| issue date = 02/29/1996
| issue date = 02/29/1996
| title = Monthly Operating Rept for Feb 1996 for WNP-2.W/960308 Ltr
| title = Monthly Operating Rept for Feb 1996 for WNP-2.W/960308 Ltr
| author name = EMBREE D G, PARRISH J V
| author name = Embree D, Parrish J
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY 1"L'-: i.REGULAT.INFORMATION DISTRIBUTION STEM (RIDS)~i E~, ACCESSION NBR:9603200157 DOC.DATE: 96/02/29 NOTARIZED:
{{#Wiki_filter:CATEGORY 1 "L'- :
NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION EMBREE,D.G.
i   .         REGULAT . INFORMATION DISTRIBUTION       STEM (RIDS)
Washington Public Power Supply System PARRISH,J.V.
E
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000397
            ~
i~,
ACCESSION NBR:9603200157               DOC.DATE: 96/02/29     NOTARIZED: NO         DOCKET FACIL:50-397         WPPSS Nuclear Project, Unit 2, Washington Public       Powe   05000397 AUTH. NAME               AUTHOR AFFILIATION EMBREE,D.G.               Washington Public Power Supply System PARRISH,J.V.             Washington Public Power Supply System RECIP.NAME               RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating rept for Feb 1996 for WNP-2.W/960308 ltr DISTRIBUTION CODE: ZE24D COPIES RECEIVED:LTR 1 ENCL i SIZE: TITLE: Monthly Operating Report (per Tech Specs)'OTES: C E RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: ACRS~ILE CEN~I RGN4 EXTERNAL: LITCO BRYCEPJ H NRC PDR COPIES LTTR ENCL 1 1 10 10 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME CLIFFORDPJ AEOD/SPD/RRAB NRR/DRPM/PECB NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 0 R D 0 U E N NOTE TO ALL"RIDS" RECIPIENTS:
Monthly operating rept   for Feb 1996 for   WNP-2.W/960308   ltr         C DISTRIBUTION CODE: ZE24D           COPIES RECEIVED:LTR   1   ENCL   i SIZE:
PLEASE HELP US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR 19 ENCL 19 WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 March 8, 1996 G02-96-049 Docket No.50-397 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 Gentlemen:
TITLE: Monthly Operating Report (per Tech Specs)
'OTES:
E RECIPIENT         COPIES          RECIPIENT          COPIES ID CODE/NAME       LTTR ENCL      ID CODE/NAME        LTTR ENCL PD4-2 PD             1    1    CLIFFORDPJ              1    1 0
INTERNAL: ACRS
            ~ILE RGN4 CEN   ~I       10 1
1 10 1
1 AEOD/SPD/RRAB NRR/DRPM/PECB 1
1 1
1           R EXTERNAL: LITCO BRYCEPJ H                1     1     NOAC                    1     1 NRC PDR              1     1 D
0 U
E N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR             19   ENCL     19
 
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 March 8, 1996 G02-96-049 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:


==Subject:==
==Subject:==
WNP-2 OPERATING LICENSE NPF-21 MONTHLY OPERATING REPORT FEBRUARY 1996 Transmitted herewith is the Monthly Operating Report for the month of February 1996 as required by Technical Specification 6.9.1.6.Sincerely V.Parrish Chief Executive Officer (Mail Drop 1023)JVP:DGE CC: LJ Callan, NRC R IV NRC Sr.Resident Inspector (927N)INPO ANI Library Utility Data Institute BPA (399)9603200l57 960229 PDR ADOCK 05000397 I PDR+EX f'II OPERATING STATUS REPORT for WNP-2 Date: March 1, 1996 2.3 4.5.6.7.8.9.Docket: 50-397 Reporting Period: FEBRUARY 1996 Outage+On-line Hours: 696.0 Utility Contact: David G.Embree (509)377-8448 Licensed Thermal Power (MW,): 3486 Nameplate Rating (Gross MW,): 1199 Design Electrical Rating (Net MW,): 1153 Maximum Dependable Capacity-summer (Gross MW,);1153 Maximum Dependable Capacity-summer (Net MW,): 1107 If changes occur above since last report, give reasons: MDC changed to reflect reactor feedwater flow calibration.
WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT FEBRUARY 1996 Transmitted herewith is the Monthly Operating Report for the month           of February 1996 as required by Technical Specification 6.9.1.6.
10.Power to which restricted, if any (Net MW,): 11.Reasons for restrictions, if any: none 12.13.14.15.16.17.18.19.20.21.22.23.24.25.Report Period Hours Hours Reactor Critical Rx Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy (MWH)Gross Electrical Energy (MWH)Net Electrical Energy (MWH)Unit Service Factor Unit Availability.
