ML17284A558: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 09/30/1988
| issue date = 09/30/1988
| title = Monthly Operating Rept for Sept 1988 for Wpps 2.W/881006 Ltr
| title = Monthly Operating Rept for Sept 1988 for Wpps 2.W/881006 Ltr
| author name = HUTCHISON L, POWERS C M
| author name = Hutchison L, Powers C
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:REGUZATORY XNFORMATXON DXSTRXBQU XON SYSTEM (RXDS)
ACCESSION NBR:8810190452 d                                      I DOC.DATE: 88          NOTARIZED: NO        DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe            05000397  )
AUTH. NAME          AUTHOR AFFILIATION HUTCHXSON,L.        Washington Public Power Supply System POWERS,C.M.        Washington Public Power Supply System RECIP.NAME          RECIPIENT AFFILIATION
 
==SUBJECT:==
crating    rept for Sept  1988  for WPPS 2.
W/881006    tr.                                                            D DISTRIBUTION      E: IE24D COPIES RECEIVED:LTR            ENCL    SIZE:              8 TITLE: Monthly Operating Report (per Tech Specs NOTES:
RECIPIENT            COPIES            RECIPXENT        COPIES            h XD CODE/NAME          LTTR ENCL      ID  CODE/NAME      LTTR ENCL PD5 LA                    1      0  PD5 PD                5    5 SAMWORTH,R                1      0 INTERNAL: ACRS                      10    10    AEOD/DOA              1    1 AEOD/DSP/TPAB            1      1  ARM TECH ADV          2    2 NRR/DLPQ/PEB 1 1          1      1  NRR/DOEA/EAB 11      1    1 gRRj D .
PB 10        1      1  NUDOCS-ABSTRACT      1    1 EG FILE        01        1      1  RGN5                  1    1 EXTERNAL: EGGG WILLIAMS,S            1      1  LPDR                  1 NRC PDR                  1      '1  NSIC                  1. 1 S
NOTE KO  ALL "RIDS" RZX.'IPIEFIS:
PIZASE HELP US KO RECCE WASTE! CXWIRCZ THE DOQ3MEPZ CDNTROL DESK RCGM  Pl-37 (EXT. 20079) TO ELIMINATE KKR NAME FMH DISTEKBUTIGN LISTS H)R DOCUKWIS YOU DGNFT HEEDt TOTAL NUMBER OF COPIES REQUIRED: LTTR          31  ENCL    29
 
OPERATING DATA REPORT NNP-2 01-Oct-88 1 ~  DOCKET:  50-397 2    REPORTING PERiOD:        Sep-88          OUTAGE +  ON-LINE HOURS        720
: 3. UTILITY CONTACT:                  LEONARD HUTCHISON    (509) 377-2486 4~  LICENSED THERMAL PONER (MNt):                                            3323 5~  NAMEPLATE RATING ( GROSS MNe ):                                        1200.9
: 6. DESIGN ELECTRICAL RATING (NET MNe):                                      1100 7~  MAXIMUM DEPENDABLE CAPACITY (GROSS MNe):                                1140
: 8. MAXIMUM DEPENDABLE CAPACITY (NET MNe):                                  1095
: 9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT~    GIVE REASONS:
: 10. PONER TO NHICH RESTRICTED~  IF  ANY (NET  MNe):
ll. REASONS  FOR RESTRICTIONS~  IF  ANY:
MONTH        YEAR    CUMULATIVE
: 12. REPORT PERIOD HOURS                                720      6575    33295 2
'13  HOURS REACTOR CRITICAL                            584.6    4318.4    24225.2
: 14. RX RESERVE SHTDNN HRS                              0'        0.0      340.4
: 15. HRS GENERATOR ON LINE                            493.7    4070.6    23212.5 lb. UNIT RESERVE SHUTDONN HOURS                        0.0        0~0      381.7 17 'ROSS THERMAL ENERGY (MNH)                      1460160    12555638 62938405 18 'ROSS ELECTRICAL ENERGY (MNH)                      476570    4156840 20973980
: 19. NET ELECTRICAL ENERGY (MNH)                      460006    4012146 20180098 20 UNIT SERVICE FACTOR                                  68.6/      61.9%      69.7%
: 21. UNIT AVAILABILITYFACTOR                            68.6/      61.9%      70.9%
: 22. UNIT CAPACITY FACTOR (MDC NET)                      58.3/      55.7/      55.4/
: 23. UNIT CAPACITY FACTOR (DER NET)                      58.1/      55.5/      55.1/
: 24. UNIT FORCED OUTAGE RATE                              6.7/      17.1/      9.7%
: 25. FORCED OUTAGE HOURS                                35.7      837.6    2482.7
: 26. SHUTDONNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE,DATE~DURATION):
: 27. IF  CURRENTLY SHUTDONN ESTIMATED STARTUP DATE:
8810190452 880980 PDR  ADOCK 05000397 R              PDC
 
