ML17304A701: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:NRC MONTHLY OPERATING REPORT DOCKET NO.50-528 UNIT NAME PVNGS-1 DATE 10 24 88 COMPLETED BY T J Bloom TELEPHONE 602 371-418 OPERATING STATUS l.2.3.4~5.6.7.8.9.10 Unit Name: Palo Verde Nuclear Generatin Station Unit 1 Reporting Period: Se tember 1988 Licensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe): 1403 Design Electrical Rating (Net MWe): 1270 Maximum Dependable Capacity (Gross MWe): 1303 Maximum Dependable Capacity (Net MWe): 1221 If Changes Occur In Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: N A Power Level to Which Restricted, If Any (Net MWe): None Reasons For Restrictions, If Any: N A ,'This Month Yr.-to-Date Cumulative ll 12 13 14.15.16 17 18 19.20.21.22 23 24 20 0 6 5 6 0 23 448.0 13 532 1 3 554 9 0 0 0.0 13 096 9 3 3 9 8 0.0 0.0 47 208 584.0 12 175 4 0 4 236 500 0 16 379 800.0 15 295 346.0 3 967 421.0 51.4S 55.9S 55.9a 53.4%96 4 51.4a 30.6%on of Each): Hours in Reporting Period Number of Hours Reactor, Was Critical 720 0 Reactor Reserve Shutdown Hours 0 0 Unit Reserve Shutdown Hours 0 0 Gross Thermal Energy Generated (MWH)Gross Electrical Energy Generated (MWH)894 600.0 Net Electrical Energy Generated (MWH)847 552.0 Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)Unit Capacity Factor (Using DER Net)92 7S Unit Forced Outage Rate 0 Oa 44 3s Shutdowns Scheduled Over Next 6 Months (Type, Date, and Durati Refuelin Outa e-03 21 89-70 Da s 25.If Shutdown At End of Report Period, Estimated Date of Startup: N A INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION.SS12OSS>>S SS'I 0409A/2264A PDR~DO~'PNU Q R Forecast~05 85 06 85 ll 85 Achieved~05 25 85//'V 06/610 85~01 28 86~j 0 L'~i ll J 1}}
{{#Wiki_filter:NRC MONTHLY OPERATING REPORT DOCKET NO. 50-528 UNIT   NAME   PVNGS-1 DATE           10 24 88 COMPLETED BY T J     Bloom TELEPHONE       602 371-418 OPERATING STATUS
: l. Unit Name:   Palo Verde Nuclear Generatin Station Unit 1
: 2. Reporting Period: Se tember 1988
: 3. Licensed Thermal Power (MWt): 3800 4 ~  Nameplate Rating (Gross MWe): 1403
: 5. Design Electrical Rating (Net MWe):               1270
: 6. Maximum Dependable Capacity (Gross MWe): 1303
: 7. Maximum Dependable Capacity (Net MWe):           1221
: 8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:       N A
: 9. Power Level   to Which Restricted, If Any (Net       MWe): None 10  Reasons For Restrictions, If Any: N A
                                          ,'This   Month         Yr.-to-Date         Cumulative ll 12 Hours Number in Reporting Period of Hours Reactor, 20 0                   6 5 6 0           23 448.0 Was  Critical                            720 0                  3 554 9            13 532 1 13  Reactor Reserve Shutdown Hours                                        0 0                      0 0                 0.0
: 14.                                                                  3 3 9 8           13 096 9
: 15. Unit Reserve  Shutdown Hours                                        0 0                     0.0                 0.0 16   Gross Thermal Energy Generated (MWH)                                             12 175    4  0      47 208 584.0 17  Gross Electrical Energy Generated (MWH)                           894 600.0         4 236 500 0          16 379  800.0 18  Net Electrical Energy Generated (MWH)                           847 552.0         3 967  421.0        15 295 346.0
: 19. Unit Service Factor                                             51.4S                55.9S
: 20. Unit Availability Factor                                                               55.9a
: 21. Unit Capacity Factor (Using MDC Net)                           96 4                                        53.4%
22  Unit Capacity Factor (Using DER Net)                           92 7S                                       51.4a 23  Unit Forced Outage Rate                     0 Oa               44 3s                 30.6%
24  Shutdowns Scheduled Over Next   6   Months (Type, Date, and     Durati on of Each):
Refuelin Outa   e - 03 21 89 - 70 Da s
: 25. If Shutdown At End of Report Period, Estimated     Date of Startup:
N A Forecast      Achieved INITIAL CRITICALITY                                   ~05 85         ~05 25 85       //'V INITIAL ELECTRICITY                                    06 85        06/610 85 COMMERCIAL OPERATION  .
SS  '
ll  85        ~01 28 86     ~j SS12OSS>>S 0409A/2264A          PDR    ~DO ~      'PNU Q I
R
 
0   L'
        ~ i ll J 1}}

Latest revision as of 10:49, 29 October 2019

Revised Monthly Operating Rept for Sept 1988 for Palo Verde Nuclear Generating Station,Unit 1
ML17304A701
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 09/30/1988
From: Bloom T
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17304A702 List:
References
NUDOCS 8811080135
Download: ML17304A701 (2)


Text

NRC MONTHLY OPERATING REPORT DOCKET NO. 50-528 UNIT NAME PVNGS-1 DATE 10 24 88 COMPLETED BY T J Bloom TELEPHONE 602 371-418 OPERATING STATUS

l. Unit Name: Palo Verde Nuclear Generatin Station Unit 1
2. Reporting Period: Se tember 1988
3. Licensed Thermal Power (MWt): 3800 4 ~ Nameplate Rating (Gross MWe): 1403
5. Design Electrical Rating (Net MWe): 1270
6. Maximum Dependable Capacity (Gross MWe): 1303
7. Maximum Dependable Capacity (Net MWe): 1221
8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons: N A

9. Power Level to Which Restricted, If Any (Net MWe): None 10 Reasons For Restrictions, If Any: N A

,'This Month Yr.-to-Date Cumulative ll 12 Hours Number in Reporting Period of Hours Reactor, 20 0 6 5 6 0 23 448.0 Was Critical 720 0 3 554 9 13 532 1 13 Reactor Reserve Shutdown Hours 0 0 0 0 0.0

14. 3 3 9 8 13 096 9
15. Unit Reserve Shutdown Hours 0 0 0.0 0.0 16 Gross Thermal Energy Generated (MWH) 12 175 4 0 47 208 584.0 17 Gross Electrical Energy Generated (MWH) 894 600.0 4 236 500 0 16 379 800.0 18 Net Electrical Energy Generated (MWH) 847 552.0 3 967 421.0 15 295 346.0
19. Unit Service Factor 51.4S 55.9S
20. Unit Availability Factor 55.9a
21. Unit Capacity Factor (Using MDC Net) 96 4 53.4%

22 Unit Capacity Factor (Using DER Net) 92 7S 51.4a 23 Unit Forced Outage Rate 0 Oa 44 3s 30.6%

24 Shutdowns Scheduled Over Next 6 Months (Type, Date, and Durati on of Each):

Refuelin Outa e - 03 21 89 - 70 Da s

25. If Shutdown At End of Report Period, Estimated Date of Startup:

N A Forecast Achieved INITIAL CRITICALITY ~05 85 ~05 25 85 //'V INITIAL ELECTRICITY 06 85 06/610 85 COMMERCIAL OPERATION .

SS '

ll 85 ~01 28 86 ~j SS12OSS>>S 0409A/2264A PDR ~DO ~ 'PNU Q I

R

0 L'

~ i ll J 1