ML091910196: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:July 16, 2009 LICENSEE: | {{#Wiki_filter:July 16, 2009 LICENSEE: PPL Susquehanna, LLC FACILITY: Susquehanna Steam Electric Station, Units 1 and 2 | ||
FACILITY: | |||
==SUBJECT:== | ==SUBJECT:== | ||
==SUMMARY== | ==SUMMARY== | ||
OF TELEPHONE CONFERENCE CALL HELD ON JUNE 25, 2009, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PPL SUSQUEHANNA, LLC, COMMENTS ON THE SAFETY EVALUATION REPORT WITH OPEN ITEMS RELATED TO THE LICENSE RENEWAL OF SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of PPL Susquehanna, LLC (PPL), held a telephone conference call on June 25, 2009, to discuss | OF TELEPHONE CONFERENCE CALL HELD ON JUNE 25, 2009, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PPL SUSQUEHANNA, LLC, COMMENTS ON THE SAFETY EVALUATION REPORT WITH OPEN ITEMS RELATED TO THE LICENSE RENEWAL OF SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of PPL Susquehanna, LLC (PPL), held a telephone conference call on June 25, 2009, to discuss PPLs comments on the Safety Evaluation Report with open items related to the license renewal of Susquehanna Steam Electric Station, Units 1 and 2 (SSES), issued by letter of March 13, 2009. | ||
The enclosure provides a listing of the participants. | The NRC staff stated in its write up concerning request for additional information 4.3-1b that the number of cycles for the 25 percent steam bypass event was 70 cycles. The purpose of the telephone conference call was for PPL to clarify that the SSES design basis includes 70 cycles for the partial feedwater heater bypass event and 10 cycles for the turbine trip with 25 percent steam bypass event. | ||
The enclosure provides a listing of the participants. | |||
The applicant had an opportunity to comment on this summary. | |||
/RA/ | |||
Evelyn H. Gettys, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388 | |||
==Enclosure:== | |||
As stated cc w/encl: See next page | |||
ML091910196 OFFICE PM:RPB1:DLR LA:DLR BC:RPB1:DLR PM:RPB1:DLR NAME EGettys IKing DPelton EGettys (DAshley for) (Signature) | |||
DATE 07/16/09 07/15/09 07/16/09 07/16/09 | |||
Memorandum to PPL Susquehanna, LLC from Evelyn H. Gettys dated July 16, 2009 | |||
==SUBJECT:== | ==SUBJECT:== | ||
==SUMMARY== | ==SUMMARY== | ||
OF TELEPHONE CONFERENCE CALL HELD ON JUNE 25, 2009, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PPL SUSQUEHANNA, LLC, COMMENTS ON THE SAFETY EVALUATION REPORT WITH OPEN ITEMS RELATED TO THE LICENSE RENEWAL OF SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 DISTRIBUTION | OF TELEPHONE CONFERENCE CALL HELD ON JUNE 25, 2009, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PPL SUSQUEHANNA, LLC, COMMENTS ON THE SAFETY EVALUATION REPORT WITH OPEN ITEMS RELATED TO THE LICENSE RENEWAL OF SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 DISTRIBUTION: | ||
: | HARD COPY: | ||
HARD COPY: DLR RF E-MAIL: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRer1 Resource RidsNrrDlrRer2 Resource RidsNrrDlrRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDraAfpb Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource --------------- EGettys FJaxheimer | DLR RF E-MAIL: | ||
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRer1 Resource RidsNrrDlrRer2 Resource RidsNrrDlrRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDraAfpb Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource | |||
--------------- | |||
EGettys FJaxheimer | |||
TELEPHONE CONFERENCE CALL SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS June 25, 2009 PARTICIPANTS AFFILIATIONS Evelyn Gettys U.S. Nuclear Regulatory Commission (NRC) | |||
Allen Hiser NRC Chuang-Yeh Yang NRC Duane Filchner PPL Susquehanna, LLC (PPL) | |||
Dave Flyte PPL Jeff Weik PPL ENCLOSURE | |||
Dayne R. Brophy Nuclear Regulatory Affairs PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA | Susquehanna Steam Electric Station, Units 1 and 2 cc: | ||
Cornelius J. Gannon Bryan A. Snapp, Esq. | |||
Vice President - Nuclear Operations Associate General Counsel PPL Susquehanna, LLC PPL Services Corporation 769 Salem Blvd., NUCSB3 Two North Ninth Street, GENTW3 Berwick, PA 18603-0467 Allentown, PA 18101-1179 Robert M. Paley Document Control Services General Manager - Plant Support PPL Susquehanna, LLC PPL Susquehanna, LLC Two North Ninth Street, GENPL4 769 Salem Blvd., NUCSB2 Allentown, PA 18101-1179 Berwick, PA 18603-0467 Richard W. Osborne Michael H. Crowthers Allegheny Electric Cooperative, Inc. | |||
Manager - Nuclear Regulatory Affairs 212 Locust Street PPL Susquehanna, LLC P.O. Box 1266 Two North Ninth Street, GENPL4 Harrisburg, PA 17108-1266 Allentown, PA 18101-1179 Director, Bureau of Radiation Protection Ronald E. Smith Pennsylvania Department of General Manager - Site Preparedness Environmental Protection and Services Rachel Carson State Office Building PPL Susquehanna, LLC P.O. Box 8469 769 Salem Blvd., NUCSA4 Harrisburg, PA 17105-8469 Berwick, PA 18603-0467 Senior Resident Inspector Michael H. Rose U.S. Nuclear Regulatory Commission Manager - Quality Assurance P.O. Box 35, NUCSA4 PPL Susquehanna, LLC Berwick, PA 18603-0035 769 Salem Blvd., NUCSB2 Berwick, PA 18603-0467 Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission Joseph J. Scopelliti 475 Allendale Road Community Relations Manager, King of Prussia, PA 19406 Susquehanna PPL Susquehanna, LLC Dr. Judith Johnsrud 634 Salem Blvd., SSO National Energy Committee Berwick, PA 18603-0467 Sierra Club 443 Orlando Avenue Board of Supervisors State College, PA 16803 Salem Township P.O. Box 405 Dayne R. Brophy Berwick, PA 18603-0035 Nuclear Regulatory Affairs PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467}} |
