ML17212B648: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:DOCKET 05000389 NOTiES;REGU Y INFORMATION DISTR I BU YSTEM ('R IDS)-AOCESSION NBR:8206040197 DOO~DATE'2/05/26 NOTARIZED:
{{#Wiki_filter:REGU       Y INFORMATION DISTR     I BU       YSTEM ('R IDS)-
YES FAGIL:50 389 St.Lucite Plant~Unit 2<Florida Power 8 Light Co.AUTH~NAME AUTHOR AFFILIATION UHRIGr R,E~Florida Power 5 Light Co.~RBCIP,NAME RECIPIENT AFFILIATION E I SENHUT F D B G~Assistant Director for Licensing  
AOCESSION NBR:8206040197               DOO ~ DATE'2/05/26 NOTARIZED: YES                   DOCKET FAGIL:50 389         St. Lucite Plant~ Unit       2< Florida Power 8 Light Co.             05000389 AUTH NAME
        ~                   AUTHOR AFFILIATION UHRIGr R,E   ~           Florida Power 5 Light Co.
  ~RBCIP,NAME             RECIPIENT AFFILIATION EI SENHUT F D B G ~       Assistant Director for Licensing


==SUBJECT:==
==SUBJECT:==
,Forwarda Amaad 10 to FSAR, h I 14~qh DISTRIBUTION CODE: 80018)COPIES'RECEIVED:LTR ENCL-" SIZE:.3 j'~,.g/l'.~~TITLE: 'PSAR/FSAR AMDTS and Related Carrespondence REC IP IKNT-ID.CODE/NAkE A/D LICENSNG LIC BR P3 LA INTERNAL: ELD/HDS2 IE/DEP EPDS 35 Mr A NRR/DE/EQB 13 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB 24 NRR/DHFS/HFEB40 NRR/DHFS/OLB I34 NRR/DSI/AE8 26 NRR/DSI/OPB 10 NRR/DSI/ET 8 8 12 NRR/DSI/PSB
,Forwarda Amaad 10 to FSAR, DISTRIBUTION CODE: 80018 )COPIES 'RECEIVED:LTR TITLE: 'PSAR/FSAR      AMDTS    and  Related    Carrespondence h I 14~ qh 3 ENCL  j'~, g/l'.~~
'9/RSB 23 EG: L 04 EXTERNALa ACRS 41 REMA REP DIV 39 NRC PDR 02 NT I'COPIES LTTR ENCL 1 0 rP 1'0 1 1"0 3 I'3 2*2 1 1.1 1 1 1 1=1 1 1 1 1 1 1 1 1 1 10 1'0 1 1 1 1 1 1 RECIPIENT ID CODE/NAME LIC BR A3 BC NERSESgV~01 IE FILE IE/DEP/EPLB 36 NRR/DE/CEB 1 1 NRR/DE/GB 28 NRR/DE/MEB 18 NRR/DE/QAB 21'NRR/DE/SEB 25 NRR/DHFS/LQB 32 NRR/DHFS/PTRB20 NRR/DSI/ASB 27 NRR/DS I/CSB 09 NRR/DS I/ICS8 16 NRR/DSI/RAB 22 NRR/DST/LGB 33 RGN2 BNL(AMDTS ONLY)LPDR 03 NSIC 05:COPIES LTTR ENCL 1 0 1 1 1'3 3 1 1 2 2:-1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 1 1 TOTAL NUMBER.OF ICOPIES REQUIRED'TTR 57 ENCL 52 M 0 ll H t I I n 0 Ih I I W I II fl IK g I M H P.O.BOX 529100 MIAMI, F L 33152 Jri~8 FLORIDA POWER&LIGHT COMPANY f1ay 26, 1982 L-82-222 Office of Nuclear Reactor Regulation Attention:
                                                                              -
t1r.Darrell G.Eisenhut, Director Division of Licensing U.S.Nuclear Regulatory Commission Washington, D.C.20555
                                                                                "
SIZE:. .
NOTiES; REC IP IKNT           COPIES              RECIPIENT            :COPIES
              -ID .CODE/NAkE           LTTR ENCL          ID CODE/NAME          LTTR ENCL A/D LICENSNG                   1      0      LIC BR A3 BC                1    0 LIC     BR P3 LA                   rP      NERSESgV  ~      01        1 INTERNAL: ELD/HDS2                         1    '0      IE FILE                    1    1 IE/DEP EPDS         35         1      1      IE/DEP/EPLB      36        '3    3 Mr A                                 "0      NRR/DE/CEB      1 1        1    1 NRR/DE/EQB          13        3    I'3      NRR/DE/GB        28        2    2 NRR/DE/HGEB 30                2    *2      NRR/DE/MEB      18      :-1 NRR/DE/MTEB 17                        1      NRR/DE/QAB      21        1    1 NRR/DE/SAB          24        1   .1       'NRR/DE/SEB      25        1     1 NRR/DHFS/HFEB40                1      1      NRR/DHFS/LQB 32            1    1 NRR/DHFS/OLB I34                      1      NRR/DHFS/PTRB20            1    1 NRR/DSI/AE8 26                1    =1        NRR/DSI/ASB 27              1 NRR/DSI/OPB          10        1      1      NRR/DS I/CSB 09             1    1 NRR/DSI/ET 8 8 NRR/DSI/PSB
                        /RSB
                              '912        1 1
1      NRR/DS I/ICS8 16 NRR/DSI/RAB NRR/DST/LGB 22 33 1
1 1
1 23        1       1                                 1     1 EG: L            04        1       1     RGN2                        2    2 EXTERNALa ACRS                  41        10    1'0      BNL(AMDTS ONLY)            1     1 REMA REP      DIV 39          1       1     LPDR            03        1 NRC PDR            02        1       1     NSIC            05        1     1 NT I'                          1       1 TOTAL NUMBER .OF ICOPIES         REQUIRED'TTR           57   ENCL     52


