ML17286A885: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:..ACCELERATED DIS UTION DEMONSTPATION SYSTEM wo REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9106180429 DOC.DATE: 91/05/31 NOTARIZED:
{{#Wiki_filter:..ACCELERATED DIS                         UTION DEMONSTPATION SYSTEM wo REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION HUTCHISON,L.B.
ACCESSION NBR:9106180429             DOC.DATE: 91/05/31   NOTARIZED: NO           DOCKET FACIL:50-397   WPPSS   Nuclear Project, Unit 2, Washington Public           Powe   05000397 AUTH. NAME           AUTHOR AFFILIATION HUTCHISON,L.B.       Washington Public Power Supply System BAKER,J.W.           Washington Public Power Supply System RECIP.NAME           RECIPIENT AFFILIATION                                                   R
Washington Public Power Supply System BAKER,J.W.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION R  


==SUBJECT:==
==SUBJECT:==
Monthly operating rept for May 1991 for WNP-2.W/910610 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR I ENCL 2 SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES D RECIPIENT ID CODE/NAME PD5 LA ENG,P.L.INTERNAL: ACRS AEOD/DSP/TPAB NRR/DOEA/OEAB RGN5 EXTERNAL: EGGG BRYCE,J.H NSIC COPIES LTTR ENCL 3 3 1 1 10 10 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD5 PD AEOD/DOA NRR/DLPQ MBEB 0 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 R D NOTE TO ALL"RIDS" RECIPIENTS:
Monthly operating rept           for May 1991 for WNP-2.W/910610   ltr.
A D D PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24 I 0*" C~P P~\,<c, WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Bccc 968~3000 George Wasbfngton Way~Rtcb!and, Wasbtngton 993524968~(509)372-5000 Docket No.50-397 June 10, 1991 G02-91-117 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555  
DISTRIBUTION CODE: IE24D           COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs)
I ENCL  2    SIZE:                D NOTES RECIPIENT               COPIES          RECIPIENT          COPIES ID  CODE/NAME            LTTR ENCL      ID CODE/NAME       LTTR ENCL PD5 LA                       3    3    PD5 PD                  1    1 ENG,P.L.                     1    1 INTERNAL: ACRS                         10    10    AEOD/DOA                1    1 AEOD/DSP/TPAB               1    1    NRR/DLPQ MBEB 0        1    1 NRR/DOEA/OEAB               1    1                            1    1 RGN5                         1    1 EXTERNAL: EGGG BRYCE,J.H                 1     1     NRC PDR                 1   1 NSIC                        1     1 R
D A
D D
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR             24   ENCL   24
 
C I   *"
0      ~P P
  ~ \,< c,
 
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Bccc 968 ~ 3000 George Wasbfngton Way ~ Rtcb!and, Wasbtngton 993524968 ~ (509) 372-5000 Docket No. 50-397 June 10, 1991 G02-91-117 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555