t1 ) , ~    l 4    .      ), (j Ill % J>      ' ~ ~ '',h  I 4 W E-  ~~ ~ <, I ~, '+i) ~
DOCKET NO.          50-397 UNIT NAME            WNP-2 DATE          10/4/88 LNIT SIIUTDONNS  / REDUCTIONS                  COMPLETED BY            LB HUTCHISON REPORT. PERIOD  ~)~
mcnth, 19 88 year TELEPHONE    (509) 377-2486
  <Z).
88-12 0E 8/28/88 TTf'F S
lV/Bs 190. 63 BEAsQH B
M~M~&
4
                                                ~E            YTll tlllMIBT                      c                        FRE CONCLUDED EXTENDED OUTAGE FOR MODIFICATION OF Y E    %EC RHR CHECK VALVES, MS-SRV/VACUUM BREAKER,              REPAIR.
AND DESIGN CHANGE OF CONTROL ROOM VENTILATING SYSTEM.
88-13    9/11/88    F  -
35.68      A                          SE                GENERATOR WAS REMOVED FROM GRID AND REACTOR                      .<ER REDUCED TO PERMIT DRYWELL ENTRY FOR INSPECTION OF CSP PIPING WELDS.
  ~+ '1"B" I
            ~
WNP"2 COMPLETED A SCHEDULED MAINTENANCE OUTAGE AND INCURRED ONE FORCED OUTAGE IN SEPTEMBER AS DESCRIBED ABOVE.
t TYPE            REASON                                                    SYSTEM  I  COMPOhCNT F-Forced      A-Equip Failure            F-Admin        1-Manual          Exhibit F h H S-Sched        B-Maint or Test    ~      G-Oper Error    2-Manual Scram    Instructions for C-Refueling                H-Other        3-Auto Scram      Preparation of D-Regulatory Bes triction                4-Continued        Data Entry Sheet E-Operator Training                      5-Reduced Load      Licensee Event Report k License Examination                9-Other            (LEB) File (NUREG-0161)
 
                                                                                                          ~
o ~
  ~
~
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.
UNIT DATE      10/4/88 COMPLETED BY LB Hutchison.
TELEPHONE          509 377-2486 SEPTEMBER 1988 MONTH DAY AVERAGE DAILYPOWER LEVEL                                DAY AVERAGE DAILYPOWER LEVEL (MWe-Net)                                                  (MWe-Net) 0                                                            1018 1                                                          17 18                    1058 19 1040 20                      980 1005 21 1012 966 23 1044 24 501                                                          1036 792                                                          1047 10                                                          26 165                                                          1045 26                                                        1055 766                                                          1055 13                                                          29 776                                                          1026(1 14 778 972 INSTRUCTIONS On this form, list the average daily unit power level in NVe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
1hese figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the-unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power 'output sheet should be footnoted to explain the apparent anomaly.
 
