Line 3: |
Line 3: |
| | issue date = 05/07/2015 | | | issue date = 05/07/2015 |
| | title = IR 05000424/2015-008 and 05000425/2015-008, Vogtle, Units 1 and 2 NRC Problem Identification and Resolution Inspection Report | | | title = IR 05000424/2015-008 and 05000425/2015-008, Vogtle, Units 1 and 2 NRC Problem Identification and Resolution Inspection Report |
| | author name = Masters A D | | | author name = Masters A |
| | author affiliation = NRC/RGN-II/DRP/RPB7 | | | author affiliation = NRC/RGN-II/DRP/RPB7 |
| | addressee name = Taber B K | | | addressee name = Taber B |
| | addressee affiliation = Southern Nuclear Operating Co, Inc | | | addressee affiliation = Southern Nuclear Operating Co, Inc |
| | docket = 05000424, 05000425 | | | docket = 05000424, 05000425 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 7, 2015 Mr. Brian Vice President - Vogtle | | {{#Wiki_filter:May 7, 2015 |
|
| |
|
| Southern Nuclear Operating Company, Inc.
| | ==SUBJECT:== |
| | | VOGTLE ELECTRIC GENERATING PLANT - NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT 05000424/2015008 AND 05000425/2015008 |
| Vogtle Electric Generating Plant
| |
| | |
| 7821 River Road Waynesboro, GA 30830
| |
| | |
| SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT 05000424/2015008 AND 05000425/2015008 | |
|
| |
|
| ==Dear Mr. Taber:== | | ==Dear Mr. Taber:== |
Line 45: |
Line 40: |
| Docket Nos. 50-424, 50-425 | | Docket Nos. 50-424, 50-425 |
|
| |
|
| License Nos. NPF-68, NPF-81 Enclosure: | | License Nos. NPF-68, NPF-81 |
| | |
| | ===Enclosure:=== |
| IR 05000424/2015008, 05000425/2015008 w/Attachment: Supplementary Information | | IR 05000424/2015008, 05000425/2015008 w/Attachment: Supplementary Information |
|
| |
|
| cc Distribution via ListServ
| | REGION II== |
| | |
| _________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:DRP RII:DRP RII:DRP SIGNATURE WXD1 via email RCT1 via email NRS2 via email SLL1 via email RRR1 for ADM2 SRS5 via email NAME WDeschaine RTaylor NChilds SLewis AMasters SSandal DATE 04/30/2015 05/07/2015 05/01/2015 05/04/2015 05/07/2015 05/01/2015 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO Letter to Brian from Anthony D. Masters dated May 7, 2015.
| |
| | |
| SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT 05000424/2015008 AND 05000425/20150008
| |
| | |
| DISTRIBUTION
| |
| : D. Gamberoni, RII L. Douglas, RII
| |
| | |
| OE Mail RIDSNRRDIRS
| |
| | |
| PUBLIC RidsNrrPMVogtle Resource Enclosure U.S. NUCLEAR REGULATORY COMMISSION
| |
| | |
| ==REGION II==
| |
| Docket Nos.: 50-424, 50-425 | | Docket Nos.: 50-424, 50-425 |
|
| |
|
Line 223: |
Line 207: |
|
| |
|
| ===Closed=== | | ===Closed=== |
| : None
| | None |
| ===Discussed=== | | ===Discussed=== |
|
| |
|
Line 229: |
Line 213: |
|
| |
|
| ==LIST OF DOCUMENTS REVIEWED== | | ==LIST OF DOCUMENTS REVIEWED== |
| ===Procedures===
| | |
| : NMP-GM-003-001, Self-Assessment Instructions for Focused Area Self-Assessment (FASA),
| |
| : Version 4.0
| |
| : NMP-GM-003, Self-Assessment and Benchmark Procedure, Version 21.1
| |
| : NMP-GM-002-005, Corrective Action Program Trending, Version 2.0
| |
| : NMP-GM-002-002, Effectiveness Revi ew Instructions, Version 4.2
| |
| : 83308-C, Testing of Safety Related NSCW System Coolers, Version 31.3
| |
| : NMP-AD-012, Operability Determinations and Functionality Assessments, Version 12.4
| |
| : NMP-ES-002, System Monitoring and Health Reporting, Version 17.0
| |
| : NMP-ES-002-005, System Monitoring, Version 45.0
| |
| : NMP-GM-002, Corrective Action Program, Versions 13, 13.1, 17, 21, 29, 30.1, and 33
| |
| : NMP-GM-002-001, Corrective Action Program Instructions, Versions 30.1 and 33.1
| |
| : NMP-GM-002-F42, Fleet Keywords for the Corrective Action Program, Version 6.0
| |
| : NMP-GM-002-GL03, Cause Analysis and Corrective Actions Guideline, Version 25.0
| |
| : NMP-GM-008, Operating Experience Program, Version 16.0
| |
| : NMP-OS-006, Operations Performance Indicators, Version 16.1
| |
| : NMP-OS-006-002, Aggregate Operator Impact Review Instruction, Version 2.0
| |
| : NMP-ES-035-007, Fleet Fire Watch Instruction, Version 2.0
| |
| : NMP-ES-035-007, Fleet Fire Watch Instruction, Version 1.0
| |
| : 13145A-1, Diesel Generator Train A, Version 6.3
| |
| : NMP-ES-005, Scoping and Importance Determination for Equipment Reliability, Version 13.0
| |
| : NMP-ES-005-001, Scoping and Importance Determination for Equipment Reliability - Single
| |
| : Point Vulnerability, Version 7.0
| |
| ===Condition Reports===
| |
| : 666516
| |
| : 666519
| |
| : 879125
| |
| : 886738
| |
| : 787908
| |
| : 736458
| |
| : 736457
| |
| : 10009629
| |
| : 10022663
| |
| : 10005548
| |