Latest revision as of 04:16, 14 November 2019
ML091910196 | |
Person / Time | |
---|---|
Site: | Susquehanna |
Issue date: | 07/16/2009 |
From: | Gettys E License Renewal Projects Branch 1 |
To: | Susquehanna |
Gettys Evelyn, NRR/DLR/RPB1 415-4029 | |
References | |
Download: ML091910196 (3) | |
Text
July 16, 2009 LICENSEE: PPL Susquehanna, LLC FACILITY: Susquehanna Steam Electric Station, Units 1 and 2
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON JUNE 25, 2009, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PPL SUSQUEHANNA, LLC, COMMENTS ON THE SAFETY EVALUATION REPORT WITH OPEN ITEMS RELATED TO THE LICENSE RENEWAL OF SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of PPL Susquehanna, LLC (PPL), held a telephone conference call on June 25, 2009, to discuss PPLs comments on the Safety Evaluation Report with open items related to the license renewal of Susquehanna Steam Electric Station, Units 1 and 2 (SSES), issued by letter of March 13, 2009.
The NRC staff stated in its write up concerning request for additional information 4.3-1b that the number of cycles for the 25 percent steam bypass event was 70 cycles. The purpose of the telephone conference call was for PPL to clarify that the SSES design basis includes 70 cycles for the partial feedwater heater bypass event and 10 cycles for the turbine trip with 25 percent steam bypass event.
The enclosure provides a listing of the participants.
The applicant had an opportunity to comment on this summary.
/RA/
Evelyn H. Gettys, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388
Enclosure:
As stated cc w/encl: See next page
ML091910196 OFFICE PM:RPB1:DLR LA:DLR BC:RPB1:DLR PM:RPB1:DLR NAME EGettys IKing DPelton EGettys (DAshley for) (Signature)
DATE 07/16/09 07/15/09 07/16/09 07/16/09
Memorandum to PPL Susquehanna, LLC from Evelyn H. Gettys dated July 16, 2009
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON JUNE 25, 2009, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PPL SUSQUEHANNA, LLC, COMMENTS ON THE SAFETY EVALUATION REPORT WITH OPEN ITEMS RELATED TO THE LICENSE RENEWAL OF SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 DISTRIBUTION:
HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRer1 Resource RidsNrrDlrRer2 Resource RidsNrrDlrRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDraAfpb Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource
EGettys FJaxheimer
TELEPHONE CONFERENCE CALL SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS June 25, 2009 PARTICIPANTS AFFILIATIONS Evelyn Gettys U.S. Nuclear Regulatory Commission (NRC)
Allen Hiser NRC Chuang-Yeh Yang NRC Duane Filchner PPL Susquehanna, LLC (PPL)
Dave Flyte PPL Jeff Weik PPL ENCLOSURE
Susquehanna Steam Electric Station, Units 1 and 2 cc:
Cornelius J. Gannon Bryan A. Snapp, Esq.
Vice President - Nuclear Operations Associate General Counsel PPL Susquehanna, LLC PPL Services Corporation 769 Salem Blvd., NUCSB3 Two North Ninth Street, GENTW3 Berwick, PA 18603-0467 Allentown, PA 18101-1179 Robert M. Paley Document Control Services General Manager - Plant Support PPL Susquehanna, LLC PPL Susquehanna, LLC Two North Ninth Street, GENPL4 769 Salem Blvd., NUCSB2 Allentown, PA 18101-1179 Berwick, PA 18603-0467 Richard W. Osborne Michael H. Crowthers Allegheny Electric Cooperative, Inc.
Manager - Nuclear Regulatory Affairs 212 Locust Street PPL Susquehanna, LLC P.O. Box 1266 Two North Ninth Street, GENPL4 Harrisburg, PA 17108-1266 Allentown, PA 18101-1179 Director, Bureau of Radiation Protection Ronald E. Smith Pennsylvania Department of General Manager - Site Preparedness Environmental Protection and Services Rachel Carson State Office Building PPL Susquehanna, LLC P.O. Box 8469 769 Salem Blvd., NUCSA4 Harrisburg, PA 17105-8469 Berwick, PA 18603-0467 Senior Resident Inspector Michael H. Rose U.S. Nuclear Regulatory Commission Manager - Quality Assurance P.O. Box 35, NUCSA4 PPL Susquehanna, LLC Berwick, PA 18603-0035 769 Salem Blvd., NUCSB2 Berwick, PA 18603-0467 Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission Joseph J. Scopelliti 475 Allendale Road Community Relations Manager, King of Prussia, PA 19406 Susquehanna PPL Susquehanna, LLC Dr. Judith Johnsrud 634 Salem Blvd., SSO National Energy Committee Berwick, PA 18603-0467 Sierra Club 443 Orlando Avenue Board of Supervisors State College, PA 16803 Salem Township P.O. Box 405 Dayne R. Brophy Berwick, PA 18603-0035 Nuclear Regulatory Affairs PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467