==Dear Sir:==
==Dear Sir:==


==Subject:==
==Subject:==
NUCLEAR PLANT NO.2 MONTHLY OPERATING REPORT MAY 1991 Transmitted herewith is the Monthly Operating Report for the month of May 1991 as required by our Technical Specifications 6.9.1.6.Very truly yours,/J..Baker-2 Plant Manager (MD 927M)bap Enclosure CC: Mr.W.H.Lovelace, NRC, Washington DC Mr.J.B.Martin, NRC Region V Ms.Dottie Sherman, ANI, Farmington CT Mr.C.Sorensen, NRC Resident Inspector (901A)Mr.J.T.Wheelock, INPO Mr.F.Yost, Utility Data Institute 9i06iS0425'i053i PDR ADOCK 05000397 R PDR  
NUCLEAR PLANT NO. 2 MONTHLYOPERATING REPORT MAY 1991 Transmitted herewith is the Monthly Operating Report for the month             of May   1991 as required by our Technical Specifications 6.9.1.6.
~~OPERATING DATA REPORT WNP-2 01-JUN-91 1.DOCKET: 50-397 2.REPORTING PERIOD: MAY-91 OUTAGE+ON-LINE HOURS 744 3.UTILITY CONTACT: 1IEONARD B.HUTCHISON (509)377-2486 4.LICENSED THERMAL POWER (MWt): 5.NAMEPLATE RATING (GROSS MWe)6.DESIGN ELECTRICAL RATING (NET MWe),: 7.MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 8.MAXIMUM DEPENDABLE CAPACITY (NET MWe): 3323 1200.9 1100 1140 1095 9.IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS: NONE 10.POWER TO WHICH RESTRICTED, IF ANY (NET MWe): 11.REASONS FOR RESTRICTIONS, IF ANY: NONE NONE 12.REPORT PERIOD HOURS 13.HOURS REACTOR CRITICAL 14.RX RESERVE SHUTDOWN HOURS 15.HOURS GENERATOR ON LINE 16.UNIT RESERVE SHUTDOWN HOURS 17.GROSS THERMAL ENERGY (MWHt)18.GROSS ELECTRICAL ENERGY (MWHe)'9.NET ELECTRICAL ENERGY (MWHe)20.UNIT SERVICE FACTOR 21.UNIT AVAILABILITY FACTOR 22'NIT CAPACITY FACTOR (MDC NET)23.UNIT CAPACITY FACTOR (DER NET)24.UNIT FORCED OUTAGE RATE 25.FORCED OUTAGE HOURS MONTH 744 0.0 0.0 0.0 0.0 0 0-5035 0.0%0.0%0.0%0.0%0.0%0 YEAR 3623 2459 0 2439.3 0 7921510 2663880 2561653 67.3S 67.3S 64.6R 64.34 0.0%0 CUMULATIVE 56647.2 41443.2 340.4 40042.2 381.7 114270535 38065520 36589823 70.7%'1.4%59.0$58.7S 7.8%3401.2 26.SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, DURATION):
Very truly yours,
27.IF CURRENTLY SHUTDOWN, GIVE APPROXIMATE STARTUP DATE: 6/23/91  
    /
>>q'1 tl 5 i h t I g-4 DOCKET NO.: 50-397 UNIT NAME: WNP-2 l DATE: JUNE 1, 1991 COMPLETED BY: LB HUTCHISON'ELEPHONE:
J.. Baker
(509)377-2486 1 UNIT HUTDOWNS/REDUCTIONS REPORT PERIOD: MAY 1991 NO.DATE TYPE HOURS REASON METHOD LER NO SYSTEM COMPONENT CAUSE&CORRECTIVE ACTION TO PREVENT RECURRENCE 91-02 4/13/91 S 744 RC FUEL XX Refueling outage continuing.
      -2 Plant Manager (MD 927M) bap Enclosure CC:     Mr. W.H. Lovelace, NRC, Washington DC Mr. J.B. Martin, NRC Region V Ms. Dottie Sherman, ANI, Farmington CT Mr. C. Sorensen, NRC Resident Inspector (901A)
Mr. J.T. Wheelock, INPO Mr. F. Yost, UtilityData Institute 9i06iS0425'i053i PDR     ADOCK     05000397 R                         PDR
 
~ ~
OPERATING DATA REPORT WNP-2 01-JUN-91
: 1. DOCKET: 50-397
: 2. REPORTING PERIOD:       MAY-91                       OUTAGE + ON-LINE   HOURS               744
: 3. UTILITY CONTACT:         1IEONARD         B. HUTCHISON (509) 377-2486
: 4. LICENSED THERMAL POWER (MWt):                                                                3323
: 5. NAMEPLATE RATING (GROSS MWe)                                                             1200.9
: 6. DESIGN ELECTRICAL RATING (NET MWe),:                                                        1100
: 7. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):                                                    1140
: 8. MAXIMUM DEPENDABLE CAPACITY (NET MWe):                                                       1095
: 9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT,             GIVE REASONS:       NONE
: 10. POWER TO WHICH RESTRICTED,         IF ANY (NET MWe):                  NONE
: 11. REASONS FOR RESTRICTIONS,           IF ANY:                             NONE MONTH        YEAR  CUMULATIVE
: 12. REPORT PERIOD HOURS                                                 744      3623    56647.2
: 13. HOURS REACTOR CRITICAL                                             0.0        2459    41443.2
: 14. RX RESERVE SHUTDOWN HOURS                                           0.0            0      340.4
: 15. HOURS GENERATOR ON LINE                                             0.0    2439.3      40042.2
: 16. UNIT RESERVE SHUTDOWN HOURS                                         0.0            0      381.7
: 17. GROSS THERMAL ENERGY (MWHt)                                           0  7921510    114270535
: 18. GROSS ELECTRICAL ENERGY   (MWHe)'9.
0  2663880    38065520 NET ELECTRICAL ENERGY (MWHe)                                     -5035    2561653    36589823
: 20. UNIT SERVICE FACTOR                                                 0.0%      67.3S      70.
67.3S 7%'1.4%
: 21. UNIT AVAILABILITYFACTOR                                            0.0%
22 'NIT CAPACITY FACTOR   (MDC NET)                                   0.0%      64.6R      59.0$
: 23. UNIT CAPACITY FACTOR (DER NET)                                     0.0%       64.34      58.7S
: 24. UNIT FORCED OUTAGE RATE                                            0.0%       0.0%         7.8%
: 25. FORCED OUTAGE HOURS                                                    0          0     3401.2
: 26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS             (TYPE, DATE, DURATION):
: 27. IF CURRENTLY SHUTDOWN, GIVE APPROXIMATE STARTUP DATE:                   6/23/91
 
