ML17289A493: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 03/31/1992
| issue date = 03/31/1992
| title = Monthly Operating Rept for Mar 1992 for Washington Public Power Supply Nuclear Plant 2.W/920408 Ltr
| title = Monthly Operating Rept for Mar 1992 for Washington Public Power Supply Nuclear Plant 2.W/920408 Ltr
| author name = BAKER J W, HUTCHISON L B
| author name = Baker J, Hutchison L
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ACCELERATED D><TRIBUTION DEMONS~TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION HUTCHISON,L.B.
{{#Wiki_filter:ACCELERATED D><TRIBUTION DEMONS~TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
Washington Public Power Supply System BAKER,J.W.
DOCKET FACIL:50-397   WPPSS   Nuclear Project, Unit 2, Washington Public           Powe 05000397 AUTH. NAME           AUTHOR AFFILIATION HUTCHISON,L.B.     Washington Public Power Supply System BAKER,J.W.         Washington Public Power Supply System RECIP.NAME           RECIPIENT AFFILIATION
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating rept for Mar Washington Public Power Supply Nuclear Plant 2.20408 r.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR C ENCL J SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES'ECIPIENT ID CODE/NAME PD5 LA DEAN,W.INTERNAL: ACRS AEOD/DSP/TPAB NRR/DOEA/OEAB RGN5 EXTERNAL: EGGG BRYCE,J.H NSIC COPIES LTTR ENCL 3 3 1 1 10 10 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD5 PD AEOD/DOA NRR/DPP,Q/~BE 0 G~FII E 0 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:
Monthly operating rept for Mar                     Washington Public Power Supply Nuclear Plant 2.             20408   r.
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24 0
DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR C ENCL                 J SIZE:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Bax 968~3000 George Wasbtngton Way~Rtcbiand, Wasbtngton 99352-0968
TITLE: Monthly Operating Report (per Tech Specs)
~(509)372-5000 Docket No.50-397 April 8, 1992 G02-92-082 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555  
NOTES'ECIPIENT                                       RECIPIENT          COPIES COPIES ID CODE/NAME           LTTR ENCL      ID  CODE/NAME      LTTR ENCL PD5 LA                     3    3    PD5 PD                  1    1 DEAN,W.                     1    1 INTERNAL: ACRS                       10    10    AEOD/DOA                1    1 AEOD/DSP/TPAB               1     1     NRR/DPP,Q/~BE     0     1    1 NRR/DOEA/OEAB              1    1        G~FII E     0       1     1 RGN5                        1     1 EXTERNAL: EGGG BRYCE,J.H              1     1     NRC PDR NSIC                        1     1 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR             24   ENCL   24
 
0 WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Bax 968 ~ 3000 George Wasbtngton Way ~ Rtcbiand, Wasbtngton 99352-0968 ~ (509) 372-5000 Docket No. 50-397 April 8,   1992 G02-92-082 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555


==Dear Sir:==
==Dear Sir:==


==Subject:==
==Subject:==
NUCLEAR PLANT NO.2 MONTHLY OPERATING REPORT MARCH 1992 Transmitted herewith is the Monthly Operating Report for the month of March 1992 as required by our Technical Specifications 6.9.1.6.Very truly yours, J.W.Baker WNP-2 Plant Manager (MD 927M)LBH:bap Enclosure CC: Mr.W.H.Lovelace, NRC, Washington DC Mr.J.B.Martin, NRC Region V Ms.Dottie Sherman, ANI, Farmington CT Mr.C.Sorensen, NRC Resident Inspector (901A)Mr.J.T.Wheelock, INPO Mr.F.Yost, Utility Data Institute 92042S0434 920331 PDR*DOCK 05000397 I R PDR'I 4g t%C H'1 K N g ql p t 5 i DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: APRIL 1, 1992 COMPLETED BY: LB HUTCHISON TELEPHONE:
NUCLEAR PLANT NO. 2 MONTHLYOPERATING REPORT MARCH 1992 Transmitted herewith is the Monthly Operating Report for the month of March 1992 as required by our Technical Specifications 6.9.1.6.
(509)377-2486'C UNIT HUTD OWNS REDUCTIONS 0 0 NO.DATE TYPE HOURS REASON METHOD LER NO SYSTEM COMPONENT AUSE&CORRECTIVE ACTION TO PREVENT RECURRENCE 92-02 2/25/92 F 436.4 H 92-007 SE RECOMB Concluded outage for modificaiton of Containment Atmospheric Control (CAC)drain piping.
Very truly yours, J.W. Baker WNP-2 Plant Manager (MD 927M)
LBH:bap Enclosure CC:     Mr. W.H. Lovelace, NRC, Washington DC Mr. J.B. Martin, NRC Region V Ms. Dottie Sherman, ANI, Farmington CT Mr. C. Sorensen, NRC Resident Inspector (901A)
Mr. J.T. Wheelock, INPO Mr. F. Yost, UtilityData Institute 92042S0434 920331 PDR     *DOCK 05000397               I R                       PDR
      'I
 
4g t%
C H '1 K N i g ql p t5
 
C DOCKET NO.:       50-397 UNIT NAME:       WNP-2 DATE:             APRIL 1, 1992 COMPLETED BY:     LB HUTCHISON TELEPHONE:       (509) 377-2486' UNIT HUTDOWNS REDUCTIONS 0       0 NO. DATE   TYPE HOURS REASON METHOD LER NO           SYSTEM COMPONENT           AUSE & CORRECTIVE ACTION TO PREVENT RECURRENCE 92-02   2/25/92 F     436.4   H               92-007     SE     RECOMB           Concluded outage for modificaiton       of Containment Atmospheric Control (CAC) drain piping.


==SUMMARY==
==SUMMARY==
: WNP-2 returned to service on March 19 after completion of plant modifications.
: WNP-2 returned to service on March 19 after completion of plant modifications.
TYPE F-FORCED S-SCHED REASON A-EQUIP FAILURE B-MAINT OR TEST C-REFUELING D-REGULATORY RESTRICTION E-OPERATOR TRAINING&LICENSE EXAM F-ADMIN G-OPER ERROR H-OTHER METHOD 1-MANUAL 2-MANUAL SCRAM 3-AUTO SCRAM 4-CONTINUED 5-REDUCED LOAD 9-OTHER SYSTEM&COMPONENT EXHIBIT F&H INSTRUCTIONS FOR PREPARATION OF DATA ENTRY SHEET LICENSEE EVENT REPORT (LER)FILE (NUREG4161)  
TYPE             REASON                                            METHOD                        SYSTEM  & COMPONENT F-FORCED         A-EQUIP FAILURE           F-ADMIN                1-MANUAL                      EXHIBITF & H S-SCHED          B-MAINTOR TEST            G-OPER ERROR           2-MANUALSCRAM                  INSTRUCTIONS FOR C-REFUELING                H-OTHER                 3-AUTO SCRAM                   PREPARATION OF D-REGULATORY RESTRICTION                          4-CONTINUED                   DATA ENTRY SHEET E-OPERATOR TRAINING &                              5-REDUCED LOAD                 LICENSEE EVENT REPORT LICENSE EXAM                                    9-OTHER                       (LER) FILE (NUREG4161)
~'(~ll OPERATING DATA REPORT WNP-2 DATE 01-Apr-,92 1.DOCKET: 50-397 2.REPORTING PERIOD: Mar-92 3.UTILITY CONTACT: OUTAGE+ON-LINE HOURS LEONARD HUTCHISON (509)377-2486 744 4.LICENSED THERMAL POWER (MWt): 5.NAMEPLATE RATING (GROSS MWe): 6.DESIGN ELECTRICAL RATING (NET MWe): 7.MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 8.MAXIMUM DEPENDABLE CAPACITY (NET MWe): 9 I F CHANGES OCCUR ABOVE S INCE LAST REPORT I GIVE REASONS None.3323 1200.9 1100 1129 1085 10.POWER TO WHICH RESTRICTED, IF ANY (NET MWe): ll.REASONS FOR RESTRICTIONS, IF ANY: 12.REPORT PERIOD HOURS 13.HOURS REACTOR CRITICAL 14.RX RESERVE SHTDWN HRS 15.HRS GENERATOR ON LINE 16.UNIT RESERVE SHUTDOWN HOURS 17.GROSS THERMAL ENERGY (MWH)18.GROSS ELECTRICAL ENERGY (MWH)19.NET ELECTRICAL ENERGY (MWH)20.UNIT SERVICE FACTOR 21.UNIT AVAILABILITY FACTOR 22.UNIT CAPACITY FACTOR (MDC NET)23.UNIT CAPACITY FACTOR (DER NET)24.UNIT FORCED OUTAGE RATE 25.FORCED OUTAGE HOURS MONTH 744 329.9 0.0 307.6 0.0 950983 319990 301461 41.34 41.34'7.34 36.84 58.74 436.4 YEAR 2184 1669.0 0.0 1632.0 0.0 5250611 1781190 1705536 74.74'4.7%72.0%71.04 25.34 552.0 CUMULATIVE 63968.2 45059.7 340.4~43431.9 381.7 124866433 41637010 39963575 67.9c 68.5~0 57.14 56.84 13.6<6855.8 26~SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE I DATE i DURATION)Refuelin outa e R-7 startin A ril 17 1992 for.74 da s.27.IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:  
 
~~A RAGE DAILY UNIT POWER L L MONTH: MARCH 1992 DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE:
~
50-397 WNP-2 MARCH 1992 LB HUTCHISON (509)377-2486 DAY AVERAGE DAILY POWER LEVEL (M We-NET)DAY AVERAGE DAILY POWER LEVEL (MWe-NET)17.18.19.160 20.775 21.1045 22.1086 23.1085 24.1081 9.1082 10.26.1079 27.]073 12.28.1089 13.29.1085 14.30.1081 15.31.1079 16.INSTRUCTIONS ON THIS FORM, LIST THE AVERAGE DAILY UNIT POWER LEVEL IN MWe-NET FOR EACH DAY IN THE REPORTING MONTH.COMPUTE TO THE NEAREST WHOLE MEGAWATI'.
  '(
THESE FIGURES WILL BE USED TO PLOT A GRAPH FOR EACH REPORTING MONTH.NOTE THAT WHEN MAXIMUM DEPENDABLE CAPACITY IS USED FOR THE NET ELECTRICAL RATING OF THE UNIT, THRE MAY BE OCCASIONS WHEN THE DAILY AVERAGE POWER LEVEL EXCEEDS THE 1009o LINE (OR THE RESTRICTED POWER LEVEL LINE).IN SUCH CASES, THE AVERAGE DAILY UNIT POWER OUTPUT SHEET SHOULD BE FOOTNOTED TO EXPLAIN THE APPARENT ANOMALY.  
~
~~~,~~~I w V}}
ll
 
OPERATING DATA REPORT WNP-2 DATE       01-Apr-,92
: 1. DOCKET: 50-397
: 2. REPORTING PERIOD:       Mar-92             OUTAGE +       ON-LINE HOURS               744
: 3. UTILITY CONTACT:                    LEONARD HUTCHISON       (509) 377-2486
: 4. LICENSED THERMAL POWER (MWt):                                                        3323
: 5. NAMEPLATE RATING (GROSS MWe):                                                    1200.9
: 6. DESIGN ELECTRICAL RATING (NET MWe):                                                  1100
: 7. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):                                            1129
: 8. MAXIMUM DEPENDABLE CAPACITY (NET MWe):                                               1085 9   IF CHANGES OCCUR ABOVE S INCE LAST REPORT I GIVE REASONS None.
: 10. POWER TO WHICH   RESTRICTED,   IF ANY (NET MWe):
ll. REASONS   FOR RESTRICTIONS,     IF ANY:
MONTH            YEAR        CUMULATIVE
: 12. REPORT PERIOD HOURS                               744            2184          63968.2
: 13. HOURS REACTOR CRITICAL                         329.9          1669.0          45059.7
: 14. RX RESERVE SHTDWN HRS                             0.0            0.0            340.4~
: 15. HRS GENERATOR ON LINE                           307. 6          1632.0          43431.9
: 16. UNIT RESERVE SHUTDOWN HOURS                       0.0            0.0            381.7
: 17. GROSS THERMAL ENERGY (MWH)                     950983          5250611        124866433
: 18. GROSS ELECTRICAL ENERGY (MWH)                 319990          1781190          41637010
: 19. NET ELECTRICAL ENERGY (MWH)                   301461          1705536          39963575
: 20. UNIT SERVICE FACTOR                             41.34            74.                67.9c
: 21. UNIT AVAILABILITYFACTOR                          41.                  74'4.7%
: 68. 5~0
: 22. UNIT CAPACITY FACTOR (MDC NET)                       34'7.34 72.0%            57. 14
: 23. UNIT CAPACITY FACTOR (DER NET)                   36.84            71.04            56.84
: 24. UNIT FORCED OUTAGE RATE                         58.74           25.34             13.6<
: 25. FORCED OUTAGE HOURS                            436.4           552.0           6855.8 26 ~ SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE I DATE i DURATION)
Refuelin outa e R-7 startin A ril 17   1992 for. 74 da s.
: 27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:
 
~ ~
A   RAGE DAILYUNIT POWER L           L DOCKET NO.:       50-397 UNIT:              WNP-2 DATE:              MARCH 1992 COMPLETED BY:      LB HUTCHISON TELEPHONE:        (509) 377-2486 MONTH:      MARCH 1992 DAY AVERAGE DAILYPOWER LEVEL                      DAY AVERAGE DAILYPOWER LEVEL (MWe-NET)                                           (MWe-NET) 17.
18.
: 19.         160
: 20.         775
: 21.         1045
: 22.         1086
: 23.         1085
: 24.         1081
: 9.                                                             1082
: 10.                                                 26.         1079
: 27.         ]073
: 12.                                                 28.         1089
: 13.                                                 29.         1085
: 14.                                                 30.         1081
: 15.                                                 31.         1079 16.
INSTRUCTIONS ON THIS FORM, LIST THE AVERAGE DAILYUNIT POWER LEVEL IN MWe-NET FOR EACH DAY IN THE REPORTING MONTH. COMPUTE TO THE NEAREST WHOLE MEGAWATI'.
THESE FIGURES WILLBE USED TO PLOT A GRAPH FOR EACH REPORTING MONTH. NOTE THAT WHEN MAXIMUMDEPENDABLE CAPACITYIS USED FOR THE NET ELECTRICALRATING OF THE UNIT, THRE MAY BE OCCASIONS WHEN THE DAILY AVERAGE POWER LEVEL EXCEEDS THE 1009o LINE (OR THE RESTRICTED POWER LEVEL LINE). IN SUCH CASES, THE AVERAGE DAILYUNIT POWER OUTPUT SHEET SHOULD BE FOOTNOTED TO EXPLAIN THE APPARENT ANOMALY.
 
      ~   ~ ~,
    ~   ~
  ~I w
V}}

Latest revision as of 14:02, 29 October 2019

Monthly Operating Rept for Mar 1992 for Washington Public Power Supply Nuclear Plant 2.W/920408 Ltr
ML17289A493
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/31/1992
From: John Baker, Hutchison L
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-92-082, GO2-92-82, NUDOCS 9204280434
Download: ML17289A493 (9)


Text

ACCELERATED D><TRIBUTION DEMONS~TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION HUTCHISON,L.B. Washington Public Power Supply System BAKER,J.W. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Mar Washington Public Power Supply Nuclear Plant 2. 20408 r.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR C ENCL J SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES'ECIPIENT RECIPIENT COPIES COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 3 3 PD5 PD 1 1 DEAN,W. 1 1 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NRR/DPP,Q/~BE 0 1 1 NRR/DOEA/OEAB 1 1 G~FII E 0 1 1 RGN5 1 1 EXTERNAL: EGGG BRYCE,J.H 1 1 NRC PDR NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24

0 WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Bax 968 ~ 3000 George Wasbtngton Way ~ Rtcbiand, Wasbtngton 99352-0968 ~ (509) 372-5000 Docket No. 50-397 April 8, 1992 G02-92-082 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Dear Sir:

Subject:

NUCLEAR PLANT NO. 2 MONTHLYOPERATING REPORT MARCH 1992 Transmitted herewith is the Monthly Operating Report for the month of March 1992 as required by our Technical Specifications 6.9.1.6.

Very truly yours, J.W. Baker WNP-2 Plant Manager (MD 927M)

LBH:bap Enclosure CC: Mr. W.H. Lovelace, NRC, Washington DC Mr. J.B. Martin, NRC Region V Ms. Dottie Sherman, ANI, Farmington CT Mr. C. Sorensen, NRC Resident Inspector (901A)

Mr. J.T. Wheelock, INPO Mr. F. Yost, UtilityData Institute 92042S0434 920331 PDR *DOCK 05000397 I R PDR

'I

4g t%

C H '1 K N i g ql p t5

C DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: APRIL 1, 1992 COMPLETED BY: LB HUTCHISON TELEPHONE: (509) 377-2486' UNIT HUTDOWNS REDUCTIONS 0 0 NO. DATE TYPE HOURS REASON METHOD LER NO SYSTEM COMPONENT AUSE & CORRECTIVE ACTION TO PREVENT RECURRENCE 92-02 2/25/92 F 436.4 H 92-007 SE RECOMB Concluded outage for modificaiton of Containment Atmospheric Control (CAC) drain piping.

