{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 July 14, 2016 Mr. Bryan C. Hanson Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUBJECT: BYRON STATION, UNITS 1 AND 2 NOTIFICATION OF AN NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION; INSPECTION REPORT 05000454/2016004; 05000455/2016004 Dear Mr. Hanson: On October 24, 2016, the U.S. Nuclear Regulatory Commission (NRC) will begin the onsite portion of the Triennial Heat Sink Performance Inspection at your Byron Station, Units 1 and 2. This inspection will be performed in accordance with NRC baseline Inspection Procedure 71111.07. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a request for documents needed for the inspection. The documents have been divided into three groups. The first group lists information necessary for our initial inspection scoping activities. This information should be available to the lead inspector no later than August 30, 2016. By September 9, 2016, the inspector will communicate the initial selected set of approximately 1 2 risk-significant heat exchangers. The second group is needed to support our in-office preparation activities. This set of documents, including the calculations associated with the selected heat exchangers, should be available at the Regional Office no later than October 13, 2016. This information should be separated for each selected component, especially if provided electronically (e.g., folder with component name that includes calculations, condition reports, maintenance history, etc). During the in-office preparation activities, the inspector may identify additional information needed to support the inspection. The last group includes the additional information above as well as plant specific reference material. This information should be available onsite to the inspector on October 24, 2016. It is also requested that corrective action documents and/or questions developed during the inspection be provided to the inspector as the documents are generated. All requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous Heat Sink Performance Inspection. If no activities were accomplished in that time period, then the request applies to the last applicable document in the previous time period. It is important that these documents be as complete as possible, in order to minimize the number of documents requested during the preparation week or during the onsite inspection.
{{#Wiki_filter:UNITED STATES
B. Hanson -2- The lead inspector for this inspection is Mr. Andrew Dunlop. We understand that our licensing contact for this inspection is Ms. L. Zurawski of your organization. If there are any questions about the inspection or the material requested in the enclosure, please contact the lead inspector at 630-829-9726, or via e-mail at Andrew.Dunlop@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.   In accordance with Title 10 of the Code of Federal Regulations of this letter and its enclosure will be available electronically for public inspection in the NRPublic Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, /RA/   Andrew Dunlop, Senior Reactor Engineer Engineering Branch 2 Division of Reactor Safety Docket Nos. 50454; 50455 License Nos. NPF37; NPF66 Enclosure:  Triennial Heat Sink Performance Inspection   Document Request cc: Distribution via LISTSERV  
                            NUCLEAR REGULATORY COMMISSION
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST Enclosure Inspection Report: 05000454/2016004; 05000455/2016004 Inspection Dates: October 24 28, 2016; Inspection Procedure: IP Lead Inspector: Andrew Dunlop, DRS 630-829-9726 Andrew.Dunlop@nrc.gov I. Information Requested By August 30, 2016: 1. List of the Generic Letter (GL) 89-cting Safety-Related heat exchangers in order of risk significance. 2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat exchanger. 3. List of Corrective Action Program documents (with a short description) associated with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, or heat exchanger testing, for the previous 3 years. 4. Copy of any self-assessment done on any of GL 89-13 heat exchangers. 5. Last two System Health Report(s) and maintenance rule system notebooks for all the GL 89-13 heat exchangers. 6. List of engineering-related operator workarounds (with a short description) associated with GL 89-13 heat exchangers that were in place within the last 3 years.   7. List of permanent and temporary modifications (with a short description) associated with GL 89-13 heat exchangers for the last 3 years.   II. Information Requested By October 13, 2016: 1. Copies of the GL 89-13 responses. 2. Copy of the Updated Final Safety Analysis Report (UFSAR) section applicable to the GL 89-13 Heat Exchanger Program. 3. Copies of procedures developed to implement the recommendations of GL 89-13 (e.g. the GL 89-13 Heat Exchanger Program description). 4. Copies of the selected Corrective Action Program documents. 5. For the specific heat exchangers selected: a. Copies of the UFSAR sections applicable for each heat exchanger.
                                                REGION III
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST 2 b. Copy of system description and design basis document for the heat exchangers (as applicable). c. Provide a list of calculations (with a short description) which currently apply to each heat exchanger. i. establish the limiting design basis heat load required to be removed by each of these heat exchangers; ii. demonstrate the heat exchangers capacity to remove the limiting heat load; iii. correlate surveillance testing and/or inspection results from these heat exchangers with design basis heat removal capability (e.g., basis for surveillance test and/or inspection acceptance criteria); iv. evaluate the potential for water hammer in each heat exchanger or associated piping; and v. evaluate excessive tube vibration in each heat exchanger. d. Copy of any operability determinations or other documentation of degradation associated with the heat exchangers or the systems that support the operation for the selected heat exchangers. e. Copy of the construction code, Design Specification, heat exchanger data sheets, and vendor documents including component drawings applicable for the heat exchangers. f. Copies of normal, abnormal, and emergency operating procedures associated with the selected heat exchangers. 6. For the Ultimate Heat Sink (UHS) and the safety-related service water system (or equivalent): a. Copies of the applicable Updated Final Safety Analysis Report (UFSAR) sections. b. Copy of system description and design basis document (as applicable). c. Copy of any operability determinations or other documentation of degradation associated with the UHS and the safety-related service water system. d. Copy of the document (e.g., UFSAR or Technical Requirements Manual) that states the maximum cooling water system inlet temperature limit that still allows full licensed power operation of the nuclear reactor.   e. Copy of system description and design basis document (as applicable). f. Copy of the construction code and Design Specification.
                                    2443 WARRENVILLE RD. SUITE 210
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST 3 g. Copies of normal, abnormal, and emergency operating procedures associated with the UHS and safety-related service water systems including procedures for loss of these systems. h. Copies of corrective action documents associated with waterhammer or hydraulic transients in the service water system since the last Heat Sink Inspection. i. If available, provide an electronic copy of piping and instrumentation diagrams for the service water system, including the intake structure. j. Provide a list of calculations (with a short description), which currently apply to UHS and safety-related service water system. k. Provide a list of instruments (with a short description) associated with automatic or alarm functions for the safety-related service water system and/or UHS. l. Provide a list of any design change (with a short description) performed on the UHS or safety-related service water system since the last heat sink performance inspection. 7. A schedule of all inspections, cleanings, maintenance, or testing of any safety-related plant heat exchanger to be performed during the on-site portion of the inspection. III. Information Requested to be Available on First Day of Inspection, October 24, 2016: 1. For the specific heat exchangers selected. a. Copy of the calculation which correlates surveillance testing results from these heat exchangers with design basis heat removal capability (e.g., basis for surveillance test acceptance criteria b. Copies of the two most recent completed tests and evaluation data confirming thermal performance for those heat exchangers which are performance tested.   c. Documentation and procedures that identify the types, accuracy, and location of any special instrumentation used for the two most recently completed thermal performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow instruments or temperature instruments). Include calibration records for the instruments used during these tests.   d. Information regarding any alarms which monitor on-line performance.   e. Copy of the document describing the inspection results of each heat exchanger.     f. The cleaning and inspection maintenance schedule for each heat exchanger for the next 5 years.   g. Copy of the design specification and heat exchanger data sheets for each heat exchanger.   h. Copy of the vendor manuals including component drawings for each heat exchanger.  