| : 10013422
| |
| : 10005644
| |
| : 138108
| |
| : 152044
| |
| : 164740
| |
| : 538849
| |
| : 597467
| |
| : 750553
| |
| : 751415
| |
| : 753454
| |
| : 755107
| |
| : 756528
| |
| : 757218
| |
| : 758675
| |
| : 768834
| |
| : 783161
| |
| : 800397
| |
| : 2927
| |
| : 2929
| |
| : 818370
| |
| : 818742
| |
| : 830348
| |
| : 835222
| |
| : 836212
| |
| : 837899
| |
| : 838044
| |
| : 838871
| |
| : 2803
| |
| : 847696
| |
| : 847715
| |
| : 853151
| |
| : 854169
| |
| : 854169
| |
| : 854171
| |
| : 865135
| |
| : 885259
| |
| : 886940
| |
| : 887102
| |
| : 897154
| |
| : 900250
| |
| : 1026761
| |
| : 10003891
| |
| : 10003897
| |
| : 10011167
| |
| : 10013699
| |
| : 10014081
| |
| : 10014381
| |
| : 10015498
| |
| : 10015985
| |
| : 10017123
| |
| : 10017506
| |
| : 10019402
| |
| : 10028619
| |
| : 10033287
| |
| : 10035756
| |
| : 10039801
| |
| : 10002493
| |
| : 445343
| |
| : 459265
| |
| : 794843
| |
| : 617317
| |
| : 825470
| |
| : 10041480
| |
| : 10041025
| |
| : 29822
| |
| : 766880
| |
| : Technical Evaluations
| |
| : 906704
| |
| : 910486
| |
| : 798369
| |
| : 908394
| |
| : 337844
| |
| : 908404
| |
| : 668572
| |
| : 668563
| |
| : 737677
| |
| : 737675
| |
| : 836852
| |
| : 849687
| |
| : 853634
| |
| : 853638
| |
| : 853645
| |
| : 853645
| |
| : 853687
| |
| : 858192
| |
| : 858193
| |
| : 858193
| |
| : 858201
| |
| : 858201
| |
| : 858202
| |
| : 858202
| |
| : 858717
| |
| : 860480
| |
| : 860480
| |
| : 860488
| |
| : 865927
| |
| : 868157
| |
| : 868157
| |
| : 882472
| |
| : 2477
| |
| : 882477
| |
| : 882479
| |
| : 882482
| |
| : 882482
| |
| : 909344
| |
| : 909356
| |
| : 909668
| |
| : 911975
| |
| : 835105
| |
| : 675693
| |
| : Corrective Action Reports
| |
| : 2916
| |
| : 249529
| |
| : 249304
| |
| : 210270
| |
| : 213052
| |
| : 256024
| |
| : 208164
| |
| : 195060
| |
| : 210112
| |
| : 210971
| |
| : 211089
| |
| : 211142
| |
| : 213395
| |
| : 255666
| |
| : 255857
| |
| ===Work Orders===
| |
| : SNC586376
| |
| : SNC586566
| |
| : SNC567223
| |
| : SNC567222
| |
| : SNC602033 SNC621555 SNC629405 SNC631008 SNC631027
| |
| : SNC632292
| |
| : SNC632880
| |
| : SNC637929 SNC642581 SNC619779 SNC589884
| |
| : SNC589884
| |
| : SNC619778
| |
| : SNC624725
| |
| : SNC624726 SNC624738 SNC524759 SNC624767
| |
| : SNC646897
| |
| : SNC640825 SNC564818
| |
| : SNC638913 SNC528990
| |
| : Self-Assessments Nuclear Oversight (NOS) audit of the CAP, Fleet-CAP-2014, April 7, 2014 Nuclear Oversight Special CAP audit, Fleet-Special
| |
| : CAP-2015 FASA Self-Assessment, Implementation of Interim Cyber Security Milestones 1-7, 5/13/2013
| |
| ===Drawings===
| |
| : 1X4DB133-1, Nuclear Service Cooling Water System P&ID, Version 54.0
| |
| : 1X4DB133-2, Nuclear Service Cooling Water System P&ID, Version 60.0
| |
| : 1X4DB134, Nuclear Service Cooling Water System P&ID, Version 31.0
| |
| : 1X3D-AA-G01A, Main one line Class 1E 125V DC and 120V vital AC systems, version 10.0 1X3D-AA-H01A, One line Class 1E 125V DC Train A, version 17.0
| |
| ===Other Documents===
| |
| : Failure Analysis of Square D Tap Switch Class 9831, 2B EDG, Date 11/24/2014
| |
| : MRC package for 3-18-2015
| |
| : CAPCO (CR daily screening) meeting package for 2/26/2015
| |
| : CAPCO (CR daily screening) meeting package for 3/18/2015 FP LCO Package, LCO Number: 1-14-026
| |
| : FP LCO Package, LCO Number: 2-13-169
| |
| : DC-1806, Design Bases for Class 1E dc system, Version 13
| |
| : System Health Report - Unit 1 1804 - 4160 Volt Alternating Current System System Health Report - Unit 2 1804 - 4160 Volt Alternating Current System
| |
| : DC-1202, Nuclear Service Cooling Water (NSCW) System Design Bases, Version 13
| |
| : DC-1202A, Nuclear Service Cooling Towers Design Bases, Revision 11
| |
| : DC-2105, NSCW Cooling Towers and Warehouses Design Bases, Version 7
| |
| : ELV-01212, Vogtle Electric Generating Plant Response to Generic Letter 89-13, dated
| |
| : January 25, 1990
| |
| : FSAR Chapter 9, Section 9.2.1, Nuclear Service Cooling Water System
| |
| : LCV-0716-C, Correspondence from CK McCoy to USNRC, Vogtle Electric Generating Plant Revised Reply to a Notice of Violation, dated April 1, 1996
| |
| : NL-04-1762, Correspondence from Don Grissette to USNRC regarding additional information concerning generic letter 96-06, dated November 5, 2004 System Health Reports, Unit 1 NSCW, Q1-2013 through Q4-2014
| |
| : System Health Reports, Unit 2 NSCW, Q1-2013 through Q4-2014
| |
| : VEGP-LR-IMP-12, Vogtle Electric Generating Plant - Units 1&2, Generic Letter 89-13 Program License Renewal Implementation Package, dated May 15, 2009 V-LO-TX-06101, Operations Lesson Plan - Nuclear Service Cooling Water System, Revision 7.1
