ML16111A889: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 9: Line 9:
| docket = 05000293
| docket = 05000293
| license number =  
| license number =  
| contact person = Burritt A L
| contact person = Burritt A
| document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs
| document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs
| page count = 13
| page count = 13
| revision = 0
}}
}}
=Text=
{{#Wiki_filter:Review of 2015 Performance at Pilgrim Nuclear Power Station Annual Assessment Meeting April 13, 2016 ML16111A889
Agenda
* Introduction
* Discussion of NRC Oversight Results
* Entergy Response and Remarks
* NRC Closing Remarks
* Break
* Public Q&A
Robust NRC Oversight
* Licensee performance, characterized by a weak corrective action program, placed plant in Column 4 of the Action Matrix
* Ongoing NRC oversight to ensure safety margins maintained
* Current regulatory actions are adequate
Pilgrim Performance Problems
* Degraded Cornerstone Column (since 4th Quarter 2013)
* Two White Performance Indicators (PIs): Unplanned Scrams, Unplanned Scrams with Complications
* Two White Parallel Findings:
o Inadequate corrective actions for the two White PIs o Did not meet Inspection Procedure 95002 Objectives o Remained in the Degraded Cornerstone column for more than five quarters
Pilgrim Performance Problems
* White Finding in September 2015 for not identifying and correcting a safety relief valve failure
* White Finding combined with performance within the Degraded Cornerstone for more than five quarters
* Led to Pilgrim performance transition to Column 4
NRC Oversight Actions Are Comprehensive
* Ensure adequate safety margins maintained
* Completed Inspection Procedure (IP) 95003 Phases A & B to ensure:
o significant issues in corrective action program (CAP) appropriately addressed o interim licensee actions arresting CAP performance declines
* Increased Problem Identification and Resolution samples on previously identified performance issues
NRC Oversight Actions Are Comprehensive
* Additional Resident Inspector was assigned to site
* Quarterly Assessments - increased management oversight
* Current regulatory actions are adequate
Key Inspections & Milestones 3/4: annual 9/01: MC                                12/01:                                                        assessment                4/13: annual letter/final                            security                        2/11: 4Q15                        letters                assessment White                            report issued                    report issued                      issued                    meeting 11/12: 3Q                          12/21: FP                      2/29: Phase A                      4/4-4/8:                    5/2-5/20:
report issued                        triennial                          issued                        Phase B                    Mods Team report issued                                                      inspection 4Q2015                        January 11-15, 2016                            1Q2016                          TBD C
PI&R Samples                                Phase A                          PI&R Sample                        IP 92723 COMPLETE                                COMPLETE                          Security baseline Report Issue 12/11 Report Issue 2/29 Four SL IV violations Three operations-                                                              follow-up Snapshot of                                                          (impeding regulatory focused (complete)                                                                                            process) corrective action Adverse weather preps (resident inspectors) program performance April 4-8, 2016                            April 2016                        May 2-20, 2016                        TBD Phase B                            Public Meeting                          Mods Team                        Phase C Six-month review of                                                                                        IP 95003 items not Baseline triennial the corrective action                  95003 update                          modification team already covered in program to determine                  Annual assessment                    inspection Phases A and B improvement progress                    meeting                                                            Safety culture assessment
Future Action to Monitor Pilgrim
* Supplemental IP 95003 Phase C o Most significant Phase of 95003 o Primary Focus - CAP and Safety Culture o Conducted after licensee declares readiness o Ensures causes understood & plan to address o Confirmatory Action Letter (CAL)
* CAL Follow-up inspection
Licensee Response and Remarks Mr. John Dent Site Vice President Entergy Nuclear Operations, Inc.
Pilgrim Annual Assessment Meeting NRC Closing Remarks
Contacting the NRC
* Report a safety concern
  - (800) 695-7403
  - Allegation@nrc.gov
* General information or questions
  - www.nrc.gov
  - Select What We Do for Public Affairs
Reference Sources
* Reactor Oversight Process
  - www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.h tml Pilgrim Special Oversight Website:
  - www.nrc.gov/info-finder/reactors/pilg/special-oversight.html
* Public Electronic Reading Room
  - www.nrc.gov/reading-rm.html
* Public Document Room
  - 800-397-4209
Review of 2015 Performance at Pilgrim Nuclear Power Station Annual Assessment Meeting April 13, 2016 ML16111A889
Agenda
* Introduction
* Discussion of NRC Oversight Results
* Entergy Response and Remarks
* NRC Closing Remarks
* Break
* Public Q&A
Robust NRC Oversight
* Licensee performance, characterized by a weak corrective action program, placed plant in Column 4 of the Action Matrix
* Ongoing NRC oversight to ensure safety margins maintained
* Current regulatory actions are adequate
Pilgrim Performance Problems
* Degraded Cornerstone Column (since 4th Quarter 2013)
* Two White Performance Indicators (PIs): Unplanned Scrams, Unplanned Scrams with Complications
* Two White Parallel Findings:
o Inadequate corrective actions for the two White PIs o Did not meet Inspection Procedure 95002 Objectives o Remained in the Degraded Cornerstone column for more than five quarters
Pilgrim Performance Problems
* White Finding in September 2015 for not identifying and correcting a safety relief valve failure
* White Finding combined with performance within the Degraded Cornerstone for more than five quarters
* Led to Pilgrim performance transition to Column 4
NRC Oversight Actions Are Comprehensive
* Ensure adequate safety margins maintained
* Completed Inspection Procedure (IP) 95003 Phases A & B to ensure:
o significant issues in corrective action program (CAP) appropriately addressed o interim licensee actions arresting CAP performance declines
* Increased Problem Identification and Resolution samples on previously identified performance issues
NRC Oversight Actions Are Comprehensive
* Additional Resident Inspector was assigned to site
* Quarterly Assessments - increased management oversight
* Current regulatory actions are adequate
Key Inspections & Milestones 3/4: annual 9/01: MC                                12/01:                                                        assessment                4/13: annual letter/final                            security                        2/11: 4Q15                        letters                assessment White                            report issued                    report issued                      issued                    meeting 11/12: 3Q                          12/21: FP                      2/29: Phase A                      4/4-4/8:                    5/2-5/20:
report issued                        triennial                          issued                        Phase B                    Mods Team report issued                                                      inspection 4Q2015                        January 11-15, 2016                            1Q2016                          TBD C
PI&R Samples                                Phase A                          PI&R Sample                        IP 92723 COMPLETE                                COMPLETE                          Security baseline Report Issue 12/11 Report Issue 2/29 Four SL IV violations Three operations-                                                              follow-up Snapshot of                                                          (impeding regulatory focused (complete)                                                                                            process) corrective action Adverse weather preps (resident inspectors) program performance April 4-8, 2016                            April 2016                        May 2-20, 2016                        TBD Phase B                            Public Meeting                          Mods Team                        Phase C Six-month review of                                                                                        IP 95003 items not Baseline triennial the corrective action                  95003 update                          modification team already covered in program to determine                  Annual assessment                    inspection Phases A and B improvement progress                    meeting                                                            Safety culture assessment
Future Action to Monitor Pilgrim
* Supplemental IP 95003 Phase C o Most significant Phase of 95003 o Primary Focus - CAP and Safety Culture o Conducted after licensee declares readiness o Ensures causes understood & plan to address o Confirmatory Action Letter (CAL)
* CAL Follow-up inspection
Licensee Response and Remarks Mr. John Dent Site Vice President Entergy Nuclear Operations, Inc.
Pilgrim Annual Assessment Meeting NRC Closing Remarks
Contacting the NRC
* Report a safety concern
  - (800) 695-7403
  - Allegation@nrc.gov
* General information or questions
  - www.nrc.gov
  - Select What We Do for Public Affairs
Reference Sources
* Reactor Oversight Process
  - www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.h tml Pilgrim Special Oversight Website:
  - www.nrc.gov/info-finder/reactors/pilg/special-oversight.html
* Public Electronic Reading Room
  - www.nrc.gov/reading-rm.html
* Public Document Room
  - 800-397-4209}}

