{{#Wiki_filter:ACCELERATED DIS REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)""":*" FACIL:50-397 WPPSS Nuclear Project, Unit AUTH.NAME AUTHOR AFFILIATION EMBREE,D.G.
{{#Wiki_filter:ACCELERATED DIS REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
Washington Public Power SMITH,G.O.
          " " ":
Washington Public Power RECIP.NAME RECIPIENT AFFILIATION NOTARIZED:
FACIL:50-397
NO DOCKET 2, Washington Public Powe 05000397 Supply System Supply System
                    *"
WPPSS NOTARIZED: NO Nuclear Project, Unit 2, Washington Public          Powe DOCKET 05000397 AUTH. NAME           AUTHOR AFFILIATION EMBREE,D.G.         Washington Public Power Supply System SMITH,G.O.           Washington Public Power Supply System RECIP.NAME           RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Month operating rept for Feb 1994 for WPPS 2.40310 ltr.DISTRIBUTION CODE IE24D COPIES RECEIVED:LTR ENCL TITLE: Monthly Operating Report (per Tech Specs)NOTES: SIZE: D RECIPIENT ID CODE/NAME PDV PD INTERNAL: ACRS AEOD/DSP/TPAB NRR/DRIL/RPEB RGN5 EXTERNAL EGS(G BRYCE i J H NSIC COPIES LTTR ENCL 1 1 10 10 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME CLIFFORD,J AEOD/DOA NRR~O+~SOEAB G FILE 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 D D R D NOTE TO ALL"RIDS" RECIPIENTS:
Month       operating rept for       Feb 1994   for WPPS   2.
D D PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 21 WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Bax968~3000George 1Pasbtngton Way~Richland, Wasbtngton 99352-0968
40310   ltr.                                                                 D DISTRIBUTION   CODE   IE24D       COPIES RECEIVED:LTR       ENCL       SIZE:
~(509)372-5000 March 10, 1994 G02-94-057 Docket No.50-397 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555  
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT              COPIES            RECIPIENT         COPIES ID  CODE/NAME            LTTR ENCL      ID CODE/NAME       LTTR ENCL PDV PD                       1    1    CLIFFORD,J              1    1            D INTERNAL: ACRS                         10    10    AEOD/DOA                1    1            D AEOD/DSP/TPAB               1    1    NRR ~O+~SOEAB          1    1 NRR/DRIL/RPEB               1    1        G  FILE      01      1    1 RGN5                         1    1 EXTERNAL   EGS(G BRYCE i J H           1     1     NRC PDR NSIC                        1     1 R
D D
D NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR             21   ENCL   21
 
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Bax968 ~ 3000George 1Pasbtngton Way ~ Richland, Wasbtngton 99352-0968 ~ (509) 372-5000 March 10, 1994 G02-94-057 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555


