ML22033A167: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:Mr. David P. Rhoades | ||
Mr. David P. Rhoades | |||
Senior Vice President | Senior Vice President | ||
Constellation Energy Generation, LLC | Constellation Energy Generation, LLC | ||
Line 24: | Line 23: | ||
Constellation Nuclear | Constellation Nuclear | ||
4300 Winfield Road | 4300 Winfield Road | ||
Warrenville, IL 60555 | Warrenville, IL 60555 | ||
SUBJECT: QUAD CITIES NUCLEAR POWER STATION UNIT 2NOTIFICATION OF NRC | SUBJECT: QUAD CITIES NUCLEAR POWER STATION UNIT 2NOTIFICATION OF NRC | ||
BASELINE INSPECTION AND REQUEST FOR INFORMATION; INSPECTION | |||
REPORT 05000265/2022001 | |||
Dear Mr. Rhoades: | Dear Mr. Rhoades: | ||
On March 21, 2022, the U.S. Nuclear Regulatory Commission (NRC) will begin the Baseline | On March 21, 2022, the U.S. Nuclear Regulatory Commission (NRC) will begin the Baseline | ||
Inservice Inspection Procedure 71111.08. This inspection is scheduled to be performed | Inservice Inspection Procedure 71111.08. This inspection is scheduled to be performed | ||
March 21, 2022, through March 25, 2022. | March 21, 2022, through March 25, 2022. | ||
Experience has shown that this inspection is resource intensive both for the NRC inspector and | Experience has shown that this inspection is resource intensive both for the NRC inspector and | ||
your staff. In order to minimize the impact to your onsite resources, and to ensure a productive | your staff. In order to minimize the impact to your onsite resources, and to ensure a productive | ||
inspection for both sides, we have enclosed a request for documents needed for this inspection. | inspection for both sides, we have enclosed a request for documents needed for this inspection. | ||
These documents have been divided into two groups. | These documents have been divided into two groups. | ||
The first group identifies information necessary to ensure that the inspector is adequately | The first group identifies information necessary to ensure that the inspector is adequately | ||
prepared. The second group identifies the information the inspector will need upon arrival at the | prepared. The second group identifies the information the inspector will need upon arrival at the | ||
site. It is important that all of these documents are up-to-date, and complete, in order to | site. It is important that all of these documents are up-to-date, and complete, in order to | ||
minimize the number of additional documents requested during the preparation and/or the | minimize the number of additional documents requested during the preparation and/or the | ||
onsite portions of the inspection. | onsite portions of the inspection. | ||
We have discussed the schedule for inspection activities with your staff and understand that our | We have discussed the schedule for inspection activities with your staff and understand that our | ||
regulatory contact for this inspection will be Mr. R. Swart, of your organization. If there are any | regulatory contact for this inspection will be Mr. R. Swart, of your organization. If there are any | ||
questions about this inspection or the material requested, please contact the lead inspector | questions about this inspection or the material requested, please contact the lead inspector | ||
John V. Bozga at 630-829-9613. | John V. Bozga at 630-829-9613. | ||
This letter does not contain new or amended information collection requirements subject to the | This letter does not contain new or amended information collection requirements subject to the | ||
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection | Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection | ||
requirements were approved by the Office of Management and Budget, Control | requirements were approved by the Office of Management and Budget, Control | ||
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to | Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to | ||
respond to, a request for information or an information collection requirement unless the | respond to, a request for information or an information collection requirement unless the | ||
requesting document displays a currently valid Office of Management and Budget Control | requesting document displays a currently valid Office of Management and Budget Control | ||
Number. | Number.February 2, 2022 | ||
D. Rhoades - 2 - | |||
D. Rhoades | This letter and its enclosure will be made available for public inspection and copying at | ||
This letter and its enclosure will be made available for public inspection and copying at | http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in | ||
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in | accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections, | ||
accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections, | |||
Exemptions, Requests for Withholding. | Exemptions, Requests for Withholding. | ||
Sincerely, | |||