Sincerely V. Parrish Chief Executive Officer (Mail Drop 1023)
Factor Unit Capacity Factor (MDC Net)Unit Capacity Factor (DER Net)Unit Forced Outage Rate Forced Outage Hours MONTH 696.0 696.0 0.0 696,0 0.0 1,940,060 658,450 632,887 100.0%100.0%82.1%78.8%0.0o/o 0.0 YEAR 1,440.0 1,440.0 0.0 1,440.0 0.0 4,356,509 1,486,050 1,432,566 100.0%100.0o/o 90 2o/o 86.3%0,0o/o 0.0 CUMULATIVE 98,288.2 71,075.8 744.9 68,690.5 958.8 204,814,059 69,063,530 66, 190,884 69.9%70.9%61.7%60.8%10.8%8,319.7 26.Shutdowns scheduled over the next 6 months (type, date, duration):
JVP:DGE CC:     LJ Callan, NRC R IV NRC Sr. Resident Inspector (927N)
27.If currently shutdown, estimated startup date: Refueling, 4/13/96, 55 days NA Note: Cumulative Unit Capacity Factors (MDC&DER)are calculated with weighted averages.
INPO ANI Library Utility Data Institute BPA (399) 9603200l57 960229 PDR     ADOCK   05000397 PDR I
AVERAGE DAILY UNIT POKER LEVEL DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE:
                                                                                          +EX
50-397 WNP-2 March 1, 1996 D.G.Embree (509)377-8448 REPORT PERIOD: FEBRUARY 1996 DAY AVERAGE DAILY POWER LEVEL (Net MWe)AVERAGE DAILY POWER LEVEL DAY (Net MWe)10 12 13 14 15 1161 1159 1139 911 789 639 887 1097 1106 1108 862 1105 984 1093 16 17 18 19 20 21 22 23 24 25 26 27 28 29 1072 670 660 647 650 648 649 648 1047 1083 1070 1083 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net)for each day in the reporting month.Compute to the nearest whole megawatt.These figures will be used to plot a graph for each reporting month.Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100%line (or the restricted power level line).In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
                                                                                                'II f
UNIT SHUTDOWNS AND POWER REDUCTIONS REPQRT PERIoD: FEBRUARY 1996 DOCKET NO.: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
 
50-397 WNP-2 March 1, 1996 D.G.Embree (509)377-8448 No.Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 96%3 2/3/96 14.5 H NA ZZ ZZZZZZ Economic dispatch goad following) at the request of 0 the BPA.9644 2/4/96 69.5 NA HC HTEXCH Main Condenser tube plugging.96%5 2/10/96 S 31.9 H NA ZZ ZZZZZZ Economic dispatch goad following) at the request of the BPA.9646 2/16/96 S 250.0 H NA ZZ ZZZZZZ Economic dispatch goad following) at the request of the BPA.S URINARY: At the beginning of the month, the plant was operating near full power.The plant was placed in economic dispatch (load following) at the request of the BPA for portions of the month.On February 4 the plant went into a planned downpower to plug leaking tubes in the condenser.
OPERATING STATUS         REPORT for WNP-2 Date:   March 1, 1996 Docket: 50-397
The plant returned to full power operation at the end of the.month with preparations to shut down at the request of BPA early in March.TYPE F-Forced S-Scheduled REASON A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administration G-Operational Error H-Other METHOD 1-Manual 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other SYSTEM&COMPONENT NUREG%161 Exhibits F&H
: 2. Reporting Period: FEBRUARY 1996                           Outage + On-line Hours: 696.0 3    Utility
~~~'4'~1 h II l>!"'r}}
 
==Contact:==
David G. Embree (509) 377-8448
: 4. Licensed Thermal Power (MW, ):                                                           3486
: 5. Nameplate Rating (Gross MW, ):                                                           1199
: 6. Design Electrical Rating (Net MW,):                                                       1153
: 7.                                        -
Maximum Dependable Capacity summer (Gross MW,);                                           1153
: 8.                                        -
Maximum Dependable Capacity summer (Net MW, ):                                           1107
: 9. If changes occur above since last report, give reasons:             MDC changed to reflect reactor feedwater flow calibration.
