ML17292B110: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY 1 REGULA Y INFORMATION DISTRIBUTI SYSTEM (RIDS)ACCESSION NBR:9711180204 DOC.DATE: 97/10/31 NOTARIZED:
{{#Wiki_filter:CATEGORY 1 REGULA     Y INFORMATION     DISTRIBUTI     SYSTEM (RIDS)
NO DOCKET FACIL:50~397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.MME AUTHOR AFFILIATION KASKO,B.Washington Public Power Supply System SMITH,G.O.
ACCESSION NBR:9711180204           DOC.DATE: 97/10/31 NOTARIZED: NO                     DOCKET FACIL:50~397     WPPSS   Nuclear Project, Unit 2, Washington Public             Powe   05000397 AUTH.MME             AUTHOR   AFFILIATION KASKO,B.             Washington Public Power Supply System SMITH,G.O.           Washington Public Power Supply System RECIP.NAME           RECIPIENT AFFILIATION
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating rept for Oct 1997 for WNP-2.W/971111 ltr.DISTRIBUTION CODE: XE24D COPIES RECEIVED:LTR ENCL" SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECXPIENT ID CODE/NAME PD4-2 PD INTERNAL: ACRS ENTE 01 BA'COPIES LTTR ENCL 1 1 1 1 1 1 1 1 RECIPIENT XD CODE/NAME COLBURN,T AEOD/SPD/RRAB NRR/DRPM/PECB RGN4 COPIES LTTR ENCL 1 1 1 1 1 1 1 1 E 0 EZTERNAL: LITCO BRYCE,J H NRC PDR 1 1 1 1 NOAC 1 1 D 0 C E N NOTE TO ALL"RIDS" RECIPIENTS:
Monthly operating rept         for Oct 1997   for WNP-2.W/971111     ltr.
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR'YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENS1ON 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11 t gl Cy'P 4 I WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~Richland, Washington 99352-0968 November 11, 1997 r G02-97-205 Docket No.50-397 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 Gentlemen:
DISTRIBUTION CODE: XE24D         COPIES RECEIVED:LTR           ENCL     " SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
E RECXPIENT           COPIES              RECIPIENT            COPIES ID CODE/NAME         LTTR ENCL          XD CODE/NAME        LTTR ENCL PD4-2 PD                   1     1       COLBURN,T                1     1 INTERNAL: ACRS                        1 0
1       AEOD/SPD/RRAB             1    1 ENTE    01      1      1      NRR/DRPM/PECB             1     1 BA'                  1     1       RGN4                      1     1 EZTERNAL: LITCO BRYCE,J H             1     1       NOAC                      1     1 NRC PDR                  1     1 D
0 C
E N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR'YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENS1ON 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR               11   ENCL     11
 
t gl Cy
    '
P 4 I
 
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ Richland, Washington 99352-0968 November 11, 1997 r
G02-97-205 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:


==Subject:==
==Subject:==
WNP-2 OPERATING LICENSE NPF-21 MONTHLY OPERATING REPORT OCTOBER 1997 Transmitted herewith is the Monthly Operating Report for the month of October 1997 as required.by'.Technical Specification 5.6.4.~, Respectfully, G.O.Smith Plant General Manager Mail Drop 927M cc: EW Merschoff-NRC RIV TG Colburn-NRR KE Perkins, Jr.-NRC RIV, WCFO NRC Sr.Resident Inspector-927N PD Robinson-Winston&Strawn INPO ANI Library Utility Data Institute,""-"'DL"Williams
WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT OCTOBER 1997 Transmitted herewith is the Monthly Operating Report for the month         of October       1997 as required. by'.Technical Specification 5.6.4.
-'BPA/;3999'7iii80204 97iQSi PDR.'ADQCK 05000397 I'PDR IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII I A k v~ll OPERATING STATUS REPORT for WNP-2 Date: November 1, 1997 2.3.4.5.Docket: 50-397 Reporting Period: OCTOBER 1997, Utility Contact: Bernice Kasko (509)377-4473 Design Electrical Rating (Net MW,): Maximum Dependable Capacity-summer (Net MW,): 1153 1107 6.7.8.9 Hours Reactor Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWH)MONTH 744,0 744.0 0.0 699,834 YEAR 4,907.7 4,783.9 1,081.3 4,443,046 CUMULATIVE 80,780.3 78,034.0 3,037.5 74,751,321 10.Challenges to safety/relief valves: None E<<I 4 UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: November 1, 1997 COMPLETED BY: B Kasko TELEPHONE:
                      ~,
(509)377M73 REPORT PERIOD: OCTOBER 1997 No.Date Type F: Forced S: Scheduled Duration (Hours)Reason (I)Method (2)Cause and Corrective Action To Prevent Recurrence None SMBrIARY: At the end of the month WNP-2 was operating at 100%power.~lREASON A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administration G-Operational Error H-Other 2 METHOD 1-Manua 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other o I)a=4}}
Respectfully, G. O. Smith Plant General Manager Mail Drop 927M cc:     EW Merschoff - NRC RIV TG Colburn - NRR KE Perkins, Jr. - NRC RIV, WCFO NRC Sr. Resident Inspector - 927N PD Robinson - Winston & Strawn INPO ANI Library UtilityData Institute,
  " "-"'DL"Williams   -'BPA /;399 9'7iii80204 97iQSi                                                         IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PDR .'ADQCK     05000397 I'
PDR
 
