ML17285B172: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:..ACCELERATED DI-UTION DEMONSrjRATION SYSTEM M~REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9004170052 DOC.DA.1 NOTARIZED:
{{#Wiki_filter:.. ACCELERATED DI-                       UTION DEMONSrjRATION SYSTEM M~
NO DOCKET g FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION HUTCHISON,L.B.
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
Washington Public Power Supply System POWERS,C.M.
ACCESSION NBR:9004170052               DOC.DA   .         1   NOTARIZED: NO         DOCKET g FACIL:50-397     WPPSS   Nuclear Project, Unit 2, Washington Public           Powe 05000397 AUTH. NAME           AUTHOR AFFILIATION HUTCHISON,L.B.         Washington Public Power Supply System POWERS,C.M.             Washington Public Power Supply System RECIP.NAME           RECIPIENT AFFXLXATION
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFXLXATION


==SUBJECT:==
==SUBJECT:==
Monthly opera~for Mar 1990 for WPPS Nuclear Power Plant, Unit.W/900409 l r.DISTRIBUTION CODE: IE2 OPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES'ECIPIENT ID CODE/NAME PD5 LA SAMWORTH,R COPIES LTTR ENCL 3 3 1 1 RECIPIENT XD CODE/NAME PD5 PD COPIES LTTR ENCL 1 1 INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/LPEB10 NUDOCS-ABSTRACT RGN5 10 10 AEOD/DOA 1 1 XRM TECH ADV 1 1~R&jBOE OEABll 1 1 G FILE Ol 1 1 1 1 2 2 1 1 1 1 EXTERNAL: EGGG STUART,V.A NRC PDR 1 1 1 1 LPDR NSIC 1 1 1, 1 NOTE TO ALL"RIDS" RECIPIENTS:
Monthly opera Plant, Unit .W/900409
PLEASE HELP US TO REDUCE WASTEl CONTACT THE.DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT;20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 28 ENCL 28 p'1ll WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 Docket No.50-397 April 9, 1990 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555  
                                  ~          lfor r.
Mar 1990  for WPPS  Nuclear Power DISTRIBUTION CODE: IE2               OPIES RECEIVED:LTR         ENCL     SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES'ECIPIENT COPIES              RECIPIENT          COPIES ID CODE/NAME           LTTR ENCL         XD CODE/NAME       LTTR ENCL PD5 LA                      3    3      PD5 PD                 1    1 SAMWORTH,R                  1     1 INTERNAL: ACRS                         10    10      AEOD/DOA              1    1 AEOD/DSP/TPAB               1    1      XRM TECH ADV          2    2 NRR/DLPQ/LPEB10             1     1     ~R&jBOE OEABll           1   1 NUDOCS-ABSTRACT              1    1        G FILE     Ol     1   1 RGN5                        1     1 EXTERNAL: EGGG STUART,V.A                 1     1       LPDR                  1   1 NRC PDR                      1     1       NSIC                  1,   1 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTEl CONTACT THE. DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT; 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                 28   ENCL   28
 
p' 1
ll
 
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No.     50-397 April 9,   1990 U. S. Nuclear     Regulatory Commission Document Control Desk Washington, D. C. 20555


==Dear,==
==Dear,==
Sir:  
Sir:


==SUBJECT:==
==SUBJECT:==
NUCLEAR PLANT NO.2 MONTHLY OPERATING REPORT MARCH 1990 Transmitted herewith is the Monthly Operating Report as required by our Technical Specifications 6.9.1.6.Very Truly Yours, 0@8 C.M.Powers (M/D 927M)WNP-2 Plant ManagerCMP/lc Enclosure cc: Mr.Mr.Ms.Mr.Mr.J.B.Martin-C.J.Bosted-Dottie Sherman J.T.Wheelock W.H.Lovelace NRC Region V NRC Resident Inspector (901A)-ANI, Farmington CT-INPO-NRC, Washington D.C.9004270052 900332 PDR ADOCK 05000397 R PDC)d~~yo0>yg$  
NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT MARCH 1990 Transmitted herewith is the Monthly Operating Report as required by our Technical Specifications 6.9.1.6.
~P";g\
Very Truly Yours, 0@8 C. M. Powers     (M/D 927M)
AEKAT PEAIQ>MARCH 199O mcnth, year LNIT SllUTDDWNS' AEDUCTIONS
WNP-2   Plant   Manager CMP/lc Enclosure cc: Mr. J. B. Martin-         NRC  Region  V Mr. C. J. Bosted-       NRC  Resident Inspector (901A)
~~DOCKET NO.UNIT llRllL DATE COMPLETEO DY TELEPl lONE 50-39 WNP-2 4/I/90 LB HUTCHISON 5-486 HK li>n E TTTP Teen<~nnznSGH~t.1&#xc3;~Y l RET CIO PllEE 0CfNNC NONE I SUhtNRY lWNP 2 OPERATED ROUTINELY DURING MARCH WITH NO OUTAGES OR SIGNIFCANT POWER REDUCTIONS.
Ms. Dottie Sherman ANI, Farmington CT Mr. J. T. Wheelock INPO Mr. W. H. Lovelace - NRC, Washington D.C.
~: TYPE F-Forced S-chcd A-Equip Failure 0-Maint or Test~C-Refueling 0-Beg<>latory Restriction E-Operator Training I License Examination F-Admin G-Oper Error l3-Other hlETlKO l-Manual 2-Manual Scrato>-Auto Scram 4-Continued R4)educed Load 9-Other SYSTEM k COMPOhCNT Exhibit F h H Instructions for Preparation'l':
d~~yo0>
Oata Entry Sheet Licensee Event Deport (LiEcB)File (NUREG-0161)
9004270052 900332 PDR     ADOCK 05000397
R OJ OPERATING DATA REPORT WNP-2 01-Apr-90 1.DOCKET: 50-397 2.REPORTING PERIOD: Mar-90 3.UTILITY CONTACT: OUTAGE+ON-LINE HOURS LEONARD HUTCHISON (509)377-2486 744 4.LICENSED THERMAL POWER (MWt): 5.NAMEPLATE RATING (GROSS MWe): 6.DESIGN ELECTRICAL RATING (NET MWe): 7.MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 8.MAXIMUM DEPENDABLE CAPACITY (NET MWe): 9.IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS: 3323 1200.9 1100 1140 1095 10.POWER TO WHICH RESTRICTED, IF ANY (NET MWe): 11.REASONS FOR RESTRICTIONS, IF ANY: 12.REPORT PERIOD HOURS 13.HOURS REACTOR CRITICAL 14.RX RESERVE SHTDWN HRS 15.HRS GENERATOR ON LINE 16.UNIT RESERVE SHUTDOWN HOURS 17.GROSS THERMAL ENERGY (MWH)18.GROSS ELECTRICAL ENERGY (MWH)19.NET ELECTRICAL ENERGY (MWH)20.UNIT SERVICE FACTOR 21.UNIT AVAILABILITY FACTOR 22.UNIT CAPACITY FACTOR (MDC NET)23.UNIT CAPACITY FACTOR (DER NET)24.UNIT FORCED OUTAGE RATE 25.FORCED OUTAGE HOURS MONTH 744 744.0 0.0 744.0 0.0 2334282 775550 748445 100.04 100.0%91.94 91.5%0.0%0.0 YEAR CUMULATIVE 2160 46424.2 2160.0 35235.3 0.0 340.4 2160.0 34007.9 0.0 381.7 6835428 95179868 2277810 31681760 2200897 30487040 100.04 73.3%100.0<74.1%93.14 60.0~o 92~6roq 59~7 i'.0<8.1%0.0 2996.2 26 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE i DATE i DURATION)27.IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:  
                                                                                      )
~0~VERAGE DAILY UNIT POWER LEVEL, MONTH MARCH 1990 DAY AVERAGE DAILY POWER LEVEL (MwE-Net)921 17.DOCKET NO.50-397 UNIT WNP;;2 DATE 4/1'/90 COMPLETED BY LB HUTCHISON TELEPHONE (590)377-2486 DAY AVERAGE DAILY POWER LEVEL (MwE-Net)1017 2.3.4.5.6.7.8.9.10.12.13.14.15.16.959 1062 1040 1037 1029 1036 1046 1030 1043 1046 1042 1034 1021 1026 1004 18.19.20.21.22.23.24.25.26.27.28.29~30.3l.1006 994 995 1000 995 1001 997 919 1006 988 978 978 966 970 INSTRUCTIONS A On this form, list the average daily unit power level in MWe-Net for each day in the reporting month.Compute to the nearest whole megawatt.These figures will be used to plot a graph for each reporting month.Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100%line (or the restricted power level line).In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
R                       PDC yg$
vP~e a}}
 