==Dear Nr.Eisenhut:==
M 0
Re: St.Lucie Unit 2 Docket No.50-389 Amendment 10 To The Final Safet Anal sis Re ort In accordance with the requirements of 10 CFR 50.30, Florida Power 8 Light Company (FPL)is submitting sixty (60)copies of Amendment 10 to the Final Safety Analysis Report, St.Lucie Plant Unit 2.The changes to the amendment are contained in the attachment.
ll H t
Very truly yours, Ew Robert E.Uhrig Vice President Advanced Systems and Technology REU/RAK/ga Attachments cc: J.P.O'Rei lly, Director, Region II (w/o attachments)
Ih I
Harold F.Reis, Esquire (w/o attachments) saosaoolW7 iiaszs PDR ADOCK 05QQQ38'P K.PDRPEOPLE...SERVING PEOPLE 1I h STATE OF FLORIDA))COUNTY OF DADE)being first duly sworn, deposes and says: That he is Vice President Light Company, the herein;~of Florida Power That he has executed the foregoing document;that the state-ments made in this said document are true and correct to the best of.his knowledge, information, and belief, and that he is authorized to execute the document on behalf of said J.M.l<i11iams, Jr.Subscribed and sworn to before me this day of NOTARY-;PUBLIC, i and for the County of Dade,~State of Florida Notary public, State of Florida at Large My Commission Expires October 30,-1983 My commission expires: ard Bondin A enc
I n
/n I I ATTACHMENT TO L-82-222 Dated May 26, 1982 Changes in the St Lucie Plant Unit 2, FSAR as a result of Amendment 10.1).Appendix 1.9B-was revised to incorporate the changes which resulted from the recent NRC review Questions/Response (FPL letters L-81-468, 474 dated October 27, 1981 and November 10, 1981 respectively).
0 I      I   W I
2)Section 2.1.3.9 and 2.1.4 were revised.to insert a subsection on the periodic update of the population data around the St Lucie 2 site and to include information on the future land uses around the site.These items were added at the NRC's request.3)Section 2.5 was revised to conform to the processed geotechnical data available regarding the Hutchinson Island soil profile.4)Chapter 3 contains general revisions including changes made for con-sistency with other chapters of the FSAR, changes made for completeness and better comprehension and other changes made to correct typographical errors.5)Section 3.7 contains a new Subsection which adequately describes the CEDM's.6)Section 3.9 was revised to include updates of the computer programs used in the analysis at the St Lucie 2 plant and a new subsection on Deep Draft Pump Operability.
II fl IK g I M
7)Chapter 4 includes general revisions to correct typographical and editorial errors.8)Sections 4.1, 4.2 and 4.3 were revised to indicate that the Part Length CEAs are not currently planned to be used at St Lucie 2.9)Section 4.4 contains information that includes updated information on the minimum and maximum allowable reactor coolant flow rate and hydraulic loads on internal components.
10)=Chapter 5 general revisions include changes for consistency with other Chapters of the FSAR along with changes to correct editorial and typo-graphical errors.11)Section 5.2 was revised to incorporate the normal and LTOP operational considerations of the PORVs.Section 5.4 was revised to modify the subsections on the Reactor Coolant Pumps and the Residual Heat Removal System to reflect the recent information provided to the NRC via various correspondence.