Latest revision as of 20:51, 30 October 2019

4/13/2016 - Pilgrim Nuclear Power Station Annual Assessment Meeting - NRC Presentation Slides
ML16111A889
Person / Time
Site: Pilgrim
Issue date: 04/13/2016
From:
NRC/RGN-I/DRP/PB5
To:
Burritt A
References
Download: ML16111A889 (13)


Text

Review of 2015 Performance at Pilgrim Nuclear Power Station Annual Assessment Meeting April 13, 2016 ML16111A889

Agenda

  • Introduction
  • Discussion of NRC Oversight Results
  • Entergy Response and Remarks
  • NRC Closing Remarks
  • Break
  • Public Q&A

Robust NRC Oversight

  • Licensee performance, characterized by a weak corrective action program, placed plant in Column 4 of the Action Matrix
  • Ongoing NRC oversight to ensure safety margins maintained
  • Current regulatory actions are adequate

Pilgrim Performance Problems

  • Degraded Cornerstone Column (since 4th Quarter 2013)
  • Two White Performance Indicators (PIs): Unplanned Scrams, Unplanned Scrams with Complications
  • Two White Parallel Findings:

o Inadequate corrective actions for the two White PIs o Did not meet Inspection Procedure 95002 Objectives o Remained in the Degraded Cornerstone column for more than five quarters

Pilgrim Performance Problems

  • White Finding in September 2015 for not identifying and correcting a safety relief valve failure
  • White Finding combined with performance within the Degraded Cornerstone for more than five quarters
  • Led to Pilgrim performance transition to Column 4

NRC Oversight Actions Are Comprehensive

  • Ensure adequate safety margins maintained

o significant issues in corrective action program (CAP) appropriately addressed o interim licensee actions arresting CAP performance declines

  • Increased Problem Identification and Resolution samples on previously identified performance issues

NRC Oversight Actions Are Comprehensive

  • Additional Resident Inspector was assigned to site
  • Quarterly Assessments - increased management oversight
  • Current regulatory actions are adequate

Key Inspections & Milestones 3/4: annual 9/01: MC 12/01: assessment 4/13: annual letter/final security 2/11: 4Q15 letters assessment White report issued report issued issued meeting 11/12: 3Q 12/21: FP 2/29: Phase A 4/4-4/8: 5/2-5/20:

report issued triennial issued Phase B Mods Team report issued inspection 4Q2015 January 11-15, 2016 1Q2016 TBD C

PI&R Samples Phase A PI&R Sample IP 92723 COMPLETE COMPLETE Security baseline Report Issue 12/11 Report Issue 2/29 Four SL IV violations Three operations- follow-up Snapshot of (impeding regulatory focused (complete) process) corrective action Adverse weather preps (resident inspectors) program performance April 4-8, 2016 April 2016 May 2-20, 2016 TBD Phase B Public Meeting Mods Team Phase C Six-month review of IP 95003 items not Baseline triennial the corrective action 95003 update modification team already covered in program to determine Annual assessment inspection Phases A and B improvement progress meeting Safety culture assessment

Future Action to Monitor Pilgrim

  • Supplemental IP 95003 Phase C o Most significant Phase of 95003 o Primary Focus - CAP and Safety Culture o Conducted after licensee declares readiness o Ensures causes understood & plan to address o Confirmatory Action Letter (CAL)
  • CAL Follow-up inspection

Licensee Response and Remarks Mr. John Dent Site Vice President Entergy Nuclear Operations, Inc.

