case N-893 (EPIDs L-2020-LLR-0147 and -0148) ML21084A1352021-04-0505 April 2021 Request for Withholding Information from Public Disclosure ML21028A7122021-02-0303 February 2021 Request for Withholding Information Regarding Proposed Alternative to Use ASME Code Case N-893 (Epids L-2020-LLR-0147 and -0148) ML20317A1342020-11-12012 November 2020 Request for Withholding Information from Public Disclosure; Guarantees of Payment of Deferred Premiums ML19336A0192019-12-0303 December 2019 Request for Withholding Information Regarding Guarantees of Payment of Deferred Premiums ML18225A2292018-08-16016 August 2018 Request for Withholding Information from Public Disclosure ML18019A0112018-01-29029 January 2018 Request for Withholding Information from Public Disclosure ML18012A0122018-01-17017 January 2018 Request for Withholding Information from Public Disclosure ML17320A1452017-11-20020 November 2017 Request for Withholding Information Regarding Guarantees of Payment of Deferred Premiums ML17201Q1302017-08-0707 August 2017 Request for Withholding Information from Public Disclosure for Braidwood Station, Unit 1, and Byron Station, Unit Nos. 1 and 2 ML17201Q1342017-08-0707 August 2017 Request for Withholding Information from Public Disclosure for Braidwood Station, Unit No. 1 ML16337A2762016-12-0909 December 2016 Calvert; Clinton; Dresden; LaSalle; Limerick; Nine Mile Point; Oyster Creek; Peach Bottom; Quad Cities; R.E. Ginna; Three Mile Island - Request for Withholding Information Regarding; Guarantees of Payment of Deferred Premiums ML16098A3222016-04-27027 April 2016 Request to Withhold Emergency Preparedness Documents from Public Disclosure (CAC Nos. MF7504-MF7525) ML16039A3382016-02-18018 February 2016 Request for Withholding Information from Public Disclosure for Byron Station, Unit Nos. 1 and 2, and Braidwood Station, Units 1 and 2 ML16007A1852016-01-21021 January 2016 Relief from the Requirements of the ASME Code(Cac Nos. MF4809, MF4810, MF4811, and MF4812) ML15007A5532015-01-15015 January 2015 Request for Withholding Information from Public Disclosure ML14238A6912014-09-0303 September 2014 Bbs Proprietary Denial Letter ML14129A3392014-05-14014 May 2014 Request for Withholding Information from Public Disclosure ML13016A5002013-01-30030 January 2013 Request for Withholding Information from Public Disclosure for Braidwood Station, Units 1 & 2; Byron Station, Units 1 & 2; Clinton Power Station, Unit 1; Dresden Nuclear Power Station, Units 2 & 3; LaSalle County Station, Units 1 & 2 ML12136A2672012-05-23023 May 2012 Request for Withholding Information from Public Disclosure ML1129305492011-11-0303 November 2011 Request for Withholding Information from Public Disclosure Affidavit CAW-11-03 ML1129203422011-11-0303 November 2011 Request for Withholding Information from Public Disclosure Affidavit CAW-11-3137 ML1113306882011-06-0303 June 2011 Request for Withholding Information from Public Disclosure ML1036400332011-01-21021 January 2011 Request for Withholding Information from Public Disclosure ML0919403202009-09-23023 September 2009 Withholding from Public Disclosure, CAW-09-2584, (TAC Nos. ME1613, ME1614, ME1615, and ME1616.) ML0925101482009-09-10010 September 2009 Withholding Information from Public Disclosure ML0923706472009-09-0202 September 2009 Request for Withholding Information from Public Disclosure ML0921603032009-08-0505 August 2009 Request for Withholding Information from Public Disclosure ML0907103302009-04-30030 April 2009 Corp., Request for Withholding Information from Public Disclosure ML0809206882008-04-0404 April 2008 Request for Withholding Information from Public Disclosure. (Tacs. MD8158/MD8159) ML0800705362008-01-31031 January 2008 Byron Station Units 1 and 2, Withholding from Public Disclosure, LTR-CDME-07-212 P-Attachment, Supplemental Information Relating to the Application for TS Improvement Re Steam Generator Tube Integrity, (Proprietary) (Tacs. MD7479, MD7482) ML0707203002007-03-28028 March 2007 Westinghouse LLC, Request for Withholding Information from Public