    ~ P";
g \
 
                                                                                                      ~ ~
DOCKET NO. 50-39 UNIT llRllL    WNP-2 DATE      4/I/90 LNIT SllUTDDWNS'  AEDUCTIONS                  COMPLETEO DY      LB HUTCHISON AEKAT PEAIQ>        MARCH    199O                                                                  TELEPl lONE            5       486 mcnth,    year HK     li>n E   TTTP   Teen<~   nnznSGH ~t. 1&#xc3;               ~Y         l RET                           CIO     PllEE     0CfNNC NONE
                                                                                                                                      ~:
I SUhtNRY lWNP 2 OPERATED ROUTINELY DURING MARCH WITH       NO OUTAGES OR SIGNIFCANT   POWER REDUCTIONS.
TYPE                                                         hlETlKO        SYSTEM  k COMPOhCNT F-Forced       A-Equip Failure               F-Admin        l-Manual            Exhibit F h H S- chcd        0-Maint or Test     ~         G-Oper Error   2-Manual Scrato     Instructions for C-Refueling                  l3-Other      >-Auto Scram         Preparation'l':
0-Beg<>latory Restriction                    4-Continued          Oata Entry Sheet E-Operator Training                          R4)educed Load      Licensee Event Deport I  License Examination                  9-Other              (LiEcB) File (NUREG-0161)
R
 
OJ OPERATING DATA REPORT WNP-2 01-Apr-90
: 1. DOCKET: 50-397
: 2. REPORTING PERIOD:     Mar-90             OUTAGE +   ON-LINE HOURS           744
: 3. UTILITY CONTACT:                  LEONARD HUTCHISON   (509) 377-2486
: 4. LICENSED THERMAL POWER (MWt):                                              3323
: 5. NAMEPLATE RATING (GROSS MWe):                                            1200.9
: 6. DESIGN ELECTRICAL RATING (NET MWe):                                        1100
: 7. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):                                    1140
: 8. MAXIMUM DEPENDABLE CAPACITY (NET MWe):                                      1095
: 9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT,   GIVE REASONS:
: 10. POWER TO WHICH RESTRICTED,   IF ANY (NET MWe):
: 11. REASONS FOR RESTRICTIONS, IF ANY:
MONTH        YEAR        CUMULATIVE
: 12. REPORT PERIOD HOURS                               744      2160        46424.2
: 13. HOURS REACTOR CRITICAL                         744.0    2160.0        35235.3
: 14. RX RESERVE SHTDWN HRS                             0.0        0.0        340.4
: 15. HRS GENERATOR ON LINE                           744.0    2160.0        34007.9
: 16. UNIT RESERVE SHUTDOWN HOURS                       0.0        0.0        381.7
: 17. GROSS THERMAL ENERGY (MWH)                   2334282    6835428      95179868
: 18. GROSS ELECTRICAL ENERGY (MWH)                 775550    2277810      31681760
: 19. NET ELECTRICAL ENERGY (MWH)                   748445    2200897      30487040
: 20. UNIT SERVICE FACTOR                             100.04    100.04          73.3%
: 21. UNIT AVAILABILITYFACTOR                        100.0%    100.0<          74.1%
: 22. UNIT CAPACITY FACTOR (MDC NET)                   91.94      93.14          60.0~o
: 23. UNIT CAPACITY FACTOR (DER NET)                   91.5%      92 ~ 6roq      59 7~
: 24. UNIT FORCED OUTAGE RATE                           0.0%                       8.1%i'.0<
: 25. FORCED OUTAGE HOURS                              0.0       0.0         2996.2 26 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE i DATE i DURATION)
: 27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:
 
