ML16111A889: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 9: Line 9:
| docket = 05000293
| docket = 05000293
| license number =  
| license number =  
| contact person = Burritt A L
| contact person = Burritt A
| document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs
| document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs
| page count = 13
| page count = 13
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Reviewof2015 Performance atPilgrim Nuclear Power StationAnnual AssessmentMeeting April13,2016 ML16111A889 Agenda*Introduction  *Discussion of NRC Oversight Results
{{#Wiki_filter:Review of 2015 Performance at Pilgrim Nuclear Power Station Annual Assessment Meeting April 13, 2016 ML16111A889
*Entergy Response and Remarks
*NRC Closing Remarks
*Break
*Public Q&A Robust NRC Oversight*Licensee performance, characterized by a weak corrective action program, placed


plant in Column 4 of the Action Matrix*Ongoing NRC oversight to ensure safety margins maintained*Current regulatory actions are adequate 
Agenda
*Degraded Cornerstone Column (since 4thQuarter 2013)*Two White Performance Indicators (PIs): Unplanned Scrams, Unplanned Scrams with Complications*Two White Parallel Findings:
* Introduction
oInadequate corrective actions for the two White PIs oDid not meet Inspection Procedure 95002 Objectives oRemained in the Degraded Cornerstone column for more than five quarters Pilgrim Performance Problems
* Discussion of NRC Oversight Results
*White Finding in September 2015 for not identifying and correcting a safety relief valve
* Entergy Response and Remarks
* NRC Closing Remarks
* Break
* Public Q&A


failure*White Finding combined with performance within the Degraded Cornerstone for more than
Robust NRC Oversight
* Licensee performance, characterized by a weak corrective action program, placed plant in Column 4 of the Action Matrix
* Ongoing NRC oversight to ensure safety margins maintained
* Current regulatory actions are adequate


five quarters
Pilgrim Performance Problems
*Led to Pilgrim performance transition to Column 4 Pilgrim Performance Problems NRC Oversight Actions Are Comprehensive*Ensure adequate safety margins maintained*Completed Inspection Procedure (IP) 95003 Phases A & B to ensure:
* Degraded Cornerstone Column (since 4th Quarter 2013)
osignificant issues in corrective action program (CAP) appropriately addressed ointerim licensee actions arresting CAP performance declines*Increased Problem Identification and Resolution samples on previously identified performance
* Two White Performance Indicators (PIs): Unplanned Scrams, Unplanned Scrams with Complications
* Two White Parallel Findings:
o Inadequate corrective actions for the two White PIs o Did not meet Inspection Procedure 95002 Objectives o Remained in the Degraded Cornerstone column for more than five quarters


issues NRC Oversight Actions Are Comprehensive*Additional Resident Inspector was assigned to site*Quarterly Assessments -increased management oversight*Current regulatory actions are adequate 9/01: MC letter/final White11/12: 3Q report issued 12/01: securityreport issued12/21: FP triennial report issued 2/11: 4Q15report issued2/29: Phase A issued3/4: annual assessment letters issued4/4-4/8:
Pilgrim Performance Problems
Phase B inspection4/13: annual assessment meeting5/2-5/20: Mods TeamApril 4-8, 2016 Phase BSix-month review of the corrective action program to determine improvement progress TBDPhase CIP 95003 items not already covered in Phases A and BSafety culture assessmentJanuary 11-15, 2016 Phase ACOMPLETEReport Issue 2/29Snapshot of corrective action program performance TBDIP 92723Four SL IV violations  (impeding regulatory
* White Finding in September 2015 for not identifying and correcting a safety relief valve failure
* White Finding combined with performance within the Degraded Cornerstone for more than five quarters
* Led to Pilgrim performance transition to Column 4


process)4Q2015CPI&R Samples COMPLETEReport Issue 12/11Three operations-focused (complete)Adverse weather preps (resident inspectors)PI&R Sample 1Q2016Security baseline follow-upMay 2-20, 2016Mods TeamBaseline triennial modification team
NRC Oversight Actions Are Comprehensive
* Ensure adequate safety margins maintained
* Completed Inspection Procedure (IP) 95003 Phases A & B to ensure:
o significant issues in corrective action program (CAP) appropriately addressed o interim licensee actions arresting CAP performance declines
* Increased Problem Identification and Resolution samples on previously identified performance issues


inspection April 2016 Public Meeting95003 updateAnnual assessment meetingKey Inspections & Milestones Future Action to Monitor Pilgrim*Supplemental IP 95003 Phase C oMost significant Phase of 95003 oPrimary Focus -CAP and Safety Culture oConducted after licensee declares readiness oEnsures causes understood & plan to address oConfirmatory Action Letter (CAL)*CAL Follow-up inspection Licensee Response and RemarksMr. John Dent Site Vice President Entergy Nuclear Operations, Inc.
NRC Oversight Actions Are Comprehensive
Pilgrim Annual Assessment MeetingNRC Closing Remarks Contacting the NRC*Report a safety concern    -(800) 695-7403  -Allegation@nrc.gov*General information or questions-www.nrc.gov
* Additional Resident Inspector was assigned to site
-Select "What We Do" for Public Affairs Reference Sources*Reactor Oversight Process
* Quarterly Assessments - increased management oversight
-www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.h tmlPilgrim Special Oversight Website:
* Current regulatory actions are adequate
-www.nrc.gov/info-finder/reactors/pilg/special-oversight.html
*Public Electronic Reading Room
-www.nrc.gov/reading-rm.html
*Public Document Room-800-397-4209 Reviewof2015 Performance atPilgrim Nuclear Power StationAnnual AssessmentMeeting April13,2016 ML16111A889 Agenda*Introduction  *Discussion of NRC Oversight Results
*Entergy Response and Remarks
*NRC Closing Remarks
*Break
*Public Q&A Robust NRC Oversight*Licensee performance, characterized by a weak corrective action program, placed


plant in Column 4 of the Action Matrix*Ongoing NRC oversight to ensure safety margins maintained*Current regulatory actions are adequate 
Key Inspections & Milestones 3/4: annual 9/01: MC                                12/01:                                                        assessment                4/13: annual letter/final                            security                        2/11: 4Q15                        letters                assessment White                            report issued                    report issued                      issued                    meeting 11/12: 3Q                          12/21: FP                      2/29: Phase A                      4/4-4/8:                    5/2-5/20:
*Degraded Cornerstone Column (since 4thQuarter 2013)*Two White Performance Indicators (PIs): Unplanned Scrams, Unplanned Scrams with Complications*Two White Parallel Findings:
report issued                        triennial                          issued                        Phase B                    Mods Team report issued                                                      inspection 4Q2015                        January 11-15, 2016                            1Q2016                          TBD C
oInadequate corrective actions for the two White PIs oDid not meet Inspection Procedure 95002 Objectives oRemained in the Degraded Cornerstone column for more than five quarters Pilgrim Performance Problems
PI&R Samples                                Phase A                          PI&R Sample                        IP 92723 COMPLETE                                COMPLETE                          Security baseline Report Issue 12/11 Report Issue 2/29 Four SL IV violations Three operations-                                                              follow-up Snapshot of                                                         (impeding regulatory focused (complete)                                                                                            process) corrective action Adverse weather preps (resident inspectors) program performance April 4-8, 2016                            April 2016                        May 2-20, 2016                        TBD Phase B                            Public Meeting                          Mods Team                        Phase C Six-month review of                                                                                        IP 95003 items not Baseline triennial the corrective action                  95003 update                          modification team already covered in program to determine                  Annual assessment                    inspection Phases A and B improvement progress                    meeting                                                            Safety culture assessment
*White Finding in September 2015 for not identifying and correcting a safety relief valve


failure*White Finding combined with performance within the Degraded Cornerstone for more than
Future Action to Monitor Pilgrim
* Supplemental IP 95003 Phase C o Most significant Phase of 95003 o Primary Focus - CAP and Safety Culture o Conducted after licensee declares readiness o Ensures causes understood & plan to address o Confirmatory Action Letter (CAL)
* CAL Follow-up inspection


five quarters
Licensee Response and Remarks Mr. John Dent Site Vice President Entergy Nuclear Operations, Inc.
*Led to Pilgrim performance transition to Column 4 Pilgrim Performance Problems NRC Oversight Actions Are Comprehensive*Ensure adequate safety margins maintained*Completed Inspection Procedure (IP) 95003 Phases A & B to ensure:
osignificant issues in corrective action program (CAP) appropriately addressed ointerim licensee actions arresting CAP performance declines*Increased Problem Identification and Resolution samples on previously identified performance


issues NRC Oversight Actions Are Comprehensive*Additional Resident Inspector was assigned to site*Quarterly Assessments -increased management oversight*Current regulatory actions are adequate 9/01: MC letter/final White11/12: 3Q report issued 12/01: securityreport issued12/21: FP triennial report issued 2/11: 4Q15report issued2/29: Phase A issued3/4: annual assessment letters issued4/4-4/8:
Pilgrim Annual Assessment Meeting NRC Closing Remarks
Phase B inspection4/13: annual assessment meeting5/2-5/20: Mods TeamApril 4-8, 2016 Phase BSix-month review of the corrective action program to determine improvement progress TBDPhase CIP 95003 items not already covered in Phases A and BSafety culture assessmentJanuary 11-15, 2016 Phase ACOMPLETEReport Issue 2/29Snapshot of corrective action program performance TBDIP 92723Four SL IV violations  (impeding regulatory


