ML16111A889: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(6 intermediate revisions by the same user not shown) | |||
Line 9: | Line 9: | ||
| docket = 05000293 | | docket = 05000293 | ||
| license number = | | license number = | ||
| contact person = Burritt A | | contact person = Burritt A | ||
| document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs | | document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs | ||
| page count = 13 | | page count = 13 | ||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:Review of 2015 Performance at Pilgrim Nuclear Power Station Annual Assessment Meeting April 13, 2016 ML16111A889 | |||
Agenda | |||
* Introduction | |||
* Discussion of NRC Oversight Results | |||
* Entergy Response and Remarks | |||
* NRC Closing Remarks | |||
* Break | |||
* Public Q&A | |||
Robust NRC Oversight | |||
* Licensee performance, characterized by a weak corrective action program, placed plant in Column 4 of the Action Matrix | |||
* Ongoing NRC oversight to ensure safety margins maintained | |||
* Current regulatory actions are adequate | |||
Pilgrim Performance Problems | |||
* Degraded Cornerstone Column (since 4th Quarter 2013) | |||
* Two White Performance Indicators (PIs): Unplanned Scrams, Unplanned Scrams with Complications | |||
* Two White Parallel Findings: | |||
o Inadequate corrective actions for the two White PIs o Did not meet Inspection Procedure 95002 Objectives o Remained in the Degraded Cornerstone column for more than five quarters | |||
Pilgrim Performance Problems | |||
* White Finding in September 2015 for not identifying and correcting a safety relief valve failure | |||
* White Finding combined with performance within the Degraded Cornerstone for more than five quarters | |||
* Led to Pilgrim performance transition to Column 4 | |||
NRC Oversight Actions Are Comprehensive | |||
* Ensure adequate safety margins maintained | |||
* Completed Inspection Procedure (IP) 95003 Phases A & B to ensure: | |||
o significant issues in corrective action program (CAP) appropriately addressed o interim licensee actions arresting CAP performance declines | |||
* Increased Problem Identification and Resolution samples on previously identified performance issues | |||
NRC Oversight Actions Are Comprehensive | |||
* Additional Resident Inspector was assigned to site | |||
* Quarterly Assessments - increased management oversight | |||
* Current regulatory actions are adequate | |||
Key Inspections & Milestones 3/4: annual 9/01: MC 12/01: assessment 4/13: annual letter/final security 2/11: 4Q15 letters assessment White report issued report issued issued meeting 11/12: 3Q 12/21: FP 2/29: Phase A 4/4-4/8: 5/2-5/20: | |||
report issued triennial issued Phase B Mods Team report issued inspection 4Q2015 January 11-15, 2016 1Q2016 TBD C | |||
PI&R Samples Phase A PI&R Sample IP 92723 COMPLETE COMPLETE Security baseline Report Issue 12/11 Report Issue 2/29 Four SL IV violations Three operations- follow-up Snapshot of (impeding regulatory focused (complete) process) corrective action Adverse weather preps (resident inspectors) program performance April 4-8, 2016 April 2016 May 2-20, 2016 TBD Phase B Public Meeting Mods Team Phase C Six-month review of IP 95003 items not Baseline triennial the corrective action 95003 update modification team already covered in program to determine Annual assessment inspection Phases A and B improvement progress meeting Safety culture assessment | |||
Future Action to Monitor Pilgrim | |||
* Supplemental IP 95003 Phase C o Most significant Phase of 95003 o Primary Focus - CAP and Safety Culture o Conducted after licensee declares readiness o Ensures causes understood & plan to address o Confirmatory Action Letter (CAL) | |||
* CAL Follow-up inspection | |||
Licensee Response and Remarks Mr. John Dent Site Vice President Entergy Nuclear Operations, Inc. | |||
Pilgrim Annual Assessment Meeting NRC Closing Remarks | |||
