ML17292A933: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 06/30/1997
| issue date = 06/30/1997
| title = Monthly Operating Rept for June 1997 for WNP-2.W/970715 Ltr
| title = Monthly Operating Rept for June 1997 for WNP-2.W/970715 Ltr
| author name = KASKO B, SMITH G O
| author name = Kasko B, Smith G
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:fy CATEGORY 1 REGULRT INFORMATION DISTRIBUTIONSTEM (RIDE)ACCESSION NBR:9707220092 DOC.DATE: 97/06/30 NOTARIZED:
{{#Wiki_filter:fy CATEGORY 1 REGULRT     INFORMATION DISTRIBUTIONSTEM     (RIDE)
NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAPE AUTHOR AFFILIATION KASKO,B.Washington Public Power Supply System SMITH,G.O.
ACCESSION NBR:9707220092                         DOC.DATE: 97/06/30   NOTARIZED: NO         DOCKET FACIL:50-397                     WPPSS Nuclear Project, Unit 2, Washington Public   Powe   05000397 AUTH.NAPE                             AUTHOR AFFILIATION KASKO,B.                             Washington Public Power Supply System SMITH,G.O.                           Washington Public Power Supply System RECIP.NAME                             RECIPIENT. AFFILIATION
Washington Public Power Supply System RECIP.NAME RECIPIENT.
AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating rept for June 1997 for WNP-2.W/970715 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR i ENCL~SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL:~ACRS~
Monthly operating rept for June 1997 for WNP-2.W/970715             ltr.
(+FILE CENTER,O 1~OC/DBA'/PAD'XTERNAL:
DISTRIBUTION CODE: IE24D                       COPIES RECEIVED:LTR   i ENCL ~ SIZE:
LITCO BRYCE,J H NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME COLBURN,T AEOD/SPD/RRAB NRR/DRPM/PECB RGN4 NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:
TITLE: Monthly Operating Report (per Tech Specs)
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-'5(EXT.
NOTES:
415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11 f C'
RECIPIENT        COPIES          RECIPIENT       COPIES ID CODE/NAME      LTTR ENCL      ID CODE/NAME     LTTR ENCL PD4-2 PD                               1    1    COLBURN,T            1    1 INTERNAL:~ACRS~                                     1    1    AEOD/SPD/RRAB        1    1
WASHINGTON PUBLIC POWER SUPPLY SYSTEM PO.Box 968~Richiand, Washington 99352-0968 July 15, 1997 G02-97-142 Docket No.50-397 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 Gentlemen:
(+FILE CENTER,O 1~                         1    1    NRR/DRPM/PECB        1    1 1    1    RGN4                  1    1 OC/DBA'/PAD'XTERNAL:
LITCO BRYCE,J H                         1   1     NOAC                 1     1 NRC PDR                                1   1 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-'5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                         11   ENCL   11 f
 
C' WASHINGTON PUBLIC POWER SUPPLY SYSTEM PO. Box 968 ~ Richiand, Washington 99352-0968 July 15, 1997 G02-97-142 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:


==Subject:==
==Subject:==
WNP-2 OPERATING LICENSE NPF-21 MONTHLY OPERATING REPORT JUNE 1997 Transmitted herewith is the Monthly Operating Report for the month of June 1997 as required by Technical Specification 5.6.4.In accordance with the guidance contained in Generic Letter 97-02, the format of this report has been amended.Respectfully, G.0, Smith Plant General Manager Mail Drop 9270 CC: EW Merschoff-NRC RIV TG Colburn-NRR KE Perkins, Jr.-NRC RIV, WCFO NRC Sr.Resident Inspector-927N PD Robinson-Winston&Strawn INPO ANI Library Utility Data Institute DL Williams-BPA/399:~An c~-4,9707220092 970630 PDR ADQCK 0500039'7 R PDR J lllilllllllllllllllll'Illllllllllll!
WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT JUNE 1997 Transmitted herewith is the Monthly Operating Report for the month of June 1997 as required by Technical Specification 5.6.4.
OPERATING STATUS REPORT for WNP-2 Date: July 1, 1997 1.Docket: 50-397 2.Reporting Period: JUNE 1997 3, Utility Contact: Bernice Kasko (509)377-4473 4.Design Electrical Rating (Net MW,): 5..Maximum Dependable Capacity-summer (Gross MW,): 1153 1153 6.7.8.9.Hours Reactor Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWH)MONTH 0.0 0.0 696.0-8,485 YEAR 2,049.2 2,049.2 1,248.0 1,699,500 CUMULATIVE 77,921.8 75,299.3 3,204.2 72,007,775 10.Challenges to safety/relief valves;See Attached Table UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: July 1, 1997 COMPLETED BY: B Kasko TELEPHONE:
In accordance with the guidance contained in Generic Letter 97-02, the format of this report has been amended.
(509)377M73 REPORT PERIOD: JUNE 1997 No.Date Type F: Forced S: Scheduled Duration (Hours)Reason (1)Method (2)Cause and Corrective Action To Prevent Recurrence 97-012 970419 720.0 Plant entered annual refueling and maintenance outage (R-12)on April 19, 1997.
Respectfully, G. 0, Smith Plant General Manager Mail Drop 9270 CC:     EW Merschoff - NRC RIV TG Colburn - NRR KE Perkins, Jr. - NRC RIV, WCFO NRC Sr. Resident Inspector - 927N PD Robinson - Winston & Strawn INPO ANI Library UtilityData Institute DL Williams - BPA / 399
:~An ~
c
    -4,9707220092 970630                                   lllilllllllllllllllll'Illllllllllll!
PDR     ADQCK 0500039'7 R                     PDR                 J
 