: 10. Power to which restricted, if any (Net MW,):                                              none
: 11. Reasons for restrictions, if any:
MONTH                YEAR            CUMULATIVE
: 12. Report Period Hours                              696.0              1,440.0            98,288.2
: 13. Hours Reactor Critical                          696.0              1,440.0            71,075.8
: 14. Rx Reserve Shutdown Hours                          0.0                  0.0              744.9
: 15. Hours Generator On-Line                         696,0              1,440.0            68,690.5
: 16. Unit Reserve Shutdown Hours                         0.0                  0.0              958.8
: 17. Gross Thermal Energy (MWH)                 1,940,060            4,356,509          204,814,059
: 18. Gross Electrical Energy (MWH)                 658,450            1,486,050          69,063,530
: 19. Net Electrical Energy (MWH)                   632,887            1,432,566          66, 190,884
: 20. Unit Service Factor                          100.0%               100.0%               69.9%
: 21. Unit Availability.Factor                      100.0%               100.0o/o             70.9%
: 22. Unit Capacity Factor (MDC Net)                  82. 1%               90 2o/o             61.7%
: 23. Unit Capacity Factor (DER Net)                  78.8%                86.3%               60.8%
: 24. Unit Forced Outage Rate                          0.0o/o               0,0o/o              10.8%
: 25. Forced Outage Hours                                0.0                  0.0            8,319.7
: 26. Shutdowns scheduled over the next 6 months (type, date, duration):                 Refueling, 4/13/96, 55 days
: 27. If currently shutdown, estimated startup date:                                             NA Note: Cumulative Unit Capacity Factors (MDC & DER) are calculated with weighted averages.
 
AVERAGE DAILY UNIT POKER LEVEL DOCKET NO.:       50-397 UNIT:    WNP-2 DATE:    March 1, 1996 COMPLETED BY:        D. G. Embree TELEPHONE:        (509) 377-8448 REPORT PERIOD:             FEBRUARY 1996 AVERAGE DAILYPOWER LEVEL                                      AVERAGE DAILYPOWER LEVEL DAY                    (Net MWe)                               DAY                 (Net MWe) 1161                                   16                    1072 1159                                   17                    670 1139                                   18                    660 911                                   19 789                                 20                      647 639                                 21                      650 887                                 22                      648 1097                                 23                      649 1106                                 24                      648 10                        1108                                 25 862                                 26                     1047 12                                                              27                     1083 13                        1105                                  28                     1070 14                        984                                  29                     1083 15                        1093 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
 
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:       50-397 UNIT NAME:       WNP-2 DATE:    March 1, 1996 COMPLETED BY:          D.G. Embree TELEPHONE:        (509) 377-8448 REPQRT PERIoD:      FEBRUARY 1996 No.         Date   Type     Hours     Reason     Method   LER Number       System Component     Cause and Corrective Action To Prevent Recurrence 96%3       2/3/96               14.5       H                       NA             ZZ   ZZZZZZ       Economic dispatch goad following) at the request of the BPA.
0 9644       2/4/96               69.5                               NA             HC   HTEXCH       Main Condenser tube plugging.
96%5       2/10/96     S       31.9       H                       NA             ZZ   ZZZZZZ       Economic dispatch goad following) at the request of the BPA.
9646       2/16/96     S       250.0       H                       NA             ZZ   ZZZZZZ       Economic dispatch goad following) at the request of the BPA.
S URINARY:             At the beginning of the month, the plant was operating near full power. The plant was placed in economic dispatch (load following) at the request of the BPA for portions of the month. On February 4 the plant went into a planned downpower to plug leaking tubes in the condenser. The plant returned to full power operation at the end of the. month with preparations to shut down at the request of BPA early in March.
TYPE                       REASON                                                          METHOD                  SYSTEM & COMPONENT F - Forced                 A - Equipment Failure             E - Operator Training &       1 - Manual              NUREG%161 Exhibits F & H S - Scheduled              B - Maintenance or Test                  License Examination    2 - Manual Scram C - Refueling                    F - Administration            3 - Auto Scram D - Regulatory Restriction        G - Operational Error          4 - Continued H - Other                      5 - Reduced Load 9 - Other
 
4' ~ '
              ~ ~
~ 1 h II l> !"
r}}

Latest revision as of 07:07, 4 February 2020

Monthly Operating Rept for Feb 1996 for WNP-2.W/960308 Ltr
ML17291B263
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/29/1996
From: Embree D, Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-96-049, GO2-96-49, NUDOCS 9603200157
Download: ML17291B263 (6)


Text

CATEGORY 1 "L'-  :

i . REGULAT . INFORMATION DISTRIBUTION STEM (RIDS)

E

~

i~,

ACCESSION NBR:9603200157 DOC.DATE: 96/02/29 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION EMBREE,D.G. Washington Public Power Supply System PARRISH,J.V. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Feb 1996 for WNP-2.W/960308 ltr C DISTRIBUTION CODE: ZE24D COPIES RECEIVED:LTR 1 ENCL i SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

'OTES:

E RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 CLIFFORDPJ 1 1 0

INTERNAL: ACRS

~ILE RGN4 CEN ~I 10 1

1 10 1

1 AEOD/SPD/RRAB NRR/DRPM/PECB 1

1 1

1 R EXTERNAL: LITCO BRYCEPJ H 1 1 NOAC 1 1 NRC PDR 1 1 D

0 U

E N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR 19 ENCL 19

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 March 8, 1996 G02-96-049 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT FEBRUARY 1996 Transmitted herewith is the Monthly Operating Report for the month of February 1996 as required by Technical Specification 6.9.1.6.

