ML16006A042: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(10 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML16006A042 | | number = ML16006A042 | ||
| issue date = 01/07/2016 | | issue date = 01/07/2016 | ||
| title = | | title = Summary of Pre-Application Meeting with NextEra Energy Duane Arnold, LLC, for Duane Arnold Spent Fuel Criticality Analyses | ||
| author name = Chawla M | | author name = Chawla M | ||
| author affiliation = NRC/NRR/DORL/LPLIII-1 | | author affiliation = NRC/NRR/DORL/LPLIII-1 | ||
| addressee name = | | addressee name = | ||
Line 9: | Line 9: | ||
| docket = 05000331 | | docket = 05000331 | ||
| license number = DPR-049 | | license number = DPR-049 | ||
| contact person = Chawla M | | contact person = Chawla M | ||
| case reference number = CAC MF6998 | | case reference number = CAC MF6998 | ||
| document type = Meeting Summary | | document type = Meeting Summary | ||
| page count = 4 | | page count = 4 | ||
| project = CAC:MF6998 | | project = CAC:MF6998 | ||
| stage = | | stage = Meeting | ||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:LICENSEE: NEXTERA ENERGY DUANE ARNOLD, LLC FACILITY: DUANE ARNOLD ENERGY CENTER SUBJECT: SUMMARY OF DECEMBER 10, 2015, PRE-APPLICATION MEETING WITH NEXTERA ENERGY DUANE ARNOLD, LLC, FOR DUANE ARNOLD SPENT FUEL CRITICALITY ANALYSES (CAC NO. MF6998) On December 10, 2015, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of NextEra Energy Duane Arnold, LLC (NEE) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss Spent Fuel Pool (SFP) criticality analyses for Duane Arnold Energy Center (DAEC). The meeting notice and agenda, dated October 26, 2015, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. | {{#Wiki_filter:LICENSEE: NEXTERA ENERGY DUANE ARNOLD, LLC FACILITY: DUANE ARNOLD ENERGY CENTER | ||
==SUBJECT:== | |||
==SUMMARY== | |||
OF DECEMBER 10, 2015, PRE-APPLICATION MEETING WITH NEXTERA ENERGY DUANE ARNOLD, LLC, FOR DUANE ARNOLD SPENT FUEL CRITICALITY ANALYSES (CAC NO. MF6998) | |||
On December 10, 2015, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of NextEra Energy Duane Arnold, LLC (NEE) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. | |||
The purpose of the meeting was to discuss Spent Fuel Pool (SFP) criticality analyses for Duane Arnold Energy Center (DAEC). The meeting notice and agenda, dated October 26, 2015, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML15336A598. A list of attendees is provided as Enclosure 1. | |||
The licensee presented information (See ADAMS Accession No. ML15335A322). The licensee discussed a potential DAEC license amendment request (LAR) to change its SFP storage requirements. DAEC is preparing a SFP storage license amendment because 2013 in situ measurements of the boron-10 (1°B) areal density of one of its SFP storage designs indicate the 10 B areal density is below that modeled in its analysis of record for some portions of the SFP. | |||
The DAEC presentation included the following aspects: | |||
* Two different SFP storage rack designs, | * Two different SFP storage rack designs, | ||
* The intention to reanalyze both SFP storage rack designs, | * The intention to reanalyze both SFP storage rack designs, | ||
Line 24: | Line 33: | ||
* Plans for the analysis to state that it will follow the guidance in interim staff guidance DSS-ISG-2010-01. | * Plans for the analysis to state that it will follow the guidance in interim staff guidance DSS-ISG-2010-01. | ||
* Schedule for submitting the LAR. | * Schedule for submitting the LAR. | ||
* Suggested future meetings to promote an efficient review. The NRC staff provided feedback on the following items: | * Suggested future meetings to promote an efficient review. | ||
* Whether both SFP storage rack designs need to be reanalyzed as opposed to just the design with the | The NRC staff provided feedback on the following items: | ||