| |
| : X4C1202V43, Flow Calculation for the Unit 2 NSCW System, Revision 7
| |
| : CRs Generated
| |
| : 10042617, Tunnel 2T2A incandescent lighting out - three fixtures
| |
| : 10042633, NSCW Electrical Receptacle deficiency - open-hot
| |
| : 10043020, Loose Penetration Labels
| |
| : 10043156, Vogtle Failure Analysis Report tracking
| |
| : 10043415, 1R18 Work Order SNC564478 is work complete but in schedule status in MAXIMO
| |
| : 10043439, IRT closure documents do not capture all actions that are outstanding.
| |
| : 10043450, PI&R inspection finding on work orders were not cancelled per
| |
| : NMP-GM-006-GL01
| |
| : 10043501, Log-keeping practices need improvement
| |
| : 10047591, CA TE extended without following
| |
| : NMP-GM-002-001
| |
| : 10047594, Failure to follow
| |
| : NMP-GM-002-GL03 for training corrective action
| |
| : 10047596, CA downgraded without following
| |
| : NMP-GM-002-001, section 4.6
| |
| : 10048988, Corrective action priority inconsistency from causal analysis
| |
| }} | | }} |
|
---|
Category:Inspection Report
MONTHYEARIR 05000424/20240052024-08-26026 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 and 2 - Report 05000424/2024005 and 05000425/2024005 IR 05000424/20244012024-08-15015 August 2024 4 - Security Baseline Inspection Report 05000424-2024401, 05000425-2024401, 05200025-2024402, and 05200026-2024403 - Cover Letter ML24212A1442024-08-0101 August 2024 Integrated Inspection Report 05200025/2024002 and 05200026/2024002 IR 05000424/20240022024-07-29029 July 2024 Integrated Inspection Report 05000424/2024002 and 05000425/2024002 IR 05000424/20244042024-07-26026 July 2024 Material Control and Accounting Program Inspection Report 05000424/2024404 and 05000425/2024404 (Cover Letter) ML24194A0342024-07-12012 July 2024 Review of the Refueling Outage 1R24 Steam Generator Tube Inspection Report ML24191A3792024-07-10010 July 2024 – Initial Test Program and Operational Programs Inspection Report 05200026/2024011 ML24130A2412024-05-13013 May 2024 Integrated Inspection Report 05200025/2024001 and 05200026/2024001 ML24127A2372024-05-0909 May 2024 Initial Test Program and Operational Programs Inspection Report 05200026/2024010 IR 05000424/20244032024-05-0101 May 2024 Cyber Security Inspection Report 05000424/2024403 and 05000425/2024403 Public IR 05000424/20240012024-04-23023 April 2024 –Integrated Inspection Report 05000424/2024001 and 05000425/2024001 IR 05000424/20230062024-02-28028 February 2024 Annual Assessment Letter for Vogtle Electric Generating Plant Units 1 and 2 - NRC Inspection Report 05000424-2023006 and 05000425-2023006 IR 05000424/20240102024-02-14014 February 2024 – Fire Protection Team Inspection Report 0500424/2024010 and 05000425/2024010 IR 05000202/20300042024-02-13013 February 2024 Integrated Inspection Report 052000250/2023004 and 05200026/2023004 IR 05000424/20230042024-02-0505 February 2024 Integrated Inspection Report 05000424-2023004 and 05000425-2023004 ML24032A0252024-02-0505 February 2024 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200026-2023009 ML24031A6102024-01-31031 January 2024 Cyber Security Inspection Report 05200026/2024401 - Public ML23318A4582023-11-14014 November 2023 Integrated Inspection Report 05200025/2023003 ML23312A3502023-11-14014 November 2023 Integrated Inspection Report 05200026/2023003 IR 05000424/20234022023-11-0606 November 2023 Security Baseline Inspection Report 05000424/2023402 and 05000425/2023402 IR 05000424/20230032023-10-27027 October 2023 Integrated Inspection Report 05000424/2023003 and 05000425/2023003 ML23254A2032023-09-13013 September 2023 Initial Test Program and Operational Programs Inspection Report 05200025/2023013 IR 05000424/20230912023-09-0505 September 2023 Plan Units 1 and 2 - NRC Investigation Report 2-2022-006 and Notice of Violation - NRC Inspection Report 05000424/2023091 and 05000425/2023091 ML23234A3002023-09-0101 September 2023 NRC Integrated Inspection Report 05200026/2023003 IR 05000424/20230052023-08-29029 August 2023 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 & 2 - Report 05000424/2023005 and 05000425/2023005 ML23223A0022023-08-14014 August 2023 (Vegp), Unit 3, Integrated Inspection Report 05200025/2023002 IR 05000424/20230112023-08-11011 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000424/2023011 and 05000425/2023011 ML23215A0822023-08-0404 August 2023 (Vego), Unit 3 Initial Test Program and Operational Programs Integrated 05200025/2023011 Inspection Report ML23212B0612023-07-31031 July 2023 Security Baseline Inspection Report 05200025/2023401 IR 05000424/20234012023-07-31031 July 2023 