ML17292B639: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 03/31/1999
| issue date = 03/31/1999
| title = Monthly Operating Rept for Mar 1999 for WNP-2.With 990413 Ltr
| title = Monthly Operating Rept for Mar 1999 for WNP-2.With 990413 Ltr
| author name = KASKO B, SMITH G O
| author name = Kasko B, Smith G
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY j.REGULA Y INFORMATION DISTRIBUTI SYSTEM (RIDS)ACCESSION NBR:9904220239 DOC.DATE: 99/03/31 NOTARIZED:
{{#Wiki_filter:CATEGORY j.
NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFIL1ATION KASKO,B.Washington Public Power Supply System SMITH,G.O.
REGULA     Y INFORMATION     DISTRIBUTI         SYSTEM (RIDS)
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000397
ACCESSION NBR:9904220239             DOC.DATE: 99/03/31 NOTARIZED: NO                   DOCKET FACIL:50-397   WPPSS   Nuclear Project, Unit 2, Washington Public             Powe   05000397 AUTH.NAME             AUTHOR   AFFIL1ATION KASKO,B.             Washington Public Power Supply System SMITH,G.O.           Washington Public Power Supply System RECIP.NAME           RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating rept for Mar 1999 for WNP-2.With 990413 ltr.C DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME LPD4-2 PD INTERNAL: AC tggEB Mm RGN4 COPIES LTTR ENCL 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME CUSHING,J AEOD/SPD/RRAB OC/DBA/PAD COPIES LTTR ENCL 1 1 1 1 1 1 EXTERNAL: LMITCO MARSHALL NRC PDR NOAC 1 1 D 1+p,iY(u t N NOTE TO ALL"RIDS't RECIPIENTS PLEASE HELP US TO REDUCE WASTE~TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~Ricltland, Washington 99352-0968 April 13, 1999 GO2-99-069 Docket No.50-397 U.S.Nuclear Regulatory Commission Document Contxol Desk Washington, D.C.20555 Gentlemen:
Monthly operating rept       for   Mar 1999   for   WNP-2.With 990413               C ltr.
DISTRIBUTION CODE: IE24D         COPIES RECEIVED:LTR           ENCL       SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT            COPIES            RECIPIENT             COPIES ID  CODE/NAME          LTTR ENCL        ID CODE/NAME       LTTR ENCL LPD4-2 PD                 1     1       CUSHING,J                1     1 INTERNAL: AC                          1     1       AEOD/SPD/RRAB             1      1 tggEB  Mm        1    1      OC/DBA/PAD               1     1 RGN4                      1     1 EXTERNAL: LMITCO MARSHALL                           NOAC                     1     1 NRC PDR D
1
                                                              +p,iY(u t N
NOTE TO ALL "RIDS't RECIPIENTS PLEASE HELP US TO REDUCE WASTE TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS
                                    ~
OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR               10   ENCL       10
 
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ Ricltland, Washington 99352-0968 April 13, 1999 GO2-99-069 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Contxol Desk Washington, D. C. 20555 Gentlemen:


==Subject:==
==Subject:==
WNP-2 OPERATING LICENSE NPF-21 MONTHLY OPERATING REPORT MARCH 1999 Transmitted herewith is the Monthly Operating Report for the month of March 1999 as required by Technical Specification 5.6.4.Respectfully, G.O.Smith Vice President, Generation Mail Drop 927M CC: EW Merschoff-NRC RIV JS Cushing-NRR NRC Sr.Resident Inspector-927N PD Robinson-Winston&Strawn INPO ANI Library Utility Data Institute DL Williams-BPA/1399 9904220239 99033i PDR ADQCK OM00397 R PDR OPERATING STATUS REPORT for WNP-2 Date: April 1, 1999 2.3.4 5.Docket: 50-397 Reporting Period: MARCH 1999 Utility Contact: Bernice Kasko (509)377-4473 Design Electrical Rating (Net MW,): Maximum Dependable Capacity-summer (Net MW,): N MONTH YEAR 1153 1107 CUMULATIVE 7.9.Hours Reactor Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWH)744.0 744.0 0.0 749,990 2,160.0 2,160.0 0.0 2,270,192 91,001.3 88,034.2 3,037.5 85,600,123 10.Challenges to safety/relief valves: None UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: April 1, 1999 COMPLETED BY: B Kasko TELEPHONE:
WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT MARCH       1999 Transmitted herewith is the Monthly Operating Report for the month           of March 1999 as required by Technical Specification 5.6.4.
(509)377M73 REPQRT PERIoD: MARCH 1999 No.NA Date Type F: Forced S: Scheduled Duration (Hours)Reason (1)Method (2)Cause and Corrective Action To Prevent Recurrence SUhGHARY: Due to economic dispatch the plant operated at 100%power during the day Monday-Friday and reduced power in the evenings to 85%.During the weekends power was reduced to 65%.Following an increase in power to 88%on March 29, the plant was reduced to 70%power to recover a repaired ASD channel.The plant was returned to 100%power on March 30~.~lREASON A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8c License Examination F-Administration G-Operational Error H-Other 2 METHOD 1-Manua 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other}}
Respectfully, G. O. Smith Vice President, Generation Mail Drop 927M CC:   EW Merschoff - NRC RIV JS Cushing - NRR NRC Sr. Resident Inspector - 927N PD Robinson - Winston & Strawn INPO ANI Library Utility Data Institute DL Williams - BPA / 1399 9904220239 99033i PDR   ADQCK OM00397 R                     PDR
 