==Dear Sirs:==
==Dear Sirs:==


==Subject:==
==Subject:==
NUCLEAR PLANT NO.2 MONTHLY OPERATING REPORT FEBRUARY 1994 Transmitted herewith is the Monthly Operating Report for the month of February, 1994 as required by our Technical Specifications 6.9.1.6.G.O.Smith Operations Division Manager (MD 9270)GOS:DGE CC: Mr.W.H.Lovelace, NRC, Washington, DC Mr.K.E.Perkins, NRC Region V Mr.R.C.Barr, NRC Resident Inspector (927N)Mr.J.T.Wheelock, INPO Mr.C.Bergesen, Utility Data Institute Mr.J.T.Irish, BPA (399)9405 j.50508'~05000~97
NUCLEAR PLANT NO. 2 MONTHLYOPERATING REPORT FEBRUARY 1994 Transmitted herewith is the Monthly Operating Report for the month           of February,   1994 as required by our Technical Specifications 6.9.1.6.
"'.', PDR ADOC PDR.R..'
G. O. Smith Operations Division Manager     (MD 9270)
I)'.4'<)j)q' OPERATING STATUS REPORT for WNP-2 Date: March 1, 1994 2.3.4 5.6.7.8.9.3323 1200.9 1120 1132 1086 n/a Docket: 50-397 Reporting Period: FEBRUARY 1994 Outage+On-Line Hours: 672.0 Utility Contact: David G.Embree (509)377-8448 Licensed Thermal Power (MW,): Nameplate Rating (Gross MW,): Design Electrical Rating (Net MW,): Maximum Dependable Capacity (Gross MW,): Maximum Dependable Capacity (Net MW,): If changes occur above since last report, give reasons;10.Power to which restricted, if any (Net MW,): 11.Reasons for restrictions, if any;about 1083 end-of-cycle coastdown 12.13.14.15.16.17.18.19.20.21.22.23.24.25.Report Period Hours Hours Reactor Critical Rx Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy (MVM)Gross Electrical Energy (MWH)Net Electrical Energy (MWH)Unit Service Factor Unit Availability Factor Unit Capacity Factor (MDC Net)Unit Capacity Factor (DER Net)Unit Forced Outage Rate Forced Outage Hours MONTH 672.0 672.0 0.0 672.0 0.0 2,222,531 771,920 742,643 100.0%100.0%101.8%98.7%0.0%0.0 YEAR 1,416.0 1,416.0 0.0 1,416.0 0.0 4,628,151 1,609,600 1,548,725 100.0%100.0%100.7%97.7%0.0%0.0 CUMULATIVE 80,744.2 57,526.2 340.4 55,483.0 381.7 163,389,457 54,921,810 52,634,110 68.7%69.2%S9.7%S9.2%12.4%7,885,3 26.Shutdowns scheduled over the next 6 months (type, date, duration):
GOS:DGE CC:   Mr. W.H. Lovelace, NRC, Washington, DC Mr. K.E. Perkins, NRC Region V Mr. R.C. Barr, NRC Resident Inspector (927N)
Refueling Outage, about April 30, 1994, 60 Days.27.If currently shutdown estimated startup date: n/a Note: Cumualtive Unit Capacity Factors (MDC&DER)are calculated with weighted averages.
Mr. J.T. Wheelock, INPO Mr. C. Bergesen, Utility Data Institute Mr. J.T. Irish, BPA (399)
AVERAGE DAILY UNIT POWER LEVEL REPORT PERIOD: FEBRUARY 1994 DOCKET NO.: 50-397 UNIT: WNP-2 DATE: March 1, 1994 COMPLETED BY: D.G.Embree TELEPHONE:
                                    "
(509)377-8448 DAY AVERAGE DAILY POWER LEVEL (Net MWe)AVERAGE DAILY POWER LEVEL DAY (Net MWe)10 12 13 14 15 1119 1118 1121 1117 1120 1101 1117 1116 1114 1110 1105 1110 1105.1106 1103 16 17 18 19 20 21 22 23 24 25 26 27 28 1105 1103 1098 1105 1108 1106 1102 1096 1104 1073 1083 1099 1083 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net)for each day in the reporting month.Compute to the nearest whole megawatt.These figures will be used to plot a graph for each reporting month.Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 1009o line (or the restricted power level line).In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
9405 j. 50508 '~05000~97       '
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT PERIOD: FEBRUARY 1994 DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: March 1, 1994 COMPLETED BY: D.G.Embree.TELEPHONE:
ADOC
(509)3774448'o.
                                        .',
Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence
PDR                     PDR.
R..'
 
I
  )'.4'<) j) q'
 