Security Baseline Inspection Report 05000424/2023401 and 05000425/2023401 (Cover Letter) ML23216A0962023-07-26026 July 2023 Document Request for Vogtle 1 & 2 RP Inspection, Report No. 05000424/2023003 and 05000425/2023003 IR 05000424/20230022023-07-24024 July 2023 Integrated Inspection Report 05000424/2023002 and 05000425/2023002 ML23198A3802023-07-19019 July 2023 NRC Integrated Inspection Report 05200026/2023002 ML23199A0892023-07-18018 July 2023 (Vegp), Unit 4 Initial Test Program and Operational Programs Integrated Inspection Report 05200026/2023007 IR 05000424/20233012023-06-30030 June 2023 NRC Operator License Examination Report 05000424/2023301 and 05000425/2023301 ML23128A2932023-05-11011 May 2023 NRC Integrated Inspection Report 05200026/2023001 ML23129A0222023-05-10010 May 2023 (Vegp), Unit 3 - Integrated Report 05200025/2023001 ML23128A3492023-05-0909 May 2023 (Vegp), Unit 4 Initial Test Program and Operational Programs Integrated Inspection Report 05200026/2023006 ML23121A3202023-05-0404 May 2023 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200025/2023010 IR 05000424/20040252023-04-28028 April 2023 Public Meeting Summary - Vogtle Electric Generating Plant, Units 1, 2, 3, & 4 Docket No. 5000424, 5000425, 5200025, 5200026, Meeting Number 20230375 IR 05000424/20230012023-04-26026 April 2023 Integrated Inspection Report 05000424/2023001 and 05000425/2023001 IR 05000424/20230902023-03-30030 March 2023 NRC Inspection Report 05000424/2023090 and 05000425/2023090, and Investigation Report 2-2022-006; and Apparent Violation ML23083B3702023-03-24024 March 2023 Security Baseline Inspection Report 05200026/2023401 IR 05000424/20220062023-03-0101 March 2023 Annual Assessment Letter for Vogtle Electric Generating Plant Units 1 and 2, NRC Inspection Reports 05000424/2022006 and 05000425/2022006 ML23044A3902023-02-14014 February 2023 Integrated Inspection Report05200025 2022007 ML23040A3612023-02-0909 February 2023 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200026/2022008 ML23040A0422023-02-0909 February 2023 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200025/2022008 ML23033A3972023-02-0707 February 2023 NRC Integrated Inspection Report 05200026/2022007 IR 05000424/20220042023-01-23023 January 2023 Integrated Inspection Report 05000424/2022004 and 05000425/2022004 ML22356A2932022-12-23023 December 2022 Information Request for the Cyber Security Baseline Security Inspection, Notification to Perform Inspection 2024-08-26
[Table view] Category:Letter
MONTHYEARML24297A6482024-10-23023 October 2024 5 to the Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, Summary Report and Revised NRC Commitments Report ML24269A2502024-09-26026 September 2024 Acknowledgement of the Withdrawal of the Requested Exemption and License Amendment Request to Remove Tier 1 and Tier 2* Requirements NL-24-0350, Core Operating Limits Report, Cycle 24, Version 22024-09-25025 September 2024 Core Operating Limits Report, Cycle 24, Version 2 NL-24-0369, Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements2024-09-25025 September 2024 Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements ML24243A0072024-09-10010 September 2024 – Correction of Amendment Nos. 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-14483 NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program ML24102A2642024-09-0909 September 2024 – Exemption Request Regarding Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0013) - Letter ML24249A2942024-09-0606 September 2024 Correction of Amendment Nos. 218 and 201 Regarding Revision to Technical Specifications to Use Online Monitoring Methodology 05200025/LER-2024-002, Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve2024-09-0505 September 2024 Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve IR 05000424/20240052024-08-26026 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 and 2 - Report 05000424/2024005 and 05000425/2024005 ML24235A1952024-08-22022 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 and 4 - Report 05200025/2024005 and 05200026/2024005 IR 05000424/20244012024-08-15015 August 2024 4 - Security Baseline Inspection Report 05000424-2024401, 05000425-2024401, 05200025-2024402, and 05200026-2024403 - Cover Letter NL-24-0299, Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information2024-08-14014 August 2024 Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information 05000425/LER-2024-001, Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod2024-08-0909 August 2024 Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod ML24218A1842024-08-0707 August 2024 Examination Report and Cover Letter 