* Whether both SFP storage rack designs need to be reanalyzed as opposed to just the design with the 10 B areal density below that modeled in its analysis of record. | |||
* The potential for current industry and NRC research into SFP neutron-absorbing material degradation to affect the submittal. | * The potential for current industry and NRC research into SFP neutron-absorbing material degradation to affect the submittal. | ||
* Justification for the computer codes being used in the analysis. | * Justification for the computer codes being used in the analysis. | ||
* Review recent SFP storage license amendments for potential lessons to be learned and to identify any aspects of the DAEC that might be new and unique. | * Review recent SFP storage license amendments for potential lessons to be learned and to identify any aspects of the DAEC that might be new and unique. | ||
The meeting concluded with both DAEC and NRC staff stating a desire to maximize efficiency in the preparation and review of the submittal. DAEC agreed to consider the NRC feedback. Both DAEC and NRC staff agreed to continue the communication started at this meeting. To that end DAEC proposed a teleconference in early January 2016 to provide an update to its plans. | |||
}} | No regulatory decisions were made at this meeting. | ||
Members of the public were not in attendance. Public Meeting Feedback forms were provided but not requested by anyone. | |||
Please direct any inquiries to me at 301-415-8371, or Mahesh.Chawla@nrc.gov. | |||
~4f'/1f-Mahesh Chawla, Project Manager Plant Licensing Branch LPL 3-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-331 | |||
==Enclosure:== | |||
List of Attendees cc: Distribution via Listserv | |||
LIST OF ATTENDEES DECEMBER 10. 2015. PRE-APPLICATION MEETING WITH NEXTERA ENERGY DUANE ARNOLD. LLC REGARDING DUANE ARNOLD ENERGY CENTER SFP CRITICALITY ANALYSES NAME ORGANIZATION NUCLEAR REGULATORY COMMISSION Mahesh Chawla NRC/NRR/DORL/LPL3-1 1 Kent Wood NRC/NRR/DSS/SRXB2 Scott Krepel NRC/NRR/DSS/SRXB2 Matt Yoder (via phone) NRC/NRR/DE/ESGB3 Aloysius Obodoako NRC/NRR/DE/ESGB 3 Khadijah West NRC/NRR/DSS/STSB4 NEXTERA ENERGY DUANE ARNOLD, LLC William Cross ReQulatorv ProQrams ManaQer Emilio Fuentes Fuel Manager Courtney Thomas Fuel ManaQer 1 Office of Nuclear Reactor Regulation, Division of Operating Reactor Licensing, LPL3-1 2 Office of Nuclear Reactor Regulation, Division of Safety Systems, Reactor Systems Branch 3 Office of Nuclear Reactor Regulation, Division of Engineering, Steam Generator Tube Integrity and Chemical Engineering Branch 4 Office of Nuclear Reactor Regulation, Division of Safety Systems, Technical Specifications Branch Enclosure | |||
Meeting Notice: ML15336A598 Meeting Summary: ML16006A042 Handouts: ML15335A322 *via email OFFICE NRR/DORL/LPLlll-1/PM NRR/DORL/LPLlll-1/LA NRR/DSS/SRXB/BC (A) NRR/DE/ESGB/BC NAME MChawla MHenderson EOesterle* GKulesa* | |||
DATE 1/06/2016 1/06/2016 1/05/2016 12/24/2015 OFFICE NRR/DSS/STSB/BC NRR/DORL/LPLlll-1/BC NRR/DORL/LPLlll-1/PM NAME RElliott* DPelton MChawla DATE 1/05/2016 1/07/2016 1/07/2016}} |
Latest revision as of 19:09, 4 December 2019
ML16006A042 | |
Person / Time | |
---|---|
Site: | Duane Arnold |
Issue date: | 01/07/2016 |
From: | Mahesh Chawla Plant Licensing Branch III |
To: | |
Chawla M | |
References | |
CAC MF6998 | |
Download: ML16006A042 (4) | |
Text
LICENSEE: NEXTERA ENERGY DUANE ARNOLD, LLC FACILITY: DUANE ARNOLD ENERGY CENTER
SUBJECT:
SUMMARY
OF DECEMBER 10, 2015, PRE-APPLICATION MEETING WITH NEXTERA ENERGY DUANE ARNOLD, LLC, FOR DUANE ARNOLD SPENT FUEL CRITICALITY ANALYSES (CAC NO. MF6998)
On December 10, 2015, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of NextEra Energy Duane Arnold, LLC (NEE) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland.
