ES-401 SONGS 2011-11: Written Examination Review Worksheet Form ES-401-9

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 1 H 2 X N U 1. K/A asks for problems with RCP motors, but question is testing on the effects of a mechanical shaft shear.

S

2. Why would Reactor Trip Recovery not be diagnosed given the info in the stem? Replaced question 2 F 2 B S 1. Why is there a Reduced Inventory Condition ref? Procedure attached as a ref because it explains why distractor C is plausible.

3 H 3 B E Rearranged distracters for length.

4 H 3 N E Consider stating at what rate 3LT226 fails low. Done 5 F 2 B E 1. Add per 3-2.16 in stem.

2. Rearranged distracters for length.

6 H 2 B E 1. For A - should loss of SDC pumps be listed first, thus resulting in a loss of all SDC flow?

2. For C - how do you differentiate between this and A?

New plausibility statements for A and C. Slight mods made for exam consistency. Added System Description info.

7 F 3 B S 8 H 2 M S The Modified question and the Original question have the same stems but different answers - why? Error in Bank question.

Changed distractor B to 228ºF and fixed plausibility statement.

Instructions

[Refer to Section D of ES-401 and Appendix B for additional information regarding each of the following concepts.]

1. Enter the level of knowledge (LOK) of each question as either (F)undamental or (H)igher cognitive level.
2. Enter the level of difficulty (LOD) of each question using a 1 - 5 (easy - difficult) rating scale (questions in the 2 - 4 range are acceptable).
3. Check the appropriate box if a psychometric flaw is identified:
  • The stem lacks sufficient focus to elicit the correct answer (e.g., unclear intent, more information is needed, or too much needless information).
  • The stem or distractors contain cues (i.e., clues, specific determiners, phrasing, length, etc).
  • The answer choices are a collection of unrelated true/false statements.
  • The distractors are not credible; single implausible distractors should be repaired, more than one is unacceptable.
  • One or more distractors is (are) partially correct (e.g., if the applicant can make unstated assumptions that are not contradicted by stem).
4. Check the appropriate box if a job content error is identified:
  • The question is not linked to the job requirements (i.e., the question has a valid K/A but, as written, is not operational in content).
  • The question requires the recall of knowledge that is too specific for the closed reference test mode (i.e., it is not required to be known from memory).
  • The question contains data with an unrealistic level of accuracy or inconsistent units (e.g., panel meter in percent with question in gallons).
  • The question requires reverse logic or application compared to the job requirements.
5. Check questions that are sampled for conformance with the approved K/A and those that are designated SRO-only (K/A and license level mismatches are unacceptable).
6. Enter question source: (B)ank, (M)odified, or (N)ew. Check that (M)odified questions meet criteria of ES-401 Section D.2.f.
7. Based on the reviewers judgment, is the question as written (U)nsatisfactory (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
8. At a minimum, explain any U ratings (e.g., how the Appendix B psychometric attributes are not being met).

ES-401 2 Form ES-401-9

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 9 H 3 B S 10 F 2 N S 11 F 3 B E For C - change to 20 seconds. Done Rearranged distractors for length 12 H 3 B S Verify overlap with SRO exam - knowledge of one question doesnt provide help on the other. Done 13 H 3 N E Is this an event on any of the scenarios? No overlap Rearranged distractors for length 14 H 3 X B U 1. Is FHIS considered ESF Actuation System? No N S 2. Reduce down to 2 choices per answer. Only need to know the first two to get the right answer. Replaced question 15 F 2 B E 1. Change which of the following are to which of the following is.

fixed

2. Is this an event on any of the scenarios? No Rearranged distractors for length and replaced one distractor 16 H 2 X N E 1. Distractors C is implausible. replaced
2. Is SFP cooling lost due to loss of SFP pumps or CCW flow to the heat exchanger? Not clear in stem. Revised stem Added System Description info in references.