05200026/LER-2024-001, Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal2024-08-0606 August 2024 Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal ML24212A1442024-08-0101 August 2024 Integrated Inspection Report 05200025/2024002 and 05200026/2024002 IR 05000424/20240022024-07-29029 July 2024 Integrated Inspection Report 05000424/2024002 and 05000425/2024002 IR 05000424/20244042024-07-26026 July 2024 Material Control and Accounting Program Inspection Report 05000424/2024404 and 05000425/2024404 (Cover Letter) NL-24-0282, License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements2024-07-25025 July 2024 License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements NL-24-0126, – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.62024-07-25025 July 2024 – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.6 ML24204A0722024-07-23023 July 2024 Issuance of Amendment No. 225, Regarding LAR to Revise TS 3.7.9 for a one-time Change to Support Nuclear Service Cooling Water Transfer Pump Repairs - Emergency Circumstances NL-24-0286, Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair2024-07-20020 July 2024 Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair ML24191A4562024-07-19019 July 2024 Request for Relief and Alternative Requirements for Squib (Explosively Actuated) Valves First Test Interval NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 ML24194A0342024-07-12012 July 2024 Review of the Refueling Outage 1R24 Steam Generator Tube Inspection Report ML24191A3792024-07-10010 July 2024 – Initial Test Program and Operational Programs Inspection Report 05200026/2024011 NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0087, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks2024-06-21021 June 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0243, Registration of Spent Fuel Cask Use2024-06-18018 June 2024 Registration of Spent Fuel Cask Use ML24163A0632024-06-12012 June 2024 2024 Licensed Operator Re-qualification Inspection Notification Letter Vogtle, Units 3 & 4 ML24155A1772024-06-0505 June 2024 Regulatory Audit in Support of Review of the LAR to Revise Emergency Diesel Generator Frequency and Voltage Ranges for Technical Specification 3.8.1, Surveillance Requirements NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24094A1402024-05-16016 May 2024 Staff Response to Request for Revision to NRC Staff Assessment of Updated Seismic Hazard Information and Latest Understanding of Seismic Hazards at the Vogtle Plant Site Following the NRC Process for the Ongoing Assessment of Natural Hazard ML24130A2412024-05-13013 May 2024 Integrated Inspection Report 05200025/2024001 and 05200026/2024001 ML24120A1812024-05-13013 May 2024 Request for Withholding Information from Public Disclosure Responses to NRC Request for Additional Information for Refueling Outage IR24 Steam Generator Tube Inspection Report – Enclosure 2 ML24101A2112024-05-11011 May 2024 Expedited Issuance of Amendment No. 198 Change to Technical Specification 5.5.13, Ventilation Filter Testing Program (VFTP) NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 ML24127A2372024-05-0909 May 2024 Initial Test Program and Operational Programs Inspection Report 05200026/2024010 NL-24-0194, Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1)2024-05-0707 May 2024 Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1) IR 05000424/20244032024-05-0101 May 2024 Cyber Security Inspection Report 05000424/2024403 and 05000425/2024403 Public ML24120A2832024-04-30030 April 2024 Project Manager Reassignment NL-24-0170, Responses to Second Round NRC Request for Additional Information for Refueling Outage 1 R24 Steam Generator Tube Inspection Report2024-04-25025 April 2024 Responses to Second Round NRC Request for Additional Information for Refueling Outage 1 R24 Steam Generator Tube Inspection Report NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 IR 05000424/20240012024-04-23023 April 2024 –Integrated Inspection Report 05000424/2024001 and 05000425/2024001 NL-24-0154, Preservice Inspection Progam Owners Activity Report2024-04-16016 April 2024 Preservice Inspection Progam Owners Activity Report 2024-09-09
[Table view] |
Inspection Report - Vogtle - 2015008 |
---|
|
|
Text
May 7, 2015
SUBJECT:
VOGTLE ELECTRIC GENERATING PLANT - NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT 05000424/2015008 AND 05000425/2015008
Dear Mr. Taber:
On April 2, 2015, the U. S. Nuclear Regulatory Commission (NRC) completed an inspection at your Vogtle Electric Generating Plant Units 1 and 2. The enclosed report documents the inspection findings, which were discussed on April 2, 2015, with Mr. G. Saxon and other members of your staff.