                                          LISLE, IL 60532-4352
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST 4 i. Copy of the calculation which establishes the limiting (maximum) design basis heat load which is required to be removed by each of these heat exchangers.   j. Copy of the operating procedure that ensures that the maximum cooling water system inlet temperature limit is not exceeded.   k. Copy of the calculations or documents which evaluate the potential for water hammer in each heat exchanger or associated piping.   l. Copy of the calculations that evaluate excessive tube vibration in each heat exchanger and the documents that describe the controls that prevent heat exchanger degradation due to excessive flow induced vibration during operation.   m. Copy of the periodic flow testing at or near maximum design flow.    n. Copy of the document which identifies the current number of tubes in service for each heat exchanger and the supporting calculation which establishes the maximum number of tubes which can be plugged in each heat exchanger.   o. Copy of the document establishing the repair criteria (plugging limit) for degraded tubes which are identified in each heat exchanger.   p. Copies of the documents that verify the structural integrity of the heat exchanger (e.g. eddy current summary sheets, ultrasonic testing results, and visual inspection results).   q. Copies of those documents that describe the methods taken to control water chemistry in the heat exchangers.   2. For the review of the operation of the safety-related service water system (or equivalent) and the UHS: a. Copies of any design change performed on the UHS in last 3 years. b. Copies of any design change performed on the safety-related service water system in last 3 years.    c. Copies of procedures for a loss of UHS.   d. Copies of procedures for a loss of service water system.   e. Inspections and/or maintenance related to preventing macrofouling (e.g., silt, dead mussel shells, or debris) and biotic fouling (e.g., fish, algae, grass, or kelp) in last 3 years. f. Copies of chemistry procedures that monitor for pH, calcium hardness, etc. Also, provide copies of the associated results for the last 3 years. g. Copies of documents associated with the monitoring of pump performance for potential strong-pump vs. weak-pump interaction.  
                                            July 14, 2016
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST 5 3. For the review associated with the system walkdown of the service water intake structure: a. Copies of corrective maintenance for the last 6 years associated with service water strainers, traveling screens and trash racks.   b. Copies of the last two inspections and/or surveillances associated with service water strainers, traveling screens and trash racks.   c. List of preventive maintenance, including frequency, associated with service water strainers, traveling screens and trash racks.   d. Copies of abnormal procedures for the traveling screens and service water strainers. e. Copies of the last two inspections and/or surveillances documenting that component mounts have not excessively degraded (i.e., due to corrosion). For example, inspections for the mounts for the, Service water pumps, service water strainers, traveling screens and trash racks.   f. Copies of the documents associated with the monitoring, trending, and remediation of silt accumulation at the service water pump bay.   g. Copies of surveillance procedures and testing results for the last performed on the service water pump bay water level instruments.     h. Copies of procedures associated with operating during adverse weather conditions (e.g., icing, high-temperatures, or low-level).   i. Copy of the evaluation for the potential effects of low-flow/level on underwater weir walls intended to limit silt or sand intake, if applicable.   If the information requested above will not be available, please contact Mr. Andrew Dunlop as soon as possible at 630-829-9726, or via e-mail Andrew.Dunlop@nrc.gov.  
Mr. Bryan C. Hanson
  B. Hanson -2- The lead inspector for this inspection is Mr. Andrew Dunlop. We understand that our licensing contact for this inspection is Ms. L. Zurawski of your organization. If there are any questions about the inspection or the material requested in the enclosure, please contact the lead inspector at 630-829-9726, or via e-mail at Andrew.Dunlop@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.   In accordance with Title 10 of the Code of Federal Regulations of this letter and Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, /RA/ Andrew Dunlop, Senior Reactor Engineer Engineering Branch 2 Division of Reactor Safety Docket Nos. 50454; 50455 License Nos. NPF37; NPF66 Enclosure:  Triennial Heat Sink Performance Inspection   Document Request cc: Distribution via LISTSERV DISTRIBUTION: Jeremy Bowen RidsNrrDorlLpl3-2 Resource RidsNrrPMByron Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII  ADAMS Accession Number ML16196A110 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME ADunlop:cl    DATE 07/14/16   OFFICIAL RECORD
Senior VP, Exelon Generation Company, LLC
President and CNO, Exelon Nuclear
4300 Winfield Road
Warrenville, IL 60555
SUBJECT: BYRON STATION, UNITS 1 AND 2 - NOTIFICATION OF AN NRC TRIENNIAL
              HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION;
              INSPECTION REPORT 05000454/2016004; 05000455/2016004
Dear Mr. Hanson:
On October 24, 2016, the U.S. Nuclear Regulatory Commission (NRC) will begin the onsite portion
of the Triennial Heat Sink Performance Inspection at your Byron Station, Units 1 and 2. This
inspection will be performed in accordance with NRC baseline Inspection Procedure 71111.07.
In order to minimize the impact that the inspection has on the site and to ensure a productive
inspection, we have enclosed a request for documents needed for the inspection. The
documents have been divided into three groups.
The first group lists information necessary for our initial inspection scoping activities. This
information should be available to the lead inspector no later than August 30, 2016. By
September 9, 2016, the inspector will communicate the initial selected set of approximately
1 - 2 risk-significant heat exchangers.
The second group is needed to support our in-office preparation activities. This set of
documents, including the calculations associated with the selected heat exchangers, should be
available at the Regional Office no later than October 13, 2016. This information should be
separated for each selected component, especially if provided electronically (e.g., folder with
component name that includes calculations, condition reports, maintenance history, etc).
During the in-office preparation activities, the inspector may identify additional information
needed to support the inspection.
The last group includes the additional information above as well as plant specific reference
material. This information should be available onsite to the inspector on October 24, 2016.
It is also requested that corrective action documents and/or questions developed during the
inspection be provided to the inspector as the documents are generated.
All requested documents are to be for the time period from the onsite inspection period back
to the documents that were provided in response to the previous Heat Sink Performance
Inspection. If no activities were accomplished in that time period, then the request applies to
the last applicable document in the previous time period. It is important that these documents
be as complete as possible, in order to minimize the number of documents requested during
the preparation week or during the onsite inspection.
 
