Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23192A03625 July 2023Review of the Spring 2022 Steam Generator Tube Inspection Report
IR 05000454/202140322 November 2021Security Baseline Inspection Report 05000454/2021403 and 05000455/2021403Fitness for Duty
Safeguards Contingency Plan
Coronavirus
COVID-19
ML17269A10825 September 2017Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team) (Mjf)Stroke time
Commercial Grade Dedication
Temporary Modification
Job Performance Measure
Large early release frequency
ML17137A05617 May 2017Information Request to Support Upcoming Temporary Instruction 191 Inspection at Byron Station, Units 1 and 2FLEX
Spent Fuel Pool Instrumentation
ML16251A04619 September 2016NRC Security Inspection Report 05000454; 455/2016201 (Cover Letter Only)
IR 05000454/201620119 September 2016Byron Station - NRC Security Inspection Report 05000454; 455/2016201 (Cover Letter Only)Affidavit
ML16196A11014 July 2016Notification of NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000454/2016004; 05000455/2016004Ultimate heat sink
Temporary Modification
Flow Induced Vibration
IR 05000454/20155013 February 2016NRC Emergency Preparedness Annual Inspection Report No. 05000454/2015501; 05000455/2015501
ML13065A1125 March 2013Email - Byron Unit 2 ISI Request for Information DEJ5Boric Acid
Non-Destructive Examination
Nondestructive Examination
Dissimilar Metal Weld
Scaffolding
IR 05000454/201050114 January 2011IR 05000454-10-501, 05000455-10-501, on 12/31/10, Byron Station, Units 1 and 2, NRC Emergency Preparedness Annual Inspection
IR 05000454/200800710 October 2008IR 05000454-08-007, (Drs), IR 05000455-08-007, (Drs), on 08/25/2008 - 08/29/2008, Byron Station, Units 1 and 2, Ti 2515/171 Verification of Site Specific Implementation of B.5.b Phase 2 and 3, Mitigating Strategies - Cover LetterB.5.b
ML07318071614 November 2007Request for Information MOD/50.59 Baseline Inspection and Temporary Instruction 2515/166, Pressurized Water Reactor Containment Sump Blockage.Commercial Grade Dedication
IR 05000454/20074028 August 2007IR 05000454-07-402, and IR 05000455-07-402, 06/04/2007 - 06/27/2007, Byron Station, Units 1 and 2, Material Control and Accounting Program - Cover LetterAffidavit
IR 05000454/200600912 January 2007IR 05000454-06-009; 05000455-06-009(DRS) on 10/30/2006 - 12/01/2006 for Byron Station; Component Design Bases InspectionUltimate heat sink
Probabilistic Risk Assessment
Significance Determination Process
Job Performance Measure
Time Critical Operator Action
Power Uprate
IR 05000454/20060048 November 2006IR 05000454/2006004; 05000455/2006004; on 07/01/2006 - 09/30/2006; Byron Station, Units 1 and 2; Fire Protection and Radiation ProtectionBoric Acid
High Radiation Area
Fire Barrier
Weld Overlay
Hydrostatic
Temporary Modification
Locked High Radiation Area
Significance Determination Process
Foreign Material Exclusion
Process Control Program
Large early release frequency
Operability Determination
Pressure boundary leak
Fire Protection Program
Substantial potential for an overexposure
Coast down
Overexposure
IR 05000454/20060033 August 2006IR 05000454-06-003; 05000455-06-003; 05000454-06-010; 05000455-06-010; on 04/01/2006-06/30/2006; Byron Station, Units 1 and 2; Routine Integrated Inspection ReportBoric Acid
Ultimate heat sink
Fire Barrier
Stroke time
Internal Flooding
Operability Determination
Earthquake
Maintenance Rule Program
Fire Protection Program
Operability Assessment
ML0619504907 July 2006Orise - Analytical Results for Three Water Samples in Batch Four from the Vicinity of the Byron Generating Station, Byron, Illinois (Inspection Report No. 050-00454/2006-003 (Rfta No. 06-001))
IR 05000454/200600212 May 2006IR 05000454-06-002; 05000455-06-002; on 01/01/2006-03/31/2006; Byron Station, Units 1 and 2; Maintenance Risk Assessments and Emergent Work Control, Identification and Resolution of ProblemsShutdown Margin
High Radiation Area
Grab sample
Fire Barrier
Probabilistic Risk Assessment
Temporary Modification
Functionality Assessment
Significance Determination Process
Operability Determination
Overexposure
IR 05000454/200200326 April 2002IR 05000454/2002-003(DRP) & IR 05000455/2002-003(DRP), Byron, Units 1 & 2 . Maintenance Risk Assessment, Emergent Work & Refueling & Outage ActivitiesSafe Shutdown
Boric Acid
Fitness for Duty
High Radiation Area
Offsite Dose Calculation Manual
Fire Barrier
Temporary Modification
Emergency Lighting
Significance Determination Process
Foreign Material Exclusion
Operability Determination
Liquid penetrant
Fire Protection Program
Power Uprate
IR 05000455/20020028 March 2002IR 05000455/2002-002, IR 05000455/2002-002 (Drp), on 12/30/2001-02/11/2002; Exelon Generation Company, LLC; Byron Station, Units 1 & 2. Post-Maintenance Testing. One Green Violation IdentifiedGrab sample
Offsite Dose Calculation Manual
Fire Barrier
Significance Determination Process
Annual Radioactive Effluent Release Report
Operability Determination
Pressure Boundary Leakage