ML12157A287: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 06/11/2012
| issue date = 06/11/2012
| title = Environmental Project Manager Change for the License Renewal License Renewal Review for Indian Point Nuclear Generating, Units 2 and 3 (TAC MD5411 and MD5412)
| title = Environmental Project Manager Change for the License Renewal License Renewal Review for Indian Point Nuclear Generating, Units 2 and 3 (TAC MD5411 and MD5412)
| author name = Wrona D J
| author name = Wrona D
| author affiliation = NRC/NRR/DLR/RPB2
| author affiliation = NRC/NRR/DLR/RPB2
| addressee name =  
| addressee name =  
Line 13: Line 13:
| document type = Letter
| document type = Letter
| page count = 3
| page count = 3
| project = TAC:MD5411, TAC:ME5412
| stage = Other
}}
}}
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 11,2012 Vice President, Operations Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249
==SUBJECT:==
ENVIRONMENTAL PROJECT MANAGER CHANGE FOR THE LICENSE RENEWAL REVIEW FOR INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 (TAC NOS. MD5411 AND MD5412)
==Dear Sir or Madam:==
This letter provides notification of a change to the Environmental Project Manager assigned to the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Project. Effective immediately, Mr. Michael Wentzel will be the Environmental Project Manager for Indian Point Nuclear Generating Unit Nos. 2 and 3.
Mr. Wentzel can be reached by telephone at 301-415-6459 or bye-mail at Michael.Wentzel@nrc.gov.
Sincerely, OJ 1 v~
David J. Wrona, Chief Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286 cc: Listserv
ML OFFICE            LA: DLR/RPB2        PM: DLR/RAPB PM: DLR/RPB2            BC: DLR/RPB2 NAME              IKing              KGreen            MWentzel          DWrona DATE              6/8/2012            6/8/2012          6/11/2012        6/11/2012
Letter to Vice President from David J. Wrona dated June 11, 2012
==SUBJECT:==
ENVIRONMENTAL PROJECT MANAGER CHANGE FOR THE LICENSE RENEWAL PROJECT FOR INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 (TAC NOS. MD5411 AND MD5412)
DISTRIBUTION:
E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDraAfpb Resource RidsOgcMailCenter Resource DWrona                    GMeyer, RI KGreen                    RConte, RI RAuluck                  DScrenci, RI OPA MKowal                    NSheehan, RI OPA DJackson, RI              PCataldo, RI STurk,OGC                NMcNamara, RI SBurnell, OPA            BWelling, RI DMclntyre, OPA            OAyegbusi, RI EDacus,OCA                MCatts, RI RKuntz                    MHalter, RI}}

Latest revision as of 03:50, 12 November 2019

Environmental Project Manager Change for the License Renewal License Renewal Review for Indian Point Nuclear Generating, Units 2 and 3 (TAC MD5411 and MD5412)
ML12157A287
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 06/11/2012
From: David Wrona
License Renewal Projects Branch 2
To:
Entergy Nuclear Operations
Wentzel M, 415-6459
References
TAC MD5411, TAC ME5412
Download: ML12157A287 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 11,2012 Vice President, Operations Entergy Nuclear Operations, Inc.

Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249

SUBJECT:

ENVIRONMENTAL PROJECT MANAGER CHANGE FOR THE LICENSE RENEWAL REVIEW FOR INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 (TAC NOS. MD5411 AND MD5412)

Dear Sir or Madam:

This letter provides notification of a change to the Environmental Project Manager assigned to the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Project. Effective immediately, Mr. Michael Wentzel will be the Environmental Project Manager for Indian Point Nuclear Generating Unit Nos. 2 and 3.

Mr. Wentzel can be reached by telephone at 301-415-6459 or bye-mail at Michael.Wentzel@nrc.gov.

Sincerely, OJ 1 v~

David J. Wrona, Chief Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286 cc: Listserv

ML OFFICE LA: DLR/RPB2 PM: DLR/RAPB PM: DLR/RPB2 BC: DLR/RPB2 NAME IKing KGreen MWentzel DWrona DATE 6/8/2012 6/8/2012 6/11/2012 6/11/2012

Letter to Vice President from David J. Wrona dated June 11, 2012

SUBJECT:

ENVIRONMENTAL PROJECT MANAGER CHANGE FOR THE LICENSE RENEWAL PROJECT FOR INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 (TAC NOS. MD5411 AND MD5412)

DISTRIBUTION:

E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDraAfpb Resource RidsOgcMailCenter Resource DWrona GMeyer, RI KGreen RConte, RI RAuluck DScrenci, RI OPA MKowal NSheehan, RI OPA DJackson, RI PCataldo, RI STurk,OGC NMcNamara, RI SBurnell, OPA BWelling, RI DMclntyre, OPA OAyegbusi, RI EDacus,OCA MCatts, RI RKuntz MHalter, RI