>>                 q'1 tl 5
i h
I g- 4 t
 
DOCKET NO.:     50-397 UNIT NAME:       WNP-2             l DATE:           JUNE 1, 1991 COMPLETED BY:   LB HUTCHISON (509) 377-2486 'ELEPHONE:
1 UNIT HUTDOWNS / REDUCTIONS REPORT PERIOD: MAY 1991 NO. DATE   TYPE HOURS REASON METHOD LER NO           SYSTEM COMPONENT       CAUSE & CORRECTIVE ACTION TO PREVENT RECURRENCE 91-02   4/13/91 S     744                                   RC     FUEL XX     Refueling outage continuing.


==SUMMARY==
==SUMMARY==
: WNP-2 was shutdown the entire month of May for refueling outage.REASON METHOD SYSTEM&COMPONENT F-FORCED S-SCHED A-EQUIP FAILURE B-MAINT OR TEST C-REFUELING D-REGULATORY RESTRICTION E-OPERATOR TRAINING&LICENSE EXAM F-ADMIN G-OPER ERROR H-OTHER 1-MANUAL 2-MANUAL SCRAM 3-AUTO SCRAM 4-CONTINUED 5-REDUCED LOAD 9-OTHER EXHIBIT F&H INSTRUCTIONS FOR PREPARATION OF DATA ENTRY SHEET LICENSEE EVENT REPORT (LER)FILE (NUREG%161)  
:     WNP-2 was shutdown the entire month of May for refueling outage.
~~<s~e~~AV GE DAILY UNIT POWER LEV MONTH: MAY 1991 DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE:
REASON                                             METHOD                     SYSTEM   & COMPONENT F-FORCED         A-EQUIP FAILURE             F-ADMIN                  1-MANUAL                  EXHIBITF & H S-SCHED          B-MAINTOR TEST              G-OPER ERROR           2-MANUALSCRAM              INSTRUCTIONS FOR C-REFUELING                H-OTHER                 3-AUTO SCRAM               PREPARATION OF D-REGULATORY RESTRICTION                            4-CONTINUED               DATA ENTRY SHEET E-OPERATOR TRAINING &                              5-REDUCED LOAD             LICENSEE EVENT REPORT LICENSE EXAM                                    9-OTHER                   (LER) FILE (NUREG%161)
50-397 WNP-2 MAY 1991 LB HUTCHISON (509)377-2486 DAY AVERAGE DAILY POWER LEVEL (MWe-NET)DAY AVERAGE DAILY POWER LEVEL (MWe-NET)17.2.18.3.19.20.21.22.8.10.26.27.12.28.13.29.14.30.31.16.INSTRUCTIONS ON THIS FORM, LIST THE AVERAGE DAILY UNIT POWER LEVEL IN MWe-NET FOR EACH DAY IN THE REPORTING MONTH.COMPUTE TO THE NEAREST WHOLE MEGAWATI'.
 
