ML18088A015: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 1: Line 1:
#REDIRECT [[IR 05000397/2018010]]
{{Adams
| number = ML18088A015
| issue date = 03/29/2018
| title = Notification of NRC Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/ Staffing/Multi-Unit Dose Assessment Plans (05000397/2018010) and Request for
| author name = Haire M
| author affiliation = NRC/RGN-IV/DRP/RPB-A
| addressee name = Reddemann M
| addressee affiliation = Energy Northwest
| docket = 05000397
| license number = NPF-021
| contact person = Alexander R
| document report number = IR 2018010
| document type = Letter, Request for Additional Information (RAI)
| page count = 7
}}
See also: [[see also::IR 05000397/2018010]]
 
=Text=
{{#Wiki_filter:March 29, 2018
Mr. Mark E. Reddemann
Chief Executive Officer
Energy Northwest
MD 1023
P.O. Box 968
Richland, WA 99352
SUBJECT:        COLUMBIA GENERATING STATION - NOTIFICATION OF NRC INSPECTION
                OF THE IMPLEMENTATION OF MITIGATION STRATEGIES AND SPENT
                FUEL POOL INSTRUMENTATION ORDERS AND EMERGENCY
                PREPAREDNESS COMMUNICATION/STAFFING/MULTI-UNIT DOSE
                ASSESSMENT PLANS (05000397/2018010) AND REQUEST FOR
                INFORMATION
Dear Mr. Reddemann:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
staff will conduct a mitigation strategies for beyond-design-basis external events, spent fuel pool
instrumentation, and emergency preparedness enhancements inspection at the Columbia
Generating Station, from June 11 - 15, 2018. The inspection will consist of two reactor
inspectors from the NRCs Region IV office, one Resident Inspector from another Region IV
reactor site, plus one of the assigned Resident Inspectors at the Columbia Generating Station
for one week. The inspection will be conducted in accordance with the NRCs Temporary
Instruction 2515/191, Inspection of the Implementation of Mitigating Strategies and Spent Fuel
Pool Instrumentation Orders, and Emergency Preparedness Communication/Staffing/Multi-Unit
Dose Assessment Plans.
Experience has shown that this inspection is resource intensive both for the NRC inspectors
and licensee staff. In order to minimize the impact to your onsite resources and to ensure a
productive inspection, we have enclosed a request for documents needed for this inspection
activity. Please note that the documents are requested to be provided by May 18, 2018. During
the onsite inspection, inspectors will verify that plans for complying with NRC Orders EA-12-049
and EA-12-051 are in place and are being implemented. Inspectors will also verify the
establishment of staffing and communications plans provided in response to the
March 12, 2012, request for information letter, and multi-unit dose assessment information
provided per COMSECY-13-0010, Schedule and Plans for Tier 2 Order on Emergency
Preparedness for Japan Lessons Learned, dated March 27, 2013. These plans and information
were provided in the site specific submittals, which were subsequently reviewed by the NRC
staff for understanding and documented in the NRCs plant safety evaluations (SEs) and safety
assessments. Therefore, appropriate personnel knowledgeable of the stations FLEX
strategies, spent fuel pool instrumentation, and emergency preparedness enhancements should
be available to support the inspectors at the site during the inspection.
 
M. E. Reddemann                                  2
We have discussed the schedule for this inspection activity with your staff and understand that
our regulatory contact for this inspection will be Richard Wynegar of your Regulatory
Compliance organization. If there are any questions about this inspection or the material
requested, please contact the lead inspector, Ryan D. Alexander, by telephone at 817-200-1195
or by e-mail at ryan.alexander@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control
number 3150 0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
                                                Sincerely,
                                                /RA Chris Newport Acting for/
                                                Mark S. Haire, Branch Chief
                                                Project Branch A
                                                Division of Reactor Projects
Docket: 50-397
License: NPF-21
Enclosure:
FLEX Strategies, Spent Fuel Pool
Instrumentation, & EP Enhancements
Inspection Request for Information
 