17 H 2 B E Rearranged distractors for length 2009 18 H 2 X B E 1. Applicant only needs know the position of 3& 4 to answer question. Revised answers

2. Position of MSIV is not discriminatory since its CLOSED in all 4 answers. Revised answers
3. Refs dont provide MSIS setpoint. Added Sys Description info
1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 19 F 2 X B E 1. Position of Reg Vlv response is not discriminatory since it goes fully closed in all 4 answers. Revised answers

2. What is position of bypass valve at 100% power? If closed, C and D are not plausible. Bypass valves are full open at 100% power.

Rearranged distractors for length.

20 F 3 B E Rearranged distractors for length.

21 H 3 X B U Question does not test on the effect of a malfunction of the AC system on the EDG (it tests on what the malfunction doesnt affect on N S the EDG). Replaced question.

22 H 3 M E 1. Remove the words has occurred from the answers. Done

2. For Explanation D - it is NEVER acceptable to use the simulator to validate plant parameters! It is always the other way around. Revised
3. Refs dont include link from 4160 VAC bus to 480 VAC MCC.

Added Rearranged distractors for length.

23 F 2 X N E Distractor D too large a value to be credible. Changed distractor D from 2.0 MWe to 0.5 MWe.

24 F 2 B S 25 F 2 B E Rearranged distractors for length.

26 F 2 M S 27 H 3 B E Changed distractors A & D by removing pressure values.

28 H 3 M E 1. Since each answer only contains one action, stem doesnt need the action(s) is (are). Reworded Stem.

Rearranged distractors for length.

29 H 2 N E Rearranged distractors for length.

30 H 3 X B E 1. In third bullet - remove which provides input to the Loop 1 Tave calculation since the applicant should know this. Fixed

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 31 F 2 X B U KA requires knowledge of the NI system. If applicant knew the effects of a pressure transmitter failing low, they would not have to know S

anything about the effects on DNBR from NIs (since there is only one correct answer). Change pressure failure to high and NI failure high. Fixed 32 H 3 X B U 1. A and B are not plausible. Controlling on the high channel with a high failure and no effect; controlling on a low channel with a high S

failure that opens the valveRevised answers

2. Both Control channels have controls on the higher indicating channel and both Safety channels have controls on the lower indicating channel. No discrimination value. Revised answers
3. No value in the two Steam Generator Pressure in each distractor.

Put in stem. Revised answers

4. Refs dont identify Control vs Safety channels. Revised answers only include safety channels 33 H 2 X B E 1. Explanation for A is misworded (Fuel Handling Spent Fuel Pool?)

Corrected plausibility statements as required. Rearranged distractors for length.

34 F 2 B S 35 H 2 B E 1. Stem which of the following are to which of the following is since there is only one action per answer. Fixed 36 F 4 B E 1. This looks like an SRO question. Are ROs required to know from memory rad release requirements (Attachment 17 to an OI?)

Licensee concurs this is definitely RO level knowledge.

2. Explanations for distracters C and D imply that flow monitor FI-7643 is inop, but stem does not say that. Corrected plausibility statements Rearranged distractors for length. Added proc ref to stem.

37 F 4 B E 1. Distractor A references -0.5 HgA not possible. Also, other 3 answers reference PSIG.

Reworded distractors A & C 38 H 3 X N S

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 39 H 2 B E Difference between 20 min and 180 min seems excessive consider a smaller time delta. Reworded distractors B & C (changed 180 minutes to 60 minutes).

40 F 3 B S 2010 41 H 3 B E 1. Shortest answer first, longest answer last (move C to A)

Reworded Stem and underlined 286 and 186 in distractors B & D.

Rearranged distractors for length.

42 H 3 X B E Distractor C - not plausible. Additional loss of inventory is not a damage mechanism to the RCPs. Reworded Stem and all distractors.