OPERATING STATUS REPORT for WNP-2 Date:   March 1, 1994 Docket: 50-397
: 2. Reporting Period: FEBRUARY 1994                           Outage   + On-Line Hours:     672.0
: 3. Utility Contact:       David G. Embree (509) 377-8448 4    Licensed Thermal Power (MW, ):                                                           3323
: 5. Nameplate Rating (Gross MW, ):                                                         1200.9
: 6. Design Electrical Rating (Net MW,):                                                       1120
: 7. Maximum Dependable Capacity (Gross MW,):                                                 1132
: 8. Maximum Dependable Capacity (Net MW, ):                                                   1086
: 9. Ifchanges occur above since last report, give reasons;                                     n/a
: 10. Power to which restricted, if any (Net MW,):                                        about 1083
: 11. Reasons for restrictions, if any;                                     end-of-cycle coastdown MONTH              YEAR          CUMULATIVE
: 12. Report Period Hours                                672.0            1,416.0            80,744.2
: 13. Hours Reactor Critical                             672.0           1,416.0           57,526.2
: 14. Rx Reserve Shutdown Hours                              0.0               0.0             340.4
: 15. Hours Generator On-Line                            672.0           1,416.0           55,483.0
: 16. Unit Reserve Shutdown Hours                            0.0               0.0             381.7
: 17. Gross Thermal Energy (MVM)                    2,222,531          4,628,151         163,389,457
: 18. Gross Electrical Energy (MWH)                    771,920          1,609,600         54,921,810
: 19. Net Electrical Energy (MWH)                      742,643          1,548,725         52,634,110
: 20. Unit Service Factor                              100.0%             100.0%               68.7%
: 21. Unit Availability Factor                          100.0%             100.0%              69.2%
: 22. Unit Capacity Factor (MDC Net)                    101. 8%            100.7%              S9.7%
: 23. Unit Capacity Factor (DER Net)                    98.7%             97.7%               S9.2%
: 24. Unit Forced Outage Rate                            0.0%              0.0%              12.4%
: 25. Forced Outage Hours                                    0.0                0.0            7,885,3
: 26. Shutdowns scheduled over the next 6 months (type, date, duration):
Refueling Outage, about April 30, 1994, 60 Days.
: 27. If currently shutdown estimated startup date:                                               n/a Note: Cumualtive Unit Capacity Factors (MDC & DER) are calculated with weighted averages.
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:       50-397 UNIT:   WNP-2 DATE:     March 1, 1994 COMPLETED BY:         D. G. Embree TELEPHONE:       (509) 377-8448 REPORT PERIOD:            FEBRUARY 1994 AVERAGE DAILYPOWER LEVEL                                        AVERAGE DAILYPOWER LEVEL DAY                    (Net MWe)                                 DAY                 (Net MWe) 1119                                   16                    1105 1118                                   17                    1103 1121                                   18                    1098 1117                                   19                    1105 1120                                 20                      1108 1101                                 21                      1106 1117                                 22                    1102 1116                                 23                    1096 1114                                 24                    1104 10                        1110                                 25                    1073 1105                                 26                    1083 12                        1110                                 27                    1099 13                        1105                                 28                    1083 14                        .1106 15                        1103 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures willbe used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 1009o line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
 
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:       50-397 UNIT NAME:       WNP-2 DATE:     March 1, 1994 COMPLETED BY:         D.G. Embree.
TELEPHONE:       (509)
REPORT PERIOD:      FEBRUARY 1994                                                                                                          3774448'o.
Date   Type     Hours     Reason     Method     LER Number       System Component     Cause and Corrective Action To Prevent Recurrence


==SUMMARY==
==SUMMARY==
: WNP-2 operated near full power during the month with no significant power reductions
:             WNP-2 operated near full power during the month with no significant power reductions         () 20%), however,       the reactor was in end-of-cycle coastdown with final feedwater temperature reduction in progress.
()20%), however, the reactor was in end-of-cycle coastdown with final feedwater temperature reduction in progress.TYPE F-Forced S-Scheduled REASON A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administration G-Operational Error H-Other METHOD 1-Manual 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other SYSTEM&COMPONENT NUREGA161 Exhibits F&H}}
TYPE                     REASON                                                            METHOD                  SYSTEM & COMPONENT F - Forced               A - Equipment Failure             E - Operator Training &         1 - Manual              NUREGA161 Exhibits F & H S - Scheduled            B - Maintenance or Test                  License Examination    2 - Manual Scram C - Refueling                    F - Administration              3 - Auto Scram D - Regulatory Restriction        G - Operational Error          4 - Continued H - Other                      5 - Reduced Load 9 - Other}}

Revision as of 13:37, 29 October 2019

Monthly Operating Rept for Feb 1994 for WNP-2.W/940310 Ltr
ML17290B016
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/28/1994
From: Embree D, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-94-057, GO2-94-57, NUDOCS 9403150508
Download: ML17290B016 (6)


Text

ACCELERATED DIS REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

" " ":

FACIL:50-397

  • "

WPPSS NOTARIZED: NO Nuclear Project, Unit 2, Washington Public Powe DOCKET 05000397 AUTH. NAME AUTHOR AFFILIATION EMBREE,D.G. Washington Public Power Supply System SMITH,G.O. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Month operating rept for Feb 1994 for WPPS 2.

40310 ltr. D DISTRIBUTION CODE IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PDV PD 1 1 CLIFFORD,J 1 1 D INTERNAL: ACRS 10 10 AEOD/DOA 1 1 D AEOD/DSP/TPAB 1 1 NRR ~O+~SOEAB 1 1 NRR/DRIL/RPEB 1 1 G FILE 01 1 1 RGN5 1 1 EXTERNAL EGS(G BRYCE i J H 1 1 NRC PDR NSIC 1 1 R

D D

D NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 21

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Bax968 ~ 3000George 1Pasbtngton Way ~ Richland, Wasbtngton 99352-0968 ~ (509) 372-5000 March 10, 1994 G02-94-057 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Dear Sirs:

Subject:

NUCLEAR PLANT NO. 2 MONTHLYOPERATING REPORT FEBRUARY 1994 Transmitted herewith is the Monthly Operating Report for the month of February, 1994 as required by our Technical Specifications 6.9.1.6.