  ~ ~
 
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968  ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 October, 6; 1988 U.S. Nuclear, Regulatory Commission Document Control Desk Washington,'.C.        20555
 
==Dear. Sir,==
 
==SUBJECT:==
NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for September, 1988 as required by our, Technical Specifications 6.9.1.6.
Very Truly Yours, C. M. Powers      (M/D 927M)
WNP-2    Plant  Manager.
CMP/lc Enclosure cc:  Mr.. J. B. Martin          NRC Region, V Mr. C. J. Bosted                      Site  Representative    (901A)
    's. Dottie  Sherman NRC ANI; Farmington    CT Mr,. J. T. Wheelock              INPO Mr,. W. H. Lovelace            NRC",  Washington D.C.
 
  ~0 f}}

Latest revision as of 08:09, 4 February 2020

Monthly Operating Rept for Sept 1988 for Wpps 2.W/881006 Ltr
ML17284A558
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/30/1988
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8810190452
Download: ML17284A558 (7)


Text

REGUZATORY XNFORMATXON DXSTRXBQU XON SYSTEM (RXDS)

ACCESSION NBR:8810190452 d I DOC.DATE: 88 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 )

AUTH. NAME AUTHOR AFFILIATION HUTCHXSON,L. Washington Public Power Supply System POWERS,C.M. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

crating rept for Sept 1988 for WPPS 2.

W/881006 tr. D DISTRIBUTION E: IE24D COPIES RECEIVED:LTR ENCL SIZE: 8 TITLE: Monthly Operating Report (per Tech Specs NOTES:

RECIPIENT COPIES RECIPXENT COPIES h XD CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 1 0 PD5 PD 5 5 SAMWORTH,R 1 0 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 ARM TECH ADV 2 2 NRR/DLPQ/PEB 1 1 1 1 NRR/DOEA/EAB 11 1 1 gRRj D .

PB 10 1 1 NUDOCS-ABSTRACT 1 1 EG FILE 01 1 1 RGN5 1 1 EXTERNAL: EGGG WILLIAMS,S 1 1 LPDR 1 NRC PDR 1 '1 NSIC 1. 1 S

NOTE KO ALL "RIDS" RZX.'IPIEFIS:

PIZASE HELP US KO RECCE WASTE! CXWIRCZ THE DOQ3MEPZ CDNTROL DESK RCGM Pl-37 (EXT. 20079) TO ELIMINATE KKR NAME FMH DISTEKBUTIGN LISTS H)R DOCUKWIS YOU DGNFT HEEDt TOTAL NUMBER OF COPIES REQUIRED: LTTR 31 ENCL 29

OPERATING DATA REPORT NNP-2 01-Oct-88 1 ~ DOCKET: 50-397 2 REPORTING PERiOD: Sep-88 OUTAGE + ON-LINE HOURS 720

3. UTILITY CONTACT: LEONARD HUTCHISON (509) 377-2486 4~ LICENSED THERMAL PONER (MNt): 3323 5~ NAMEPLATE RATING ( GROSS MNe ): 1200.9
6. DESIGN ELECTRICAL RATING (NET MNe): 1100 7~ MAXIMUM DEPENDABLE CAPACITY (GROSS MNe): 1140
8. MAXIMUM DEPENDABLE CAPACITY (NET MNe): 1095
9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT~ GIVE REASONS:
10. PONER TO NHICH RESTRICTED~ IF ANY (NET MNe):

ll. REASONS FOR RESTRICTIONS~ IF ANY:

MONTH YEAR CUMULATIVE

12. REPORT PERIOD HOURS 720 6575 33295 2

'13 HOURS REACTOR CRITICAL 584.6 4318.4 24225.2

14. RX RESERVE SHTDNN HRS 0' 0.0 340.4
15. HRS GENERATOR ON LINE 493.7 4070.6 23212.5 lb. UNIT RESERVE SHUTDONN HOURS 0.0 0~0 381.7 17 'ROSS THERMAL ENERGY (MNH) 1460160 12555638 62938405 18 'ROSS ELECTRICAL ENERGY (MNH) 476570 4156840 20973980
19. NET ELECTRICAL ENERGY (MNH) 460006 4012146 20180098 20 UNIT SERVICE FACTOR 68.6/ 61.9% 69.7%
21. UNIT AVAILABILITYFACTOR 68.6/ 61.9% 70.9%
22. UNIT CAPACITY FACTOR (MDC NET) 58.3/ 55.7/ 55.4/
23. UNIT CAPACITY FACTOR (DER NET) 58.1/ 55.5/ 55.1/
24. UNIT FORCED OUTAGE RATE 6.7/ 17.1/ 9.7%
25. FORCED OUTAGE HOURS 35.7 837.6 2482.7
26. SHUTDONNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE,DATE~DURATION):
27. IF CURRENTLY SHUTDONN ESTIMATED STARTUP DATE:

8810190452 880980 PDR ADOCK 05000397 R PDC

t1 ) , ~ l 4 . ), (j Ill % J> ' ~ ~ ,h I 4 W E- ~~ ~ <, I ~, '+i) ~

DOCKET NO. 50-397 UNIT NAME WNP-2 DATE 10/4/88 LNIT SIIUTDONNS / REDUCTIONS COMPLETED BY LB HUTCHISON REPORT. PERIOD ~)~

mcnth, 19 88 year TELEPHONE (509) 377-2486

<Z).

88-12 0E 8/28/88 TTf'F S

lV/Bs 190. 63 BEAsQH B

M~M~&

4

~E YTll tlllMIBT c FRE CONCLUDED EXTENDED OUTAGE FOR MODIFICATION OF Y E %EC RHR CHECK VALVES, MS-SRV/VACUUM BREAKER, REPAIR.

AND DESIGN CHANGE OF CONTROL ROOM VENTILATING SYSTEM.

88-13 9/11/88 F -

35.68 A SE GENERATOR WAS REMOVED FROM GRID AND REACTOR .<ER REDUCED TO PERMIT DRYWELL ENTRY FOR INSPECTION OF CSP PIPING WELDS.

~+ '1"B" I

~

WNP"2 COMPLETED A SCHEDULED MAINTENANCE OUTAGE AND INCURRED ONE FORCED OUTAGE IN SEPTEMBER AS DESCRIBED ABOVE.

t TYPE REASON SYSTEM I COMPOhCNT F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F h H S-Sched B-Maint or Test ~ G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Bes triction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report k License Examination 9-Other (LEB) File (NUREG-0161)

~

o ~

~

~

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.

UNIT DATE 10/4/88 COMPLETED BY LB Hutchison.

TELEPHONE 509 377-2486 SEPTEMBER 1988 MONTH DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) (MWe-Net) 0 1018 1 17 18 1058 19 1040 20 980 1005 21 1012 966 23 1044 24 501 1036 792 1047 10 26 165 1045 26 1055 766 1055 13 29 776 1026(1 14 778 972 INSTRUCTIONS On this form, list the average daily unit power level in NVe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

1hese figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the-unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power 'output sheet should be footnoted to explain the apparent anomaly.

~ ~

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 October, 6; 1988 U.S. Nuclear, Regulatory Commission Document Control Desk Washington,'.C. 20555

Dear. Sir,

SUBJECT:

NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for September, 1988 as required by our, Technical Specifications 6.9.1.6.

Very Truly Yours, C. M. Powers (M/D 927M)

WNP-2 Plant Manager.

CMP/lc Enclosure cc: Mr.. J. B. Martin NRC Region, V Mr. C. J. Bosted Site Representative (901A)

's. Dottie Sherman NRC ANI; Farmington CT Mr,. J. T. Wheelock INPO Mr,. W. H. Lovelace NRC", Washington D.C.

~0 f