13)Section 6.2 revised the combined leakage rate of bypass leakage to~27 and this subsection was also revised to correct editorial comments.14)Section 6.3 revised the subsection to clarify the source of charging pump-water with regards to the small break ECCS analysis.15)Tables 7.3 was revised to a)include the charging pumps to actuate on SIAS b)fill in"laters" c)and correct'.discrepancies.
H        P.O. BOX 529100 MIAMI,F L 33152 Jri ~8 FLORIDA POWER & LIGHT COMPANY f1ay 26, 1982 L-82-222 Office of Nuclear Reactor Regulation Attention: t1r. Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555
16), Chapter 8-corrected typographical errors and corrected references.
 
17)Chapter 9 was revised to include a writeup on charging pumps.actuation to be consistent with the information provided to the NRC previously.
==Dear Nr. Eisenhut:==
18)Chapter 12 was revised to include the Post Accident Sampling System Sources.19)Chapter 15 was changed to include the revised Accident Analysis and revised dose calculations for loss of coolant accident.E 20)220 Series Questions were revised to add missing information into the text that the NRC staff has already reviewed and also we corrected some typographical errors.21)490 Series Questions were revised to conform more closely with FSAR Section 4.2.I 22)492 Series Questions contained the new Questions/Responses to three new questions and also present are editorial comments.}}
 
Re:  St. Lucie Unit    2 Docket No. 50-389 Amendment 10 To The    Final Safet  Anal  sis  Re ort In accordance  with the requirements of 10 CFR 50.30, Florida Power 8 Light Company (FPL) is submitting sixty (60) copies of Amendment 10 to the Final Safety Analysis Report, St. Lucie Plant Unit 2.
The changes  to the  amendment  are contained in the attachment.
Very  truly yours, Robert E. Uhrig Ew Vice President Advanced Systems    and Technology REU/RAK/ga Attachments cc:  J. P. O'Rei  lly, Director, Region II (w/o attachments)
Harold F. Reis, Esquire (w/o attachments) saosaoolW7    iiaszs PDR ADOCK 05QQQ38'P K    .            PDR                                                  PEOPLE... SERVING PEOPLE
 
1I h
 
STATE OF FLORIDA    )
                      )
COUNTY OF DADE      )
being    first      duly sworn, deposes and says:
That he  is            Vice President                          ~
of Florida Power Light  Company, the                herein; That he has executed the foregoing document; that the state-ments made in this said document are true and correct to the best of.his knowledge, information, and belief, and that he is authorized to execute the document on behalf of said J. M. l<i11iams, Jr.
Subscribed and sworn to before            me    this day of
~
NOTARY-;PUBLIC, State of Florida i  and  for the      County of Dade, Notary public, State of Florida at Large My Commission Expires October 30, -1983 My commission expires:                        ard Bondin A enc
 
      /
n I
I
 
ATTACHMENT TO  L-82-222 Dated May 26, 1982 Changes  in the St Lucie Plant Unit 2,    FSAR as a  result of  Amendment 10.
1). Appendix 1.9B  was revised to incorporate the changes which resulted from the recent NRC review Questions/Response (FPL letters L-81-468, 474 dated October 27, 1981 and November 10, 1981 respectively).
: 2)    Section 2.1.3.9 and 2.1.4 were revised. to insert a subsection on the periodic update of the population data around the St Lucie 2 site and to include information on the future land uses around the site. These items were added at the NRC's request.
: 3)    Section 2.5 was revised to conform to the processed geotechnical data available regarding the Hutchinson Island soil profile.
: 4)    Chapter 3 contains general revisions including changes made        for con-sistency with other chapters of the FSAR, changes made for completeness and better comprehension and other changes made to correct typographical errors.
: 5)    Section 3.7 contains a new Subsection which adequately describes the CEDM's.
: 6)    Section 3.9 was revised to include updates of the computer programs used in the analysis at the St Lucie 2 plant and a new subsection on Deep Draft  Pump  Operability.
: 7)    Chapter 4 includes general revisions to correct typographical and          editorial errors.
: 8)    Sections 4 .1, 4.2 and 4.3 were revised to indicate that the Part Length CEAs are not currently planned to be used at St Lucie 2.
: 9)    Section 4.4    contains information that includes updated information on the minimum and maximum allowable    reactor coolant flow rate and hydraulic loads on internal components.
: 10)  =
Chapter 5 general revisions include changes for consistency with other Chapters of the FSAR along with changes to correct editorial and typo-graphical errors.
Section 5.2 was revised to incorporate the normal and        LTOP  operational 11) considerations of the PORVs.
Coolant Section 5.4 was revised to modify the subsections on the Reactor        information Pumps and the Residual Heat Removal System      to  reflect  the  recent provided to the NRC via various    correspondence.
: 13)   Section 6.2 revised the combined leakage rate of bypass leakage to ~ 27 and this subsection was also revised to correct editorial comments.
: 14)   Section 6.3 revised the subsection to clarify the source of charging pump-water   with regards to the small break ECCS analysis.
: 15)   Tables 7.3 was revised to a) include the charging pumps to actuate on SIAS b)   fill in "laters" c) and correct '.discrepancies.
: 16) , Chapter 8 corrected typographical errors and corrected references.
: 17)   Chapter   9 was revised to include a writeup on charging pumps. actuation to be consistent with the information provided to the NRC previously.
: 18)   Chapter 12 was revised to include the Post Accident Sampling System Sources.
: 19)   Chapter 15 was changed to include the revised Accident Analysis and revised dose calculations for loss of coolant accident.
E
: 20)   220 Series Questions were revised to add missing information into the text that the NRC staff has already reviewed and also we corrected some typographical errors.
: 21)   490 Series Questions were   revised to conform more closely with FSAR Section 4.2.
I
: 22)   492 Series Questions contained the   new Questions/Responses to three new questions and also present are   editorial   comments.}}