On the basis of the samples selected for review, the inspectors concluded that, in general, problems were properly identified, evaluated, and corrected. In reviewing your corrective action program, the inspectors assessed how well your staff identified problems at a low threshold, your staff's implementation of the station's process for prioritizing and evaluating these problems, and the effectiveness of corrective actions taken by the station to resolve these problems. In each of these areas, the inspectors determined that your staff's performance was adequate to support nuclear safety.
The inspectors also evaluated other processes your staff used to identify issues for resolution.
These included your use of audits and self-assessments to identify latent problems and your incorporation of lessons learned from industry operating experience into station programs, processes, and procedures. The inspectors determined that your station's performance in each of these areas supported nuclear safety.
Finally, the inspectors determined that your station's management maintains a safety-conscious work environment adequate to support nuclear safety. Based on the inspectors' observations, your employees are willing to raise concerns related to nuclear safety through at least one of the several means available. In accordance with 10 CFR 2.390 of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). Adams is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA By Reinaldo Rodriguez For/
Anthony D. Masters, Chief Reactor Projects Branch 7 Division of Reactor Projects
Docket Nos. 50-424, 50-425
License Nos. NPF-68, NPF-81
Enclosure:
IR 05000424/2015008, 05000425/2015008 w/Attachment: Supplementary Information
REGION II==
Docket Nos.: 50-424, 50-425
License Nos.: NPF-68, NPF-81 Report Nos.: 05000424/2015008 and 05000425/2015008
Licensee: Southern Nuclear Operating Company, Inc. (SNC)
Facility: Vogtle Electric Generating Plant, Units 1 and 2
Location: Waynesboro, GA 30830
Dates: March 16 - April 2, 2015 Inspectors: Wesley Deschaine, Resident Inspector Sequoyah (Team Leader) Shani Lewis, Project Engineer Natasha Childs, Resident Inspector Oconee Ryan Taylor, Senior Project Inspector Approved by: Anthony D. Masters, Chief Reactor Projects Branch 7
Division of Reactor Projects
SUMMARY
IR 05000424/2015008 and 05000425/2015008; March 16 - April 2, 2015; Vogtle Electric Generating Plant, Units 1 and 2; Biennial Inspection of the Problem Identification and Resolution
Program.
The inspection was conducted by two resident inspectors, a senior project inspector, and a project engineer. No findings were identified.
The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 5.
Identification and Resolution of Problems The inspectors concluded that, in general, problems were properly identified, evaluated, prioritized, and corrected. The licensee was effective at identifying problems and entering them into the corrective action program (CAP) for resolution, as evidenced by the relatively few number of deficiencies identified by external organizations (including the NRC) that had not been previously identified by the licensee, during the review period. Generally, prioritization and evaluation of issues were adequate, formal root cause evaluations for significant problems were adequate, and corrective actions specified for pr oblems were acceptable. Overall, corrective actions developed and implemented for issues were generally effective and implemented in a timely manner.
The inspectors determined that overall, audits and self-assessments were adequate in identifying deficiencies and areas for improvement in the CAP, and appropriate corrective actions were developed to address the issues identified. Operating experience usage was found to be generally acceptable and integrated into the licensee's processes for performing and managing work and plant operations.
Based on discussions and interviews conducted with plant employees from various departments, the inspectors determined that personnel at the site felt free to raise safety concerns to management and use the CAP to resolve those concerns.
REPORT DETAILS
4OA2 Problem Identification and Resolution
1. Corrective Action Program Effectiveness
a. Inspection Scope
The inspectors reviewed the licensee's CAP procedures which described the administrative process for initiating and reso lving problems primarily through the use of condition reports (CRs). To verify that problems were being properly identified, appropriately characterized, and entered into the CAP, the inspectors reviewed CRs that had been issued between February 2013 and February 2015, including a detailed review of selected CRs associated with the following risk-significant systems: Emergency Diesel Generators (EDGs), Nuclear Service Cooling Water (NSCW), 125VDC Electrical, and 4160V Electrical systems. Where possible, the inspectors independently verified that the corrective actions were implemented as intended. The inspectors also reviewed selected common causes and generic concerns associated with root cause evaluations (RCE) to determine if they had been appropriately addressed. To help ensure that samples were reviewed across all cornerstones of safety identified in the Reactor Oversight Process (ROP), the inspectors selected a representative number of CRs that were identified and assigned to the major plant departments, including operations, maintenance, engineering, health physics, chemistry, emergency preparedness, and security. These CRs were reviewed to assess each department's threshold for identifying and documenting plant problems, thoroughness of evaluations, and adequacy of corrective actions. The inspectors reviewed selected CRs, verified corrective actions were implemented, and attended meetings where CRs were evaluated for significance to determine whether the licensee was identifying, accurately characterizing, and entering problems into the CAP at an appropriate threshold.
Plant walkdowns of equipment within the selected systems listed above and other plant areas were conducted by inspectors to assess the material condition and to identify deficiencies that had not been previously entered into the CAP. The inspectors reviewed CRs, maintenance history, corrective actions (CAs), completed work orders (WOs) for the systems, and reviewed associated system health reports. These reviews were performed to verify that problems were being properly identified, appropriately characterized, and entered into the CAP. Items reviewed generally covered a two-year period of time; however, in accordance with the inspection procedure, a five-year review was performed for selected systems for age-related issues.