B. Hanson                                       -2-
The lead inspector for this inspection is Mr. Andrew Dunlop. We understand that our licensing
contact for this inspection is Ms. L. Zurawski of your organization. If there are any questions
about the inspection or the material requested in the enclosure, please contact the lead
inspector at 630-829-9726, or via e-mail at Andrew.Dunlop@nrc.gov.
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, Control
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required
to respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget Control
Number.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
of this letter and its enclosure will be available electronically for public inspection in the NRCs
Public Document Room or from the Publicly Available Records (PARS) component of the NRC's
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible
from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic
Reading Room).
                                                Sincerely,
                                                /RA/
                                                Andrew Dunlop, Senior Reactor Engineer
                                                Engineering Branch 2
                                                Division of Reactor Safety
Docket Nos. 50-454; 50-455
License Nos. NPF-37; NPF-66
Enclosure:
   Triennial Heat Sink Performance Inspection
    Document Request
cc: Distribution via LISTSERV
 
      TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
Inspection Report:           05000454/2016004; 05000455/2016004
Inspection Dates:             October 24 - 28, 2016;
Inspection Procedure:         IP 71111.07, Heat Sink Performance
Lead Inspector:               Andrew Dunlop, DRS
                              630-829-9726
                              Andrew.Dunlop@nrc.gov
I.     Information Requested By August 30, 2016:
      1. List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting
          Safety-Related Equipment, heat exchangers in order of risk significance.
      2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat
          exchanger.
      3. List of Corrective Action Program documents (with a short description) associated
          with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, or heat
          exchanger testing, for the previous 3 years.
      4. Copy of any self-assessment done on any of GL 89-13 heat exchangers.
      5. Last two System Health Report(s) and maintenance rule system notebooks for all the
          GL 89-13 heat exchangers.
      6. List of engineering-related operator workarounds (with a short description)
          associated with GL 89-13 heat exchangers that were in place within the last 3 years.
      7. List of permanent and temporary modifications (with a short description) associated
          with GL 89-13 heat exchangers for the last 3 years.
II.   Information Requested By October 13, 2016:
      1. Copies of the GL 89-13 responses.
      2. Copy of the Updated Final Safety Analysis Report (UFSAR) section applicable to the
          GL 89-13 Heat Exchanger Program.
      3. Copies of procedures developed to implement the recommendations of GL 89-13
          (e.g. the GL 89-13 Heat Exchanger Program description).
      4. Copies of the selected Corrective Action Program documents.
      5. For the specific heat exchangers selected:
          a. Copies of the UFSAR sections applicable for each heat exchanger.
                                                                                        Enclosure
 
