IR 05000361/2012301: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 1: Line 1:
#REDIRECT [[IR 05000348/2012301]]
{{Adams
| number = ML113490267
| issue date = 12/15/2011
| title = Notification of NRC Initial Operator Licensing Examination 05000361/2012-301; 05000362/2012-301
| author name = Haire M
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name = Dietrich P
| addressee affiliation = Southern California Edison Co
| docket = 05000361, 05000362
| license number = NPF-010, NPF-015
| contact person =
| document type = Letter, License-Operator, Part 55 Examination Related Material
| page count = 4
}}
 
{{IR-Nav| site = 05000361 | year = 2012 | report number = 301 }}
 
=Text=
{{#Wiki_filter:December 15, 2011
 
==SUBJECT:==
SAN ONOFRE NUCLEAR GENERATING STATION - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000361/2012301; 05000362/2012301
 
==Dear Mr. Dietrich:==
In a telephone conversation on December 12, 2011 between William Arbour, Operations Training Manager, and Gabriel Apger, Chief Examiner, arrangements were made for the administration of licensing examinations at San Onofre Nuclear Generating Station during the weeks of October 8, October 15, and October 22, 2012.
 
As agreed during the telephone conversation, the NRC staff will prepare the draft written examination outline, and your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
 
To meet the above schedule, it will be necessary for your staff to furnish the operating test outlines by July 27, 2012. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by August 17, 2012. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examinations and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In addition, your support for on-site validation of the examinations is required during the week of September 10, 2012. UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125 Mr. Peter Dietrich - 2 -
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
 
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
 
To permit timely NRC review and evaluation, your staff should submit preliminary operator and senior operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
 
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on February 28, 2013. The public reporting burden for this collection of information is estimated to average 50 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, developing the written examination outlines, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV. The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.
 
Mr. Peter Dietrich - 3 -
Thank you for your cooperation in this matter. Mr. Arbour has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Apger at 817-200-1508, or myself at 817-200-1159.
 
Sincerely,
/RA/ S. Garchow for
 
Mark S. Haire, Chief Operations Branch Division of Reactor Safety Dockets: 50-361; 50-362 Licenses: NPF-10; NPF-15
 
cc via Electronic Distribution Mr. Peter Dietrich - 4 -
Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Art.Howell@nrc.gov) DRP Director (Kriss.Kennedy@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Tom.Blount@nrc.gov) Senior Resident Inspector (Greg.Warnick@nrc.gov) Resident Inspector (John.Reynoso@nrc.gov)
Branch Chief, DRP/D (Ryan.Lantz@nrc.gov) Senior Project Engineer, DRP/D (Don.Allen@nrc.gov) SONGS Administrative Assistant (Heather.Hutchinson@nrc.gov) Project Engineer, DRP/D (David.You@nrc.gov) Project Engineer, DRP/D (Brian.Parks@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Randy.Hall@nrc.gov) Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource RIV/ETA: OEDO (Mark.Franke@nrc.gov) DRS/TSB STA (Dale.Powers@nrc.gov)
 
R:\ ADAMS ML ADAMS: No Yes SUNSI Review Complete Reviewer Initials: SDH Publicly Available Non-Sensitive Non-publicly Available Sensitive OE: OB C: OB GApger MHaire /RA/ /RA/ S. Garchow for 12/15/2012 12/15/2012 OFFICIAL RECORD COPY  T=Telephone E=E-mail F=Fax
}}

Revision as of 06:58, 29 June 2019

Notification of NRC Initial Operator Licensing Examination 05000361/2012-301; 05000362/2012-301
ML113490267
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 12/15/2011
From: Mark Haire
Operations Branch IV
To: Peter Dietrich
Southern California Edison Co
References
Download: ML113490267 (4)


Text

December 15, 2011

SUBJECT:

SAN ONOFRE NUCLEAR GENERATING STATION - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000361/2012301; 05000362/2012301

Dear Mr. Dietrich:

In a telephone conversation on December 12, 2011 between William Arbour, Operations Training Manager, and Gabriel Apger, Chief Examiner, arrangements were made for the administration of licensing examinations at San Onofre Nuclear Generating Station during the weeks of October 8, October 15, and October 22, 2012.

As agreed during the telephone conversation, the NRC staff will prepare the draft written examination outline, and your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the operating test outlines by July 27, 2012. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by August 17, 2012. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examinations and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In addition, your support for on-site validation of the examinations is required during the week of September 10, 2012. UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125 Mr. Peter Dietrich - 2 -

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary operator and senior operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on February 28, 2013. The public reporting burden for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, developing the written examination outlines, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV. The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.

Mr. Peter Dietrich - 3 -

Thank you for your cooperation in this matter. Mr. Arbour has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Apger at 817-200-1508, or myself at 817-200-1159.

Sincerely,

/RA/ S. Garchow for

Mark S. Haire, Chief Operations Branch Division of Reactor Safety Dockets: 50-361; 50-362 Licenses: NPF-10; NPF-15

cc via Electronic Distribution Mr. Peter Dietrich - 4 -

Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Art.Howell@nrc.gov) DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Tom.Blount@nrc.gov) Senior Resident Inspector (Greg.Warnick@nrc.gov) Resident Inspector (John.Reynoso@nrc.gov)

Branch Chief, DRP/D (Ryan.Lantz@nrc.gov) Senior Project Engineer, DRP/D (Don.Allen@nrc.gov) SONGS Administrative Assistant (Heather.Hutchinson@nrc.gov) Project Engineer, DRP/D (David.You@nrc.gov) Project Engineer, DRP/D (Brian.Parks@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Randy.Hall@nrc.gov) Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource RIV/ETA: OEDO (Mark.Franke@nrc.gov) DRS/TSB STA (Dale.Powers@nrc.gov)

R:\ ADAMS ML ADAMS: No Yes SUNSI Review Complete Reviewer Initials: SDH Publicly Available Non-Sensitive Non-publicly Available Sensitive OE: OB C: OB GApger MHaire /RA/ /RA/ S. Garchow for 12/15/2012 12/15/2012 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax