ML17292A592: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 10/31/1996
| issue date = 10/31/1996
| title = Monthly Operating Rept for Oct 1996 for WNP-2.W/961011 Ltr
| title = Monthly Operating Rept for Oct 1996 for WNP-2.W/961011 Ltr
| author name = KASKO B, SMITH G O
| author name = Kasko B, Smith G
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY1REGULAT(INFORMATION DISTRIBUTIONOCSTEM (RIDE)ACCESSION NBR:9611190191 DOC.DATE:
{{#Wiki_filter:CATEGORY 1 REGULAT( INFORMATION DISTRIBUTIONOCSTEM (RIDE)
96/10/31NOTARIZED:
ACCESSION NBR:9611190191           DOC.DATE:   96/10/31    NOTARIZED: NO              DOCKET  ¹ FACII;:5p-,.397 ''WPPSS Nuclear Project, Unit 2, Washington           Public    Powe  05000397 AUTH.IAIAME           AUTHOR AFFILIATION KASKO,B.             Washington Public Power Supply System SMITH,G.O.           Washington Public Power Supply System RECIP.NAME           RECIPIENT AFFILIATION
NODOCKET¹FACII;:5p-,.397 WPPSSNuclearProject,Unit2,Washington PublicPowe05000397AUTH.IAIAME
''AUTHORAFFILIATION KASKO,B.Washington PublicPowerSupplySystemSMITH,G.O.
Washington PublicPowerSupplySystemRECIP.NAME RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly,operating reptforOct1996forWNP-2Operating LicenseNPF-21.W/961011 ltr.DISTRIBUTION CODE:IE24DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:MonthlyOperating Report(perTechSpecs)NOTES:ERECIPIENT IDCODE/NAME PD4-2PDINTERNAL:
Monthly,     operating rept for Oct      1996  for WNP-2  Operating License NPF-21.W/961011       ltr.
FILECENTER108/DBA/PAD EXTERNALLITCOBRYCEIJHNRCPDRCOPIESLTTRENCL111111111111RECIPIENT IDCODE/NAME COLBURN,T AEOD/SPD/RRAB NRR/DRPM/PECB RGN4NOACCOPIESLTTRENCL11111111110RDUNOTETOALL"RIDS"RECIPIENTS:
DISTRIBUTION CODE: IE24D          COPIES RECEIVED:LTR         ENCL        SIZE:
PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION 415-2083TOTALNUMBEROFCOPIESREQUIRED:
TITLE: Monthly Operating Report (per Tech Specs)
LTTR11ENCL11
NOTES:
~~l WASHINGTON PUBLICPOWERSUPPLYSYSTEMI'.O.Box968~3000GeorgeWashington Way~Richland, Washington 99352-0968
E RECIPIENT          COPIES              RECIPIENT          COPIES ID CODE/NAME        LTTR ENCL          ID  CODE/NAME       LTTR ENCL PD4-2 PD                  1    1      COLBURN,T                 1    1 0
~(509)372-5000October11,1996G02-96-223 DocketNo.50-397U.S.NuclearRegulatory Commission DocumentControlDeskWashington, D.C.20555Gentlemen:
INTERNAL:                              1    1      AEOD/SPD/RRAB             1    1 FILE  CENTER    1      1    1      NRR/DRPM/PECB             1    1                R 08/DBA/PAD                1    1      RGN4                      1    1 EXTERNAL    LITCO BRYCE I J  H      1    1      NOAC                      1    1 NRC PDR                  1    1 D
U NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR              11  ENCL    11
 
  ~ ~
l
 
WASHINGTON PUBLIC POWER SUPPLY SYSTEM I'.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352-0968 ~ (509) 372-5000 October 11, 1996 G02-96-223 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:


==Subject:==
==Subject:==
WNP-2OPERATING LICENSENPF-21MONTHLYOPERATING REPORTOCTOBER1996Transmitted herewithistheMonthlyOperating ReportforthemonthofOctober1996asrequiredbyTechnical Specification 6.9.1.6.Respectfully, G.O.SmithPlantGeneralManagerMailDrop9270cc:LJCallan-NRCRIVTGColburn-NRRKEPerkins,Jr.-NRCRIV,WCFONRCSr.ResidentInspector
WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT OCTOBER 1996 Transmitted herewith is the Monthly Operating Report for the month                  of October    1996 as required by Technical Specification 6.9.1.6.
-927NNSReynolds-Winston&StrawnINPOANILibraryUtilityDataInstitute DLWilliams-BPA/3999biii90i9i 9b103iPDRADOCK05000397, RPDR IO14hIh;~4'J OPERATING STATUSREPORTforWNP-2Date:November1,19962.'.4.6.7.8.9.10.11.Outage+On-lineHours:745.034861199115311531107nonenoneDocket:50-397Reporting Period:OCTOBER1996UtilityContact:BerniceKasko(509)377-4473LicensedThermalPower(MW,):Nameplate Rating(GrossMW,):DesignElectrical Rating(NetMW,):MaximumDependable Capacity-summer(GrossMW,):MaximumDependable Capacity-summer(NetMW,):Ifchangesoccurabovesincelastreport,givereasons:Powertowhichrestricted, ifany(NetMW,):Reasonsforrestrictions, ifany:12.13.14.15.16.17.18.19.20.21.22.23.24.25.ReportPeriodHoursHoursReactorCriticalRxReserveShutdownHoursHoursGenerator On-LineUnitReserveShutdownHoursGrossThermalEnergy(MWH)GrossElectrical Energy(MWH)NetElectrical Energy(MWH)UnitServiceFactorUnitAvailability FactorUnitCapacityFactor(MDCNet)UnitCapacityFactor(DERNet)UnitForcedOutageRateForcedOutageHoursMONTH745.0745.00.0745.00.02,432,864 822,140793,218100.0%100.0%96.2%92.3%0.0%0.0YEAR7,320.04,772.8985.94,535.6997.412,400,967 4,103,520 3,907,623 62.0%75.6%48.3%46.3%2.6%123.3CUMULATIVE 104,168.2 74,408.61,730.871,786.11,956.2212,858,517 71,681,000 68,665,941
Respectfully, G. O. Smith Plant General Manager Mail Drop 9270 cc:   LJ Callan - NRC RIV TG Colburn - NRR KE Perkins, Jr. - NRC RIV, WCFO NRC Sr. Resident Inspector - 927N NS Reynolds - Winston & Strawn INPO ANI Library UtilityData Institute DL Williams - BPA / 399 9biii90i9i          9b103i PDR    ADOCK        05000397, R                          PDR
,68.9%70.8%60.3%59.4%10.5%8,443.026.Shutdowns scheduled overthenext6months(type,date,duration):
 
Refueling outagebegins4/12/97,durationis42days27.Ifcurrently
IO 1
: shutdown, estimated startupdate;Note:Cumulative UnitCapacityFactors(MDC&DER)arecalculated withweightedaverages.
4 h I
ttAVERAGEDAILYUNITPOWERLEVELREPORTPERIOD:OCTOBER1996DOCKETNO.:50-397UNIT:WNP-2DATE:November1,1996COMPLETED BY:BKnskoTELEPHONE:
    ~4 'J h;
(509)377M73DAYAVERAGEDAILYPOWERLEVEL(NetMWe)AVERAGEDAILYPOWERLEVELDAY(NetMWe)101213141511401143113911311112113711341133106010068926398901136114216171819202122232425262728293031114311381123113711301139114511011042103677910241042104910591087INSTRUCTIONS Onthisform,listtheaveragedailyunitpowerlevelinMWe(net)foreachdayinthereporting month.Computetothenearestwholemegawatt.
 
Thesefigureswillbeusedtoplotagraphforeachreporting month.Notethatwhenmaximumdependable capacityisusedforthenetelectrical ratingoftheunit,theremaybeoccasions whenthedailyaveragepowerlevelexceedsthe100%line(ortherestricted powerlevelline).Insuchcases,theaveragedailyunitpoweroutputsheetshouldbefootnoted toexplaintheapparentanomaly.  
OPERATING STATUS REPORT for WNP-2 Date: November 1, 1996 Docket: 50-397 2.'. Reporting Period: OCTOBER 1996                              Outage   + On-line Hours:     745.0 Utility
~I~fQ4 UNITSHUTDOWNS ANDPOWERREDUCTIONS REPORTPERIOD:OCTOBER1996DOCKETNOut50-397UNlTNAME.'NP-2 DATE:November1,1996COMPLETED BY:BKaskoTELEPHONE:
 
(509)377M73No.DateTypeHoursReasonMethodLERNumberSystemComponent CauseandCorrective ActionToPreventRecurrence 96-1210/11/96SZero96-1310/26/96FZeroN/AN/AN/AN/ACHPUMPXXReducedpowertoperformscramtimetesting,turbinevalvetestinganddigitalfeedwater testing.CBMOTORXReducedpowertoperformmaintenance onASDchannel1A2.SUMMARY:AttheendofthemonthWNP-2wasoperating at100%power.TYPEF-ForcedS-Scheduled REASONA-Equipment FailureB-Maintenance orTestC-Refueling D-Regulatory Restriction E-OperatorTraining&LicenseExamination F-Administration 6-Operational ErrorH-OtherMETHOD~1-Menue2-ManualScram3-AutoScram4-Continued 5-ReducedLoad9-OtherSYSTEM&COMPONENT G411ttsF&,
==Contact:==
IpIAII'}}
Bernice Kasko (509) 377-4473
: 4. Licensed Thermal Power (MW, ):                                                               3486 Nameplate Rating (Gross MW, ):                                                               1199
: 6. Design Electrical Rating (Net MW,):                                                         1153
: 7. Maximum Dependable Capacity - summer (Gross MW,):                                           1153
: 8. Maximum Dependable Capacity - summer (Net MW, ):                                             1107
: 9. Ifchanges occur above since last report, give reasons:                                      none
: 10. Power to which restricted, if any (Net MW,):                                                 none
: 11. Reasons for restrictions, if any:
MONTH              YEAR          CUMULATIVE
: 12. Report Period Hours                                745.0            7,320.0          104,168.2
: 13. Hours Reactor Critical                            745.0            4,772.8          74,408.6
: 14. Rx Reserve Shutdown Hours                            0.0              985.9            1,730.8
: 15. Hours Generator On-Line                            745.0            4,535.6          71,786.1
: 16. Unit Reserve Shutdown Hours                          0.0               997.4            1,956.2
: 17. Gross Thermal Energy (MWH)                  2,432,864            12,400,967         212,858,517
: 18. Gross Electrical Energy (MWH)                  822,140            4,103,520         71,681,000
: 19. Net Electrical Energy (MWH)                    793,218            3,907,623         68,665,941
: 20. Unit Service Factor                            100.0%                62.0%               ,68.9%
: 21. Unit Availability Factor                      100.0%                 75.6%               70.8%
: 22. Unit Capacity Factor (MDC Net)                  96.2%                48.3%                60.3%
: 23. Unit Capacity Factor (DER Net)                  92.3%               46.3%               59.4%
: 24. Unit Forced Outage Rate                            0.0%                2.6%                10.5%
: 25. Forced Outage Hours                                  0.0              123.3            8,443.0
: 26. Shutdowns scheduled over the next 6 months (type, date, duration): Refueling outage begins 4/12/97, duration is 42 days
: 27. Ifcurrently shutdown,     estimated startup date; Note: Cumulative Unit Capacity Factors (MDC & DER) are calculated with weighted averages.
 
t AVERAGE DAILY UNIT POWER LEVEL t          DOCKET NO.: 50-397 UNIT: WNP-2 DATE: November 1, 1996 COMPLETED BY: B Knsko TELEPHONE: (509) 377M73 REPORT PERIOD:              OCTOBER 1996 AVERAGE DAILYPOWER LEVEL                                        AVERAGE DAILYPOWER LEVEL DAY                      (Net MWe)                                 DAY                  (Net MWe) 1140                                  16                      1143 1143                                  17                      1138 1139                                  18                      1123 1131                                  19                      1137 1112                                  20                      1130 1137                                  21                      1139 1134                                  22                      1145 1133                                  23                      1101 1060                                  24                      1042 10                        1006                                  25                      1036 892                                  26                      779 12                          639                                  27                      1024 13                          890                                  28                      1042 14                        1136                                  29                      1049 15                        1142                                  30                      1059 31                    1087 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month. Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
 
4
~ I ~
fQ
 
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NOut 50-397 UNlT NAME.'NP-2 DATE: November 1, 1996 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD:      OCTOBER 1996 No.         Date    Type      Hours      Reason    Method    LER Number        System Component      Cause and Corrective Action To Prevent Recurrence 96-12    10/11/96    S        Zero                N/A          N/A              CH  PUMPXX        Reduced power to perform scram time testing, turbine valve testing and digital feedwater testing.
96-13    10/26/96    F        Zero                N/A          N/A              CB  MOTORX        Reduced power to perform maintenance on ASD channel 1A2.
 
==SUMMARY==
:               At the  end  of the month WNP-2 was operating at      100% power.
TYPE                      REASON                                                            METHOD                    SYSTEM      & COMPONENT F - Forced                A - Equipment Failure            E - Operator Training &          ~1- Menue                        G41    1      ttsF&,
S - Scheduled             B - Maintenance or Test                  License Examination    2 - Manual Scram C - Refueling                   F - Administration              3 - Auto Scram D - Regulatory Restriction       6 -- Operational Error          4 - Continued H Other                          5 - Reduced Load 9 - Other
 
I pI A
II'}}

Latest revision as of 03:45, 4 December 2019

Monthly Operating Rept for Oct 1996 for WNP-2.W/961011 Ltr
ML17292A592
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/31/1996
From: Kasko B, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-96-223, NUDOCS 9611190191
Download: ML17292A592 (9)


Text

CATEGORY 1 REGULAT( INFORMATION DISTRIBUTIONOCSTEM (RIDE)

ACCESSION NBR:9611190191 DOC.DATE: 96/10/31 NOTARIZED: NO DOCKET ¹ FACII;:5p-,.397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.IAIAME AUTHOR AFFILIATION KASKO,B. Washington Public Power Supply System SMITH,G.O. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly, operating rept for Oct 1996 for WNP-2 Operating License NPF-21.W/961011 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

E RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 COLBURN,T 1 1 0

INTERNAL: 1 1 AEOD/SPD/RRAB 1 1 FILE CENTER 1 1 1 NRR/DRPM/PECB 1 1 R 08/DBA/PAD 1 1 RGN4 1 1 EXTERNAL LITCO BRYCE I J H 1 1 NOAC 1 1 NRC PDR 1 1 D

U NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11

~ ~

l

WASHINGTON PUBLIC POWER SUPPLY SYSTEM I'.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352-0968 ~ (509) 372-5000 October 11, 1996 G02-96-223 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT OCTOBER 1996 Transmitted herewith is the Monthly Operating Report for the month of October 1996 as required by Technical Specification 6.9.1.6.

