ML17286B039: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 08/31/1991
| issue date = 08/31/1991
| title = Monthly Operating Rept for Aug 1991 for WNP-2.W/910906 Ltr
| title = Monthly Operating Rept for Aug 1991 for WNP-2.W/910906 Ltr
| author name = BAKER J W, HUTCHISON L B
| author name = Baker J, Hutchison L
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:ACCELERATED                                      DEMONS~TION                SYSTEM
  ~  '
DISTRIBUTION REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9109180251              DOC.DATE: 91/08/31 NOTARIZED: NO              DOCKET FACIL:50-397    WPPSS    Nuclear Project, Unit 2, Washington Public          Powe  05000397 AUTH. NAME            AUTHOR AFFILIATION HUTCHISON,L.B.        Washington Public Power Supply System BAKER,J.W.            Washington Public Power Supply System RECIP.NAME            RECIPIENT AFFILIATION
 
==SUBJECT:==
Monthly operating rept          for Aug 1991  for WNP-2.W/910906    ltr.
DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ( ENCL TITLE: Monthly Operating Report (per Tech Specs)                    3    SIZE:              D NOTES RECIPIENT              COPIES          RECIPIENT          COPIES ID  .CODE/NAME          LTTR ENCL      ID CODE/NAME        LTTR ENCL PD5 LA                      3    3    PD5 PD                  1    1 ENG, P. L.                  1    1                                                D INTERNAL: ACRS                          10    10    AEOD/DOA                1    1 D
AEOD/DSP/TPAB                1    1    NRR DLPQ LPEB10        1    1 NRR/DOEA/OEAB                1    1                    01      1    1 RGN5                        1    1
  ~
EXTERNAL    EG6G BRYCE NSIC
          +l    >
E f~ 8- P(P 43' H        1 1
1 1
NRC PDR                1    1 D
D D
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL  NUMBER  OF COPIES REQUIRED: LTTR          24 ENCL      24
 
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 September 6, 1991 G02-91-165 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
 
==Dear Sir:==
 
==Subject:==
NUCLEAR PLANT NO. 2 MONTHLYOPERATING REPORT AUGUST 1991 Transmitted herewith is the Monthly Operating Report for the month of August 1991 as required by our Technical Specifications 6.9.1.6.
Very truly yours, J.. Baker WNP-2 Plant Manager (MD 927M) bap Enclosure CC:    Mr. W.H. Lovelace, NRC, Washington DC Mr. J.B. Martin, NRC Region V Ms. Dottie Sherman, ANI, Farmington CT Mr. C. Sorensen, NRC Resident Inspector (901A)
Mr. J.T. Wheelock, INPO Mr. F. Yost, Utility Data Institute
        ,9i09i8025i 9i083i05000397 j
PDR-ADOCK          -- PDR R
 
DOCKET NO.:    50-397 UNIT NAME:      WNP-2 DATE:          SEPTEMBER 3, 1991 COMPLETED BY. LB HUTCHISON TELEPHONE:      (509) 377-2486 UNIT SHUTDOWN / REDUCTIONS NO.
0 91-03 BIO 6/12/91  F    744
                              "*" """" "                              c N/A Plant remained shutdown due to upgrading of plant Emergency Operating Procedures and to provide additional licensed operator training.
 
==SUMMARY==
:    WNP-2 remains in administrative shutdown as described above.
H-OTHER'S TYPE            REASON                                              METHOD                      SYSTEM  & COMPONENT F-FORCED        A-EQUIP FAILURE              F-ADMIN                1-MANUAL                  EXHIBITF & H S-SCHED          B-MAINTOR TEST                G-OPER ERROR          2-MANUALSCRAM              INSTRUCTIONS FOR C-REFUELING                                          3-AUTO SCRAM                PREPARATION OF D-REGULATORY RESTRICTION                            4-CONTINUED                DATA ENTRY SHEET E-OPERATOR TRAINING &                                5-REDUCED LOAD              LICENSEE EVENT REPORT LICENSE EXAM                                      9-OTHER                    (LER) FILE (NUREG4161)
 
OPERATING DATA REPORT WNP-2 01-Sep-91
: 1. DOCKET:  50-397
: 2. REPORTING PERIOD:      Aug-91              OUTAGE +  ON-LINE HOURS            744
: 3. UTILITY CONTACT:                    LEONARD HUTCHISON      (509) 377-2486
: 4. LICENSED THERMAL POWER (MWt):                                                3323
: 5. NAMEPLATE RATING (GROSS MWe):                                              1200.9
: 6. DESIGN ELECTRICAL RATING (NET MWe),:    .                                    1100
: 7. MAXIMUM DEPENDABLE CAPACXTY (GROSS MWe):                                      1129
: 8. MAXIMUM DEPENDABLE CAPACXTY (NET MWe):                                        1085 9    IF  CHANGES OCCUR ABOVE SXNCE LAST REPORT I GIVE REASONS None.
1 0 ~ POWER TO WHICH RESTRICTED I    IF ANY (NET MWe)
: 11. REASONS FOR RESTRICTIONS,    XF ANY:    None.
MONTH          YEAR    CUMULATIVE
: 12. REPORT PERIOD HOURS                                  744          5831    58855.2
: 13. HOURS REACTOR CRITICAL                              0.0        2459.0    41443.2
: 14. RX RESERVE SHTDWN HRS                                0.0          0.0      340.4
: 15. HRS GENERATOR ON LINE                                0.0        2439.3    40042.4
: 16. UNIT RESERVE SHUTDOWN HOURS                          0.0          0.0      381.7
: 17. GROSS THERMAL ENERGY (MWH)                              0    7921510 114270535
: 18. GROSS. ELECTRICAL ENERGY (MWH)                          0    2663880 38065520 19-  NET ELECTRICAL ENERGY (MWH)                      -10536      2533772 36561942
: 20. UNIT SERVICE FACTOR                                  0.04        41.8~a      68.0<
'1. UNIT AVAILABILITYFACTOR                              0.0%
0.0<
41.8~O 39.8>o 68.7~O 56.7~o
: 22. UNIT CAPACITY FACTOR (MDC NET)
: 23. UNIT CAPACXTY. FACTOR (DER NET)                      0. 0>o      39.5<o      56.5~o
: 24. UNIT FORCED OUTAGE RATE                            100.04        44.34        11.84
: 25. FORCED OUTAGE HOURS                                744.0        1944.0      5345.2 26    SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE f DATE g DURATION) 9/10/91
: 27. IF CURRENTLY      SHUTDOWN ESTIMATED STARTUP DATE:
 
O.
h ~
    ~
DOCKET NO.:      50-397 UNIT:            WNP-2 DATE:            SEPT 3, 1991 COMPLETED BY:    LB HUTCHISON TELEPHONE:        (509) 377-2486 MONTH:      AUGUST 1991 DAY AVERAGE DAILYPOWER LEVEL                      DAY AVERAGE DAILYPOWER LEVEL (MWe-NET)                                          (MWe-NET) 17.
: 2.                                              18.
19.
: 4.                                              20.
21.
22.
23.
: 8.                                              24.
9.
: 10.                                                26.
27.
: 12.                                                28.
: 13.                                                29.
: 14.                                                30.
31.
16.
INSTRUCTIONS ON THIS FORM, LIST THE AVERAGE DAILYUNIT POWER LEVEL IN MWe-NET FOR EACH DAY IN THE REPORTING MONTH. COMPUTE TO THE NEAREST WHOLE MEGAWATT.
THESE FIGURES WILLBE USED TO PLOT A GRAPH FOR EACH REPORTING MONTH. NOTE THAT WHEN MAXIMUMDEPENDABLE CAPACITYIS USED FOR THE NET ELECTRICALRATING OF THE UNIT, THRE MAY BE OCCASIONS WHEN THE DAILY AVERAGE POWER LFVEL EXCEEDS THE 100Fo LINE (OR THE RESTRICTED POWER LEVEL LINE). IN SUCH CASES, THE AVERAGE DAILYUNIT POWER OUTPUT SHEET SHOULD BE FOOTNOTED TO EXPLAIN THE APPARENT ANOMALY.}}

Latest revision as of 07:44, 4 February 2020

Monthly Operating Rept for Aug 1991 for WNP-2.W/910906 Ltr
ML17286B039
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/31/1991
From: John Baker, Hutchison L
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-91-165, NUDOCS 9109180251
Download: ML17286B039 (6)


Text

ACCELERATED DEMONS~TION SYSTEM

~ '

DISTRIBUTION REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9109180251 DOC.DATE: 91/08/31 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION HUTCHISON,L.B. Washington Public Power Supply System BAKER,J.W. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Aug 1991 for WNP-2.W/910906 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ( ENCL TITLE: Monthly Operating Report (per Tech Specs) 3 SIZE: D NOTES RECIPIENT COPIES RECIPIENT COPIES ID .CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 3 3 PD5 PD 1 1 ENG, P. L. 1 1 D INTERNAL: ACRS 10 10 AEOD/DOA 1 1 D

AEOD/DSP/TPAB 1 1 NRR DLPQ LPEB10 1 1 NRR/DOEA/OEAB 1 1 01 1 1 RGN5 1 1

~

EXTERNAL EG6G BRYCE NSIC

+l >

E f~ 8- P(P 43' H 1 1

1 1

NRC PDR 1 1 D

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 September 6, 1991 G02-91-165 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Dear Sir:

Subject:

NUCLEAR PLANT NO. 2 MONTHLYOPERATING REPORT AUGUST 1991 Transmitted herewith is the Monthly Operating Report for the month of August 1991 as required by our Technical Specifications 6.9.1.6.