OPERATING STATUS REPORT for WNP-2 Date:   April 1, 1999 Docket: 50-397
: 2. Reporting Period: MARCH 1999
: 3. Utility
 
==Contact:==
Bernice Kasko (509) 377-4473 Design Electrical Rating (Net MW,):                                       1153
: 5. Maximum Dependable Capacity - summer (Net MW,):                           1107 N
MONTH         YEAR   CUMULATIVE Hours Reactor Critical                         744.0       2,160.0   91,001.3
: 7. Hours Generator On-Line                        744.0       2,160.88,034.2 Unit Reserve Shutdown Hours                      0.0          0.0    3,037.5
: 9. Net Electrical Energy (MWH)                749,990    2,270,192  85,600,123
: 10. Challenges to safety/relief valves:                                     None
 
UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: April 1, 1999 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPQRT PERIoD:       MARCH 1999 Type F: Forced         Duration No.        Date      S: Scheduled     (Hours)     Reason (1) Method (2)             Cause and Corrective Action To Prevent Recurrence NA SUhGHARY:                 Due to economic dispatch the plant operated at 100% power during the day Monday - Friday and reduced power in the evenings to 85%. During the weekends power was reduced to 65%. Following an increase in power to 88% on March 29, the plant was reduced to 70% power to recover a repaired ASD channel. The plant was returned to 100% power on March 30~.
~lREASON                                                               2 METHOD A - Equipment Failure               E - Operator Training 8c          1- Manua B - Maintenance or Test                     License Examination      2- Manual Scram C - Refueling                       F - Administration                3 - Auto Scram D - Regulatory Restriction             -
G Operational Error               4 - Continued H - Other                         5 - Reduced Load 9 - Other}}

Latest revision as of 03:41, 4 December 2019

Monthly Operating Rept for Mar 1999 for WNP-2.With 990413 Ltr
ML17292B639
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/31/1999
From: Kasko B, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-99-069, GO2-99-69, NUDOCS 9904220239
Download: ML17292B639 (4)


Text

CATEGORY j.

REGULA Y INFORMATION DISTRIBUTI SYSTEM (RIDS)

ACCESSION NBR:9904220239 DOC.DATE: 99/03/31 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFIL1ATION KASKO,B. Washington Public Power Supply System SMITH,G.O. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Mar 1999 for WNP-2.With 990413 C ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL LPD4-2 PD 1 1 CUSHING,J 1 1 INTERNAL: AC 1 1 AEOD/SPD/RRAB 1 1 tggEB Mm 1 1 OC/DBA/PAD 1 1 RGN4 1 1 EXTERNAL: LMITCO MARSHALL NOAC 1 1 NRC PDR D

1

+p,iY(u t N

NOTE TO ALL "RIDS't RECIPIENTS PLEASE HELP US TO REDUCE WASTE TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS

~

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ Ricltland, Washington 99352-0968 April 13, 1999 GO2-99-069 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Contxol Desk Washington, D. C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT MARCH 1999 Transmitted herewith is the Monthly Operating Report for the month of March 1999 as required by Technical Specification 5.6.4.

Respectfully, G. O. Smith Vice President, Generation Mail Drop 927M CC: EW Merschoff - NRC RIV JS Cushing - NRR NRC Sr. Resident Inspector - 927N PD Robinson - Winston & Strawn INPO ANI Library Utility Data Institute DL Williams - BPA / 1399 9904220239 99033i PDR ADQCK OM00397 R PDR

OPERATING STATUS REPORT for WNP-2 Date: April 1, 1999 Docket: 50-397

2. Reporting Period: MARCH 1999
3. Utility

Contact:

Bernice Kasko (509) 377-4473 4 Design Electrical Rating (Net MW,): 1153

5. Maximum Dependable Capacity - summer (Net MW,): 1107 N

MONTH YEAR CUMULATIVE Hours Reactor Critical 744.0 2,160.0 91,001.3

7. Hours Generator On-Line 744.0 2,160.0 88,034.2 Unit Reserve Shutdown Hours 0.0 0.0 3,037.5
9. Net Electrical Energy (MWH) 749,990 2,270,192 85,600,123
10. Challenges to safety/relief valves: None

UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: April 1, 1999 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPQRT PERIoD: MARCH 1999 Type F: Forced Duration No. Date S: Scheduled (Hours) Reason (1) Method (2) Cause and Corrective Action To Prevent Recurrence NA SUhGHARY: Due to economic dispatch the plant operated at 100% power during the day Monday - Friday and reduced power in the evenings to 85%. During the weekends power was reduced to 65%. Following an increase in power to 88% on March 29, the plant was reduced to 70% power to recover a repaired ASD channel. The plant was returned to 100% power on March 30~.

~lREASON 2 METHOD A - Equipment Failure E - Operator Training 8c 1- Manua B - Maintenance or Test License Examination 2- Manual Scram C - Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction -

G Operational Error 4 - Continued H - Other 5 - Reduced Load 9 - Other