Control Room walk-downs were also performed to assess the main control room (MCR) deficiency list and to ascertain if deficiencies were entered into the CAP and tracked to resolution. Operator workarounds (OWA) and operator burden screenings were reviewed, and the inspectors verified com pensatory measures for deficient equipment which were being implemented in the field.
The inspectors conducted a detailed review of selected CRs to assess the adequacy of the root cause and apparent cause evaluations of the problems identified. The inspectors reviewed these evaluations against the descriptions of the problem described in the CRs and the guidance in licensee procedure NMP-GM-002-GL03, "Cause Analysis and Corrective Actions Guideline." The inspectors assessed if the licensee had adequately determined the cause(s) of identified problems, and had adequately addressed operability, reportability, common cause, generic concerns, extent-of-condition, and extent-of-cause. The review also assessed if the licensee had appropriately identified and prioritized corrective actions to prevent recurrence.
The inspectors reviewed selected industry oper ating experience (OE) items, including NRC generic communications, to verify that they had been appropriately evaluated for applicability and that issues identified through these reviews had been entered into the CAP.
The inspectors reviewed site trend reports, to determine if the licensee effectively trended identified issues and initiated appropriate corrective actions when adverse trends were identified.
The inspectors reviewed licensee audits and self-assessments, including those which focused on problem identification and resolution programs and processes, to verify that findings were entered into the CAP and to verify that these audits and assessments were consistent with the NRC's assessment of the licensee's CAP.
The inspectors attended various plant meetings to observe management oversight functions of the corrective action process. These included CR screening meetings and Management Review Committee (MRC) meetings.
Documents reviewed are listed in the Attachment.
b. Assessment Problem Identification The inspectors determined that the licensee was generally effective in identifying problems and entering them into the CAP and there was an appropriately low threshold for entering issues into the CAP. This conclusion was based on a review of the requirements for initiating CRs as described in licensee procedure NMP-GM-002-001, "Corrective Action Program Instructions," management's expectation that employees were encouraged to initiate CRs for any reason. Trending was generally effective in monitoring equipment performance. Site management was actively involved in the CAP and focused appropriate attention on significant plant issues. Based on reviews and walkdowns of accessible portions of the selected systems, the inspectors determined that system deficiencies were being identified and placed in the CAP.
A performance deficiency was identified during the inspection associated with the site's failure to identify and correct the condition adverse to quality discovered during the failure analysis for the 2B EDG bridge transfer switch. Specifically, the failure analysis report concluded that the bridge transfer switch failed due to hardened and degraded grease not being properly removed during preventative maintenance (PM). The report also concludes that the PM procedure may be inadequate to remove the older grease and should be updated to mitigate future failures. The site has entered this issue into the CAP as CRs 10041480 and 10043156. However, because this performance deficiency did not adversely affect any ROP cornerstone objectives, the inspectors determined the issue was of minor significance and not subject to enforcement action in accordance
with the NRC's Enforcement Policy.
Problem Prioritization and Evaluation
Based on the review of CRs sampled by the inspection team during the onsite period, the inspectors concluded that problems were generally prioritized and evaluated in accordance with the licensee's CAP procedures as described in the CR severity level determination guidance in NMP-GM-002-001. Each CR was assigned a priority level at the CAP coordinator (CAPCO) meeting, and adequate consideration was given to system or component operability and associated plant risk.
The inspectors determined that station personnel had conducted root cause and apparent cause analyses in compliance with the licensee's CAP procedures and assigned cause determinations were appropriate, considering the significance of the issues being evaluated. A variety of formal causal-analysis techniques were used depending on the type and complexity of the issue consistent with NMP-GM-002-GL03.
The inspectors identified three performance deficiencies associated with the licensee's prioritization and evaluation of issues. These issues were screened in accordance with Manual Chapter 0612, "Issue Screening," and were determined to be of minor significance and not subject to enforcement action in accordance with the NRC's
Enforcement Policy.
- The inspectors reviewed Corrective Action Report (CAR) 210971 associated with a NRC non-cited violation (NCV), and identified the following issues with the Apparent Cause Determination (ACD):
o Technical Evaluation (TE) 860480 was a corrective action for Operations training to perform a Gap Analysis to address potential knowledge gaps identified by the apparent cause team. This action was one of several actions to resolve apparent cause #1 (AC1) and contributing cause #1 (CC1) of the ACD. The priority level of TE 860480 was downgraded from a level 2 to level 3 without following the process as outlined in section 4.6 of NMP-GM-002-001. Additionally, the apparent cause analysts did not follow the process outlined in NMP-GM-002-GL03 when initially assigning the corrective action. The licensee has entered these issues into the CAP as CRs 10047594 and 10047596.
o TE 853634 was a corrective action for the Chemistry department to perform a department stand down to discuss upcoming procedure changes as a result of the event. The action was one of several actions to resolve AC1 and CC1 of the ACD. The action due date was extended without following NMP-GM-002-001.