I v ~
A k ll
 
OPERATING STATUS REPORT for WNP-2 Date:   November 1, 1997 Docket: 50-397
: 2. Reporting Period: OCTOBER 1997,
: 3. Utility Contact: Bernice Kasko (509) 377-4473
: 4. Design Electrical Rating (Net MW,):                                   1153
: 5. Maximum Dependable Capacity - summer (Net MW,):                       1107 MONTH        YEAR  CUMULATIVE
: 6. Hours Reactor Critical                       744,0     4,907.7   80,780.3
: 7. Hours Generator On-Line                      744.0      4,783.78,034.0
: 8. Unit Reserve Shutdown Hours                    0.0    1,081.3    3,037.5 9  Net Electrical Energy (MWH)                699,834  4,443,046  74,751,321
: 10. Challenges to safety/relief valves:                                   None
 
E<<
I 4
 
UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: November 1, 1997 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD:       OCTOBER 1997 Type F: Forced       Duration No.        Date      S: Scheduled     (Hours)     Reason (I) Method (2)             Cause and Corrective Action To Prevent Recurrence None SMBrIARY:                 At the end of the month WNP-2       was operating at 100% power.
~lREASON                                                                 2 METHOD A - Equipment Failure               E - Operator Training &            1 - Manua B - Maintenance or Test                     License Examination        2 - Manual Scram C - Refueling                       F - Administration                3 - Auto Scram D - Regulatory Restriction           -
G Operational Error               4 - Continued H - Other                         5 - Reduced Load 9 - Other
 
o I) a= 4}}

Revision as of 13:03, 29 October 2019

Monthly Operating Rept for Oct 1997 for WNP-2.W/971111 Ltr
ML17292B110
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/31/1997
From: Kasko B, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-97-205, NUDOCS 9711180204
Download: ML17292B110 (8)


Text

CATEGORY 1 REGULA Y INFORMATION DISTRIBUTI SYSTEM (RIDS)

ACCESSION NBR:9711180204 DOC.DATE: 97/10/31 NOTARIZED: NO DOCKET FACIL:50~397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.MME AUTHOR AFFILIATION KASKO,B. Washington Public Power Supply System SMITH,G.O. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Oct 1997 for WNP-2.W/971111 ltr.

DISTRIBUTION CODE: XE24D COPIES RECEIVED:LTR ENCL " SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

E RECXPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL XD CODE/NAME LTTR ENCL PD4-2 PD 1 1 COLBURN,T 1 1 INTERNAL: ACRS 1 0

1 AEOD/SPD/RRAB 1 1 ENTE 01 1 1 NRR/DRPM/PECB 1 1 BA' 1 1 RGN4 1 1 EZTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

0 C

E N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR'YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENS1ON 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11

t gl Cy

'

P 4 I

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ Richland, Washington 99352-0968 November 11, 1997 r

G02-97-205 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT OCTOBER 1997 Transmitted herewith is the Monthly Operating Report for the month of October 1997 as required. by'.Technical Specification 5.6.4.

~,

Respectfully, G. O. Smith Plant General Manager Mail Drop 927M cc: EW Merschoff - NRC RIV TG Colburn - NRR KE Perkins, Jr. - NRC RIV, WCFO NRC Sr. Resident Inspector - 927N PD Robinson - Winston & Strawn INPO ANI Library UtilityData Institute,

" "-"'DL"Williams -'BPA /;399 9'7iii80204 97iQSi IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PDR .'ADQCK 05000397 I'

PDR

I v ~

A k ll

OPERATING STATUS REPORT for WNP-2 Date: November 1, 1997 Docket: 50-397

2. Reporting Period: OCTOBER 1997,
3. Utility Contact: Bernice Kasko (509) 377-4473
4. Design Electrical Rating (Net MW,): 1153
5. Maximum Dependable Capacity - summer (Net MW,): 1107 MONTH YEAR CUMULATIVE
6. Hours Reactor Critical 744,0 4,907.7 80,780.3
7. Hours Generator On-Line 744.0 4,783.9 78,034.0
8. Unit Reserve Shutdown Hours 0.0 1,081.3 3,037.5 9 Net Electrical Energy (MWH) 699,834 4,443,046 74,751,321
10. Challenges to safety/relief valves: None

E<<

I 4

UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: November 1, 1997 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD: OCTOBER 1997 Type F: Forced Duration No. Date S: Scheduled (Hours) Reason (I) Method (2) Cause and Corrective Action To Prevent Recurrence None SMBrIARY: At the end of the month WNP-2 was operating at 100% power.

~lREASON 2 METHOD A - Equipment Failure E - Operator Training & 1 - Manua B - Maintenance or Test License Examination 2 - Manual Scram C - Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction -

G Operational Error 4 - Continued H - Other 5 - Reduced Load 9 - Other

o I) a= 4