Respectfully, G. O. Smith Plant General Manager Mail Drop 9270 cc: LJ Callan - NRC RIV TG Colburn - NRR KE Perkins, Jr. - NRC RIV, WCFO NRC Sr. Resident Inspector - 927N NS Reynolds - Winston & Strawn INPO ANI Library UtilityData Institute DL Williams - BPA / 399 9biii90i9i 9b103i PDR ADOCK 05000397, R PDR

IO 1

4 h I

~4 'J h;

OPERATING STATUS REPORT for WNP-2 Date: November 1, 1996 Docket: 50-397 2.'. Reporting Period: OCTOBER 1996 Outage + On-line Hours: 745.0 Utility

Contact:

Bernice Kasko (509) 377-4473

4. Licensed Thermal Power (MW, ): 3486 Nameplate Rating (Gross MW, ): 1199
6. Design Electrical Rating (Net MW,): 1153
7. Maximum Dependable Capacity - summer (Gross MW,): 1153
8. Maximum Dependable Capacity - summer (Net MW, ): 1107
9. Ifchanges occur above since last report, give reasons: none
10. Power to which restricted, if any (Net MW,): none
11. Reasons for restrictions, if any:

MONTH YEAR CUMULATIVE

12. Report Period Hours 745.0 7,320.0 104,168.2
13. Hours Reactor Critical 745.0 4,772.8 74,408.6
14. Rx Reserve Shutdown Hours 0.0 985.9 1,730.8
15. Hours Generator On-Line 745.0 4,535.6 71,786.1
16. Unit Reserve Shutdown Hours 0.0 997.4 1,956.2
17. Gross Thermal Energy (MWH) 2,432,864 12,400,967 212,858,517
18. Gross Electrical Energy (MWH) 822,140 4,103,520 71,681,000
19. Net Electrical Energy (MWH) 793,218 3,907,623 68,665,941
20. Unit Service Factor 100.0% 62.0% ,68.9%
21. Unit Availability Factor 100.0% 75.6% 70.8%
22. Unit Capacity Factor (MDC Net) 96.2% 48.3% 60.3%
23. Unit Capacity Factor (DER Net) 92.3% 46.3% 59.4%
24. Unit Forced Outage Rate 0.0% 2.6% 10.5%
25. Forced Outage Hours 0.0 123.3 8,443.0
26. Shutdowns scheduled over the next 6 months (type, date, duration): Refueling outage begins 4/12/97, duration is 42 days
27. Ifcurrently shutdown, estimated startup date; Note: Cumulative Unit Capacity Factors (MDC & DER) are calculated with weighted averages.

t AVERAGE DAILY UNIT POWER LEVEL t DOCKET NO.: 50-397 UNIT: WNP-2 DATE: November 1, 1996 COMPLETED BY: B Knsko TELEPHONE: (509) 377M73 REPORT PERIOD: OCTOBER 1996 AVERAGE DAILYPOWER LEVEL AVERAGE DAILYPOWER LEVEL DAY (Net MWe) DAY (Net MWe) 1140 16 1143 1143 17 1138 1139 18 1123 1131 19 1137 1112 20 1130 1137 21 1139 1134 22 1145 1133 23 1101 1060 24 1042 10 1006 25 1036 892 26 779 12 639 27 1024 13 890 28 1042 14 1136 29 1049 15 1142 30 1059 31 1087 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month. Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

4

~ I ~

fQ

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NOut 50-397 UNlT NAME.'NP-2 DATE: November 1, 1996 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD: OCTOBER 1996 No. Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 96-12 10/11/96 S Zero N/A N/A CH PUMPXX Reduced power to perform scram time testing, turbine valve testing and digital feedwater testing.

96-13 10/26/96 F Zero N/A N/A CB MOTORX Reduced power to perform maintenance on ASD channel 1A2.

SUMMARY

At the end of the month WNP-2 was operating at 100% power.

TYPE REASON METHOD SYSTEM & COMPONENT F - Forced A - Equipment Failure E - Operator Training & ~1- Menue G41 1 ttsF&,

S - Scheduled B - Maintenance or Test License Examination 2 - Manual Scram C - Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction 6 -- Operational Error 4 - Continued H Other 5 - Reduced Load 9 - Other

I pI A

II'