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
    b. Copy of system description and design basis document for the heat exchangers
        (as applicable).
    c. Provide a list of calculations (with a short description) which currently apply to
        each heat exchanger.
              i. establish the limiting design basis heat load required to be removed by
                  each of these heat exchangers;
              ii. demonstrate the heat exchangers capacity to remove the limiting heat
                  load;
            iii. correlate surveillance testing and/or inspection results from these heat
                  exchangers with design basis heat removal capability (e.g., basis for
                  surveillance test and/or inspection acceptance criteria);
            iv. evaluate the potential for water hammer in each heat exchanger or
                  associated piping; and
              v. evaluate excessive tube vibration in each heat exchanger.
    d. Copy of any operability determinations or other documentation of degradation
        associated with the heat exchangers or the systems that support the operation
        for the selected heat exchangers.
    e. Copy of the construction code, Design Specification, heat exchanger data
        sheets, and vendor documents including component drawings applicable for the
        heat exchangers.
    f. Copies of normal, abnormal, and emergency operating procedures associated
        with the selected heat exchangers.
6. For the Ultimate Heat Sink (UHS) and the safety-related service water system
    (or equivalent):
    a. Copies of the applicable Updated Final Safety Analysis Report (UFSAR)
        sections.
    b. Copy of system description and design basis document (as applicable).
    c. Copy of any operability determinations or other documentation of degradation
        associated with the UHS and the safety-related service water system.
    d. Copy of the document (e.g., UFSAR or Technical Requirements Manual) that
        states the maximum cooling water system inlet temperature limit that still allows
        full licensed power operation of the nuclear reactor.
    e. Copy of system description and design basis document (as applicable).
    f. Copy of the construction code and Design Specification.
                                            2
 
    TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
          g. Copies of normal, abnormal, and emergency operating procedures associated
              with the UHS and safety-related service water systems including procedures for
              loss of these systems.
          h. Copies of corrective action documents associated with waterhammer or hydraulic
              transients in the service water system since the last Heat Sink Inspection.
          i. If available, provide an electronic copy of piping and instrumentation diagrams for
              the service water system, including the intake structure.
          j. Provide a list of calculations (with a short description), which currently apply to
              UHS and safety-related service water system.
          k. Provide a list of instruments (with a short description) associated with automatic
              or alarm functions for the safety-related service water system and/or UHS.
          l. Provide a list of any design change (with a short description) performed on the
              UHS or safety-related service water system since the last heat sink performance
              inspection.
      7. A schedule of all inspections, cleanings, maintenance, or testing of any safety-related
          plant heat exchanger to be performed during the on-site portion of the inspection.
III. Information Requested to be Available on First Day of Inspection, October 24, 2016:
      1. For the specific heat exchangers selected.
          a. Copy of the calculation which correlates surveillance testing results from these
              heat exchangers with design basis heat removal capability (e.g., basis for
              surveillance test acceptance criteria
          b. Copies of the two most recent completed tests and evaluation data confirming
              thermal performance for those heat exchangers which are performance tested.
          c. Documentation and procedures that identify the types, accuracy, and location of
              any special instrumentation used for the two most recently completed thermal
              performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow
              instruments or temperature instruments). Include calibration records for the
              instruments used during these tests.
          d. Information regarding any alarms which monitor on-line performance.
          e. Copy of the document describing the inspection results of each heat exchanger.
          f. The cleaning and inspection maintenance schedule for each heat exchanger for
              the next 5 years.
          g. Copy of the design specification and heat exchanger data sheets for each heat
              exchanger.
          h. Copy of the vendor manuals including component drawings for each heat
              exchanger.
                                                  3
 
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
    i. Copy of the calculation which establishes the limiting (maximum) design basis
        heat load which is required to be removed by each of these heat exchangers.
    j. Copy of the operating procedure that ensures that the maximum cooling water
        system inlet temperature limit is not exceeded.
    k. Copy of the calculations or documents which evaluate the potential for water
        hammer in each heat exchanger or associated piping.
    l. Copy of the calculations that evaluate excessive tube vibration in each heat
        exchanger and the documents that describe the controls that prevent heat
        exchanger degradation due to excessive flow induced vibration during operation.
    m. Copy of the periodic flow testing at or near maximum design flow.
     n. Copy of the document which identifies the current number of tubes in service for
        each heat exchanger and the supporting calculation which establishes the
        maximum number of tubes which can be plugged in each heat exchanger.
    o. Copy of the document establishing the repair criteria (plugging limit) for degraded
        tubes which are identified in each heat exchanger.
    p. Copies of the documents that verify the structural integrity of the heat exchanger
        (e.g. eddy current summary sheets, ultrasonic testing results, and visual
        inspection results).
    q. Copies of those documents that describe the methods taken to control water
        chemistry in the heat exchangers.
2. For the review of the operation of the safety-related service water system
    (or equivalent) and the UHS:
    a. Copies of any design change performed on the UHS in last 3 years.
    b. Copies of any design change performed on the safety-related service water
        system in last 3 years.
     c. Copies of procedures for a loss of UHS.
    d. Copies of procedures for a loss of service water system.
    e. Inspections and/or maintenance related to preventing macrofouling (e.g., silt,
        dead mussel shells, or debris) and biotic fouling (e.g., fish, algae, grass, or kelp)
        in last 3 years.
    f. Copies of chemistry procedures that monitor for pH, calcium hardness, etc.
        Also, provide copies of the associated results for the last 3 years.
    g. Copies of documents associated with the monitoring of pump performance for
        potential strong-pump vs. weak-pump interaction.
                                          4
 
        TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
        3. For the review associated with the system walkdown of the service water intake
            structure:
            a. Copies of corrective maintenance for the last 6 years associated with service
                water strainers, traveling screens and trash racks.
            b. Copies of the last two inspections and/or surveillances associated with service
                water strainers, traveling screens and trash racks.
            c. List of preventive maintenance, including frequency, associated with service
                water strainers, traveling screens and trash racks.
            d. Copies of abnormal procedures for the traveling screens and service water
                strainers.
            e. Copies of the last two inspections and/or surveillances documenting that
                component mounts have not excessively degraded (i.e., due to corrosion). For
                example, inspections for the mounts for the, Service water pumps, service water
                strainers, traveling screens and trash racks.
            f. Copies of the documents associated with the monitoring, trending, and
                remediation of silt accumulation at the service water pump bay.
            g. Copies of surveillance procedures and testing results for the last performed on
                the service water pump bay water level instruments.
            h. Copies of procedures associated with operating during adverse weather
                conditions (e.g., icing, high-temperatures, or low-level).
            i. Copy of the evaluation for the potential effects of low-flow/level on underwater
                weir walls intended to limit silt or sand intake, if applicable.
If the information requested above will not be available, please contact Mr. Andrew Dunlop as
soon as possible at 630-829-9726, or via e-mail Andrew.Dunlop@nrc.gov.
                                                      5
 