Revision as of 00:33, 30 October 2019

Forwards Amend 10 to FSAR
ML17212B648
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 05/26/1982
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML17212B649 List:
References
L-82-222, NUDOCS 8206040197
Download: ML17212B648 (10)


Text

REGU Y INFORMATION DISTR I BU YSTEM ('R IDS)-

AOCESSION NBR:8206040197 DOO ~ DATE'2/05/26 NOTARIZED: YES DOCKET FAGIL:50 389 St. Lucite Plant~ Unit 2< Florida Power 8 Light Co. 05000389 AUTH NAME

~ AUTHOR AFFILIATION UHRIGr R,E ~ Florida Power 5 Light Co.

~RBCIP,NAME RECIPIENT AFFILIATION EI SENHUT F D B G ~ Assistant Director for Licensing

SUBJECT:

,Forwarda Amaad 10 to FSAR, DISTRIBUTION CODE: 80018 )COPIES 'RECEIVED:LTR TITLE: 'PSAR/FSAR AMDTS and Related Carrespondence h I 14~ qh 3 ENCL j'~, g/l'.~~

-

"

SIZE:. .

NOTiES; REC IP IKNT COPIES RECIPIENT :COPIES

-ID .CODE/NAkE LTTR ENCL ID CODE/NAME LTTR ENCL A/D LICENSNG 1 0 LIC BR A3 BC 1 0 LIC BR P3 LA rP NERSESgV ~ 01 1 INTERNAL: ELD/HDS2 1 '0 IE FILE 1 1 IE/DEP EPDS 35 1 1 IE/DEP/EPLB 36 '3 3 Mr A "0 NRR/DE/CEB 1 1 1 1 NRR/DE/EQB 13 3 I'3 NRR/DE/GB 28 2 2 NRR/DE/HGEB 30 2 *2 NRR/DE/MEB 18  :-1 NRR/DE/MTEB 17 1 NRR/DE/QAB 21 1 1 NRR/DE/SAB 24 1 .1 'NRR/DE/SEB 25 1 1 NRR/DHFS/HFEB40 1 1 NRR/DHFS/LQB 32 1 1 NRR/DHFS/OLB I34 1 NRR/DHFS/PTRB20 1 1 NRR/DSI/AE8 26 1 =1 NRR/DSI/ASB 27 1 NRR/DSI/OPB 10 1 1 NRR/DS I/CSB 09 1 1 NRR/DSI/ET 8 8 NRR/DSI/PSB

/RSB

'912 1 1

1 NRR/DS I/ICS8 16 NRR/DSI/RAB NRR/DST/LGB 22 33 1

1 1

1 23 1 1 1 1 EG: L 04 1 1 RGN2 2 2 EXTERNALa ACRS 41 10 1'0 BNL(AMDTS ONLY) 1 1 REMA REP DIV 39 1 1 LPDR 03 1 NRC PDR 02 1 1 NSIC 05 1 1 NT I' 1 1 TOTAL NUMBER .OF ICOPIES REQUIRED'TTR 57 ENCL 52

M 0

ll H t

Ih I

I n

0 I I W I

II fl IK g I M

H P.O. BOX 529100 MIAMI,F L 33152 Jri ~8 FLORIDA POWER & LIGHT COMPANY f1ay 26, 1982 L-82-222 Office of Nuclear Reactor Regulation Attention: t1r. Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Nr. Eisenhut:

Re: St. Lucie Unit 2 Docket No. 50-389 Amendment 10 To The Final Safet Anal sis Re ort In accordance with the requirements of 10 CFR 50.30, Florida Power 8 Light Company (FPL) is submitting sixty (60) copies of Amendment 10 to the Final Safety Analysis Report, St. Lucie Plant Unit 2.

