|
|
(4 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML15232A069 | | | number = ML15232A069 |
| | issue date = 08/24/2015 | | | issue date = 08/24/2015 |
| | title = Waterford Steam Electric Station, Unit 3 - Acceptance of Requested Licensing Action Revision to Control Element Assemble Drop Times (TAC No. MF6459) | | | title = Acceptance of Requested Licensing Action Revision to Control Element Assemble Drop Times |
| | author name = Orenak M D | | | author name = Orenak M |
| | author affiliation = NRC/NRR/DORL/LPLIV-2 | | | author affiliation = NRC/NRR/DORL/LPLIV-2 |
| | addressee name = | | | addressee name = |
Line 9: |
Line 9: |
| | docket = 05000382 | | | docket = 05000382 |
| | license number = NPF-038 | | | license number = NPF-038 |
| | contact person = Wang A B | | | contact person = Wang A |
| | case reference number = TAC MF6459 | | | case reference number = TAC MF6459 |
| | document type = Letter | | | document type = Letter |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Vice President, Operations Entergy Operations, Inc. Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-0751 August 24,2015 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 24,2015 Vice President, Operations Entergy Operations, Inc. |
| | Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-0751 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| WATERFORD STEAM ELECTRIC STATION, UNIT 3 -ACCEPTANCE OF REQUESTED LICENSING ACTION RE: REVISION TO CONTROL ELEMENT ASSEMBLY DROP TIMES (TAC NO. MF6459) | | WATERFORD STEAM ELECTRIC STATION, UNIT 3 -ACCEPTANCE OF REQUESTED LICENSING ACTION RE: REVISION TO CONTROL ELEMENT ASSEMBLY DROP TIMES (TAC NO. MF6459) |
|
| |
|
| ==Dear Sir or Madam:== | | ==Dear Sir or Madam:== |
| By letter dated July 2, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15197A106), Entergy Operations, Inc. (the licensee) submitted a license amendment request for Waterford Steam Electric Station, Unit 3. The proposed amendment request would modify Technical Specification (TS) 3.1.3.4 to revise control element assembly drop times to be less than or equal to 3.5 seconds. By letter dated August 3, 2015 (ADAMS Accession No. ML 15205A306), the U.S. Nuclear Regulatory Commission (NRC) staff informed the licensee that the submittal was incomplete but provided the licensee the opportunity to supplement the application to address the missing information. By letter dated August 14, 2015 (ADAMS Accession No. ML 15226A346), the licensee provided the requested supplement. The purpose of this letter is to provide the results of the NRC staff's acceptance review of this amendment request and supplement. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified, despite completion of an Vice President, Operations adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence. If you have any questions, please contact me at 301-415-3229 or michael.orenak@nrc.gov. Docket No. 50-382 cc: Distribution via Listserv Michael D. Orenak, Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
| |
|
| |
|
| ML 15232A069 OFFICE DORL/LPL4-2/PM DORL/LPL4-2/LA Sincerely, IRA Michael D. Orenak, Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LPL4-2 R/F RidsNRRLIC109 Resource RidsNrrDorllpl4-2 Resource RidsNrrLAPBlechman Resource SSun, NRR JParillo, NRR RidsNrrDraArcb Resource RidsNrrDorl Resource DSS/SRXB/BC DORL/LPL4-2/BC DORL/LPL4-2/PM NAME MOrenak PBlechman (LRonewicz for) CJackson MKhanna MOrenak DATE 8/21/15 8/20/15 8/21/15 8/24/15 8/24/15}}
| | By letter dated July 2, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15197A106), Entergy Operations, Inc. (the licensee) submitted a license amendment request for Waterford Steam Electric Station, Unit 3. The proposed amendment request would modify Technical Specification (TS) 3.1.3.4 to revise control element assembly drop times to be less than or equal to 3.5 seconds. By letter dated August 3, 2015 (ADAMS Accession No. ML15205A306), the U.S. Nuclear Regulatory Commission (NRC) staff informed the licensee that the submittal was incomplete but provided the licensee the opportunity to supplement the application to address the missing information. By letter dated August 14, 2015 (ADAMS Accession No. ML15226A346), the licensee provided the requested supplement. |
| | The purpose of this letter is to provide the results of the NRC staff's acceptance review of this amendment request and supplement. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. |
| | Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. |
| | The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified, despite completion of an |
| | |
| | Vice President, Operations adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence. |
| | If you have any questions, please contact me at 301-415-3229 or michael.orenak@nrc.gov. |