THESE FIGURES WILL BE USED TO PLOT A GRAPH FOR EACH REPORTING MONTH.NOTE THAT WHEN MAXIMUM DEPENDABLE CAPACITY IS USED FOR THE NET ELECTRICAL RATING OF THE UNIT, THRE MAY BE OCCASIONS WHEN THE DAILY AVERAGE POWER LEVEL EXCEEDS THE 100'Fo LINE (OR THE RESTRICTED POWER LEVEL LINE).IN SUCH CASES, THE AVERAGE DAILY UNIT POWER OUTPUT SHEET SHOULD BE FOOTNOTED TO EXPLAIN THE APPARENT ANOMALY.}}
  ~ ~ < s ~ ~
          ~
AV   GE DAILYUNIT POWER LEV DOCKET NO.:       50-397 UNIT:            WNP-2 DATE:            MAY 1991 COMPLETED BY:    LB HUTCHISON TELEPHONE:        (509) 377-2486 MONTH:      MAY 1991 DAY AVERAGE DAILYPOWER LEVEL                      DAY AVERAGE DAILYPOWER LEVEL (MWe-NET)                                         (MWe-NET) 17.
: 2.                                               18.
: 3.                                               19.
20.
21.
22.
8.
: 10.                                               26.
27.
: 12.                                               28.
: 13.                                               29.
: 14.                                               30.
31.
16.
INSTRUCTIONS ON THIS FORM, LIST THE AVERAGE DAILYUNIT POWER LEVEL IN MWe-NET FOR EACH DAY IN THE REPORTING MONTH. COMPUTE TO THE NEAREST WHOLE MEGAWATI'.
THESE FIGURES WILLBE USED TO PLOT A GRAPH FOR EACH REPORTING MONTH. NOTE THAT WHEN MAXIMUMDEPENDABLE CAPACITYIS USED FOR THE NET ELECTRICALRATING OF THE UNIT, THRE MAY BE OCCASIONS WHEN THE DAILY AVERAGE POWER LEVEL EXCEEDS THE 100'Fo LINE (OR THE RESTRICTED POWER LEVEL LINE). IN SUCH CASES, THE AVERAGE DAILYUNIT POWER OUTPUT SHEET SHOULD BE FOOTNOTED TO EXPLAINTHE APPARENT ANOMALY.}}

Latest revision as of 14:13, 29 October 2019

Monthly Operating Rept for May 1991 for WNP-2.W/910610 Ltr
ML17286A885
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/31/1991
From: John Baker, Hutchison L
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-91-117, NUDOCS 9106180429
Download: ML17286A885 (7)


Text

..ACCELERATED DIS UTION DEMONSTPATION SYSTEM wo REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9106180429 DOC.DATE: 91/05/31 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION HUTCHISON,L.B. Washington Public Power Supply System BAKER,J.W. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION R

SUBJECT:

Monthly operating rept for May 1991 for WNP-2.W/910610 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs)

I ENCL 2 SIZE: D NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 3 3 PD5 PD 1 1 ENG,P.L. 1 1 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NRR/DLPQ MBEB 0 1 1 NRR/DOEA/OEAB 1 1 1 1 RGN5 1 1 EXTERNAL: EGGG BRYCE,J.H 1 1 NRC PDR 1 1 NSIC 1 1 R

D A

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24

C I *"

0 ~P P

~ \,< c,

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Bccc 968 ~ 3000 George Wasbfngton Way ~ Rtcb!and, Wasbtngton 993524968 ~ (509) 372-5000 Docket No. 50-397 June 10, 1991 G02-91-117 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Dear Sir:

Subject:

NUCLEAR PLANT NO. 2 MONTHLYOPERATING REPORT MAY 1991 Transmitted herewith is the Monthly Operating Report for the month of May 1991 as required by our Technical Specifications 6.9.1.6.

Very truly yours,

/

J.. Baker

-2 Plant Manager (MD 927M) bap Enclosure CC: Mr. W.H. Lovelace, NRC, Washington DC Mr. J.B. Martin, NRC Region V Ms. Dottie Sherman, ANI, Farmington CT Mr. C. Sorensen, NRC Resident Inspector (901A)

Mr. J.T. Wheelock, INPO Mr. F. Yost, UtilityData Institute 9i06iS0425'i053i PDR ADOCK 05000397 R PDR