The purpose of the meeting was to discuss Spent Fuel Pool (SFP) criticality analyses for Duane Arnold Energy Center (DAEC). The meeting notice and agenda, dated October 26, 2015, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML15336A598. A list of attendees is provided as Enclosure 1.
The licensee presented information (See ADAMS Accession No. ML15335A322). The licensee discussed a potential DAEC license amendment request (LAR) to change its SFP storage requirements. DAEC is preparing a SFP storage license amendment because 2013 in situ measurements of the boron-10 (1°B) areal density of one of its SFP storage designs indicate the 10 B areal density is below that modeled in its analysis of record for some portions of the SFP.
The DAEC presentation included the following aspects:
- Two different SFP storage rack designs,
- The intention to reanalyze both SFP storage rack designs,
- Current DEAC technical specifications and anticipated changes for the SFP and eliminating the new fuel storage vault as an option.
- Plans for the analysis to state that it will follow the guidance in interim staff guidance DSS-ISG-2010-01.
- Schedule for submitting the LAR.
- Suggested future meetings to promote an efficient review.
The NRC staff provided feedback on the following items:
- Whether both SFP storage rack designs need to be reanalyzed as opposed to just the design with the 10 B areal density below that modeled in its analysis of record.
- The potential for current industry and NRC research into SFP neutron-absorbing material degradation to affect the submittal.
- Justification for the computer codes being used in the analysis.
- Review recent SFP storage license amendments for potential lessons to be learned and to identify any aspects of the DAEC that might be new and unique.
The meeting concluded with both DAEC and NRC staff stating a desire to maximize efficiency in the preparation and review of the submittal. DAEC agreed to consider the NRC feedback. Both DAEC and NRC staff agreed to continue the communication started at this meeting. To that end DAEC proposed a teleconference in early January 2016 to provide an update to its plans.
No regulatory decisions were made at this meeting.
Members of the public were not in attendance. Public Meeting Feedback forms were provided but not requested by anyone.
Please direct any inquiries to me at 301-415-8371, or Mahesh.Chawla@nrc.gov.
~4f'/1f-Mahesh Chawla, Project Manager Plant Licensing Branch LPL 3-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-331
Enclosure:
List of Attendees cc: Distribution via Listserv
LIST OF ATTENDEES DECEMBER 10. 2015. PRE-APPLICATION MEETING WITH NEXTERA ENERGY DUANE ARNOLD. LLC REGARDING DUANE ARNOLD ENERGY CENTER SFP CRITICALITY ANALYSES NAME ORGANIZATION NUCLEAR REGULATORY COMMISSION Mahesh Chawla NRC/NRR/DORL/LPL3-1 1 Kent Wood NRC/NRR/DSS/SRXB2 Scott Krepel NRC/NRR/DSS/SRXB2 Matt Yoder (via phone) NRC/NRR/DE/ESGB3 Aloysius Obodoako NRC/NRR/DE/ESGB 3 Khadijah West NRC/NRR/DSS/STSB4 NEXTERA ENERGY DUANE ARNOLD, LLC William Cross ReQulatorv ProQrams ManaQer Emilio Fuentes Fuel Manager Courtney Thomas Fuel ManaQer 1 Office of Nuclear Reactor Regulation, Division of Operating Reactor Licensing, LPL3-1 2 Office of Nuclear Reactor Regulation, Division of Safety Systems, Reactor Systems Branch 3 Office of Nuclear Reactor Regulation, Division of Engineering, Steam Generator Tube Integrity and Chemical Engineering Branch 4 Office of Nuclear Reactor Regulation, Division of Safety Systems, Technical Specifications Branch Enclosure
Meeting Notice: ML15336A598 Meeting Summary: ML16006A042 Handouts: ML15335A322 *via email OFFICE NRR/DORL/LPLlll-1/PM NRR/DORL/LPLlll-1/LA NRR/DSS/SRXB/BC (A) NRR/DE/ESGB/BC NAME MChawla MHenderson EOesterle* GKulesa*
DATE 1/06/2016 1/06/2016 1/05/2016 12/24/2015 OFFICE NRR/DSS/STSB/BC NRR/DORL/LPLlll-1/BC NRR/DORL/LPLlll-1/PM NAME RElliott* DPelton MChawla DATE 1/05/2016 1/07/2016 1/07/2016