| | Michael D. Orenak, Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382 cc: Distribution via Listserv |
| | |
| | ML15232A069 OFFICE DORL/LPL4-2/PM DORL/LPL4-2/LA DSS/SRXB/BC DORL/LPL4-2/BC DORL/LPL4-2/PM NAME MOrenak PBlechman (LRonewicz for) CJackson MKhanna MOrenak DATE 8/21/15 8/20/15 8/21/15 8/24/15 8/24/15}} |
Letter Sequence Acceptance Review |
---|
|
|
MONTHYEARW3F1-2015-0037, License Amendment Request, Cyber Security Plan Implementation Schedule2015-06-29029 June 2015 License Amendment Request, Cyber Security Plan Implementation Schedule Project stage: Request W3F1-2015-0040, License Amendment Request to Revise Control Element Assembly Drop Times Associated with Technical Specification 3.1.3.42015-07-0202 July 2015 License Amendment Request to Revise Control Element Assembly Drop Times Associated with Technical Specification 3.1.3.4 Project stage: Request ML15208A5702015-07-27027 July 2015 NRR E-mail Capture - NRC Acceptance Review for Amendment Request Regarding Cyber Security Milestone 8 Extension Project stage: Acceptance Review ML15210A7822015-07-29029 July 2015 NRR E-mail Capture - NRC Acceptance Review for Amendment Request Regarding Risk Informed Surveillance Requirements Project stage: Acceptance Review ML15205A3062015-08-0303 August 2015 Regarding License Amendment Request to Revise Control Element Assembly, Unacceptable with Opportunity to Supplement Project stage: Other W3F1-2015-0061, Provides Supplement to Revise Control Element Assembly Drop Times Associated with Technical Specification 3.1.3.42015-08-14014 August 2015 Provides Supplement to Revise Control Element Assembly Drop Times Associated with Technical Specification 3.1.3.4 Project stage: Request ML15218A1932015-08-20020 August 2015 Transmittal Letter, Individual Notice of Consideration of Issuance of Amendment, Order Imposing Procedures for Document Access to SUNSI, to Revise Control Element Assembly Drop Time Project stage: Other ML15232A0692015-08-24024 August 2015 Acceptance of Requested Licensing Action Revision to Control Element Assemble Drop Times Project stage: Acceptance Review ML15232A2752015-08-26026 August 2015 Request for Additional Information Regarding the Increased Control Element Assembly Drop Times License Amendment Request Project stage: RAI ML15218A3202015-09-0101 September 2015 Individual Notice of Consideration of Issuance of Amendment, Order Imposing Procedures for Document Access to SUNSI, to Revise Control Element Assembly Drop Time Project stage: Other ML15268A0202015-09-23023 September 2015 Attachment 3, Fuel Thermal Conductivity Degradation Evaluation (Non-Proprietary) Project stage: Request W3F1-2015-0062, Control Element Assembly Drop Times Submittal Request for Additional Information2015-09-23023 September 2015 Control Element Assembly Drop Times Submittal Request for Additional Information Project stage: Request ML15272A0692015-10-0101 October 2015 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance W3F1-2015-0085, Transfer of License and Conforming Amendment2015-10-29029 October 2015 Transfer of License and Conforming Amendment Project stage: Other 2015-08-14
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000382/20244022024-10-10010 October 2024 Security Baseline Inspection Report 05000382/2024402 Public IR 05000382/20244032024-10-0909 October 2024 Security Baseline Inspection Report 05000382/2024403 IR 05000382/20240112024-10-0101 October 2024 State Fire Protection Team Inspection Report 05000382/2024011 IR 05000382/20230042024-09-25025 September 2024 Integrated Inspection Report 05000382/2023004, Disputed Non-Cited Violation Revised ML24268A1132024-09-24024 September 2024 Acknowledgment of Response to NRC Inspection Report 05000382/2024013, and Notice of Violation ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000382/20240052024-08-21021 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Waterford Steam Electric Station, Unit 3 Report 05000382/2024005 IR 05000382/20240132024-08-20020 August 2024 Notice of Violation; NRC Inspection Report 05000382/2024013 ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment 05000382/LER-2024-004, Automatic Reactor Trip Due to Lightning Strike2024-08-15015 August 2024 Automatic Reactor Trip Due to Lightning Strike IR 05000382/20240022024-08-0808 August 2024 Integrated Inspection Report 05000382/2024002 ML24164A2512024-08-0707 August 2024 Issuance of Amendment No. 271 Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program ML24213A1632024-08-0101 August 2024 2024 Waterford Notification of Biennial Problem Identification and Resolution Inspection and Request for Information ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification 05000382/LER-2024-003, Automatic EFAS