OPERATING STATUS REPORT for WNP-2 Date: July 1, 1997
: 1. Docket: 50-397
: 2. Reporting Period: JUNE 1997 3, Utility
 
==Contact:==
Bernice Kasko (509) 377-4473
: 4. Design Electrical Rating (Net MW,):                                           1153 5.. Maximum Dependable Capacity - summer (Gross MW,):                             1153 MONTH      YEAR          CUMULATIVE
: 6. Hours Reactor Critical                            0.0  2,049.2          77,921.8
: 7. Hours Generator On-Line                           0.0   2,049.2           75,299.3
: 8. Unit Reserve Shutdown Hours                    696.0    1,248.0           3,204.2
: 9. Net Electrical Energy (MWH)                  -8,485  1,699,500         72,007,775
: 10. Challenges to safety/relief valves;                             See Attached Table
 
UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: July 1, 1997 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD:       JUNE 1997 Type F: Forced       Duration No.        Date      S: Scheduled     (Hours)     Reason (1) Method (2)                 Cause and Corrective Action To Prevent Recurrence 97-012     970419                       720.0                               Plant entered annual refueling and maintenance outage (R-12) on April 19, 1997.


==SUMMARY==
==SUMMARY==
: The plant continued the month in the annual planned refueling/maintenance outage which began on April 19, 1997.~lREAS ON A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administration G-Operational Error H-Other~2METHOD 1-Manual 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other SRV CHALLENGES DATE TYPE REASO MS-RV-1B MS-RV-1D MS-RV-2A MS-RV-2B MS-RV-2D'S-RV-3A MS-RV-4A MS-RV-4C MS-RV-4D MS-RV-5C 6/17/97 6/17/97 6/17/97 6/17/97 6/17/97 6/17/97 6/17/97 6/17/97 6/17/97 6/17/97 B B B B B B B B B B C C C C C C C C C C e of Actuation Reason A=Automatic B=Remote Manual C=Spring A=Overpressure B=ADS or other safety C=Test D=Inadvertent (Accidental/Spurious)
:                 The plant continued the month in the annual planned refueling/maintenance outage which began on April 19, 1997.
E=Manual Relief All of the MSRVs functioned normally.There were no other MSRV challenges during the period.  
~lREAS ON                                                             ~2METHOD A - Equipment Failure               E - Operator Training &          1 - Manual B - Maintenance or Test                     License Examination      2 - Manual Scram C - Refueling                       F - Administration                3 - Auto Scram D - Regulatory Restriction           G - Operational Error           4 - Continued H - Other                       5 - Reduced Load 9 - Other
~g 4 p t J.tj i~1 V I ,/J}}
 
SRV CHALLENGES DATE                         TYPE                 REASO MS-RV-1B               6/17/97                        B                      C MS-RV-1D               6/17/97                        B                      C MS-RV-2A               6/17/97                        B                      C MS-RV-2B               6/17/97                        B                      C MS-RV-2D               6/17/97                        B                      C
            'S-RV-3A 6/17/97                        B                      C MS-RV-4A               6/17/97                        B                      C MS-RV-4C               6/17/97                        B                      C MS-RV-4D               6/17/97                        B                      C MS-RV-5C               6/17/97                         B                     C e of Actuation                     Reason A = Automatic                           A = Overpressure B = Remote Manual                       B = ADS or other safety C = Spring                            C  = Test D = Inadvertent (Accidental/Spurious)
E = Manual Relief All of the MSRVs functioned normally. There were no other MSRV challenges during the period.
 
                  ~g 4 p
J.
t tj i~
1 V
I
              ,/
J}}

Latest revision as of 03:43, 4 December 2019

Monthly Operating Rept for June 1997 for WNP-2.W/970715 Ltr
ML17292A933
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/30/1997
From: Kasko B, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, GO2-97-142, NUDOCS 9707220092
Download: ML17292A933 (7)


Text

fy CATEGORY 1 REGULRT INFORMATION DISTRIBUTIONSTEM (RIDE)

ACCESSION NBR:9707220092 DOC.DATE: 97/06/30 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAPE AUTHOR AFFILIATION KASKO,B. Washington Public Power Supply System SMITH,G.O. Washington Public Power Supply System RECIP.NAME RECIPIENT. AFFILIATION

SUBJECT:

Monthly operating rept for June 1997 for WNP-2.W/970715 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR i ENCL ~ SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 COLBURN,T 1 1 INTERNAL:~ACRS~ 1 1 AEOD/SPD/RRAB 1 1

(+FILE CENTER,O 1~ 1 1 NRR/DRPM/PECB 1 1 1 1 RGN4 1 1 OC/DBA'/PAD'XTERNAL:

LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-'5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11 f

C' WASHINGTON PUBLIC POWER SUPPLY SYSTEM PO. Box 968 ~ Richiand, Washington 99352-0968 July 15, 1997 G02-97-142 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT JUNE 1997 Transmitted herewith is the Monthly Operating Report for the month of June 1997 as required by Technical Specification 5.6.4.

In accordance with the guidance contained in Generic Letter 97-02, the format of this report has been amended.

Respectfully, G. 0, Smith Plant General Manager Mail Drop 9270 CC: EW Merschoff - NRC RIV TG Colburn - NRR KE Perkins, Jr. - NRC RIV, WCFO NRC Sr. Resident Inspector - 927N PD Robinson - Winston & Strawn INPO ANI Library UtilityData Institute DL Williams - BPA / 399

~An ~

c

-4,9707220092 970630 lllilllllllllllllllll'Illllllllllll!

PDR ADQCK 0500039'7 R PDR J

OPERATING STATUS REPORT for WNP-2 Date: July 1, 1997

1. Docket: 50-397
2. Reporting Period: JUNE 1997 3, Utility

Contact:

Bernice Kasko (509) 377-4473

4. Design Electrical Rating (Net MW,): 1153 5.. Maximum Dependable Capacity - summer (Gross MW,): 1153 MONTH YEAR CUMULATIVE
6. Hours Reactor Critical 0.0 2,049.2 77,921.8
7. Hours Generator On-Line 0.0 2,049.2 75,299.3
8. Unit Reserve Shutdown Hours 696.0 1,248.0 3,204.2
9. Net Electrical Energy (MWH) -8,485 1,699,500 72,007,775
10. Challenges to safety/relief valves; See Attached Table

UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: July 1, 1997 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD: JUNE 1997 Type F: Forced Duration No. Date S: Scheduled (Hours) Reason (1) Method (2) Cause and Corrective Action To Prevent Recurrence 97-012 970419 720.0 Plant entered annual refueling and maintenance outage (R-12) on April 19, 1997.

SUMMARY

The plant continued the month in the annual planned refueling/maintenance outage which began on April 19, 1997.

~lREAS ON ~2METHOD A - Equipment Failure E - Operator Training & 1 - Manual B - Maintenance or Test License Examination 2 - Manual Scram C - Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction G - Operational Error 4 - Continued H - Other 5 - Reduced Load 9 - Other

SRV CHALLENGES DATE TYPE REASO MS-RV-1B 6/17/97 B C MS-RV-1D 6/17/97 B C MS-RV-2A 6/17/97 B C MS-RV-2B 6/17/97 B C MS-RV-2D 6/17/97 B C

'S-RV-3A 6/17/97 B C MS-RV-4A 6/17/97 B C MS-RV-4C 6/17/97 B C MS-RV-4D 6/17/97 B C MS-RV-5C 6/17/97 B C e of Actuation Reason A = Automatic A = Overpressure B = Remote Manual B = ADS or other safety C = Spring C = Test D = Inadvertent (Accidental/Spurious)

E = Manual Relief All of the MSRVs functioned normally. There were no other MSRV challenges during the period.

~g 4 p

J.

t tj i~

1 V

I

,/

J