Contacting the NRC | |||
* Report a safety concern | |||
- (800) 695-7403 | |||
- Allegation@nrc.gov | |||
* General information or questions | |||
- www.nrc.gov | |||
- Select What We Do for Public Affairs | |||
Reference Sources | |||
* Reactor Oversight Process | |||
- www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.h tml Pilgrim Special Oversight Website: | |||
- www.nrc.gov/info-finder/reactors/pilg/special-oversight.html | |||
* Public Electronic Reading Room | |||
- www.nrc.gov/reading-rm.html | |||
* Public Document Room | |||
- 800-397-4209 | |||
Review of 2015 Performance at Pilgrim Nuclear Power Station Annual Assessment Meeting April 13, 2016 ML16111A889 | |||
Agenda | |||
* Introduction | |||
* Discussion of NRC Oversight Results | |||
* Entergy Response and Remarks | |||
* NRC Closing Remarks | |||
* Break | |||
* Public Q&A | |||
Robust NRC Oversight | |||
* Licensee performance, characterized by a weak corrective action program, placed plant in Column 4 of the Action Matrix | |||
* Ongoing NRC oversight to ensure safety margins maintained | |||
* Current regulatory actions are adequate | |||
Pilgrim Performance Problems | |||
* Degraded Cornerstone Column (since 4th Quarter 2013) | |||
* Two White Performance Indicators (PIs): Unplanned Scrams, Unplanned Scrams with Complications | |||
* Two White Parallel Findings: | |||
o Inadequate corrective actions for the two White PIs o Did not meet Inspection Procedure 95002 Objectives o Remained in the Degraded Cornerstone column for more than five quarters | |||
Pilgrim Performance Problems | |||
* White Finding in September 2015 for not identifying and correcting a safety relief valve failure | |||
* White Finding combined with performance within the Degraded Cornerstone for more than five quarters | |||
* Led to Pilgrim performance transition to Column 4 | |||
NRC Oversight Actions Are Comprehensive | |||
* Ensure adequate safety margins maintained | |||
* Completed Inspection Procedure (IP) 95003 Phases A & B to ensure: | |||
o significant issues in corrective action program (CAP) appropriately addressed o interim licensee actions arresting CAP performance declines | |||
* Increased Problem Identification and Resolution samples on previously identified performance issues | |||
NRC Oversight Actions Are Comprehensive | |||
* Additional Resident Inspector was assigned to site | |||
* Quarterly Assessments - increased management oversight | |||
* Current regulatory actions are adequate | |||
Key Inspections & Milestones 3/4: annual 9/01: MC 12/01: assessment 4/13: annual letter/final security 2/11: 4Q15 letters assessment White report issued report issued issued meeting 11/12: 3Q 12/21: FP 2/29: Phase A 4/4-4/8: 5/2-5/20: | |||
report issued triennial issued Phase B Mods Team report issued inspection 4Q2015 January 11-15, 2016 1Q2016 TBD C | |||
PI&R Samples Phase A PI&R Sample IP 92723 COMPLETE COMPLETE Security baseline Report Issue 12/11 Report Issue 2/29 Four SL IV violations Three operations- follow-up Snapshot of (impeding regulatory focused (complete) process) corrective action Adverse weather preps (resident inspectors) program performance April 4-8, 2016 April 2016 May 2-20, 2016 TBD Phase B Public Meeting Mods Team Phase C Six-month review of IP 95003 items not Baseline triennial the corrective action 95003 update modification team already covered in program to determine Annual assessment inspection Phases A and B improvement progress meeting Safety culture assessment | |||
Future Action to Monitor Pilgrim | |||
* Supplemental IP 95003 Phase C o Most significant Phase of 95003 o Primary Focus - CAP and Safety Culture o Conducted after licensee declares readiness o Ensures causes understood & plan to address o Confirmatory Action Letter (CAL) | |||
* CAL Follow-up inspection | |||
Licensee Response and Remarks Mr. John Dent Site Vice President Entergy Nuclear Operations, Inc. | |||
