| title = Monthly Operating Repts for May 1989 for Palo Verde Nuclear Generating Station Units 1,2 & 3
| title = Monthly Operating Repts for May 1989 for Palo Verde Nuclear Generating Station Units 1,2 & 3
| author name = HAYNES J G, PORTER K F
| author name = Haynes J, Porter K
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| addressee name =  
| addressee name =  

Revision as of 20:37, 18 June 2019

Monthly Operating Repts for May 1989 for Palo Verde Nuclear Generating Station Units 1,2 & 3
ML17304B254
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 05/31/1989
From: Haynes J, Porter K
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
254-00256-JGH-K, 254-256-JGH-K, NUDOCS 8906200079
Download: ML17304B254 (36)


Text

~y" gCCELZP>TED D1SlBU'EON DEMONSTR+OY, SY~Eg REGULATORY INFORMATION DISTRIBUTION SYSTEM (RXDS)ACCESSION NBR:890 FACIL:STN-50-528 STN-50-529.STN-50-530 AUTH.NAME PORTER,K.F.

HAYNES,J.G.

RECIP.NAME 6200079 DOC.DATE: 89/05/31 NOTARIZED:

NO DOCKET Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTHOR AFFILIATION Arizona Public Service Co.(formerly Arizona Nuclear Power Arizona Public Service Co.(formerly Arizona Nuclear Power R RECIPIENT AFFILIATION I

SUBJECT:

Monthly operating repts for May 1989 for PVNGS Units 1,2&3.W/890614 ltr.DISTRIBUTXON CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs NOTES:Standardized plant.Standardized plant.Standardized plant.05000528 05000529 A 05000530 D RECIPIENT ID CODE/NAME PD5 LA CHAN,T DAVXS,M.INTERNAL ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 10 NRg4DR-RPB 10 G FXCE 01 EXTERNAL'G&G S IMPSON I F NRC PDR NOTES: COPIES LTTR ENCL 4 4 1 1 1 1 10 10 1 1 1 1 1 1 1 1 1 1.1 1 1 1 RECIPIENT ID CODE/NAME PD5 PD DAVIS,M AEOD/DOA IRM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN5 LPDR NSIC COPIES LTTR ENCL 1 1 1 1 1 1 2 2 1 1 1 1 1'1 1 1 1 D NOTE'IO ALL"RIES" RECIPIENIS'LEASE HELP US 10 REDUCE WASTE.'ONI'ACT

'IHE DOCUMENI'XNIBDL DESK, ROOM Pl-37 (EXT.20079)K)ELIMINATE YOUR NAME PKH DISTIGKlTIGN LISTS FOR DOCUMENIS YOU DON'T NEED)TOTAL NUMBER OF COPIES REQUIRED: LTTR 33 ENCL 33

/f Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O, BOX 52034~PHOENIX.ARIZONA 85072-2034 254-00256-JGH/KFP June 14, 1989 Docket Nos.STN 50-528/529/530 Document Control Desk U.S.Nuclear Regulatory Commission Mail Station Pl-137 Washington, D.C.20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2 and 3 Monthly Operating Reports for May 1989 File'9-024-404 89-056-026 Attached are the Monthly Operating Reports for May 1989 prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the Palo Verde Nuclear Generating Station, Units 1, 2 and 3 Operating Licenses.By copy of this letter, we are also forwarding the Monthly Operating Reports to the Regional Administrator of the Region V Office.If you have any questions, please contact Mr.K.F.Porter, at (602)371-4187.Very truly yours, J.G.Haynes Vice President Nuclear Production JGH/KFP/dim Attachments cc: M.J.Davis J~B.Martin T.J.Polich J.A.Amenta INPO Records Center (all w/attachments) 3906200079 390531 PDR ADOCK 05000528 PDC 0~1 Monthly Page 2 Operating Report bcc: E.D.A.R.J.J.D.R.F.M.K.B.R.D.D.D.L.W.J.W.R.K.W~A.S~J~T.K~G.E.C.C.P.S.P.D.R.D.W.J.B.E.B.C.J.E.M.B.A.C.L.B.S.E.A.E.R.L.E.R.C.W.F.F.C.L.J.D.M.W.F.R.H.L.Lawson J.Wiley Wootten E.Younger Kahler F.Conway T.Reilly W.McCaskey Van Brunt, Jr.Karner Gehr Adney Allen Allen Andrews Bernier Buckingham Clyde Contois Ecklund Gouge Hackbert Hardy Heinicke Henson Ide LoCicero Marsh Page Porter Quinn Rogers Schey Scott Shriver Johnson Sowers Spaw Stevens Teeter Vogt (7040)(9012)(4141)(6915)(7106)(6123)(6345)(7048)(6451)(6079)(6985)(7035)(6486)(6795)(8038)(6452)(6078)(6932)(6144)(6123)(7102)(7035)(7035)(7048),(6231)"(6428)(6148)(6077)(6081)(2208)(7006)(7102)(4161)(7434)(6920)(7035)(6070)(6345)(9012)(6102)(6086)(all w/attachments) li I(

NRC MONTHLY OPERATING REPORT DOCKET NO.50-528 UNIT NAME PVNGS-1 DATE.06 06 89 COMPLETED BY K F Porter TELEPHONE 602 3 1-4187 OPERATING STATUS l.2.3.5.6.7.8~9.10.Unit Name: Palo Verde Nuclear Generatin Station Unit 1 Licensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe): 1403 Design Electrical Rating (Net MWe):~12 0 Maximum Dependable Capacity (Gross MWe): 1303 Maximum Dependable Capacity (Net MWe): 1221 If Changes Occur In Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: N A Power Level to Which Restricted, If Any (Net MWe): None Reasons For Restrictions, If Any: N A 11.12.13 14 15 16 17 18.19 20 21 22.23 24 Hours in Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)Gross Electrical Energy Generated (MWH)Net Electrical Energy Generated (MWH)Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)Unit Capaci.ty Factor (Using DER Net)Unit Forced Outage Rate Shutdowns Scheduled Over Next N A This Month 44 Yr.-to-Date 3 624.0 1 522 0 Cumulative 29 280 0 1 262 1 1 522.0 16 826 9 5 565 298.0 60 931 221.0 1 933 700.0 21 163 100 0 1 796.575 0 42 0%42.0 19 93 190.0 57 5 57 5 40 6%55 4 53 2 28 1 39.0a 6 Months (Type, Date, and Duration of Each): 25.If Shutdown At End of Report Period, Estimated Date of Startup: Au ust 26 1989 INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Forecast Achieved~05 85~05 25 85~06 85~06 10 85~11 85,~01 28 86

)l AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-528 UNIT NAME PVNGS-1 DATE 06 06 89 COMPLETED BY K F Porter TELEPHONE 602 371-418 MONTH: MAY 1989 DAY AVERAGE DAILY POWER LEVEL DAY 17 AVERAGE DAILY POWER LEVEL I 18 19 0 20 21 22 23 24 25 10 26 27 12 28 13 29 14 30 31 16 1

REFUELING INFORMATION DOCKET NO.50-528 UNIT NAME PVNGS-1 DATE 06 06 89 COMPLETED BY K F Porter TELEPHONE 602 3 1-418 1.Scheduled date for next refueling shutdown.03/01/91, 3rd refueling.

2.Scheduled date for restart following refueling.

06/03/91 3.Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

To be determined.

4.Scheduled date for submitting proposed licensing action and supporting information.

To be determined.

5.Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

The fuel vendor for the next reload will be Combustion Engineering.

6.The number of fuel assemblies a)In the core.241 b)In the spent fuel storage pool.80 7.Licensed spent fuel storage capacity.1329'Intended change in spent fuel storage capacity.None 8.Projected date of last refueling that can be discharged to spent fuel storage pool assuming'present capacity.2004 (18 Month reloads and full core discharge capability).

'1 H li (0

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.50-528 UNIT NAME PVNGS-1 DATE 06 06 89 COMPLETED BY K F.Porter TELEPHONE 602 3 1-4187 MAY 1989 05/01 05/12 05/31 0000 1130 2400 Unit begins month in Mode 5, 2nd Refueling Outage.Unit'ntered Mode 6.Unit ends month in Mode 6.

SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K.F.Porter Method of Duration Shutting System Component No.Date Type Hours Reason Down Reactor LER No.Code Code Cause and Corrective Action to Prevent Recurrence 89/03 04/08/89 S 744 N/A N/A N/A 2nd refueling outage.F-Forced S-Scheduled Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administrative G-Operational Error H-Other (Explain)-5-Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20%or Greater in the Past 24 Hours 9-Other-(Explain)

Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER)File (NUREG 0161)Exhibit H-Same Source 0 h NRC MONTHLY OPERATING REPORT DOCKET NO.50-529 UNIT NAME PVNGS-2 DATE , 06 06 89 COMPLETED BY K'F Porter TELEPHONE 602 3 1-4187 OPERATING STATUS 1.2.3.4.5.6.7.8.9.10 Unit Name: Palo Verde Nuclear Generatin Station Unit 2 Licensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe): 1403 Design Electrical Rating (Net MWe):~12 0 Maximum Dependable Capacity (Gross MWe): 1303 Maximum Dependable Capacity (Net MWe): 1221 If Changes Occur In Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: N A Power Level to Which Restricted, If Any (Net MWe): None Reasons For Restrictions, If Any: N A ll 12 13 14 15 16 17 18 19.20.21.22 23 24 This Month Cumulative 23 664 0 Yr.-to-Date 3 624 0 1453 16 500 4 1 461 1 16 201 8 0 0 0.0 0 0 59 414 317 0 5 487 540.0 1 911 100.0 1 762 088.0 40.3 20 779 570.0 19 446 141.0 68 5 68 5 40.3 6 3 39.8a 64 38 3s (Type, Date, and Duration of Each): 15 Hours in Reporting Period 744 0 Number of Hours Reactor Was Critical 0 Reactor Reserve Shutdown Hours 0 Hours Generator On-Line 0 Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)0 Gross Electrical Energy Generated (MWH)0 Net Electrical Energy Generated (MWH)0 Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)Unit Capacity Factor (Using DER Net)0 Unit Forced Outage Rate 100 Shutdowns Scheduled Over Next 6 Months Refuelin Outa e-02 90-58 Da s 25.If Shutdown At End of Report Period, Estimated Date of Startup: June 12 1989 INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION-6-Forecast~03 86~06 86~11 86 Achieved~04 18 86 05 20 86 09 19 86 t

,0 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-529 UNIT NAME PVNGS-2 DATE 06 06 89 COMPLETED BY K F Porter TELEPHONE 602 3 1-418 MONTH: MAY 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 17 18 19 20 21 22 23 24 25 10 26 27 12 28 13 29 14 30 15 31 16 i I 1 ,V REFUELING INFORMATION DOCKET NO.50-529 UNIT NAME PVNGS-2 DATE 06 06 89 COMPLETED BY K F Porter TELEPHONE 602 3 1-418 1.Scheduled date for next refueling shutdown.01/13/90, 2nd refueling.

2~Scheduled date for restart following refueling.

04/17/90 3.Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment'l To be determined 4.Scheduled date for submitting proposed licensing action and supporting information.

09/89 5.Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

To be determined 6.The number of fuel assemblies a)In the core.241 b)In the spent fuel storage pool.7.Licensed spent fuel storage capacity.108 1329 Intended change in spent fuel storage capacity.None 8.Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.2004 (18 Month reloads and full core discharge capability).

e'

!

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.50-529 ,UNIT NAME PVNGS-2 DATE 06 06 89 COMPLETED BY K F Porter TELEPHONE 602 3 1-4187 MAY 1989 05/01 05/31 0000 2400 Unit began month in Mode 5, ADV repair outage.Unit ended month in Mode 5.