~ ~

OPERATING DATA REPORT WNP-2 01-JUN-91

1. DOCKET: 50-397
2. REPORTING PERIOD: MAY-91 OUTAGE + ON-LINE HOURS 744
3. UTILITY CONTACT: 1IEONARD B. HUTCHISON (509) 377-2486
4. LICENSED THERMAL POWER (MWt): 3323
5. NAMEPLATE RATING (GROSS MWe) 1200.9
6. DESIGN ELECTRICAL RATING (NET MWe),: 1100
7. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 1140
8. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 1095
9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS: NONE
10. POWER TO WHICH RESTRICTED, IF ANY (NET MWe): NONE
11. REASONS FOR RESTRICTIONS, IF ANY: NONE MONTH YEAR CUMULATIVE
12. REPORT PERIOD HOURS 744 3623 56647.2
13. HOURS REACTOR CRITICAL 0.0 2459 41443.2
14. RX RESERVE SHUTDOWN HOURS 0.0 0 340.4
15. HOURS GENERATOR ON LINE 0.0 2439.3 40042.2
16. UNIT RESERVE SHUTDOWN HOURS 0.0 0 381.7
17. GROSS THERMAL ENERGY (MWHt) 0 7921510 114270535
18. GROSS ELECTRICAL ENERGY (MWHe)'9.

0 2663880 38065520 NET ELECTRICAL ENERGY (MWHe) -5035 2561653 36589823

20. UNIT SERVICE FACTOR 0.0% 67.3S 70.

67.3S 7%'1.4%

21. UNIT AVAILABILITYFACTOR 0.0%

22 'NIT CAPACITY FACTOR (MDC NET) 0.0% 64.6R 59.0$

23. UNIT CAPACITY FACTOR (DER NET) 0.0% 64.34 58.7S
24. UNIT FORCED OUTAGE RATE 0.0% 0.0% 7.8%
25. FORCED OUTAGE HOURS 0 0 3401.2
26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, DURATION):
27. IF CURRENTLY SHUTDOWN, GIVE APPROXIMATE STARTUP DATE: 6/23/91

>> q'1 tl 5

i h

I g- 4 t

DOCKET NO.: 50-397 UNIT NAME: WNP-2 l DATE: JUNE 1, 1991 COMPLETED BY: LB HUTCHISON (509) 377-2486 'ELEPHONE:

1 UNIT HUTDOWNS / REDUCTIONS REPORT PERIOD: MAY 1991 NO. DATE TYPE HOURS REASON METHOD LER NO SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO PREVENT RECURRENCE 91-02 4/13/91 S 744 RC FUEL XX Refueling outage continuing.

SUMMARY

WNP-2 was shutdown the entire month of May for refueling outage.

REASON METHOD SYSTEM & COMPONENT F-FORCED A-EQUIP FAILURE F-ADMIN 1-MANUAL EXHIBITF & H S-SCHED B-MAINTOR TEST G-OPER ERROR 2-MANUALSCRAM INSTRUCTIONS FOR C-REFUELING H-OTHER 3-AUTO SCRAM PREPARATION OF D-REGULATORY RESTRICTION 4-CONTINUED DATA ENTRY SHEET E-OPERATOR TRAINING & 5-REDUCED LOAD LICENSEE EVENT REPORT LICENSE EXAM 9-OTHER (LER) FILE (NUREG%161)

~ ~ < s e ~ ~

~

AV GE DAILYUNIT POWER LEV DOCKET NO.: 50-397 UNIT: WNP-2 DATE: MAY 1991 COMPLETED BY: LB HUTCHISON TELEPHONE: (509) 377-2486 MONTH: MAY 1991 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe-NET) (MWe-NET) 17.

2. 18.
3. 19.

20.

21.

22.

8.

10. 26.

27.

12. 28.
13. 29.
14. 30.

31.

16.

INSTRUCTIONS ON THIS FORM, LIST THE AVERAGE DAILYUNIT POWER LEVEL IN MWe-NET FOR EACH DAY IN THE REPORTING MONTH. COMPUTE TO THE NEAREST WHOLE MEGAWATI'.

THESE FIGURES WILLBE USED TO PLOT A GRAPH FOR EACH REPORTING MONTH. NOTE THAT WHEN MAXIMUMDEPENDABLE CAPACITYIS USED FOR THE NET ELECTRICALRATING OF THE UNIT, THRE MAY BE OCCASIONS WHEN THE DAILY AVERAGE POWER LEVEL EXCEEDS THE 100'Fo LINE (OR THE RESTRICTED POWER LEVEL LINE). IN SUCH CASES, THE AVERAGE DAILYUNIT POWER OUTPUT SHEET SHOULD BE FOOTNOTED TO EXPLAINTHE APPARENT ANOMALY.