Disclosure for Byron, Unit 2 and Braidwood, Unit 2 - SG-CDME-07-02P ML0706801162007-03-28028 March 2007 Request for Withholding Information from Public Disclosure from Westinghouse SG Amend RAI 21507 ML0706602592007-03-26026 March 2007 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure for Byron Unit 2 and Braidwood, Unit 2 - Ltr. Dated 2/23/07 ML0706100602007-03-14014 March 2007 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure ML0627802872006-11-0808 November 2006 Withholding from Public Disclosure, Westinghouse Electric Company LLC, SG-SGDA-06-20-P-Attachment, Revision 1, MC8967 & MC8969 ML0620006702006-09-20020 September 2006 Westinghouse Request for Withholding Information from Public Disclosure by Letter Dated October 3, 2005, ML0624402462006-09-15015 September 2006 Westinghouse Request for Withholding Information from Public Disclosure for Byron Unit 1 and Braidwood Unit 2 by Letter Dated 03/31/2006 ML0522300992005-08-16016 August 2005 Westinghouse, Request for Withholding Information from Public Disclosure for Byron, Unit 2 and Braidwood, Unit 2 ML0404404252004-02-13013 February 2004 (Egc), Withholding Information from Public Disclosure, Jeffrey A. Benjamin 02/05/2004 Letter Addressing an Issue Related to EGC Plants 2021-07-23
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 7, 2017 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO)
Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC,DISCLOSURE FOR BRAIDWOOD STATION, UNIT NO. 1 (CAC NO. MF9597)
Dear Mr. Hanson:
By letter dated March 31, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17095A268), you submitted four affidavits. Two affidavits were dated October 7, 2016, one affidavit was dated December 7, 2016, and one affidavit was dated March 27, 2017, and were executed by Gayle Elliott of AREVA Inc., requesting that the information contained in the following documents be withheld from public disclosl'.Jre pursuant to Title 1O of the Code of Federal Regulations (1 O CFR), Part 2, Section 2.390:
Engineering Information Record, 51-9238120-002, "PWSCC Evaluation of UHP Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations," dated October 7, 2016 '
Calculation Summary Sheet, 32-9241722-001, "Byron & Braidwood Peening Residual Plus Operating Stress Analysis," dated October 7, 2016 Special Process Qualification Record, 150-8086004-001, "Qualification of the Cavitation Peening Process for Reactor Vessel Closure Head (RVCH) Nozzles," dated December 7, 2016 Engineering Information Record, 51-8093944-001, "Summary Report, RVCH Peening Implementation, Braidwood, Unit 1," dated March 27, 2017 The affidavits state that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(c) The information includes test data or analytical techniques concerning a process, methodology, or component, the application of which results in a c~mpetitive advantage for AREVA. *
(d) The information reveals certain distinguishing aspects of a process, methodology, or component, the exclusive use of which provides a competitive advantage for AREVA in product optimization or marketability.
B. Hanson (e) The information is vital to a competitive advantage held by AREVA, would be helpful to competitors to AREVA, and would likely cause substantial harm to the competitive position of AREVA We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the above documents marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. The non-proprietary version of Engineering Information Record, 51-9238120-002, is provided as Engineering Information Record, 51-9263014-000 (ADAMS Accession No. ML17095A269).
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-6606.
Sincerely, 7,JtJ;b-oel S. Wiebe, Senior Project Manager Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. STN 50-456 cc:
Gayle Elliott, Deputy Director Licensing & Regulatory Affairs AREVA Inc.
3315 Old Forest Road Lynchburg, VA 24501 Distribution via Listserv
ML17201Q134 OFFICE LPL3/PM LPL3/LA LPL3/BC LPL3/PM NAME JWiebe SRohrer DWrona JWiebe DATE 07/24/17 07/24/17 08/04/17' 08/07/17