Pilgrim Annual Assessment Meeting NRC Closing Remarks

Contacting the NRC

  • Report a safety concern

- (800) 695-7403

- Allegation@nrc.gov

  • General information or questions

- www.nrc.gov

- Select What We Do for Public Affairs

Reference Sources

  • Reactor Oversight Process

- www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.h tml Pilgrim Special Oversight Website:

- www.nrc.gov/info-finder/reactors/pilg/special-oversight.html

  • Public Electronic Reading Room

- www.nrc.gov/reading-rm.html

  • Public Document Room

- 800-397-4209

Review of 2015 Performance at Pilgrim Nuclear Power Station Annual Assessment Meeting April 13, 2016 ML16111A889

Agenda

  • Introduction
  • Discussion of NRC Oversight Results
  • Entergy Response and Remarks
  • NRC Closing Remarks
  • Break
  • Public Q&A

Robust NRC Oversight

  • Licensee performance, characterized by a weak corrective action program, placed plant in Column 4 of the Action Matrix
  • Ongoing NRC oversight to ensure safety margins maintained
  • Current regulatory actions are adequate

Pilgrim Performance Problems

  • Degraded Cornerstone Column (since 4th Quarter 2013)
  • Two White Performance Indicators (PIs): Unplanned Scrams, Unplanned Scrams with Complications
  • Two White Parallel Findings:

o Inadequate corrective actions for the two White PIs o Did not meet Inspection Procedure 95002 Objectives o Remained in the Degraded Cornerstone column for more than five quarters

Pilgrim Performance Problems

  • White Finding in September 2015 for not identifying and correcting a safety relief valve failure
  • White Finding combined with performance within the Degraded Cornerstone for more than five quarters
  • Led to Pilgrim performance transition to Column 4

NRC Oversight Actions Are Comprehensive

  • Ensure adequate safety margins maintained

o significant issues in corrective action program (CAP) appropriately addressed o interim licensee actions arresting CAP performance declines

  • Increased Problem Identification and Resolution samples on previously identified performance issues

NRC Oversight Actions Are Comprehensive

  • Additional Resident Inspector was assigned to site
  • Quarterly Assessments - increased management oversight
  • Current regulatory actions are adequate

Key Inspections & Milestones 3/4: annual 9/01: MC 12/01: assessment 4/13: annual letter/final security 2/11: 4Q15 letters assessment White report issued report issued issued meeting 11/12: 3Q 12/21: FP 2/29: Phase A 4/4-4/8: 5/2-5/20:

report issued triennial issued Phase B Mods Team report issued inspection 4Q2015 January 11-15, 2016 1Q2016 TBD C

PI&R Samples Phase A PI&R Sample IP 92723 COMPLETE COMPLETE Security baseline Report Issue 12/11 Report Issue 2/29 Four SL IV violations Three operations- follow-up Snapshot of (impeding regulatory focused (complete) process) corrective action Adverse weather preps (resident inspectors) program performance April 4-8, 2016 April 2016 May 2-20, 2016 TBD Phase B Public Meeting Mods Team Phase C Six-month review of IP 95003 items not Baseline triennial the corrective action 95003 update modification team already covered in program to determine Annual assessment inspection Phases A and B improvement progress meeting Safety culture assessment

Future Action to Monitor Pilgrim

  • Supplemental IP 95003 Phase C o Most significant Phase of 95003 o Primary Focus - CAP and Safety Culture o Conducted after licensee declares readiness o Ensures causes understood & plan to address o Confirmatory Action Letter (CAL)
  • CAL Follow-up inspection

Licensee Response and Remarks Mr. John Dent Site Vice President Entergy Nuclear Operations, Inc.

Pilgrim Annual Assessment Meeting NRC Closing Remarks

Contacting the NRC

  • Report a safety concern

- (800) 695-7403

- Allegation@nrc.gov

  • General information or questions

- www.nrc.gov

- Select What We Do for Public Affairs

Reference Sources

  • Reactor Oversight Process

- www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.h tml Pilgrim Special Oversight Website:

- www.nrc.gov/info-finder/reactors/pilg/special-oversight.html

  • Public Electronic Reading Room

- www.nrc.gov/reading-rm.html

  • Public Document Room

- 800-397-4209