B. Hanson                                                                 -2-
The lead inspector for this inspection is Mr. Andrew Dunlop. We understand that our licensing
contact for this inspection is Ms. L. Zurawski of your organization. If there are any questions
about the inspection or the material requested in the enclosure, please contact the lead
inspector at 630-829-9726, or via e-mail at Andrew.Dunlop@nrc.gov.
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, Control
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required
to respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget Control
Number.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
of this letter and its enclosure will be available electronically for public inspection in the NRCs
Public Document Room or from the Publicly Available Records (PARS) component of the NRC's
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible
from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic
Reading Room).
                                                                          Sincerely,
                                                                          /RA/
                                                                          Andrew Dunlop, Senior Reactor Engineer
                                                                          Engineering Branch 2
                                                                          Division of Reactor Safety
Docket Nos. 50-454; 50-455
License Nos. NPF-37; NPF-66
Enclosure:
   Triennial Heat Sink Performance Inspection
    Document Request
cc: Distribution via LISTSERV
DISTRIBUTION:                                             Cynthia Pederson                                        Linda Linn
Jeremy Bowen                                               Darrell Roberts                                          DRPIII
RidsNrrDorlLpl3-2 Resource                                 Richard Skokowski                                        DRSIII
RidsNrrPMByron Resource                                   Allan Barker
RidsNrrDirsIrib Resource                                   Carole Ariano
ADAMS Accession Number ML16196A110
    Publicly Available                       Non-Publicly Available                       Sensitive                 Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
  OFFICE             RIII                                 RIII                           RIII                               RIII
  NAME               ADunlop:cl
   DATE               07/14/16
                                                                OFFICIAL RECORD
}}
}}

Latest revision as of 16:50, 30 October 2019

Notification of NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000454/2016004; 05000455/2016004
ML16196A110
Person / Time
Site: Byron  Constellation icon.png
Issue date: 07/14/2016
From: Dunlop A
NRC/RGN-III/DRS/EB2
To: Bryan Hanson
Exelon Generation Co
References
IR 2016004
Download: ML16196A110 (8)


See also: IR 05000454/2016004

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, IL 60532-4352

July 14, 2016

Mr. Bryan C. Hanson

Senior VP, Exelon Generation Company, LLC

President and CNO, Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: BYRON STATION, UNITS 1 AND 2 - NOTIFICATION OF AN NRC TRIENNIAL

HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION;

INSPECTION REPORT 05000454/2016004; 05000455/2016004

Dear Mr. Hanson:

On October 24, 2016, the U.S. Nuclear Regulatory Commission (NRC) will begin the onsite portion

of the Triennial Heat Sink Performance Inspection at your Byron Station, Units 1 and 2. This

inspection will be performed in accordance with NRC baseline Inspection Procedure 71111.07.

In order to minimize the impact that the inspection has on the site and to ensure a productive

inspection, we have enclosed a request for documents needed for the inspection. The

documents have been divided into three groups.

The first group lists information necessary for our initial inspection scoping activities. This

information should be available to the lead inspector no later than August 30, 2016. By

September 9, 2016, the inspector will communicate the initial selected set of approximately

1 - 2 risk-significant heat exchangers.

The second group is needed to support our in-office preparation activities. This set of

documents, including the calculations associated with the selected heat exchangers, should be

available at the Regional Office no later than October 13, 2016. This information should be

separated for each selected component, especially if provided electronically (e.g., folder with

component name that includes calculations, condition reports, maintenance history, etc).

During the in-office preparation activities, the inspector may identify additional information

needed to support the inspection.

The last group includes the additional information above as well as plant specific reference

material. This information should be available onsite to the inspector on October 24, 2016.

It is also requested that corrective action documents and/or questions developed during the

inspection be provided to the inspector as the documents are generated.

All requested documents are to be for the time period from the onsite inspection period back

to the documents that were provided in response to the previous Heat Sink Performance

Inspection. If no activities were accomplished in that time period, then the request applies to

the last applicable document in the previous time period. It is important that these documents

be as complete as possible, in order to minimize the number of documents requested during

the preparation week or during the onsite inspection.

B. Hanson -2-

The lead inspector for this inspection is Mr. Andrew Dunlop. We understand that our licensing

contact for this inspection is Ms. L. Zurawski of your organization. If there are any questions

about the inspection or the material requested in the enclosure, please contact the lead

inspector at 630-829-9726, or via e-mail at Andrew.Dunlop@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required

to respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy

of this letter and its enclosure will be available electronically for public inspection in the NRCs

Public Document Room or from the Publicly Available Records (PARS) component of the NRC's

Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible

from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic

Reading Room).

