ML17292A701: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 01/31/1997
| issue date = 01/31/1997
| title = Monthly Operating Rept for Jan 1996 for WNP-2.W/970212 Ltr
| title = Monthly Operating Rept for Jan 1996 for WNP-2.W/970212 Ltr
| author name = KASKO B, SMITH G O
| author name = Kasko B, Smith G
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:CATEGORY 1 REGULAT      INFORMATION DISTRIBUTIONlSTEM        (RIDE)
~ 2 A,. (-'j'lMF~PN  .N.!R;9702210005        DOC.DATE: 97/01/31    NOTARIZED: NO          DOCKET
    .FACll",50-397 WppSS'Nuclear Project, Unit 2, Washington Public Powe                  05000397 AUTH.hAME          'UTHOR AFFILIATION
    'KASKO,B.                Washington Public Power Supply System SMITH, G.v.            Washington Public Power Supply System RECIP.NAME              RECIPIENT AFFILIATION
 
==SUBJECT:==
Monthly operating rept for Jan 1996          for  WNP-2.W/970212  ltr.
DISTRIBUTION CODE: IE24D            COPIES RECEIVED:LTR        ENCL    SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT            COPIES            RECIPIENT        COPIES ID CODE/NAME          LTTR ENCL        ID CODE/NAME      LTTR ENCL PD4-2  PD                1    1    COLBURN,T              1    1 INTERNAL: ACRS                              1    1    AEOD/SPD/RRAB          1    1            0 ILE                      1    1    NRR/DRPM/PECB          1    1 R
OC DBA PAD                1    1    RGN4                  1    1 EXTERNAL: LITCO BRYCE,J H                  1    1    NOAC                  1    1 NRC PDR                  1    1 D
N NOTE TO ALL  "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                11  ENCL    11
 
0
  < TW ~
            '1
    ~
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ Richland, Washington 99352-0968 February 12, 1997 G02-97-026 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:
 
==Subject:==
WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT JANUARY 1997 Transmitted herewith is the Monthly Operating Report for the month        of January 1997 as required by Technical Specification 6.9.1.6.
Respectfully, Plant General Manager Mail Drop 9270 I
CC:      LJ Callan - NRC RIV TG Colburn - NRR KE Perkins, Jr. - NRC RIV, WCFO NRC Sr. Resident Inspector - 927N NS Reynolds - Winston & Strawn INPO ANI Library UtilityData Institute DL Williams - BPA / 399
...,97022i0005            970i3i
",", PDR
( R'    t:'ADQCK
                '-"        05000397 PDR
 
OPERATING STATUS REPORT for WNP-2 Date:  February 1, 1997 Docket: 50-397
: 2. Reporting Period: JANUARY 1997                              Outage    + On-line Hours:      744.0
: 3. Utility
 
==Contact:==
Bernice Kasko (509) 377-4473
: 4. Licensed Thermal Power (MW, ):                                                              3486
: 5. Nameplate Rating (Gross MW, ):                                                              1199
: 6. Design Electrical Rating (Net MW,):                                                          1153
: 7. Maximum Dependable Capacity - summer (Gross MW,):                                            1153
: 8. Maximum Dependable Capacity - summer (Net MW, ):                                              1107
: 9. Ifchanges occur above since last report, give reasons:                                        none
: 10. Power to which restricted, if any (Net MW,):                                                  none Reasons for restrictions, ifany:
MONTH                YEAR          CUMULATIVE
: 12. Report Period Hours                                744.0                744.0          106,376.2
: 13. Hours Reactor Critical                            744.0                744.0          76,616.6
: 14. Rx Reserve Shutdown Hours                            0.0                  0.0            1,730.8
: 15. Hours Generator On-Line                          744.0                744.0          73,994.1
: 16. Unit Reserve Shutdown Hours                          0.0                  0.0            1,956.2
: 17. Gross Thermal Energy (MWH)                  2,024,281            2,024,281          219,870,311
: 18. Gross Electrical Energy (MWH)                  676,994              676,994          74,061,784
: 19. Net Electrical Energy (MwH)                    652,396              652,396          70,960,671
: 20. Unit Service Factor                            100.0%                100.0%              69.6%
: 21. Unit Availability Factor                        100.0%                100.0%              71.4%
: 22. Unit Capacity Factor (MDC Net)                  79.2%                79.2%              61.0%
: 23. Unit Capacity Factor (DER Net)                  76.0%                76.0%              60. 1%
: 24. Unit Forced Outage Rate                            0.0%                0.0%              10.2%
: 25. Forced Outage Hours                                  0.0                  0.0            8,443.0
: 26. Shutdowns scheduled over the next 6 months (type, date, duration): Refueling outage begins 4/18/97, duration is 60 days
: 27. Ifcurrently shutdown,    estimated startup date:
Note: Cumulative Unit Capacity Factors (MDC & DER) are calculated with wei ghted averages.
 