G. O. Smith Operations Division Manager (MD 9270)

GOS:DGE CC: Mr. W.H. Lovelace, NRC, Washington, DC Mr. K.E. Perkins, NRC Region V Mr. R.C. Barr, NRC Resident Inspector (927N)

Mr. J.T. Wheelock, INPO Mr. C. Bergesen, Utility Data Institute Mr. J.T. Irish, BPA (399)

"

9405 j. 50508 '~05000~97 '

ADOC

.',

PDR PDR.

R..'

I

)'.4'<) j) q'

OPERATING STATUS REPORT for WNP-2 Date: March 1, 1994 Docket: 50-397

2. Reporting Period: FEBRUARY 1994 Outage + On-Line Hours: 672.0
3. Utility Contact: David G. Embree (509) 377-8448 4 Licensed Thermal Power (MW, ): 3323
5. Nameplate Rating (Gross MW, ): 1200.9
6. Design Electrical Rating (Net MW,): 1120
7. Maximum Dependable Capacity (Gross MW,): 1132
8. Maximum Dependable Capacity (Net MW, ): 1086
9. Ifchanges occur above since last report, give reasons; n/a
10. Power to which restricted, if any (Net MW,): about 1083
11. Reasons for restrictions, if any; end-of-cycle coastdown MONTH YEAR CUMULATIVE
12. Report Period Hours 672.0 1,416.0 80,744.2
13. Hours Reactor Critical 672.0 1,416.0 57,526.2
14. Rx Reserve Shutdown Hours 0.0 0.0 340.4
15. Hours Generator On-Line 672.0 1,416.0 55,483.0
16. Unit Reserve Shutdown Hours 0.0 0.0 381.7
17. Gross Thermal Energy (MVM) 2,222,531 4,628,151 163,389,457
18. Gross Electrical Energy (MWH) 771,920 1,609,600 54,921,810
19. Net Electrical Energy (MWH) 742,643 1,548,725 52,634,110
20. Unit Service Factor 100.0% 100.0% 68.7%
21. Unit Availability Factor 100.0% 100.0% 69.2%
22. Unit Capacity Factor (MDC Net) 101. 8% 100.7% S9.7%
23. Unit Capacity Factor (DER Net) 98.7% 97.7% S9.2%
24. Unit Forced Outage Rate 0.0% 0.0% 12.4%
25. Forced Outage Hours 0.0 0.0 7,885,3
26. Shutdowns scheduled over the next 6 months (type, date, duration):

Refueling Outage, about April 30, 1994, 60 Days.

27. If currently shutdown estimated startup date: n/a Note: Cumualtive Unit Capacity Factors (MDC & DER) are calculated with weighted averages.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-397 UNIT: WNP-2 DATE: March 1, 1994 COMPLETED BY: D. G. Embree TELEPHONE: (509) 377-8448 REPORT PERIOD: FEBRUARY 1994 AVERAGE DAILYPOWER LEVEL AVERAGE DAILYPOWER LEVEL DAY (Net MWe) DAY (Net MWe) 1119 16 1105 1118 17 1103 1121 18 1098 1117 19 1105 1120 20 1108 1101 21 1106 1117 22 1102 1116 23 1096 1114 24 1104 10 1110 25 1073 1105 26 1083 12 1110 27 1099 13 1105 28 1083 14 .1106 15 1103 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures willbe used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 1009o line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: March 1, 1994 COMPLETED BY: D.G. Embree.

TELEPHONE: (509)

REPORT PERIOD: FEBRUARY 1994 3774448'o.

Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence

SUMMARY

WNP-2 operated near full power during the month with no significant power reductions () 20%), however, the reactor was in end-of-cycle coastdown with final feedwater temperature reduction in progress.

TYPE REASON METHOD SYSTEM & COMPONENT F - Forced A - Equipment Failure E - Operator Training & 1 - Manual NUREGA161 Exhibits F & H S - Scheduled B - Maintenance or Test License Examination 2 - Manual Scram C - Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction G - Operational Error 4 - Continued H - Other 5 - Reduced Load 9 - Other