                                    Request for Information
    FLEX Strategies, Spent Fuel Pool Instrumentation, & EP Enhancements Inspection
                                  Columbia Generating Station
Inspection Report:            05000397/2018010
Inspection Dates:              June 11 - 15, 2018
Inspection Procedure:          Temporary Instruction 2515/191, Inspection of the
                              Implementation of Mitigating Strategies and Spent Fuel Pool
                              Instrumentation Orders, and Emergency Preparedness
                              Communication/Staffing/Multi-Unit Dose Assessment Plans
Inspectors:                    Ryan D. Alexander, Team Lead, Sr. Project Engineer, Region IV
                              Eduardo Uribe, Reactor Inspector, Region IV
                              Daniel Bradley, Sr. Resident Inspector, Callaway Plant
                              Gregory Kolcum, Sr. Resident Inspector, Columbia Generating
                              Station
Information Requested for the In-Office Preparation Week
The following information should be sent to the Region IV office in hard copy or electronic
format (use of the Certrec IMS information portal is preferred), to the attention of Ryan
Alexander, by May 18, 2018. Additionally, a copy of any material physically sent to the Region
IV office (e.g., CD/DVDs) should also be delivered to the resident inspectors office at Columbia
Generating Station. The inspectors will select specific items from the information requested
below and then request from your staff additional documents needed during the onsite
inspection week. Also, we request that you categorize the documents in your response with the
numbered list below. Please provide requested documentation electronically if possible. If
requested documents are large and only hard copy formats are available, please inform the lead
inspector, and provide subject documentation during the first day of the onsite inspection. If you
have any questions regarding this information request, please call the lead inspector as soon as
possible.
TI 2515/191 - Appendix A
A. Provide current revision of the FLEX Final Integrated Plan (i.e., current FLEX Program
    Document), including any revisions since August 2017 submission to the NRC.
B. Provide the FLEX Strategy Basis Document.
C. Provide each operating, off-normal, abnormal, and/or emergency procedures where entry
    into one or more FLEX Support Guidelines are initiated.
D. Provide a list and copies of every FLEX Support Guideline (FSG) or equivalent procedure
    which you developed or revised to implement your mitigating strategies.
E. Provide a list of key pieces of equipment that directly perform a FLEX mitigation strategy for
    core cooling, containment, and/or spent fuel pool cooling.
F. Provide a listing/summaries of plant modifications completed related to the FLEX program.
G. Provide a listing of calculations, evaluations, and 50.59 reviews related to the FLEX program
    and modifications.
 
H. Applicable site specific hazards for the Columbia Generating Station:
  1) Provide documents which show the locations and configuration of structure(s) which
      store FLEX equipment.
  2) Seismic
      (a) Provide evaluation/evidence as to how FLEX equipment is stored to meet (i) the
          stations seismic design basis (e.g., in an existing safety-related structure); (ii) in a
          structure that meets the design requirements as described in ASCE 7-10, Minimum
          Design Loads for Buildings and Other Structures, with a Building Risk Category of
          IV; OR (iii) Outside a structure and evaluated for seismic interactions to ensure
          equipment is not damaged by non-seismically robust components or structures.
      (b) Provide the travel route(s) for FLEX equipment from storage location(s) to their
          location(s) of use, AND evaluation(s) which demonstrate that for the potential for soil
          liquefaction is not of a concern for these travel route(s).
      (c) Seismic concerns for water source(s)
          (1) If the FLEX water sources are seismically robust, then provide the assessment
              that shows that they are.
          (2) If the FLEX water sources are not seismically robust, then provide:
              (a) an assessment of alternate water sources, and
              (b) the procedure(s) which describe when and how to access those sources.
  3) External Flooding {CGS screened-out relative to design basis external flooding hazard}
          No documents requested.
  4) Severe storms with high winds {CGS screened-out relative to high winds hazard}
          No documents requested.
  5) Snow, Ice, and Extreme Cold
      For each key piece of equipment described in Item E (above) that directly performs or
      implements a FLEX mitigation strategy:
      (a) Provide procedures/documents demonstrating how the FLEX equipment is
          maintained at a temperature within a range to ensure that it will function when called
          upon.
      (b) Proved procedures/documents demonstrating how the FLEX equipment can be
          moved from the storage location to its deployment location during extreme snowfall
          and ice storms.
  6) Extreme high temperatures
      For each key piece of equipment described in Item E (above) that directly performs or
      implements a FLEX mitigation strategy:
      (a) Provide procedures/documents which describes the high-temperature limit of the
          range within which the equipment will function.
      (b) Provide procedures/documents which describe how the equipment is maintained
          below that limit in its storage location.
                                                  2
 