Actuation During Surveillance Test2024-07-10010 July 2024 Automatic EFAS Actuation During Surveillance Test ML24150A3852024-06-0404 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000382/2024011) and Request for Information ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 ML24141A1012024-05-20020 May 2024 Amended Integrated Inspection Report 05000382/2023004 05000382/LER-2024-002, Automatic Reactor Trip Due to Transformer Failure2024-05-16016 May 2024 Automatic Reactor Trip Due to Transformer Failure 05000382/LER-2024-001, Manual Reactor Trip Due to Engineered Safety Features Actuation System Relay Failure2024-05-15015 May 2024 Manual Reactor Trip Due to Engineered Safety Features Actuation System Relay Failure ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions IR 05000382/20240012024-05-0606 May 2024 Integrated Inspection Report 05000382/2024001 ML24067A1032024-04-25025 April 2024 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams IR 05000382/20244012024-03-18018 March 2024 Material Control and Accounting Program Inspection Report 05000382/2024401 ML24074A3742024-03-15015 March 2024 Acknowledgement of Response to NRC Inspection Report 05000382/2023004 and Disputed Non-Cited Violation ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24032A0032024-03-0606 March 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0053 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000382/20230062024-02-28028 February 2024 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3 Report 05000382/2023006 05000382/LER-2023-004, Non-Compliance with Technical Specifications Due to Performing Startup Channel 1 Functional Testing During Fuel Movement2024-02-14014 February 2024 Non-Compliance with Technical Specifications Due to Performing Startup Channel 1 Functional Testing During Fuel Movement ML24039A1992024-02-12012 February 2024 – Integrated Inspection Report 05000382/2023004 IR 05000382/20230102024-01-31031 January 2024 Comprehensive Engineering Team Inspection Report 05000382/2023010 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 – Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and 05000382/LER-2023-003, Steam Generator Tube Degradation Indicated by Failed In-Situ Pressure Testing2023-12-30030 December 2023 Steam Generator Tube Degradation Indicated by Failed In-Situ Pressure Testing ML23340A2292023-12-28028 December 2023 Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000382/20230032023-11-14014 November 2023 Integrated Inspection Report 05000382/2023003 and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000382/20234012023-10-0404 October 2023 Cyber Security Inspection Report 05000382/2023401 (Cover Letter Only) IR 05000382/20230052023-08-21021 August 2023 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2023005) IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 IR 05000382/20230022023-08-0808 August 2023 Integrated Inspection Report 05000382/2023002 2024-09-06
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 24,2015 Vice President, Operations Entergy Operations, Inc.
Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-0751
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3 -ACCEPTANCE OF REQUESTED LICENSING ACTION RE: REVISION TO CONTROL ELEMENT ASSEMBLY DROP TIMES (TAC NO. MF6459)
Dear Sir or Madam:
By letter dated July 2, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15197A106), Entergy Operations, Inc. (the licensee) submitted a license amendment request for Waterford Steam Electric Station, Unit 3. The proposed amendment request would modify Technical Specification (TS) 3.1.3.4 to revise control element assembly drop times to be less than or equal to 3.5 seconds. By letter dated August 3, 2015 (ADAMS Accession No. ML15205A306), the U.S. Nuclear Regulatory Commission (NRC) staff informed the licensee that the submittal was incomplete but provided the licensee the opportunity to supplement the application to address the missing information. By letter dated August 14, 2015 (ADAMS Accession No. ML15226A346), the licensee provided the requested supplement.
The purpose of this letter is to provide the results of the NRC staff's acceptance review of this amendment request and supplement. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified, despite completion of an
Vice President, Operations adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.
If you have any questions, please contact me at 301-415-3229 or michael.orenak@nrc.gov.
Michael D. Orenak, Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382 cc: Distribution via Listserv
ML15232A069 OFFICE DORL/LPL4-2/PM DORL/LPL4-2/LA DSS/SRXB/BC DORL/LPL4-2/BC DORL/LPL4-2/PM NAME MOrenak PBlechman (LRonewicz for) CJackson MKhanna MOrenak DATE 8/21/15 8/20/15 8/21/15 8/24/15 8/24/15