Sincerely,

/RA/

Andrew Dunlop, Senior Reactor Engineer

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-454; 50-455

License Nos. NPF-37; NPF-66

Enclosure:

Triennial Heat Sink Performance Inspection

Document Request

cc: Distribution via LISTSERV

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

Inspection Report: 05000454/2016004; 05000455/2016004

Inspection Dates: October 24 - 28, 2016;

Inspection Procedure: IP 71111.07, Heat Sink Performance

Lead Inspector: Andrew Dunlop, DRS

630-829-9726

Andrew.Dunlop@nrc.gov

I. Information Requested By August 30, 2016:

1. List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting

Safety-Related Equipment, heat exchangers in order of risk significance.

2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat

exchanger.

3. List of Corrective Action Program documents (with a short description) associated

with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, or heat

exchanger testing, for the previous 3 years.

4. Copy of any self-assessment done on any of GL 89-13 heat exchangers.

5. Last two System Health Report(s) and maintenance rule system notebooks for all the

GL 89-13 heat exchangers.

6. List of engineering-related operator workarounds (with a short description)

associated with GL 89-13 heat exchangers that were in place within the last 3 years.

7. List of permanent and temporary modifications (with a short description) associated

with GL 89-13 heat exchangers for the last 3 years.

II. Information Requested By October 13, 2016:

1. Copies of the GL 89-13 responses.

2. Copy of the Updated Final Safety Analysis Report (UFSAR) section applicable to the

GL 89-13 Heat Exchanger Program.

3. Copies of procedures developed to implement the recommendations of GL 89-13

(e.g. the GL 89-13 Heat Exchanger Program description).

4. Copies of the selected Corrective Action Program documents.

5. For the specific heat exchangers selected:

a. Copies of the UFSAR sections applicable for each heat exchanger.

Enclosure

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

b. Copy of system description and design basis document for the heat exchangers

(as applicable).

c. Provide a list of calculations (with a short description) which currently apply to

each heat exchanger.

i. establish the limiting design basis heat load required to be removed by

each of these heat exchangers;

ii. demonstrate the heat exchangers capacity to remove the limiting heat

load;

iii. correlate surveillance testing and/or inspection results from these heat

exchangers with design basis heat removal capability (e.g., basis for

surveillance test and/or inspection acceptance criteria);

iv. evaluate the potential for water hammer in each heat exchanger or

associated piping; and

v. evaluate excessive tube vibration in each heat exchanger.

d. Copy of any operability determinations or other documentation of degradation

associated with the heat exchangers or the systems that support the operation

for the selected heat exchangers.

e. Copy of the construction code, Design Specification, heat exchanger data

sheets, and vendor documents including component drawings applicable for the

heat exchangers.

f. Copies of normal, abnormal, and emergency operating procedures associated

with the selected heat exchangers.

6. For the Ultimate Heat Sink (UHS) and the safety-related service water system

(or equivalent):

a. Copies of the applicable Updated Final Safety Analysis Report (UFSAR)

sections.

b. Copy of system description and design basis document (as applicable).

c. Copy of any operability determinations or other documentation of degradation

associated with the UHS and the safety-related service water system.

d. Copy of the document (e.g., UFSAR or Technical Requirements Manual) that

states the maximum cooling water system inlet temperature limit that still allows

full licensed power operation of the nuclear reactor.

e. Copy of system description and design basis document (as applicable).

f. Copy of the construction code and Design Specification.

2

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

g. Copies of normal, abnormal, and emergency operating procedures associated

with the UHS and safety-related service water systems including procedures for

loss of these systems.

h. Copies of corrective action documents associated with waterhammer or hydraulic

transients in the service water system since the last Heat Sink Inspection.

i. If available, provide an electronic copy of piping and instrumentation diagrams for

the service water system, including the intake structure.

j. Provide a list of calculations (with a short description), which currently apply to

UHS and safety-related service water system.

k. Provide a list of instruments (with a short description) associated with automatic

or alarm functions for the safety-related service water system and/or UHS.

l. Provide a list of any design change (with a short description) performed on the

UHS or safety-related service water system since the last heat sink performance

inspection.

7. A schedule of all inspections, cleanings, maintenance, or testing of any safety-related

plant heat exchanger to be performed during the on-site portion of the inspection.

III. Information Requested to be Available on First Day of Inspection, October 24, 2016:

1. For the specific heat exchangers selected.

a. Copy of the calculation which correlates surveillance testing results from these

heat exchangers with design basis heat removal capability (e.g., basis for

surveillance test acceptance criteria

b. Copies of the two most recent completed tests and evaluation data confirming

thermal performance for those heat exchangers which are performance tested.

c. Documentation and procedures that identify the types, accuracy, and location of

any special instrumentation used for the two most recently completed thermal

performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow

instruments or temperature instruments). Include calibration records for the

instruments used during these tests.

d. Information regarding any alarms which monitor on-line performance.

e. Copy of the document describing the inspection results of each heat exchanger.

f. The cleaning and inspection maintenance schedule for each heat exchanger for

the next 5 years.

g. Copy of the design specification and heat exchanger data sheets for each heat

exchanger.

h. Copy of the vendor manuals including component drawings for each heat

exchanger.