  7) Volcanic Ash
      For each key piece of equipment described in Item E (above) that directly performs or
      implements a FLEX mitigation strategy:
      (a) Provide procedures/documents which describe how the equipment is
            stored/protected from the volcanic ash fall hazard applicable to the station.
      (b) Provide procedures/documents which describe how the equipment has been
            evaluated to ensure manual actions required by plant personnel can be
            accomplished during volcanic ash fall conditions.
      (c) Provide procedures/documents which describe how the equipment is maintained
            functional when providing their FLEX functions during volcanic ash fall conditions.
I. Provide the station-specific FLEX strategies time validation study(ies).
J. Provide the relevant station procedure(s)/guideline(s) which describe the testing and
  maintenance program for FLEX equipment.
  1) As applicable, also provide a listing of the model work orders established to conduct
      period testing and maintenance activities for FLEX equipment.
      NOTE - A sample of records for completed maintenance/testing activities will be
      requested for review during the onsite inspection week.
K. Provide documents/procedures which describe the programmatic controls in place to ensure
  that if equipment and applicable connections are unavailable (e.g., due to maintenance,
  non-functionality), then compensatory measures are implemented in accordance with
  guidance outlined NEI 12-06.
L. Provide the station-specific National SAFER Center Playbook
M. Relative to personnel training on FLEX strategies, provide:
  1) FLEX training bases document(s)
  2) Lesson plans/training documents for site emergency response leaders responsible for
      the implementation of FLEX strategies.
          NOTE - Records for staff completing this training may be requested for review during
          the onsite inspection week.
  3) Lesson plans/training documents for site personnel responsible for the execution of
      mitigating strategies for BDBEEs (i.e., operators, craft personnel, security, radiation
      protection, etc.).
          NOTE - Records for staff completing this training may be requested for review during
          the onsite inspection week.
N. A current copy of administrative procedure(s) for the Corrective Action Program,
  modification program, operations procedure writing and implementation, and top-level
  documents for the work control and work scheduling programs. (If FLEX related procedures
  such as FSGs or the FIP/FLEX Program Document are maintained under a different
  process, please include copies of those procedures.)
O. A current copy of the U/FSAR, Technical Specifications, and Technical Specification Bases
  documents.
P. Listing of corrective action program document summaries generated related to FLEX
  equipment, strategies, procedures, and/or training.
      NOTE - Complete corrective action program documents for a selection of those included
      in the summary will be requested for review during the onsite inspection week.
                                                3
 
Q. A copy of any audits/self-assessments related to your preparation for this inspection, as well
    as any related to the implementation or maintenance of the FLEX program.
TI 2515/191 - Appendix B
R. Provide the procedures implemented for maintenance, testing, calibration, and use of the
    primary and backup Spent Fuel Pool (SFP) instrumentation channels.
S. Provide lesson plans/training documents which describe the training program that address
    the use, maintenance, calibration, surveillance, and the use of alternate power to the
    primary and backup SFP instrument channels.
TI 2515/191 - Appendix C
T. Communications:
    1) Provide documents which show that the communications system(s), technologies,
        equipment and power supplies would be available from the beginning of the event and
        operate during an ELAP.
    2) Provide the procedures and/or guidance used to implement the communication
        capabilities.
    3) Provide documents which show that you have added any new communications
        equipment, portable power supplies and/or systems have been added to ongoing testing
        and preventative maintenance programs.
U. Staffing:
    1) Provide documents which show that onsite and augmented staff will be available to
        implement the strategies in response to a large scale natural event that results an ELAP
        and impedes access to the site, and that functions/tasks have been appropriately
        staffed.
    2) Provide documents which show that the site access methods (e.g., roadways, navigable
        bodies of water and dockage, airlift, etc.) expected to be available following the event
        and available to the Emergency Response Organization (ERO) [as described in the
        Phase 1 and 2 staffing assessments and NRC safety assessment].
    3) Provide documents which show the testing, training, and drills/exercises performed by
        the station to demonstrate the EROs ability to utilize the communications systems
        and/or equipment.
V. Provide documents and procedures which show that your dose assessment
    process/program is capable of analyzing concurrent radiological releases from all on-site
    significant sources, including releases from spent fuel pools (i.e., multi-unit/multi-source
    dose assessment capability).
Lead Inspector Contact Information:
Ryan D. Alexander, Sr. Project Engineer            Mailing Address:
817-200-1195                                      U.S. NRC, Region IV
Ryan.Alexander@nrc.gov                            Attn: Ryan Alexander, DRP
                                                    1600 East Lamar Blvd.
                                                    Arlington, TX 76011-4511
                                                  4
 