]I If J f ill'I J' SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K.F.Porter Method of Duration Shutting System Component No.Date Type Hours Reason Down Reactor LER No.Code Code5 Cause and Corrective Action to Prevent Recurrence 89/02 03/15/89 F 744 N/A N/A N/A Continuation of outage from the previous month.F-Forced S-Scheduled Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administrative G-Operational Error H-Other (Explain)Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20%or Greater in the Past 24 Hours 9-Other-(Explain) Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER)File (NUREG 0161)Exhibit H-Same Source 0 i'i I 1[

NRC MONTHLY OPERATING REPORT DOCKET NO.50-530 UNIT NAME PVNGS-3 DATE 06 06 89 COMPLETED BY K F Porter TELEPHONE 602 371-4187 OPERATING STATUS 1.2.3.4.5.6.7.8.9.10 Unit Name: Palo Verde Nuclear Generatin Station Unit 3 Licensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe): 1403 Design Electrical Rating (Net MWe):~12 0 Maximum Dependable Capacity (Gross MWe): 1303 Maximum Dependable Capacity (Net MWe): 1221 If Changes Occur In Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: N A Power Level to Which Restricted, If Any (Net MWe): None Reasons For Restrictions, If Any: N A This Month Yr.-to-Date Cumulative 11.12.13.14 15 16 17.18'9 20 21 22.23 24 Hours in Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)Gross Electrical Energy Generated (MWH)Net Electrical Energy Generated (MWH)Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)Unit Capacity Factor (Using DER Net)Unit Forced Outage Rate Shutdowns Scheduled Over Next N A 44 0 3 6240 1 106.1 12 240 0 9 307 8 1 095.0 9 273 0 Og Og 4 090 086.0 1 420 500.0 1 327 990.0 30 2%30 2a 34 402 824 0 12 06 00.0 11 363 465.0 5 8 75 8 ,0 30 0 76 0%73 1 9 1 Oa Oa 31.1%6 Months (Type, Date, and Duration of Each): 25.If Shutdown At End of Report Period, Estimated Date of Startup: Au ust 6 1989 INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION-ll-Forecast 07787~07 87 09 87 Achieved~10 25 8 11 28 87 01 08 88 i 0'

,0 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-530 UNIT NAME PVNGS-3 DATE 06 06 89 COMPLETED BY K F.Porter TELEPHONE 602 3 1-4187 MONTH: MAY 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 17 19 20 21 22 23 24 25 10 26 27 12 28 13 29 14 30 15 31 16 i I\4 f kI t[

0 REFUELING INFORMATION DOCKET NO.50-530 UNIT NAME PVNGS-3 DATE 06 06 89 COMPLETED BY K F.Porter TELEPHONE 602 3 1-418 1.Scheduled date for next refueling shutdown.ll/17/90, 2nd refueling.

2.Scheduled date for restart following refueling.

02/19/91 3.Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment'E To be determined.

4.Scheduled date for submitting proposed licensing action and supporting information.

To be determined.

5.Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

The fuel vendor for the next reload will be Combustion Engineering.

6.The number of fuel assemblies a)In the core.241 b)In the spent fuel storage pool.104 7.Licensed spent fuel storage capacity.1329 Intended change in spent fuel storage capacity.None 8.Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.2005 (18 Month reloads and full core discharge capability).

1 II E I,

,0

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.50-530 UNIT NAME PVNGS-3 DATE 06 06 89 COMPLETED BY K F Porter TELEPHONE 602 3 1-4187 MAY 1989 05/01 05/31 0000 2400 Unit began month in Mode 6, 1st Refueling Outage.Unit ended month in Mode 6.

SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K.F.Porter No.Date Typel Duration Hours Method of Shutting System Component Reason Down Reactor LER No.Code Code Cause and Corrective Action to Prevent Recurrence 89/03 03/08/89 S 744 N/A N/A N/A C ontinuation of unit refueling outage.F-Forced S-Scheduled Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administrative G-Operational Error H-Other (Explain)Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20%or Greater in the Past 24 Hours 9-Other-(Explain) Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER)File (NUREG 0161)Exhibit H-Same Source