~
y f  ~l                          AVj~&AGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-397 UNIT: WNP-2 DATE: February 1, 1997 COMPLETED BY: B Kasko TELEPHONE: (509) 377-4473 REPORT PERIOD:            JANUARY 1997 AVERAGE DAILYPOWER LEVEL                                        AVERAGE DAILYPOWER LEVEL DAY                    (Net MWe)                                DAY                  (Net MWe) 1130                                  16                      742 1133                                  17                      761 1138                                  18                      750 1026                                  19                      750 1053                                  20                      749 1056                                    21                      747 1034                                    22                      754 985                                    23                      749 1015                                  24                      752 10                        1032                                  25                      754 786                                  26                      754 12                        789                                  27                      755 13                        1052                                  28                      750 14                        1147                                  29                      750 15                        961                                  30                      705 31                      624 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month. Compute to the nearest whole megawatt.
These figures willbe used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 1009o line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
 
fj UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: February 1, 1997 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD:      JANUARY 1997 No.        Date    Type    Hours      Reason    Method    LER Number      System Component      Cause and Corrective Action To Prevent Recurrence 97%1      1/11/97    S          0        H          1          N/A            ZZ    ZZZZZZ        Economic dispatch 97-02      1/16/97    S          0        A          1          N/A            CB    INSTRU        RRC pump A failure due to problems with adjustable speed drives
 
==SUMMARY==
 
TYPE                      REASON                                                          METHOD                  SYSTEM    & COMPONENT forced S -
AAqluuluana Faiiuna              E - Operator Training &              anua                      G%1  1      1tsF&
Scheduled            B - Maintenance or Test                  License Examination    2 - Manual Scram C - Refueling                    F - Administration            3 - Auto Scram D - Regulatory Restriction          -
G Operational Error            4 - Continued H - Other                      5 - Reduced Load 9 - Other
 
C l
gr 4    ~1 1
          'C}}

Latest revision as of 07:01, 4 February 2020

Monthly Operating Rept for Jan 1996 for WNP-2.W/970212 Ltr
ML17292A701
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/31/1997
From: Kasko B, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-97-026, GO2-97-26, NUDOCS 9702210005
Download: ML17292A701 (7)


Text

CATEGORY 1 REGULAT INFORMATION DISTRIBUTIONlSTEM (RIDE)

~ 2 A,. (-'j'lMF~PN .N.!R;9702210005 DOC.DATE: 97/01/31 NOTARIZED: NO DOCKET

.FACll",50-397 WppSS'Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.hAME 'UTHOR AFFILIATION

'KASKO,B. Washington Public Power Supply System SMITH, G.v. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Jan 1996 for WNP-2.W/970212 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 COLBURN,T 1 1 INTERNAL: ACRS 1 1 AEOD/SPD/RRAB 1 1 0 ILE 1 1 NRR/DRPM/PECB 1 1 R

OC DBA PAD 1 1 RGN4 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11

0

< TW ~

'1

~

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ Richland, Washington 99352-0968 February 12, 1997 G02-97-026 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT JANUARY 1997 Transmitted herewith is the Monthly Operating Report for the month of January 1997 as required by Technical Specification 6.9.1.6.