43 H 2 B S 1. Explanation for A make sense? Corrected plausibility statement for distractor A.

44 H 3 N S 45 H 3 N S 46 F 3 B S 47 F 2 N S 48 F 3 B E Add per SO23-14-5 to stem. Reworded stem 49 H 3 M E 1. Is it plausible to have an ADV open with a LBLOCA (primary at 600 psig, HPSI injecting)? Yes - promoting natural circ Rearranged distractors for length.

50 H 3 B E In correct answer: how can REP CET temp be lower than Thot if temps are stable? Changed REP CET to 560F 51 H 2 X X B U KA is knowledge of the reasons, not just the actions. Also, the identified Learning Obj states the basis for each step, not just the M S action required. Also, MFW not credible. Reworded stem and distracters.

52 H 4 B E 1. Stem confusing regarding all 3 charging pumps started. Reworded stem

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 53 F 3 X N U Question doesnt test on the REASON for actions contained in EOP for a loss of DC. Modified distractors C & D and added ... due to S

loss of Train A(B) control power to each distractor.

54 H 4 B E 1. Overlap with an In-Plant JPM? No - this is reason for 2009 2. Since the stem states the procedure is in progress, is C correct until Attachment 2 is complete? How does the applicant know the FIS has been placed in LOCAL? Added bullet for Fire Isolation Switches to stem.

55 H 3 M E Review potential cueing with Q-27 as it gives values for Nitrogen pressure and SA pressure. Removed pressure values from Q27.

Rearranged distractors for length.

56 F 3 B E 1. Distractor C - what is a permanently connected bus load?

Removed "...permanently connected..." from distractor C.

Rearranged distractors for length.

57 H 3 B E 1. KA states the Rod In-Hold-Out switch, not the CEDMCS Manual Control Switch. Same thing at SONGS

2. Explanation for A states that Critical Data was just taken but that isnt identified in the stem. Corrected plausibility statement for Answer and distractor D 58 H 2 B S 59 H 3 B E 1. Modify stem to read Which action is required per ARI xxx Done
2. In answer D: change reason from shutdown margin to restore CEAs above PPDIL to match procedure. Done 60 F 3 B E 1. Add In accordance with SO23-8-14, which of the following Done 61 H 3 N E 1. Should the stem include any Containment parameters? Added bullet for Containment Normal Sump level.
2. Explanation for distractor D is incomplete. Fixed
3. Isolating letdown is not next step. Revised stem Rearranged distractors for length.
1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 62 H 3 X B U 1. What is the operational implication of defining Extinguished?

N S 2. Distractor C says combustion appears to have stopped completely but AOI defines Extinguished as the cessation of combustion any appeal worry here?

3. Distractor D says smoke is been evacuated. Should be is being or has been?
4. Attached ref is the definition of Fire, not Extinguished.

Replaced question.

63 F 2 B E 1. For C - add Containment Personnel Air Lock Added

...Personnel... to distractor C.

2. For D - a Containment Purge in progress is one of the conditions that must be met if the Equipment Hatch is open. Is it a stand alone condition for meeting TS requirements? LCO 3.9.3,c.2 64 F 3 N S 1. Same rad monitor for Sim JPM S-8. Overlap? Yes but no overlap.

Changed reference from ARPs to System Description 65 H 2 X M E 1. Add per procedure xxx to stem question. Done

2. Make the distractors correspond to the 4 temperatures given in the stem for plausibility. Done 66 F 2 N S 67 F 3 X N E 1. While the Safety Limits are defined in TS, the purposes of the trips are defined in the System Description. Revise stem. Not required -

Added references from LCS & TS

2. Replaced distractor B and associated plausibility statement to avoid overlap with Q70..

68 F 3 B S 69 H 2 X B E 1. Stem asks what documentation is REQUIRED? but correct answer states peer checker MAY sign it could be argued there is no correct answer. Change stem to how is it documented? Done

2. For Distractors A and B - add Control Room Area. Added to all distractors 70 F 3 N S
1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 71 H 2 M S Explanation for D is wrong. 2 REM would be 16.67 hrs. Corrected plausibility statement for distractor D.