SUMMARY

WNP-2 returned to service on March 19 after completion of plant modifications.

TYPE REASON METHOD SYSTEM & COMPONENT F-FORCED A-EQUIP FAILURE F-ADMIN 1-MANUAL EXHIBITF & H S-SCHED B-MAINTOR TEST G-OPER ERROR 2-MANUALSCRAM INSTRUCTIONS FOR C-REFUELING H-OTHER 3-AUTO SCRAM PREPARATION OF D-REGULATORY RESTRICTION 4-CONTINUED DATA ENTRY SHEET E-OPERATOR TRAINING & 5-REDUCED LOAD LICENSEE EVENT REPORT LICENSE EXAM 9-OTHER (LER) FILE (NUREG4161)

~

'(

~

ll

OPERATING DATA REPORT WNP-2 DATE 01-Apr-,92

1. DOCKET: 50-397
2. REPORTING PERIOD: Mar-92 OUTAGE + ON-LINE HOURS 744
3. UTILITY CONTACT: LEONARD HUTCHISON (509) 377-2486
4. LICENSED THERMAL POWER (MWt): 3323
5. NAMEPLATE RATING (GROSS MWe): 1200.9
6. DESIGN ELECTRICAL RATING (NET MWe): 1100
7. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 1129
8. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 1085 9 IF CHANGES OCCUR ABOVE S INCE LAST REPORT I GIVE REASONS None.
10. POWER TO WHICH RESTRICTED, IF ANY (NET MWe):

ll. REASONS FOR RESTRICTIONS, IF ANY:

MONTH YEAR CUMULATIVE

12. REPORT PERIOD HOURS 744 2184 63968.2
13. HOURS REACTOR CRITICAL 329.9 1669.0 45059.7
14. RX RESERVE SHTDWN HRS 0.0 0.0 340.4~
15. HRS GENERATOR ON LINE 307. 6 1632.0 43431.9
16. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 381.7
17. GROSS THERMAL ENERGY (MWH) 950983 5250611 124866433
18. GROSS ELECTRICAL ENERGY (MWH) 319990 1781190 41637010
19. NET ELECTRICAL ENERGY (MWH) 301461 1705536 39963575
20. UNIT SERVICE FACTOR 41.34 74. 67.9c
21. UNIT AVAILABILITYFACTOR 41. 74'4.7%
68. 5~0
22. UNIT CAPACITY FACTOR (MDC NET) 34'7.34 72.0% 57. 14
23. UNIT CAPACITY FACTOR (DER NET) 36.84 71.04 56.84
24. UNIT FORCED OUTAGE RATE 58.74 25.34 13.6<
25. FORCED OUTAGE HOURS 436.4 552.0 6855.8 26 ~ SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE I DATE i DURATION)

Refuelin outa e R-7 startin A ril 17 1992 for. 74 da s.

27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:

~ ~

A RAGE DAILYUNIT POWER L L DOCKET NO.: 50-397 UNIT: WNP-2 DATE: MARCH 1992 COMPLETED BY: LB HUTCHISON TELEPHONE: (509) 377-2486 MONTH: MARCH 1992 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe-NET) (MWe-NET) 17.

18.

19. 160
20. 775
21. 1045
22. 1086
23. 1085
24. 1081
9. 1082
10. 26. 1079
27. ]073
12. 28. 1089
13. 29. 1085
14. 30. 1081
15. 31. 1079 16.

INSTRUCTIONS ON THIS FORM, LIST THE AVERAGE DAILYUNIT POWER LEVEL IN MWe-NET FOR EACH DAY IN THE REPORTING MONTH. COMPUTE TO THE NEAREST WHOLE MEGAWATI'.

THESE FIGURES WILLBE USED TO PLOT A GRAPH FOR EACH REPORTING MONTH. NOTE THAT WHEN MAXIMUMDEPENDABLE CAPACITYIS USED FOR THE NET ELECTRICALRATING OF THE UNIT, THRE MAY BE OCCASIONS WHEN THE DAILY AVERAGE POWER LEVEL EXCEEDS THE 1009o LINE (OR THE RESTRICTED POWER LEVEL LINE). IN SUCH CASES, THE AVERAGE DAILYUNIT POWER OUTPUT SHEET SHOULD BE FOOTNOTED TO EXPLAIN THE APPARENT ANOMALY.

~ ~ ~,

~ ~

~I w

V