0
~   ~
VERAGE DAILY UNIT   POWER   LEVEL, DOCKET NO.       50-397 UNIT     WNP;;2 DATE     4/1'/90 COMPLETED BY       LB HUTCHISON TELEPHONE       (590)377-2486 MONTH      MARCH  1990 DAY AVERAGE  DAILY  POWER  LEVEL                      DAY AVERAGE   DAILY   POWER   LEVEL (MwE-Net)                                               (MwE-Net) 921                              17.                  1017
: 2.                 959                              18.                  1006
: 3.               1062                              19.                    994
: 4.               1040                              20.                    995
: 5.               1037                              21.                  1000
: 6.               1029                              22.                  995
: 7.               1036                              23.                  1001
: 8.               1046                              24.                  997
: 9.               1030                               25.                   919 1043                              26.                 1006 10.
1046                              27.                 988 1042                              28.                 978 12.
1034                              29 ~                 978 13.
1021                              30.                 966 14.
1026                              3l.                 970 15.
1004 16.
INSTRUCTIONS A
On this form, list the   average   daily unit   power     level in   MWe-Net   for each day   in the reporting month.     Compute   to the nearest whole megawatt.
These   figures will   be used to plot a graph for each reporting month.                 Note that when maximum   dependable   capacity   is used for   the net   electrical   rating   of the unit, there may   be occasions   when the daily   average   power level   exceeds   the 100%
line (or the restricted power         level   line).     In such cases,   the   average     daily unit power output sheet should be footnoted to explain the apparent anomaly.
 
vP ~ e a}}

Latest revision as of 14:24, 29 October 2019

Monthly Operating Rept for Mar 1990 for Washington Nuclear Plant Unit 2.W/900409 Ltr
ML17285B172
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/31/1990
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9004170052
Download: ML17285B172 (9)


Text

.. ACCELERATED DI- UTION DEMONSrjRATION SYSTEM M~

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9004170052 DOC.DA . 1 NOTARIZED: NO DOCKET g FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION HUTCHISON,L.B. Washington Public Power Supply System POWERS,C.M. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFXLXATION

SUBJECT:

Monthly opera Plant, Unit .W/900409

~ lfor r.

Mar 1990 for WPPS Nuclear Power DISTRIBUTION CODE: IE2 OPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES'ECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL XD CODE/NAME LTTR ENCL PD5 LA 3 3 PD5 PD 1 1 SAMWORTH,R 1 1 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 XRM TECH ADV 2 2 NRR/DLPQ/LPEB10 1 1 ~R&jBOE OEABll 1 1 NUDOCS-ABSTRACT 1 1 G FILE Ol 1 1 RGN5 1 1 EXTERNAL: EGGG STUART,V.A 1 1 LPDR 1 1 NRC PDR 1 1 NSIC 1, 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEl CONTACT THE. DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT; 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 28 ENCL 28

p' 1

ll

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 April 9, 1990 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Dear,

Sir:

SUBJECT:

NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT MARCH 1990 Transmitted herewith is the Monthly Operating Report as required by our Technical Specifications 6.9.1.6.