72 H 3 B E For B - provide noun name for valve. Added procedure title to Stem and valve name to distractor B.

73 F 2 B E Rearranged distractors for length.

2009 74 F 2 B E 1. Add in accordance with AOI xxx to stem. Added procedure title to Stem.

2. For B and C - the AOI states pre-fire plan, not fire pre-plan.

Fixed 75 F 2 X B U 1. Fourth bullet - does could NOT be opened manually mean by depressing trip buttons in the CR or locally? From the CR N S

2. For C - alternate DC supply breaker? yes
3. Add in accordance with AOI xxx to stem. Replaced question
4. Dont need to know Loss of Annun, only RNO of Step 2 of SPTAs.

Replaced question Comments:

1. Bank - 45 (60%), New - 21 (28%), Modified - 9 (12%).
2. LOK: H - 43 (57%), F - 32 (43%).
3. LOD: 2.61 average
4. Questions from last two NRC exams: 4

ES-401 SONGS 2011-11: Written Examination Review Worksheet Form ES-401-9

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 76 H 3 B S 77 H 3 B E 1. Add selection of appropriate procedures. Modified all distractors to new format.

2. For B - why use 320F? With 100% plenum, doesnt the procedure skip the step for using rep CETs? Modified all distractors to new format.
3. Change Thot to REP CET on B and D to match procedure.

Done

4. Add in accordance with procedure SO23-12-3 to stem. Done 78 H 3 X M U 1. Step 3c RNO is controlled plant shutdown but isnt step 3c answered 'yes since CBO is less than 4 gpm? Yes - Changed S

leakage to 6 GPM

2. Add in accordance with procedure SO23-13-6 to stem. Done
3. For B, procedure states Containment entry, not Emergency Containment entry. Fixed
4. For D - where does the 5 seconds after CEAs have been inserted come from? Is this plausible? Revised distractor 79 F 3 B E How is question related to pzr press control malfunction? Added bullet for controller failure.

80 H 3 N E 1. Explanation for D refers to FR procedure, but question is about SFSC procedure. Revised explanation.

2. What is the significance of the second bullet? If you added to the question, During an ATWS, which of the following satisfies : would you need any of the bullets? Loss of busses affects available charging pumps.
3. Distractors only require knowledge of 1, 2, 3, 4 (not 5). Revised all distracters to selections for 1-4.

81 H 3 N E Need to assessf facility conditions. The conclusion that DC Bus 1 is lost is given in the stem. Modified conditions in Stem to reflect loss of DC Bus

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 82 H 2 M E 1. Does the stem imply voltage is higher on all safety channels? If so, would they all agree within 1/2 decade? Changed 2nd bullet to singular condition

2. What ref verifies the statement in the stem that the NIs will shift from Count Rate Circuit to Campbelling Circuit? added reference for Campbelling 83 F 3 N E If the answer is the ODCM, should it not be listed as a ref? Was it included in the ref material? Added reference to ODCM. Rearranged distractors for length.

84 H 3 B E Distractor A wording doesnt make sense ( within 14 days of the plan). Also, not aware of any 14 day NRC report - change to 8 2010 hours0.0233 days <br />0.558 hours <br />0.00332 weeks <br />7.64805e-4 months <br />. Modified distractor A Reworded stem for clarity 85 H 3 M E Selection of appropriate procedures doesnt provide much discrimination since it is just the first CSF listed in part 1) of each question. Modified Stem and removed procedure reference from all distractors 86 H 2 N E Change stem to read Which one of the following identifies the correct Technical Specification Condition, Required Action and Completion Time Modified Stem 87 H 4 N E 1. A - assessing water level in Plenum region with PZR level at 10% not plausible. Also, why would you transition to FR-5? Modified distractor A

2. Explanation for B not correct. Revised explanation and included reference. Removed ref pertaining to SITs.
3. . Answers as written dont flow from stems question of what the CRSs top priority would be. Revised stem and format of distractors
1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 88 H 1 X X B U 1. Distractor C marginally plausible. Changed to Mode 3 in 6 hrs.