There was no assessment of the potential impact of the extension and the appropriate level of management approval was not received. The licensee has entered this issue into the CAP as CR 100475594.
- The inspectors reviewed CAR 211142 associated with an NRC NCV and identified the following issue with the Apparent Cause Determination:
o The ACD report listed seven corrective actions to address AC1; none of the seven actions were assigned a priority level 2, which is not in accordance with NMP-GM-002-001. This procedure states that corrective actions assigned to address an apparent cause should be assigned a level 2 priority. The potential weakness in assigning the incorrect priority level is that the action could potentially be revised and/or receive due date extensions without receiving the appropriate levels of review appropriate for the significance. The licensee has entered this issue into the CAP as CR 10049368.
Corrective Actions
Based on a review of corrective action documents, interviews with licensee staff, and verification of completed corrective actions, the inspectors determined that overall, corrective actions were timely, commensurate with the safety significance of the issues, and effective, in that conditions adverse to quality were corrected and non-recurring. For significant conditions adverse to quality, the corrective actions directly addressed the cause and effectively prevented recurrence in that a review of performance indicators, CRs, and effectiveness reviews demonstrated that the significant conditions adverse to quality had not recurred. Effectiveness reviews for corrective actions to prevent recurrence (CAPRs) were sufficient to ensure corrective actions were properly implemented and were effective.
c. Findings
No findings were identified.
2. Use of Operating Experience
a. Inspection Scope
The inspectors examined the licensee's use of industry OE to assess the effectiveness of how external and internal operating experience information was used to prevent similar or recurring problems at the plant. In addition, the inspectors selected operating experience documents (e.g., NRC generic communications, 10 CFR Part 21 reports, licensee event reports, vendor notifications, and plant internal operating experience items, etc.), which had been issued since February 2013, to verify whether the licensee had appropriately evaluated each notification for applicability to the Vogtle Electric Generating Plant, Units 1 and 2, and whether issues identified through these reviews were entered into the CAP.
b. Assessment
Based on a review of selected documentation related to operating experience issues, the inspectors determined that the licensee was generally effective in screening operating experience for applicability to the plant. Industry OE was evaluated at either the corporate or plant level depending on the source and type of the document. Relevant information was then forwarded to the applicable department for further action or informational purposes. OE issues requiring action were entered into the CAP for tracking and closure. In addition, operating experience was included in all apparent cause and root cause evaluations in accordance with licensee procedure NMP-GM-002-GL03.
c. Findings
No findings were identified.
3. Self-Assessments and Audits
a. Inspection Scope
The inspectors reviewed audit reports and self-assessment reports, including those which focused on problem identification and resolution, to assess the thoroughness and self-criticism of the licensee's audits and self-assessments, and to verify that problems identified through those activities were appropriately prioritized and entered into the CAP for resolution in accordance with licensee procedure NMP-GM-003, "Self-Assessment and Benchmark Procedure."
b. Assessment The inspectors determined that the scopes of assessments and audits were adequate.
Self-assessments were generally detailed and critical, as evidenced by findings consistent with the inspector's independent review. The inspectors verified that CRs were created to document areas for improvement and findings resulting from the self-assessments, and verified that actions had been completed consistent with those recommendations. Generally, the licensee performed evaluations that were technically accurate.
c. Findings
No findings were identified.
4. Safety-Conscious Work Environment
a. Inspection Scope
During the course of the inspection, the inspectors assessed the station's safety-conscious work environment (SCWE) through re view of the stations Employee Concerns Program (ECP) and interviews with various departmental personnel. The inspectors reviewed a sample of ECP issues to verify that concerns were being properly reviewed and identified deficiencies were being resolved and entered into the CAP when appropriate.
b. Assessment Based on the interviews conducted and the CRs reviewed, the inspectors determined that licensee management emphasized the need for all employees to identify and report problems using the appropriate methods established within the administrative programs, including the CAP and ECP. These methods were readily accessible to all employees.
Based on discussions conducted with a samp le of plant employees from various departments, the inspectors determined that employees felt free to raise issues, and that management encouraged employees to place issues into the CAP for resolution. The inspectors did not identify any reluctance on the part of the licensee staff to report safety concerns.
c. Findings
No findings were identified.
4OA6 Exit
Exit Meeting Summary
On April 2, 2015, the inspectors presented the inspection results to Mr. G. Saxon and other members of the site staff. The inspectors confirmed that proprietary information was not provided or examined during the inspection.
ATTACHMENT:
SUPPLEMENTARY INFORMATION
KEY POINTS OF CONTACT
Licensee personnel
- G. Saxon, Plant Manager
- G. Gunn, Regulatory Affairs Manager
- J. Wade, Site Design Engineering Manager
- K. Morrow, Licensing Engineer
- K. Walden, Licensing Engineer
- M. Carstensen, Engineer
- M. Cline, Site CAPCO
- N. Koteel, Fleet PI Manager
- T. Thompson, Site System Engineering Manager
- T. Simmons, PI Manager
- T. Moorer, Director EHS
NRC personnel
- A. Alen, Resident Inspector
- M. Cain, Senior Resident Inspector
LIST OF REPORT ITEMS
Opened and Closed
None
Closed
None
Discussed
None
LIST OF DOCUMENTS REVIEWED