ML18054A836: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:consumers Power POWERINli MICHlliAN"S PIUlliRESS General Offices: 1945 West Parnell Road, Jackson, Ml 49201 * (517) 788-1636 July 10, 1989 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 -LICENSE DPR-20 -PALISADES PLANT -RESPONSE TO GENERIC LETTER 89-08 -EROSION/CORROSION INDUCED PIPE WALL THINNING (TAC NO. 73440)
{{#Wiki_filter:consumers
* Kenneth W Berry Director Nuclear Licensing Nuclear Regulatory Commission Generic Letter 89-08, Erosion/Corrosion Induced Pipe Wall Thinning, dated May 2, 1989, requires Consumers Power Company to provide assurances that a program, consisting systematic measures to ensure that erosion/corrosion does not lead to of single phase and two phase high-energy carbon steel systems,.
* Power                                                       Kenneth W Berry POWERINli                                                   Director Nuclear Licensing MICHlliAN"S PIUlliRESS General Offices: 1945 West Parnell Road, Jackson, Ml 49201 * (517) 788-1636 July 10, 1989 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -
has been implemented.
RESPONSE TO GENERIC LETTER 89 EROSION/CORROSION INDUCED PIPE WALL THINNING (TAC NO. 73440)
Our response is to include information on whether or not we have implemented or intend to implement a long term erosion/corrosion monitoring program that provides assurances that procedures or administrative controls are in place to assure the NUMARC program or another equally effective program is implemented and the structural integrity of all high-energy (two phase as well as single phase) carbon steel systems is maintained.
Nuclear Regulatory Commission Generic Letter 89-08, Erosion/Corrosion Induced Pipe Wall Thinning, dated May 2, 1989, requires Consumers Power Company to provide assurances that a program, consisting o~ systematic measures to ensure that erosion/corrosion does not lead to d~gradation of single phase and two phase high-energy carbon steel systems,. has been implemented. Our response is to include information on whether or not we have implemented or intend to implement a long term erosion/corrosion monitoring program that provides assurances that procedures or administrative controls are in place to assure the NUMARC program or another equally effective program is implemented and the structural integrity of all high-energy (two phase as well as single phase) carbon steel systems is maintained. Consumers Power Company's response for our Palisades Plant is provided herein.
Consumers Power Company's response for our Palisades Plant is provided herein. Pursuant to Generic Letter 89-08, a review of the NUMARC guidelines contained in Appendix A of NUREG-1344, which was transmitted with the Generic Letter, has been performed.
Pursuant to Generic Letter 89-08, a review of the NUMARC guidelines contained in Appendix A of NUREG-1344, which was transmitted with the Generic Letter, has been performed. The in-place Palisades Erosion/Corrosion Program meets and/or exceeds the requirements of NUREG-1344, Appendix A. Our program was developed in house and further improvements have been made through consultant input. The program is an ongoing program controlled and implemented by plant procedures.
The in-place Palisades Erosion/Corrosion Program meets and/or exceeds the requirements of NUREG-1344, Appendix A. Our program was developed in house and further improvements have been made through consultant input. The program is an ongoing program controlled and implemented by plant procedures.
Kenneth W Berry Director, Nuclear Licensing CC   Administrator, Region III, USNRC NRC Resident Inspector - Palisades
Kenneth W Berry Director, Nuclear Licensing CC Administrator, Region III, USNRC NRC Resident Inspector  
                                        -89071801s9             S907To--~~-----
-Palisades  
PDR       ADOCK 05000255 OC0789-0148-NL04                         P                             PNU
-89071801s9 PDR ADOCK 05000255 OC0789-0148-NL04 P PNU
 