2009 3 S 2. Would failure of one Matrix Channel cause an inadvertent SI? No-revised stem.

3. Stem question needs rewording - failure of a channel doesnt impact TSs. Fixed
4. Is Explanation for A correct? Procedure should be 13-6, not 13-7.
5. From Tech Refs on Worksheet: why is SO23-13-17, step 5 applicable? Removed step 5, added LCO 3.3.5.

89 H 2 X B E Distractor A is not plausible - if Turbine Inlet Steam Supply was disabled, pump could not trip on overspeed. Changed procedure entry in distractors A and B and rearranged for length 90 H 3 X B U 1. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Tech Specs are considered RO knowledge. Replaced question N S

2. No ref that shows effect of Relay K-1 and control power. Replaced question 91 H 3 M E 1. What defines small vs large oscillations? Could affect Distractor B if its not procedurally defined. Modified stem
2. Add procedure SO23-5-1.7, Power Operations, to the stem. Done
3. What is the significance of MOC? None - removed from stem
4. Explanations for A and C are incorrect regarding use of PLCEAs or GR6 rods. All explanations should address both parts of the question. Revised all explanations.

92 H 2 X B U 1. Since this question is written in 4X4 format, it can be answered by only knowing 1/2 of the correct answer. Therefore no knowledge of S

procedures is required. Revised all distractors

2. Where in SO23-5-1.7 does it explain the effect of a neg ITC?

Added ref for ITC

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 93 H 2 X X B U 1. Is there anything in the stem that might indicate that there might be plenum or tube voiding? What is the max core delta T allowed during N S natural circ?

2. Dont need to know second part to answer the question since first part is unique for all distracters.
3. Is Reactor Vessel Head level the same as Reactor Vessel level?

When is level in the Plenum?

4. In the stem, should ask for action(s) and then the reason for the actions.
5. For B - per FS-10, is the response for SG tube voiding to steam the affected generator (thus increasing the cooldown rate)?
6. For B - where in SO23-12-11, Attach 3, is direction given to reduce cooldown rate and increase safety injection flow?
7. For D - should the second column of SO23-12-11, Attach 5, be highlighted instead of the third column (for the direction given to raise steaming and feeding rates)?

Replaced question 94 H 2 N E 1. Stem asks for requirements regarding the Shift Composition and required action answers are only required answers. Revised stem

2. For the 4th bullet - change to 2 hrs remaining on shift. Done Replaced distractor B 95 H 3 B E 1. Explanation for C - is it also incorrect since Condition D is only applicable during Modes 5 and 6? Modified plausibility statement
2. Explanation for D is also in error. Modified plausibility statement
3. For Distracter A - why is it plausible to place the Unit in Mode 2?

Changed MODE in distractor A 96 F 2 B E For B - only if dual redundant components are available? Also, not sure can perform the protected components function is correct.

Modified distractor B 97 F 3 B S 98 F 3 B E In the stem - capitalized DOSE EQUIVALENT and changed 1 to 1.0

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 99 H 3 B E 1. Distractor D doesnt address Unit 3.

2. For C - doesnt specify whether a Mode change is considered like A and B.

Modified wording in Stem (removed spuriously). Removed Unit 3 actions from all distractors.

100 H 3 B E Modified all distractors with procedure references and added reference for Step 8.c.

Comments:

1. Bank - 13 (52%), New - 8 (32%), Modified - 4 (16%).
2. LOK: H - 20 (80%), F - 5 (20%).
3. LOD: 2.76 average
4. Questions from last two NRC exams: 2