 
ML18088A015
  SUNSI Review  ADAMS:        Sensitive          Non-Publicly Available Keyword
By: MHS/dll/rdr  Yes  No    Non-Sensitive      Publicly Available    NRC-002
OFFICE          DRP/RPBA        C:DRP/RPBA
NAME            RAlexander      MHaire
SIGNATURE        /RA/            /RA CNewport Acting for/
DATE            03/22/2018      03/29/2018
}}

Latest revision as of 13:57, 21 October 2019

Notification of NRC Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/ Staffing/Multi-Unit Dose Assessment Plans (05000397/2018010) and Request for
ML18088A015
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/29/2018
From: Mark Haire
NRC/RGN-IV/DRP/RPB-A
To: Reddemann M
Energy Northwest
Alexander R
References
IR 2018010
Download: ML18088A015 (7)


See also: IR 05000397/2018010

Text

March 29, 2018

Mr. Mark E. Reddemann

Chief Executive Officer

Energy Northwest

MD 1023

P.O. Box 968

Richland, WA 99352

SUBJECT: COLUMBIA GENERATING STATION - NOTIFICATION OF NRC INSPECTION

OF THE IMPLEMENTATION OF MITIGATION STRATEGIES AND SPENT

FUEL POOL INSTRUMENTATION ORDERS AND EMERGENCY

PREPAREDNESS COMMUNICATION/STAFFING/MULTI-UNIT DOSE

ASSESSMENT PLANS (05000397/2018010) AND REQUEST FOR

INFORMATION

Dear Mr. Reddemann:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

staff will conduct a mitigation strategies for beyond-design-basis external events, spent fuel pool

instrumentation, and emergency preparedness enhancements inspection at the Columbia

Generating Station, from June 11 - 15, 2018. The inspection will consist of two reactor

inspectors from the NRCs Region IV office, one Resident Inspector from another Region IV

reactor site, plus one of the assigned Resident Inspectors at the Columbia Generating Station

for one week. The inspection will be conducted in accordance with the NRCs Temporary

Instruction 2515/191, Inspection of the Implementation of Mitigating Strategies and Spent Fuel

Pool Instrumentation Orders, and Emergency Preparedness Communication/Staffing/Multi-Unit

Dose Assessment Plans.

Experience has shown that this inspection is resource intensive both for the NRC inspectors

and licensee staff. In order to minimize the impact to your onsite resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection

activity. Please note that the documents are requested to be provided by May 18, 2018. During

the onsite inspection, inspectors will verify that plans for complying with NRC Orders EA-12-049

and EA-12-051 are in place and are being implemented. Inspectors will also verify the

establishment of staffing and communications plans provided in response to the

March 12, 2012, request for information letter, and multi-unit dose assessment information

provided per COMSECY-13-0010, Schedule and Plans for Tier 2 Order on Emergency

Preparedness for Japan Lessons Learned, dated March 27, 2013. These plans and information

were provided in the site specific submittals, which were subsequently reviewed by the NRC

staff for understanding and documented in the NRCs plant safety evaluations (SEs) and safety

assessments. Therefore, appropriate personnel knowledgeable of the stations FLEX

strategies, spent fuel pool instrumentation, and emergency preparedness enhancements should

be available to support the inspectors at the site during the inspection.

M. E. Reddemann 2

We have discussed the schedule for this inspection activity with your staff and understand that

our regulatory contact for this inspection will be Richard Wynegar of your Regulatory

Compliance organization. If there are any questions about this inspection or the material

requested, please contact the lead inspector, Ryan D. Alexander, by telephone at 817-200-1195

or by e-mail at ryan.alexander@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control

number 3150 0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA Chris Newport Acting for/

Mark S. Haire, Branch Chief

Project Branch A

Division of Reactor Projects

Docket: 50-397

License: NPF-21

Enclosure:

FLEX Strategies, Spent Fuel Pool

Instrumentation, & EP Enhancements

Inspection Request for Information

Request for Information

FLEX Strategies, Spent Fuel Pool Instrumentation, & EP Enhancements Inspection

Columbia Generating Station

Inspection Report: 05000397/2018010

Inspection Dates: June 11 - 15, 2018

Inspection Procedure: Temporary Instruction 2515/191, Inspection of the

Implementation of Mitigating Strategies and Spent Fuel Pool

Instrumentation Orders, and Emergency Preparedness

Communication/Staffing/Multi-Unit Dose Assessment Plans

Inspectors: Ryan D. Alexander, Team Lead, Sr. Project Engineer, Region IV

Eduardo Uribe, Reactor Inspector, Region IV

Daniel Bradley, Sr. Resident Inspector, Callaway Plant

Gregory Kolcum, Sr. Resident Inspector, Columbia Generating

Station

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or electronic

format (use of the Certrec IMS information portal is preferred), to the attention of Ryan

Alexander, by May 18, 2018. Additionally, a copy of any material physically sent to the Region

IV office (e.g., CD/DVDs) should also be delivered to the resident inspectors office at Columbia

Generating Station. The inspectors will select specific items from the information requested

below and then request from your staff additional documents needed during the onsite

inspection week. Also, we request that you categorize the documents in your response with the

numbered list below. Please provide requested documentation electronically if possible. If

requested documents are large and only hard copy formats are available, please inform the lead

inspector, and provide subject documentation during the first day of the onsite inspection. If you

have any questions regarding this information request, please call the lead inspector as soon as

possible.

TI 2515/191 - Appendix A

A. Provide current revision of the FLEX Final Integrated Plan (i.e., current FLEX Program

Document), including any revisions since August 2017 submission to the NRC.

B. Provide the FLEX Strategy Basis Document.

C. Provide each operating, off-normal, abnormal, and/or emergency procedures where entry

into one or more FLEX Support Guidelines are initiated.

D. Provide a list and copies of every FLEX Support Guideline (FSG) or equivalent procedure

which you developed or revised to implement your mitigating strategies.

E. Provide a list of key pieces of equipment that directly perform a FLEX mitigation strategy for

core cooling, containment, and/or spent fuel pool cooling.

F. Provide a listing/summaries of plant modifications completed related to the FLEX program.

G. Provide a listing of calculations, evaluations, and 50.59 reviews related to the FLEX program

and modifications.

H. Applicable site specific hazards for the Columbia Generating Station:

1) Provide documents which show the locations and configuration of structure(s) which

store FLEX equipment.

2) Seismic

(a) Provide evaluation/evidence as to how FLEX equipment is stored to meet (i) the

stations seismic design basis (e.g., in an existing safety-related structure); (ii) in a

structure that meets the design requirements as described in ASCE 7-10, Minimum

Design Loads for Buildings and Other Structures, with a Building Risk Category of

IV; OR (iii) Outside a structure and evaluated for seismic interactions to ensure

equipment is not damaged by non-seismically robust components or structures.

(b) Provide the travel route(s) for FLEX equipment from storage location(s) to their

location(s) of use, AND evaluation(s) which demonstrate that for the potential for soil

liquefaction is not of a concern for these travel route(s).

(c) Seismic concerns for water source(s)

(1) If the FLEX water sources are seismically robust, then provide the assessment

that shows that they are.

(2) If the FLEX water sources are not seismically robust, then provide:

(a) an assessment of alternate water sources, and

(b) the procedure(s) which describe when and how to access those sources.

3) External Flooding {CGS screened-out relative to design basis external flooding hazard}

No documents requested.

4) Severe storms with high winds {CGS screened-out relative to high winds hazard}

No documents requested.

5) Snow, Ice, and Extreme Cold

For each key piece of equipment described in Item E (above) that directly performs or

implements a FLEX mitigation strategy:

(a) Provide procedures/documents demonstrating how the FLEX equipment is

maintained at a temperature within a range to ensure that it will function when called

upon.

(b) Proved procedures/documents demonstrating how the FLEX equipment can be

moved from the storage location to its deployment location during extreme snowfall

and ice storms.

6) Extreme high temperatures

For each key piece of equipment described in Item E (above) that directly performs or

implements a FLEX mitigation strategy:

(a) Provide procedures/documents which describes the high-temperature limit of the

range within which the equipment will function.

(b) Provide procedures/documents which describe how the equipment is maintained

below that limit in its storage location.

2

7) Volcanic Ash

For each key piece of equipment described in Item E (above) that directly performs or

implements a FLEX mitigation strategy:

(a) Provide procedures/documents which describe how the equipment is

stored/protected from the volcanic ash fall hazard applicable to the station.

(b) Provide procedures/documents which describe how the equipment has been

evaluated to ensure manual actions required by plant personnel can be

accomplished during volcanic ash fall conditions.