* CONSUMERS POWER COMPANY Palisades Plant Docket 50-255 License DPR-20
                    *
* Response to Generic Letter 89-08 At the request of the Commission and pursuant to the Atomic Energy Act of 1954 and the Energy Reorganization Act of 1974, as amended, and the Commission's Rules and Regulations thereunder, Consumers Power Company submits our response to NRC Generic Letter 89-03 dated May 2, 1989, entitled, "Erosion/Corrosion Induced Pipe Wall Thinning".
* CONSUMERS POWER COMPANY Palisades Plant Docket 50-255 License DPR-20 Response to Generic Letter 89-08 At the request of the Commission and pursuant to the Atomic Energy Act of 1954 and the Energy Reorganization Act of 1974, as amended, and the Commission's Rules and Regulations thereunder, Consumers Power Company submits our response to NRC Generic Letter 89-03 dated May 2, 1989, entitled, "Erosion/Corrosion Induced Pipe Wall Thinning". Consumers Power Company's response is dated July 10, 1989.
Consumers Power Company's response is dated July 10, 1989. CONSUMERS POWER COMPANY To the best of my knowledge, information and belief, the contents of this submittal are truthful and complete.
CONSUMERS POWER COMPANY To the best of my knowledge, information and belief, the contents of this submittal are truthful and complete.
By P Hoffman, Vice Nuclear Operations Sworn and subscribed to before me this 10th day of July 1989.
By P Hoffman, Vice Nuclear Operations Sworn and subscribed to before me this 10th day of July 1989.
Elaine E Buehrer, Notary Public Jackson County, Michigan My commission expires October 31, 1989 OC0789-0148-NL04
~t&~tu/
[SEAL]}}
Elaine E Buehrer, Notary Public
[SEAL]
Jackson County, Michigan My commission expires October 31, 1989 OC0789-0148-NL04}}

Revision as of 18:55, 21 October 2019

Submits Response to Generic Ltr 89-08, Erosion/Corrosion Induced Pipe Wall Thinning. In-place Erosion/Corrosion Program at Facility Meets &/Or Exceeds Requirements in App a of NUREG-1344
ML18054A836
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/10/1989
From: Berry K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-NUREG-1344 GL-89-08, GL-89-8, TAC-73440, NUDOCS 8907180189
Download: ML18054A836 (2)


Text

consumers

  • Power Kenneth W Berry POWERINli Director Nuclear Licensing MICHlliAN"S PIUlliRESS General Offices: 1945 West Parnell Road, Jackson, Ml 49201 * (517) 788-1636 July 10, 1989 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -

RESPONSE TO GENERIC LETTER 89 EROSION/CORROSION INDUCED PIPE WALL THINNING (TAC NO. 73440)

Nuclear Regulatory Commission Generic Letter 89-08, Erosion/Corrosion Induced Pipe Wall Thinning, dated May 2, 1989, requires Consumers Power Company to provide assurances that a program, consisting o~ systematic measures to ensure that erosion/corrosion does not lead to d~gradation of single phase and two phase high-energy carbon steel systems,. has been implemented. Our response is to include information on whether or not we have implemented or intend to implement a long term erosion/corrosion monitoring program that provides assurances that procedures or administrative controls are in place to assure the NUMARC program or another equally effective program is implemented and the structural integrity of all high-energy (two phase as well as single phase) carbon steel systems is maintained. Consumers Power Company's response for our Palisades Plant is provided herein.

Pursuant to Generic Letter 89-08, a review of the NUMARC guidelines contained in Appendix A of NUREG-1344, which was transmitted with the Generic Letter, has been performed. The in-place Palisades Erosion/Corrosion Program meets and/or exceeds the requirements of NUREG-1344, Appendix A. Our program was developed in house and further improvements have been made through consultant input. The program is an ongoing program controlled and implemented by plant procedures.

Kenneth W Berry Director, Nuclear Licensing CC Administrator, Region III, USNRC NRC Resident Inspector - Palisades

-89071801s9 S907To--~~-----

PDR ADOCK 05000255 OC0789-0148-NL04 P PNU

CONSUMERS POWER COMPANY To the best of my knowledge, information and belief, the contents of this submittal are truthful and complete.

By P Hoffman, Vice Nuclear Operations Sworn and subscribed to before me this 10th day of July 1989.

~t&~tu/

Elaine E Buehrer, Notary Public

[SEAL]

Jackson County, Michigan My commission expires October 31, 1989 OC0789-0148-NL04