3

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

i. Copy of the calculation which establishes the limiting (maximum) design basis

heat load which is required to be removed by each of these heat exchangers.

j. Copy of the operating procedure that ensures that the maximum cooling water

system inlet temperature limit is not exceeded.

k. Copy of the calculations or documents which evaluate the potential for water

hammer in each heat exchanger or associated piping.

l. Copy of the calculations that evaluate excessive tube vibration in each heat

exchanger and the documents that describe the controls that prevent heat

exchanger degradation due to excessive flow induced vibration during operation.

m. Copy of the periodic flow testing at or near maximum design flow.

n. Copy of the document which identifies the current number of tubes in service for

each heat exchanger and the supporting calculation which establishes the

maximum number of tubes which can be plugged in each heat exchanger.

o. Copy of the document establishing the repair criteria (plugging limit) for degraded

tubes which are identified in each heat exchanger.

p. Copies of the documents that verify the structural integrity of the heat exchanger

(e.g. eddy current summary sheets, ultrasonic testing results, and visual

inspection results).

q. Copies of those documents that describe the methods taken to control water

chemistry in the heat exchangers.

2. For the review of the operation of the safety-related service water system

(or equivalent) and the UHS:

a. Copies of any design change performed on the UHS in last 3 years.

b. Copies of any design change performed on the safety-related service water

system in last 3 years.

c. Copies of procedures for a loss of UHS.

d. Copies of procedures for a loss of service water system.

e. Inspections and/or maintenance related to preventing macrofouling (e.g., silt,

dead mussel shells, or debris) and biotic fouling (e.g., fish, algae, grass, or kelp)

in last 3 years.

f. Copies of chemistry procedures that monitor for pH, calcium hardness, etc.

Also, provide copies of the associated results for the last 3 years.

g. Copies of documents associated with the monitoring of pump performance for

potential strong-pump vs. weak-pump interaction.

4

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

3. For the review associated with the system walkdown of the service water intake

structure:

a. Copies of corrective maintenance for the last 6 years associated with service

water strainers, traveling screens and trash racks.

b. Copies of the last two inspections and/or surveillances associated with service

water strainers, traveling screens and trash racks.

c. List of preventive maintenance, including frequency, associated with service

water strainers, traveling screens and trash racks.

d. Copies of abnormal procedures for the traveling screens and service water

strainers.

e. Copies of the last two inspections and/or surveillances documenting that

component mounts have not excessively degraded (i.e., due to corrosion). For

example, inspections for the mounts for the, Service water pumps, service water

strainers, traveling screens and trash racks.

f. Copies of the documents associated with the monitoring, trending, and

remediation of silt accumulation at the service water pump bay.

g. Copies of surveillance procedures and testing results for the last performed on

the service water pump bay water level instruments.

h. Copies of procedures associated with operating during adverse weather

conditions (e.g., icing, high-temperatures, or low-level).

i. Copy of the evaluation for the potential effects of low-flow/level on underwater

weir walls intended to limit silt or sand intake, if applicable.

If the information requested above will not be available, please contact Mr. Andrew Dunlop as

soon as possible at 630-829-9726, or via e-mail Andrew.Dunlop@nrc.gov.

5

B. Hanson -2-

The lead inspector for this inspection is Mr. Andrew Dunlop. We understand that our licensing

contact for this inspection is Ms. L. Zurawski of your organization. If there are any questions

about the inspection or the material requested in the enclosure, please contact the lead

inspector at 630-829-9726, or via e-mail at Andrew.Dunlop@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required

to respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy

of this letter and its enclosure will be available electronically for public inspection in the NRCs

Public Document Room or from the Publicly Available Records (PARS) component of the NRC's

Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible

from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic

Reading Room).

Sincerely,

/RA/

Andrew Dunlop, Senior Reactor Engineer

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-454; 50-455

License Nos. NPF-37; NPF-66

Enclosure:

Triennial Heat Sink Performance Inspection

Document Request

cc: Distribution via LISTSERV

DISTRIBUTION: Cynthia Pederson Linda Linn

Jeremy Bowen Darrell Roberts DRPIII

RidsNrrDorlLpl3-2 Resource Richard Skokowski DRSIII

RidsNrrPMByron Resource Allan Barker

RidsNrrDirsIrib Resource Carole Ariano

ADAMS Accession Number ML16196A110

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE RIII RIII RIII RIII

NAME ADunlop:cl

DATE 07/14/16

OFFICIAL RECORD