Sincerely V. Parrish Chief Executive Officer (Mail Drop 1023)

JVP:DGE CC: LJ Callan, NRC R IV NRC Sr. Resident Inspector (927N)

INPO ANI Library Utility Data Institute BPA (399) 9603200l57 960229 PDR ADOCK 05000397 PDR I

+EX

'II f

OPERATING STATUS REPORT for WNP-2 Date: March 1, 1996 Docket: 50-397

2. Reporting Period: FEBRUARY 1996 Outage + On-line Hours: 696.0 3 Utility

Contact:

David G. Embree (509) 377-8448

4. Licensed Thermal Power (MW, ): 3486
5. Nameplate Rating (Gross MW, ): 1199
6. Design Electrical Rating (Net MW,): 1153
7. -

Maximum Dependable Capacity summer (Gross MW,); 1153

8. -

Maximum Dependable Capacity summer (Net MW, ): 1107

9. If changes occur above since last report, give reasons: MDC changed to reflect reactor feedwater flow calibration.
10. Power to which restricted, if any (Net MW,): none
11. Reasons for restrictions, if any:

MONTH YEAR CUMULATIVE

12. Report Period Hours 696.0 1,440.0 98,288.2
13. Hours Reactor Critical 696.0 1,440.0 71,075.8
14. Rx Reserve Shutdown Hours 0.0 0.0 744.9
15. Hours Generator On-Line 696,0 1,440.0 68,690.5
16. Unit Reserve Shutdown Hours 0.0 0.0 958.8
17. Gross Thermal Energy (MWH) 1,940,060 4,356,509 204,814,059
18. Gross Electrical Energy (MWH) 658,450 1,486,050 69,063,530
19. Net Electrical Energy (MWH) 632,887 1,432,566 66, 190,884
20. Unit Service Factor 100.0% 100.0% 69.9%
21. Unit Availability.Factor 100.0% 100.0o/o 70.9%
22. Unit Capacity Factor (MDC Net) 82. 1% 90 2o/o 61.7%
23. Unit Capacity Factor (DER Net) 78.8% 86.3% 60.8%
24. Unit Forced Outage Rate 0.0o/o 0,0o/o 10.8%
25. Forced Outage Hours 0.0 0.0 8,319.7
26. Shutdowns scheduled over the next 6 months (type, date, duration): Refueling, 4/13/96, 55 days
27. If currently shutdown, estimated startup date: NA Note: Cumulative Unit Capacity Factors (MDC & DER) are calculated with weighted averages.

AVERAGE DAILY UNIT POKER LEVEL DOCKET NO.: 50-397 UNIT: WNP-2 DATE: March 1, 1996 COMPLETED BY: D. G. Embree TELEPHONE: (509) 377-8448 REPORT PERIOD: FEBRUARY 1996 AVERAGE DAILYPOWER LEVEL AVERAGE DAILYPOWER LEVEL DAY (Net MWe) DAY (Net MWe) 1161 16 1072 1159 17 670 1139 18 660 911 19 789 20 647 639 21 650 887 22 648 1097 23 649 1106 24 648 10 1108 25 862 26 1047 12 27 1083 13 1105 28 1070 14 984 29 1083 15 1093 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: March 1, 1996 COMPLETED BY: D.G. Embree TELEPHONE: (509) 377-8448 REPQRT PERIoD: FEBRUARY 1996 No. Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 96%3 2/3/96 14.5 H NA ZZ ZZZZZZ Economic dispatch goad following) at the request of the BPA.

0 9644 2/4/96 69.5 NA HC HTEXCH Main Condenser tube plugging.

96%5 2/10/96 S 31.9 H NA ZZ ZZZZZZ Economic dispatch goad following) at the request of the BPA.

9646 2/16/96 S 250.0 H NA ZZ ZZZZZZ Economic dispatch goad following) at the request of the BPA.

S URINARY: At the beginning of the month, the plant was operating near full power. The plant was placed in economic dispatch (load following) at the request of the BPA for portions of the month. On February 4 the plant went into a planned downpower to plug leaking tubes in the condenser. The plant returned to full power operation at the end of the. month with preparations to shut down at the request of BPA early in March.

TYPE REASON METHOD SYSTEM & COMPONENT F - Forced A - Equipment Failure E - Operator Training & 1 - Manual NUREG%161 Exhibits F & H S - Scheduled B - Maintenance or Test License Examination 2 - Manual Scram C - Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction G - Operational Error 4 - Continued H - Other 5 - Reduced Load 9 - Other