Respectfully, Plant General Manager Mail Drop 9270 I

CC: LJ Callan - NRC RIV TG Colburn - NRR KE Perkins, Jr. - NRC RIV, WCFO NRC Sr. Resident Inspector - 927N NS Reynolds - Winston & Strawn INPO ANI Library UtilityData Institute DL Williams - BPA / 399

...,97022i0005 970i3i

",", PDR

( R' t:'ADQCK

'-" 05000397 PDR

OPERATING STATUS REPORT for WNP-2 Date: February 1, 1997 Docket: 50-397

2. Reporting Period: JANUARY 1997 Outage + On-line Hours: 744.0
3. Utility

Contact:

Bernice Kasko (509) 377-4473

4. Licensed Thermal Power (MW, ): 3486
5. Nameplate Rating (Gross MW, ): 1199
6. Design Electrical Rating (Net MW,): 1153
7. Maximum Dependable Capacity - summer (Gross MW,): 1153
8. Maximum Dependable Capacity - summer (Net MW, ): 1107
9. Ifchanges occur above since last report, give reasons: none
10. Power to which restricted, if any (Net MW,): none Reasons for restrictions, ifany:

MONTH YEAR CUMULATIVE

12. Report Period Hours 744.0 744.0 106,376.2
13. Hours Reactor Critical 744.0 744.0 76,616.6
14. Rx Reserve Shutdown Hours 0.0 0.0 1,730.8
15. Hours Generator On-Line 744.0 744.0 73,994.1
16. Unit Reserve Shutdown Hours 0.0 0.0 1,956.2
17. Gross Thermal Energy (MWH) 2,024,281 2,024,281 219,870,311
18. Gross Electrical Energy (MWH) 676,994 676,994 74,061,784
19. Net Electrical Energy (MwH) 652,396 652,396 70,960,671
20. Unit Service Factor 100.0% 100.0% 69.6%
21. Unit Availability Factor 100.0% 100.0% 71.4%
22. Unit Capacity Factor (MDC Net) 79.2% 79.2% 61.0%
23. Unit Capacity Factor (DER Net) 76.0% 76.0% 60. 1%
24. Unit Forced Outage Rate 0.0% 0.0% 10.2%
25. Forced Outage Hours 0.0 0.0 8,443.0
26. Shutdowns scheduled over the next 6 months (type, date, duration): Refueling outage begins 4/18/97, duration is 60 days
27. Ifcurrently shutdown, estimated startup date:

Note: Cumulative Unit Capacity Factors (MDC & DER) are calculated with wei ghted averages.

~

y f ~l AVj~&AGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-397 UNIT: WNP-2 DATE: February 1, 1997 COMPLETED BY: B Kasko TELEPHONE: (509) 377-4473 REPORT PERIOD: JANUARY 1997 AVERAGE DAILYPOWER LEVEL AVERAGE DAILYPOWER LEVEL DAY (Net MWe) DAY (Net MWe) 1130 16 742 1133 17 761 1138 18 750 1026 19 750 1053 20 749 1056 21 747 1034 22 754 985 23 749 1015 24 752 10 1032 25 754 786 26 754 12 789 27 755 13 1052 28 750 14 1147 29 750 15 961 30 705 31 624 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month. Compute to the nearest whole megawatt.

These figures willbe used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 1009o line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

fj UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: February 1, 1997 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD: JANUARY 1997 No. Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 97%1 1/11/97 S 0 H 1 N/A ZZ ZZZZZZ Economic dispatch 97-02 1/16/97 S 0 A 1 N/A CB INSTRU RRC pump A failure due to problems with adjustable speed drives

SUMMARY

TYPE REASON METHOD SYSTEM & COMPONENT forced S -

AAqluuluana Faiiuna E - Operator Training & anua G%1 1 1tsF&

Scheduled B - Maintenance or Test License Examination 2 - Manual Scram C - Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction -

G Operational Error 4 - Continued H - Other 5 - Reduced Load 9 - Other

C l

gr 4 ~1 1

'C