(c) Provide procedures/documents which describe how the equipment is maintained

functional when providing their FLEX functions during volcanic ash fall conditions.

I. Provide the station-specific FLEX strategies time validation study(ies).

J. Provide the relevant station procedure(s)/guideline(s) which describe the testing and

maintenance program for FLEX equipment.

1) As applicable, also provide a listing of the model work orders established to conduct

period testing and maintenance activities for FLEX equipment.

NOTE - A sample of records for completed maintenance/testing activities will be

requested for review during the onsite inspection week.

K. Provide documents/procedures which describe the programmatic controls in place to ensure

that if equipment and applicable connections are unavailable (e.g., due to maintenance,

non-functionality), then compensatory measures are implemented in accordance with

guidance outlined NEI 12-06.

L. Provide the station-specific National SAFER Center Playbook

M. Relative to personnel training on FLEX strategies, provide:

1) FLEX training bases document(s)

2) Lesson plans/training documents for site emergency response leaders responsible for

the implementation of FLEX strategies.

NOTE - Records for staff completing this training may be requested for review during

the onsite inspection week.

3) Lesson plans/training documents for site personnel responsible for the execution of

mitigating strategies for BDBEEs (i.e., operators, craft personnel, security, radiation

protection, etc.).

NOTE - Records for staff completing this training may be requested for review during

the onsite inspection week.

N. A current copy of administrative procedure(s) for the Corrective Action Program,

modification program, operations procedure writing and implementation, and top-level

documents for the work control and work scheduling programs. (If FLEX related procedures

such as FSGs or the FIP/FLEX Program Document are maintained under a different

process, please include copies of those procedures.)

O. A current copy of the U/FSAR, Technical Specifications, and Technical Specification Bases

documents.

P. Listing of corrective action program document summaries generated related to FLEX

equipment, strategies, procedures, and/or training.

NOTE - Complete corrective action program documents for a selection of those included

in the summary will be requested for review during the onsite inspection week.

3

Q. A copy of any audits/self-assessments related to your preparation for this inspection, as well

as any related to the implementation or maintenance of the FLEX program.

TI 2515/191 - Appendix B

R. Provide the procedures implemented for maintenance, testing, calibration, and use of the

primary and backup Spent Fuel Pool (SFP) instrumentation channels.

S. Provide lesson plans/training documents which describe the training program that address

the use, maintenance, calibration, surveillance, and the use of alternate power to the

primary and backup SFP instrument channels.

TI 2515/191 - Appendix C

T. Communications:

1) Provide documents which show that the communications system(s), technologies,

equipment and power supplies would be available from the beginning of the event and

operate during an ELAP.

2) Provide the procedures and/or guidance used to implement the communication

capabilities.

3) Provide documents which show that you have added any new communications

equipment, portable power supplies and/or systems have been added to ongoing testing

and preventative maintenance programs.

U. Staffing:

1) Provide documents which show that onsite and augmented staff will be available to

implement the strategies in response to a large scale natural event that results an ELAP

and impedes access to the site, and that functions/tasks have been appropriately

staffed.

2) Provide documents which show that the site access methods (e.g., roadways, navigable

bodies of water and dockage, airlift, etc.) expected to be available following the event

and available to the Emergency Response Organization (ERO) [as described in the

Phase 1 and 2 staffing assessments and NRC safety assessment].

3) Provide documents which show the testing, training, and drills/exercises performed by

the station to demonstrate the EROs ability to utilize the communications systems

and/or equipment.

V. Provide documents and procedures which show that your dose assessment

process/program is capable of analyzing concurrent radiological releases from all on-site

significant sources, including releases from spent fuel pools (i.e., multi-unit/multi-source

dose assessment capability).

Lead Inspector Contact Information:

Ryan D. Alexander, Sr. Project Engineer Mailing Address:

817-200-1195 U.S. NRC, Region IV

Ryan.Alexander@nrc.gov Attn: Ryan Alexander, DRP

1600 East Lamar Blvd.

Arlington, TX 76011-4511

4

ML18088A015

SUNSI Review ADAMS: Sensitive Non-Publicly Available Keyword

By: MHS/dll/rdr Yes No Non-Sensitive Publicly Available NRC-002

OFFICE DRP/RPBA C:DRP/RPBA

NAME RAlexander MHaire

SIGNATURE /RA/ /RA CNewport Acting for/

DATE 03/22/2018 03/29/2018