Pilgrim Annual Assessment Meeting NRC Closing Remarks | |||
Contacting the NRC | |||
* Report a safety concern | |||
- (800) 695-7403 | |||
- Allegation@nrc.gov | |||
* General information or questions | |||
- www.nrc.gov | |||
- Select What We Do for Public Affairs | |||
Reference Sources | |||
* Reactor Oversight Process | |||
- www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.h tml Pilgrim Special Oversight Website: | |||
- www.nrc.gov/info-finder/reactors/pilg/special-oversight.html | |||
* Public Electronic Reading Room | |||
- www.nrc.gov/reading-rm.html | |||
* Public Document Room | |||
- 800-397-4209}} |
Latest revision as of 20:51, 30 October 2019
ML16111A889 | |
Person / Time | |
---|---|
Site: | Pilgrim |
Issue date: | 04/13/2016 |
From: | NRC/RGN-I/DRP/PB5 |
To: | |
Burritt A | |
References | |
Download: ML16111A889 (13) | |
Text
Review of 2015 Performance at Pilgrim Nuclear Power Station Annual Assessment Meeting April 13, 2016 ML16111A889
Agenda
- Introduction
- Discussion of NRC Oversight Results
- Entergy Response and Remarks
- NRC Closing Remarks
- Break
- Public Q&A
Robust NRC Oversight
- Licensee performance, characterized by a weak corrective action program, placed plant in Column 4 of the Action Matrix
- Ongoing NRC oversight to ensure safety margins maintained
- Current regulatory actions are adequate
Pilgrim Performance Problems
- Degraded Cornerstone Column (since 4th Quarter 2013)
- Two White Parallel Findings:
o Inadequate corrective actions for the two White PIs o Did not meet Inspection Procedure 95002 Objectives o Remained in the Degraded Cornerstone column for more than five quarters
Pilgrim Performance Problems
- White Finding in September 2015 for not identifying and correcting a safety relief valve failure
- White Finding combined with performance within the Degraded Cornerstone for more than five quarters
- Led to Pilgrim performance transition to Column 4
NRC Oversight Actions Are Comprehensive
- Ensure adequate safety margins maintained
- Completed Inspection Procedure (IP) 95003 Phases A & B to ensure:
o significant issues in corrective action program (CAP) appropriately addressed o interim licensee actions arresting CAP performance declines
- Increased Problem Identification and Resolution samples on previously identified performance issues
NRC Oversight Actions Are Comprehensive
- Additional Resident Inspector was assigned to site
- Quarterly Assessments - increased management oversight
- Current regulatory actions are adequate
Key Inspections & Milestones 3/4: annual 9/01: MC 12/01: assessment 4/13: annual letter/final security 2/11: 4Q15 letters assessment White report issued report issued issued meeting 11/12: 3Q 12/21: FP 2/29: Phase A 4/4-4/8: 5/2-5/20:
report issued triennial issued Phase B Mods Team report issued inspection 4Q2015 January 11-15, 2016 1Q2016 TBD C
PI&R Samples Phase A PI&R Sample IP 92723 COMPLETE COMPLETE Security baseline Report Issue 12/11 Report Issue 2/29 Four SL IV violations Three operations- follow-up Snapshot of (impeding regulatory focused (complete) process) corrective action Adverse weather preps (resident inspectors) program performance April 4-8, 2016 April 2016 May 2-20, 2016 TBD Phase B Public Meeting Mods Team Phase C Six-month review of IP 95003 items not Baseline triennial the corrective action 95003 update modification team already covered in program to determine Annual assessment inspection Phases A and B improvement progress meeting Safety culture assessment
Future Action to Monitor Pilgrim
- Supplemental IP 95003 Phase C o Most significant Phase of 95003 o Primary Focus - CAP and Safety Culture o Conducted after licensee declares readiness o Ensures causes understood & plan to address o Confirmatory Action Letter (CAL)
- CAL Follow-up inspection
Licensee Response and Remarks Mr. John Dent Site Vice President Entergy Nuclear Operations, Inc.
Pilgrim Annual Assessment Meeting NRC Closing Remarks
Contacting the NRC
- Report a safety concern
- (800) 695-7403
- Allegation@nrc.gov
- General information or questions
- www.nrc.gov
- Select What We Do for Public Affairs
Reference Sources
- Reactor Oversight Process
- www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.h tml Pilgrim Special Oversight Website:
- www.nrc.gov/info-finder/reactors/pilg/special-oversight.html
- Public Electronic Reading Room
- www.nrc.gov/reading-rm.html
- Public Document Room
- 800-397-4209
Review of 2015 Performance at Pilgrim Nuclear Power Station Annual Assessment Meeting April 13, 2016 ML16111A889
Agenda
- Introduction
- Discussion of NRC Oversight Results
- Entergy Response and Remarks
- NRC Closing Remarks
- Break
- Public Q&A
Robust NRC Oversight
- Licensee performance, characterized by a weak corrective action program, placed plant in Column 4 of the Action Matrix
- Ongoing NRC oversight to ensure safety margins maintained
- Current regulatory actions are adequate
Pilgrim Performance Problems
- Degraded Cornerstone Column (since 4th Quarter 2013)
- Two White Parallel Findings:
o Inadequate corrective actions for the two White PIs o Did not meet Inspection Procedure 95002 Objectives o Remained in the Degraded Cornerstone column for more than five quarters
Pilgrim Performance Problems
- White Finding in September 2015 for not identifying and correcting a safety relief valve failure
- White Finding combined with performance within the Degraded Cornerstone for more than five quarters
- Led to Pilgrim performance transition to Column 4
NRC Oversight Actions Are Comprehensive
- Ensure adequate safety margins maintained
- Completed Inspection Procedure (IP) 95003 Phases A & B to ensure:
o significant issues in corrective action program (CAP) appropriately addressed o interim licensee actions arresting CAP performance declines
- Increased Problem Identification and Resolution samples on previously identified performance issues
NRC Oversight Actions Are Comprehensive
- Additional Resident Inspector was assigned to site
- Quarterly Assessments - increased management oversight
- Current regulatory actions are adequate
Key Inspections & Milestones 3/4: annual 9/01: MC 12/01: assessment 4/13: annual letter/final security 2/11: 4Q15 letters assessment White report issued report issued issued meeting 11/12: 3Q 12/21: FP 2/29: Phase A 4/4-4/8: 5/2-5/20:
report issued triennial issued Phase B Mods Team report issued inspection 4Q2015 January 11-15, 2016 1Q2016 TBD C
PI&R Samples Phase A PI&R Sample IP 92723 COMPLETE COMPLETE Security baseline Report Issue 12/11 Report Issue 2/29 Four SL IV violations Three operations- follow-up Snapshot of (impeding regulatory focused (complete) process) corrective action Adverse weather preps (resident inspectors) program performance April 4-8, 2016 April 2016 May 2-20, 2016 TBD Phase B Public Meeting Mods Team Phase C Six-month review of IP 95003 items not Baseline triennial the corrective action 95003 update modification team already covered in program to determine Annual assessment inspection Phases A and B improvement progress meeting Safety culture assessment
Future Action to Monitor Pilgrim
- Supplemental IP 95003 Phase C o Most significant Phase of 95003 o Primary Focus - CAP and Safety Culture o Conducted after licensee declares readiness o Ensures causes understood & plan to address o Confirmatory Action Letter (CAL)
- CAL Follow-up inspection
Licensee Response and Remarks Mr. John Dent Site Vice President Entergy Nuclear Operations, Inc.
Pilgrim Annual Assessment Meeting NRC Closing Remarks
Contacting the NRC
- Report a safety concern
- (800) 695-7403
- Allegation@nrc.gov
- General information or questions
- www.nrc.gov
- Select What We Do for Public Affairs
Reference Sources
- Reactor Oversight Process
- www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.h tml Pilgrim Special Oversight Website:
- www.nrc.gov/info-finder/reactors/pilg/special-oversight.html
- Public Electronic Reading Room
- www.nrc.gov/reading-rm.html
- Public Document Room
- 800-397-4209