process)4Q2015CPI&R Samples COMPLETEReport Issue 12/11Three operations-focused (complete)Adverse weather preps (resident inspectors)PI&R Sample 1Q2016Security baseline follow-upMay 2-20, 2016Mods TeamBaseline triennial modification team
Contacting the NRC
* Report a safety concern
  - (800) 695-7403
  - Allegation@nrc.gov
* General information or questions
  - www.nrc.gov
  - Select What We Do for Public Affairs


inspection April 2016 Public Meeting95003 updateAnnual assessment meetingKey Inspections & Milestones Future Action to Monitor Pilgrim*Supplemental IP 95003 Phase C oMost significant Phase of 95003 oPrimary Focus -CAP and Safety Culture oConducted after licensee declares readiness oEnsures causes understood & plan to address oConfirmatory Action Letter (CAL)*CAL Follow-up inspection Licensee Response and RemarksMr. John Dent Site Vice President Entergy Nuclear Operations, Inc.
Reference Sources
Pilgrim Annual Assessment MeetingNRC Closing Remarks Contacting the NRC*Report a safety concern   -(800) 695-7403 -Allegation@nrc.gov*General information or questions-www.nrc.gov
* Reactor Oversight Process
-Select "What We Do" for Public Affairs Reference Sources*Reactor Oversight Process
  - www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.h tml Pilgrim Special Oversight Website:
-www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.h tmlPilgrim Special Oversight Website:
  - www.nrc.gov/info-finder/reactors/pilg/special-oversight.html
-www.nrc.gov/info-finder/reactors/pilg/special-oversight.html
* Public Electronic Reading Room
*Public Electronic Reading Room
  - www.nrc.gov/reading-rm.html
-www.nrc.gov/reading-rm.html
* Public Document Room
*Public Document Room-800-397-4209}}
  - 800-397-4209
 
Review of 2015 Performance at Pilgrim Nuclear Power Station Annual Assessment Meeting April 13, 2016 ML16111A889
 
Agenda
* Introduction
* Discussion of NRC Oversight Results
* Entergy Response and Remarks
* NRC Closing Remarks
* Break
* Public Q&A
 
Robust NRC Oversight
* Licensee performance, characterized by a weak corrective action program, placed plant in Column 4 of the Action Matrix
* Ongoing NRC oversight to ensure safety margins maintained
* Current regulatory actions are adequate
 
Pilgrim Performance Problems
* Degraded Cornerstone Column (since 4th Quarter 2013)
* Two White Performance Indicators (PIs): Unplanned Scrams, Unplanned Scrams with Complications
* Two White Parallel Findings:
o Inadequate corrective actions for the two White PIs o Did not meet Inspection Procedure 95002 Objectives o Remained in the Degraded Cornerstone column for more than five quarters
 
Pilgrim Performance Problems
* White Finding in September 2015 for not identifying and correcting a safety relief valve failure
* White Finding combined with performance within the Degraded Cornerstone for more than five quarters
* Led to Pilgrim performance transition to Column 4
 
NRC Oversight Actions Are Comprehensive
* Ensure adequate safety margins maintained
* Completed Inspection Procedure (IP) 95003 Phases A & B to ensure:
o significant issues in corrective action program (CAP) appropriately addressed o interim licensee actions arresting CAP performance declines
* Increased Problem Identification and Resolution samples on previously identified performance issues
 
NRC Oversight Actions Are Comprehensive
* Additional Resident Inspector was assigned to site
* Quarterly Assessments - increased management oversight
* Current regulatory actions are adequate
 
Key Inspections & Milestones 3/4: annual 9/01: MC                                12/01:                                                        assessment                4/13: annual letter/final                            security                        2/11: 4Q15                        letters                assessment White                            report issued                    report issued                      issued                    meeting 11/12: 3Q                          12/21: FP                      2/29: Phase A                      4/4-4/8:                    5/2-5/20:
report issued                        triennial                          issued                        Phase B                    Mods Team report issued                                                      inspection 4Q2015                        January 11-15, 2016                            1Q2016                          TBD C
PI&R Samples                                Phase A                          PI&R Sample                        IP 92723 COMPLETE                                COMPLETE                          Security baseline Report Issue 12/11 Report Issue 2/29 Four SL IV violations Three operations-                                                              follow-up Snapshot of                                                          (impeding regulatory focused (complete)                                                                                            process) corrective action Adverse weather preps (resident inspectors) program performance April 4-8, 2016                            April 2016                        May 2-20, 2016                        TBD Phase B                            Public Meeting                          Mods Team                        Phase C Six-month review of                                                                                        IP 95003 items not Baseline triennial the corrective action                  95003 update                          modification team already covered in program to determine                  Annual assessment                    inspection Phases A and B improvement progress                    meeting                                                            Safety culture assessment
 
Future Action to Monitor Pilgrim
* Supplemental IP 95003 Phase C o Most significant Phase of 95003 o Primary Focus - CAP and Safety Culture o Conducted after licensee declares readiness o Ensures causes understood & plan to address o Confirmatory Action Letter (CAL)
* CAL Follow-up inspection
 
Licensee Response and Remarks Mr. John Dent Site Vice President Entergy Nuclear Operations, Inc.
 
Pilgrim Annual Assessment Meeting NRC Closing Remarks
 
Contacting the NRC
* Report a safety concern
  - (800) 695-7403
  - Allegation@nrc.gov
* General information or questions
  - www.nrc.gov
  - Select What We Do for Public Affairs
 
Reference Sources
* Reactor Oversight Process
  - www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.h tml Pilgrim Special Oversight Website:
  - www.nrc.gov/info-finder/reactors/pilg/special-oversight.html
* Public Electronic Reading Room
  - www.nrc.gov/reading-rm.html
* Public Document Room
  - 800-397-4209}}

Latest revision as of 20:51, 30 October 2019

4/13/2016 - Pilgrim Nuclear Power Station Annual Assessment Meeting - NRC Presentation Slides
ML16111A889
Person / Time
Site: Pilgrim
Issue date: 04/13/2016
From:
NRC/RGN-I/DRP/PB5
To:
Burritt A
References
Download: ML16111A889 (13)


Text

Review of 2015 Performance at Pilgrim Nuclear Power Station Annual Assessment Meeting April 13, 2016 ML16111A889

Agenda

  • Introduction
  • Discussion of NRC Oversight Results
  • Entergy Response and Remarks
  • NRC Closing Remarks
  • Break
  • Public Q&A

Robust NRC Oversight

  • Licensee performance, characterized by a weak corrective action program, placed plant in Column 4 of the Action Matrix
  • Ongoing NRC oversight to ensure safety margins maintained
  • Current regulatory actions are adequate

Pilgrim Performance Problems

  • Degraded Cornerstone Column (since 4th Quarter 2013)
  • Two White Performance Indicators (PIs): Unplanned Scrams, Unplanned Scrams with Complications
  • Two White Parallel Findings:

o Inadequate corrective actions for the two White PIs o Did not meet Inspection Procedure 95002 Objectives o Remained in the Degraded Cornerstone column for more than five quarters

Pilgrim Performance Problems

  • White Finding in September 2015 for not identifying and correcting a safety relief valve failure
  • White Finding combined with performance within the Degraded Cornerstone for more than five quarters
  • Led to Pilgrim performance transition to Column 4

NRC Oversight Actions Are Comprehensive

  • Ensure adequate safety margins maintained

o significant issues in corrective action program (CAP) appropriately addressed o interim licensee actions arresting CAP performance declines

  • Increased Problem Identification and Resolution samples on previously identified performance issues

NRC Oversight Actions Are Comprehensive

  • Additional Resident Inspector was assigned to site
  • Quarterly Assessments - increased management oversight
  • Current regulatory actions are adequate

Key Inspections & Milestones 3/4: annual 9/01: MC 12/01: assessment 4/13: annual letter/final security 2/11: 4Q15 letters assessment White report issued report issued issued meeting 11/12: 3Q 12/21: FP 2/29: Phase A 4/4-4/8: 5/2-5/20:

report issued triennial issued Phase B Mods Team report issued inspection 4Q2015 January 11-15, 2016 1Q2016 TBD C

PI&R Samples Phase A PI&R Sample IP 92723 COMPLETE COMPLETE Security baseline Report Issue 12/11 Report Issue 2/29 Four SL IV violations Three operations- follow-up Snapshot of (impeding regulatory focused (complete) process) corrective action Adverse weather preps (resident inspectors) program performance April 4-8, 2016 April 2016 May 2-20, 2016 TBD Phase B Public Meeting Mods Team Phase C Six-month review of IP 95003 items not Baseline triennial the corrective action 95003 update modification team already covered in program to determine Annual assessment inspection Phases A and B improvement progress meeting Safety culture assessment

Future Action to Monitor Pilgrim

  • Supplemental IP 95003 Phase C o Most significant Phase of 95003 o Primary Focus - CAP and Safety Culture o Conducted after licensee declares readiness o Ensures causes understood & plan to address o Confirmatory Action Letter (CAL)
  • CAL Follow-up inspection

Licensee Response and Remarks Mr. John Dent Site Vice President Entergy Nuclear Operations, Inc.