The changes to the amendment are contained in the attachment.

Very truly yours, Robert E. Uhrig Ew Vice President Advanced Systems and Technology REU/RAK/ga Attachments cc: J. P. O'Rei lly, Director, Region II (w/o attachments)

Harold F. Reis, Esquire (w/o attachments) saosaoolW7 iiaszs PDR ADOCK 05QQQ38'P K . PDR PEOPLE... SERVING PEOPLE

1I h

STATE OF FLORIDA )

)

COUNTY OF DADE )

being first duly sworn, deposes and says:

That he is Vice President ~

of Florida Power Light Company, the herein; That he has executed the foregoing document; that the state-ments made in this said document are true and correct to the best of.his knowledge, information, and belief, and that he is authorized to execute the document on behalf of said J. M. l<i11iams, Jr.

Subscribed and sworn to before me this day of

~

NOTARY-;PUBLIC, State of Florida i and for the County of Dade, Notary public, State of Florida at Large My Commission Expires October 30, -1983 My commission expires: ard Bondin A enc

/

n I

I

ATTACHMENT TO L-82-222 Dated May 26, 1982 Changes in the St Lucie Plant Unit 2, FSAR as a result of Amendment 10.

1). Appendix 1.9B was revised to incorporate the changes which resulted from the recent NRC review Questions/Response (FPL letters L-81-468, 474 dated October 27, 1981 and November 10, 1981 respectively).

2) Section 2.1.3.9 and 2.1.4 were revised. to insert a subsection on the periodic update of the population data around the St Lucie 2 site and to include information on the future land uses around the site. These items were added at the NRC's request.
3) Section 2.5 was revised to conform to the processed geotechnical data available regarding the Hutchinson Island soil profile.
4) Chapter 3 contains general revisions including changes made for con-sistency with other chapters of the FSAR, changes made for completeness and better comprehension and other changes made to correct typographical errors.
5) Section 3.7 contains a new Subsection which adequately describes the CEDM's.
6) Section 3.9 was revised to include updates of the computer programs used in the analysis at the St Lucie 2 plant and a new subsection on Deep Draft Pump Operability.
7) Chapter 4 includes general revisions to correct typographical and editorial errors.
8) Sections 4 .1, 4.2 and 4.3 were revised to indicate that the Part Length CEAs are not currently planned to be used at St Lucie 2.
9) Section 4.4 contains information that includes updated information on the minimum and maximum allowable reactor coolant flow rate and hydraulic loads on internal components.
10) =

Chapter 5 general revisions include changes for consistency with other Chapters of the FSAR along with changes to correct editorial and typo-graphical errors.

Section 5.2 was revised to incorporate the normal and LTOP operational 11) considerations of the PORVs.

Coolant Section 5.4 was revised to modify the subsections on the Reactor information Pumps and the Residual Heat Removal System to reflect the recent provided to the NRC via various correspondence.

13) Section 6.2 revised the combined leakage rate of bypass leakage to ~ 27 and this subsection was also revised to correct editorial comments.
14) Section 6.3 revised the subsection to clarify the source of charging pump-water with regards to the small break ECCS analysis.
15) Tables 7.3 was revised to a) include the charging pumps to actuate on SIAS b) fill in "laters" c) and correct '.discrepancies.
16) , Chapter 8 corrected typographical errors and corrected references.
17) Chapter 9 was revised to include a writeup on charging pumps. actuation to be consistent with the information provided to the NRC previously.
18) Chapter 12 was revised to include the Post Accident Sampling System Sources.
19) Chapter 15 was changed to include the revised Accident Analysis and revised dose calculations for loss of coolant accident.

E

20) 220 Series Questions were revised to add missing information into the text that the NRC staff has already reviewed and also we corrected some typographical errors.
21) 490 Series Questions were revised to conform more closely with FSAR Section 4.2.

I

22) 492 Series Questions contained the new Questions/Responses to three new questions and also present are editorial comments.