Very truly yours, J.. Baker WNP-2 Plant Manager (MD 927M) bap Enclosure CC: Mr. W.H. Lovelace, NRC, Washington DC Mr. J.B. Martin, NRC Region V Ms. Dottie Sherman, ANI, Farmington CT Mr. C. Sorensen, NRC Resident Inspector (901A)

Mr. J.T. Wheelock, INPO Mr. F. Yost, Utility Data Institute

,9i09i8025i 9i083i05000397 j

PDR-ADOCK -- PDR R

DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: SEPTEMBER 3, 1991 COMPLETED BY. LB HUTCHISON TELEPHONE: (509) 377-2486 UNIT SHUTDOWN / REDUCTIONS NO.

0 91-03 BIO 6/12/91 F 744

"*" """" " c N/A Plant remained shutdown due to upgrading of plant Emergency Operating Procedures and to provide additional licensed operator training.

SUMMARY

WNP-2 remains in administrative shutdown as described above.

H-OTHER'S TYPE REASON METHOD SYSTEM & COMPONENT F-FORCED A-EQUIP FAILURE F-ADMIN 1-MANUAL EXHIBITF & H S-SCHED B-MAINTOR TEST G-OPER ERROR 2-MANUALSCRAM INSTRUCTIONS FOR C-REFUELING 3-AUTO SCRAM PREPARATION OF D-REGULATORY RESTRICTION 4-CONTINUED DATA ENTRY SHEET E-OPERATOR TRAINING & 5-REDUCED LOAD LICENSEE EVENT REPORT LICENSE EXAM 9-OTHER (LER) FILE (NUREG4161)

OPERATING DATA REPORT WNP-2 01-Sep-91

1. DOCKET: 50-397
2. REPORTING PERIOD: Aug-91 OUTAGE + ON-LINE HOURS 744
3. UTILITY CONTACT: LEONARD HUTCHISON (509) 377-2486
4. LICENSED THERMAL POWER (MWt): 3323
5. NAMEPLATE RATING (GROSS MWe): 1200.9
6. DESIGN ELECTRICAL RATING (NET MWe),: . 1100
7. MAXIMUM DEPENDABLE CAPACXTY (GROSS MWe): 1129
8. MAXIMUM DEPENDABLE CAPACXTY (NET MWe): 1085 9 IF CHANGES OCCUR ABOVE SXNCE LAST REPORT I GIVE REASONS None.

1 0 ~ POWER TO WHICH RESTRICTED I IF ANY (NET MWe)

11. REASONS FOR RESTRICTIONS, XF ANY: None.

MONTH YEAR CUMULATIVE

12. REPORT PERIOD HOURS 744 5831 58855.2
13. HOURS REACTOR CRITICAL 0.0 2459.0 41443.2
14. RX RESERVE SHTDWN HRS 0.0 0.0 340.4
15. HRS GENERATOR ON LINE 0.0 2439.3 40042.4
16. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 381.7
17. GROSS THERMAL ENERGY (MWH) 0 7921510 114270535
18. GROSS. ELECTRICAL ENERGY (MWH) 0 2663880 38065520 19- NET ELECTRICAL ENERGY (MWH) -10536 2533772 36561942
20. UNIT SERVICE FACTOR 0.04 41.8~a 68.0<

'1. UNIT AVAILABILITYFACTOR 0.0%

0.0<

41.8~O 39.8>o 68.7~O 56.7~o

22. UNIT CAPACITY FACTOR (MDC NET)
23. UNIT CAPACXTY. FACTOR (DER NET) 0. 0>o 39.5<o 56.5~o
24. UNIT FORCED OUTAGE RATE 100.04 44.34 11.84
25. FORCED OUTAGE HOURS 744.0 1944.0 5345.2 26 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE f DATE g DURATION) 9/10/91
27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:

O.

h ~

~

DOCKET NO.: 50-397 UNIT: WNP-2 DATE: SEPT 3, 1991 COMPLETED BY: LB HUTCHISON TELEPHONE: (509) 377-2486 MONTH: AUGUST 1991 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe-NET) (MWe-NET) 17.

2. 18.

19.

4. 20.

21.

22.

23.

8. 24.

9.

10. 26.

27.

12. 28.
13. 29.
14. 30.

31.

16.

INSTRUCTIONS ON THIS FORM, LIST THE AVERAGE DAILYUNIT POWER LEVEL IN MWe-NET FOR EACH DAY IN THE REPORTING MONTH. COMPUTE TO THE NEAREST WHOLE MEGAWATT.

THESE FIGURES WILLBE USED TO PLOT A GRAPH FOR EACH REPORTING MONTH. NOTE THAT WHEN MAXIMUMDEPENDABLE CAPACITYIS USED FOR THE NET ELECTRICALRATING OF THE UNIT, THRE MAY BE OCCASIONS WHEN THE DAILY AVERAGE POWER LFVEL EXCEEDS THE 100Fo LINE (OR THE RESTRICTED POWER LEVEL LINE). IN SUCH CASES, THE AVERAGE DAILYUNIT POWER OUTPUT SHEET SHOULD BE FOOTNOTED TO EXPLAIN THE APPARENT ANOMALY.