Pilgrim Annual Assessment Meeting NRC Closing Remarks

Contacting the NRC

  • Report a safety concern

- (800) 695-7403

- Allegation@nrc.gov

  • General information or questions

- www.nrc.gov

- Select What We Do for Public Affairs

Reference Sources

  • Reactor Oversight Process

- www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.h tml Pilgrim Special Oversight Website:

- www.nrc.gov/info-finder/reactors/pilg/special-oversight.html

  • Public Electronic Reading Room

- www.nrc.gov/reading-rm.html

  • Public Document Room

- 800-397-4209

Review of 2015 Performance at Pilgrim Nuclear Power Station Annual Assessment Meeting April 13, 2016 ML16111A889

Agenda

  • Introduction
  • Discussion of NRC Oversight Results
  • Entergy Response and Remarks
  • NRC Closing Remarks
  • Break
  • Public Q&A

Robust NRC Oversight

  • Licensee performance, characterized by a weak corrective action program, placed plant in Column 4 of the Action Matrix
  • Ongoing NRC oversight to ensure safety margins maintained
  • Current regulatory actions are adequate

Pilgrim Performance Problems

  • Degraded Cornerstone Column (since 4th Quarter 2013)
  • Two White Performance Indicators (PIs): Unplanned Scrams, Unplanned Scrams with Complications
  • Two White Parallel Findings:

o Inadequate corrective actions for the two White PIs o Did not meet Inspection Procedure 95002 Objectives o Remained in the Degraded Cornerstone column for more than five quarters

Pilgrim Performance Problems

  • White Finding in September 2015 for not identifying and correcting a safety relief valve failure
  • White Finding combined with performance within the Degraded Cornerstone for more than five quarters
  • Led to Pilgrim performance transition to Column 4

NRC Oversight Actions Are Comprehensive

  • Ensure adequate safety margins maintained

o significant issues in corrective action program (CAP) appropriately addressed o interim licensee actions arresting CAP performance declines

  • Increased Problem Identification and Resolution samples on previously identified performance issues

NRC Oversight Actions Are Comprehensive

  • Additional Resident Inspector was assigned to site
  • Quarterly Assessments - increased management oversight
  • Current regulatory actions are adequate

Key Inspections & Milestones 3/4: annual 9/01: MC 12/01: assessment 4/13: annual letter/final security 2/11: 4Q15 letters assessment White report issued report issued issued meeting 11/12: 3Q 12/21: FP 2/29: Phase A 4/4-4/8: 5/2-5/20:

report issued triennial issued Phase B Mods Team report issued inspection 4Q2015 January 11-15, 2016 1Q2016 TBD C

PI&R Samples Phase A PI&R Sample IP 92723 COMPLETE COMPLETE Security baseline Report Issue 12/11 Report Issue 2/29 Four SL IV violations Three operations- follow-up Snapshot of (impeding regulatory focused (complete) process) corrective action Adverse weather preps (resident inspectors) program performance April 4-8, 2016 April 2016 May 2-20, 2016 TBD Phase B Public Meeting Mods Team Phase C Six-month review of IP 95003 items not Baseline triennial the corrective action 95003 update modification team already covered in program to determine Annual assessment inspection Phases A and B improvement progress meeting Safety culture assessment

Future Action to Monitor Pilgrim

  • Supplemental IP 95003 Phase C o Most significant Phase of 95003 o Primary Focus - CAP and Safety Culture o Conducted after licensee declares readiness o Ensures causes understood & plan to address o Confirmatory Action Letter (CAL)
  • CAL Follow-up inspection

Licensee Response and Remarks Mr. John Dent Site Vice President Entergy Nuclear Operations, Inc.

Pilgrim Annual Assessment Meeting NRC Closing Remarks

Contacting the NRC

  • Report a safety concern

- (800) 695-7403

- Allegation@nrc.gov

  • General information or questions

- www.nrc.gov

- Select What We Do for Public Affairs

Reference Sources

  • Reactor Oversight Process

- www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.h tml Pilgrim Special Oversight Website:

- www.nrc.gov/info-finder/reactors/pilg/special-oversight.html

  • Public Electronic Reading Room

- www.nrc.gov/reading-rm.html

  • Public Document Room

- 800-397-4209