Very Truly Yours, 0@8 C. M. Powers (M/D 927M)

WNP-2 Plant Manager CMP/lc Enclosure cc: Mr. J. B. Martin- NRC Region V Mr. C. J. Bosted- NRC Resident Inspector (901A)

Ms. Dottie Sherman ANI, Farmington CT Mr. J. T. Wheelock INPO Mr. W. H. Lovelace - NRC, Washington D.C.

d~~yo0>

9004270052 900332 PDR ADOCK 05000397

)

R PDC yg$

~ P";

g \

~ ~

DOCKET NO. 50-39 UNIT llRllL WNP-2 DATE 4/I/90 LNIT SllUTDDWNS' AEDUCTIONS COMPLETEO DY LB HUTCHISON AEKAT PEAIQ> MARCH 199O TELEPl lONE 5 486 mcnth, year HK li>n E TTTP Teen<~ nnznSGH ~t. 1Ã ~Y l RET CIO PllEE 0CfNNC NONE

~:

I SUhtNRY lWNP 2 OPERATED ROUTINELY DURING MARCH WITH NO OUTAGES OR SIGNIFCANT POWER REDUCTIONS.

TYPE hlETlKO SYSTEM k COMPOhCNT F-Forced A-Equip Failure F-Admin l-Manual Exhibit F h H S- chcd 0-Maint or Test ~ G-Oper Error 2-Manual Scrato Instructions for C-Refueling l3-Other >-Auto Scram Preparation'l':

0-Beg<>latory Restriction 4-Continued Oata Entry Sheet E-Operator Training R4)educed Load Licensee Event Deport I License Examination 9-Other (LiEcB) File (NUREG-0161)

R

OJ OPERATING DATA REPORT WNP-2 01-Apr-90

1. DOCKET: 50-397
2. REPORTING PERIOD: Mar-90 OUTAGE + ON-LINE HOURS 744
3. UTILITY CONTACT: LEONARD HUTCHISON (509) 377-2486
4. LICENSED THERMAL POWER (MWt): 3323
5. NAMEPLATE RATING (GROSS MWe): 1200.9
6. DESIGN ELECTRICAL RATING (NET MWe): 1100
7. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 1140
8. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 1095
9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS:
10. POWER TO WHICH RESTRICTED, IF ANY (NET MWe):
11. REASONS FOR RESTRICTIONS, IF ANY:

MONTH YEAR CUMULATIVE

12. REPORT PERIOD HOURS 744 2160 46424.2
13. HOURS REACTOR CRITICAL 744.0 2160.0 35235.3
14. RX RESERVE SHTDWN HRS 0.0 0.0 340.4
15. HRS GENERATOR ON LINE 744.0 2160.0 34007.9
16. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 381.7
17. GROSS THERMAL ENERGY (MWH) 2334282 6835428 95179868
18. GROSS ELECTRICAL ENERGY (MWH) 775550 2277810 31681760
19. NET ELECTRICAL ENERGY (MWH) 748445 2200897 30487040
20. UNIT SERVICE FACTOR 100.04 100.04 73.3%
21. UNIT AVAILABILITYFACTOR 100.0% 100.0< 74.1%
22. UNIT CAPACITY FACTOR (MDC NET) 91.94 93.14 60.0~o
23. UNIT CAPACITY FACTOR (DER NET) 91.5% 92 ~ 6roq 59 7~
24. UNIT FORCED OUTAGE RATE 0.0% 8.1%i'.0<
25. FORCED OUTAGE HOURS 0.0 0.0 2996.2 26 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE i DATE i DURATION)
27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:

0

~ ~

VERAGE DAILY UNIT POWER LEVEL, DOCKET NO. 50-397 UNIT WNP;;2 DATE 4/1'/90 COMPLETED BY LB HUTCHISON TELEPHONE (590)377-2486 MONTH MARCH 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MwE-Net) (MwE-Net) 921 17. 1017

2. 959 18. 1006
3. 1062 19. 994
4. 1040 20. 995
5. 1037 21. 1000
6. 1029 22. 995
7. 1036 23. 1001
8. 1046 24. 997
9. 1030 25. 919 1043 26. 1006 10.

1046 27. 988 1042 28. 978 12.

1034 29 ~ 978 13.

1021 30. 966 14.

1026 3l. 970 15.

1004 16.

INSTRUCTIONS A

On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100%

line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.