John V. Bozga, Senior Reactor Inspector | |||
Engineering Branch 1 | |||
Division of Reactor Safety | |||
Docket No. 50-265 | Docket No. 50-265 | ||
License No. DPR-30 | License No. DPR-30 | ||
Enclosure: | Enclosure: | ||
Document Request for Baseline | Document Request for Baseline | ||
Inservice Inspection | |||
cc: Distribution via LISTSERV | cc: Distribution via LISTSERV | ||
Signed by Bozga, John | |||
on 02/02/22 | |||
D. Rhoades - 3 - | |||
Letter to David P. Rhoades from John V. Bozga dated February 2, 2022. | Letter to David P. Rhoades from John V. Bozga dated February 2, 2022. | ||
SUBJECT: QUAD CITIES NUCLEAR POWER STATION UNIT 2NOTIFICATION OF NRC | |||
SUBJECT: QUAD CITIES NUCLEAR POWER STATION UNIT 2NOTIFICATION OF NRC | |||
BASELINE INSPECTION AND REQUEST FOR INFORMATION; INSPECTION | |||
REPORT 05000265/2022001 | |||
DISTRIBUTION: | DISTRIBUTION: | ||
Jessie Quichocho | Jessie Quichocho | ||
Line 88: | Line 90: | ||
DRPIII | DRPIII | ||
DRSIII | DRSIII | ||
Inspection Report: | |||
Inspection Dates: | |||
Inspection Procedures: | |||
Lead Inspector: | |||
A. | |||
ADAMS Accession Number: ML22033A167 | |||
Publicly Available Non-Publicly Available Sensitive Non-Sensitive | |||
OFFICE RIII | |||
NAME JBozga:mb | |||
DATE 02/02/2022 | |||
OFFICIAL RECORD COPY | |||
BASELINE INSERVICE INSPECTION DOCUMENT REQUEST | |||
Inspection Report: 05000265/2022001 | |||
Inspection Dates: March 21, 2022 - March 25, 2022 | |||
Inspection Procedures:Inspection Procedure 71111-08, Inservice Inspection | |||
Lead Inspector: John V. Bozga, DRS | |||
630-829-9613 | |||
john.bozga@nrc.gov | |||
A. Information for the In-Office Preparation Week | |||
The following information (electronic copy) is requested by March 7, 2022, to facilitate | The following information (electronic copy) is requested by March 7, 2022, to facilitate | ||
the selection of specific items that will be reviewed during the onsite inspection week. | the selection of specific items that will be reviewed during the onsite inspection week. | ||
The inspector will select specific items from the information requested below and request | The inspector will select specific items from the information requested below and request | ||
a list of additional documents needed onsite to your staff. We request that the specific | a list of additional documents needed onsite to your staff. We request that the specific | ||
items selected from the lists be available and ready for review on the first day of | items selected from the lists be available and ready for review on the first day of | ||
inspection. If you have any questions regarding this information, please call the | inspection. If you have any questions regarding this information, please call the | ||
inspector as soon as possible. | inspector as soon as possible. | ||
BASELINE INSERVICE INSPECTION DOCUMENT REQUEST | 1. For the upcoming outage, a detailed schedule and description of: | ||
a. Non-Destructive Examinations (NDEs) planned for Class 1 and 2 Systems and | |||
containment, performed as part of your American Society of Mechanical | |||
Engineers (ASME) Code Inservice Inspection (ISI) Program (include edition and | |||
addenda of Code committed to), and NDEs planned for other systems performed | |||
as part of a Risk-Informed ISI Program, or other augmented inspection programs | |||
commitments, as part of an industry initiative; and | |||
b. Welding on Code Class 1, 2, or 3 components. For each weld examination, | |||
include the weld identification number, description of weld (component name), | |||
category, class, type of exam and procedure number, and date of examination. | |||
2. A copy of the NDE procedures and welding procedures used to perform the activities | |||
identified in A.1 (including NDE calibration and flaw characterization/sizing | |||
procedures and Welding Procedure Qualification Records). For ultrasonic | |||
examination procedures qualified in accordance with Appendix VIII of Section XI | |||
of the ASME Code, provide documentation supporting the procedure qualification | |||
(e.g., the Electric Power Research Institute performance demonstration qualification | |||
summary sheets). | |||
3. A copy of ASME Section XI, Code Relief Requests applicable to the examinations | |||
identified in A.1. | |||
4. A copy of the 10-year ISI Program showing those required exams scheduled to be | |||
performed this outage, and those which have been completed. | |||
B. Onsite Information to Be Provided to the Inspector on the First Day of the | |||
Enclosure | |||
BASELINE INSERVICE INSPECTION DOCUMENT REQUEST | |||
5. A list identifying NDE reports (ultrasonic, radiography, magnetic particle, or dye | |||
penetrant), which have identified relevant indications on Code Class 1 and 2 | |||
Systems since the beginning of the last refueling outage. | |||
6. List with short description of the welds in Code Class 1, 2 and 3 Systems, which | |||
have been fabricated due to component repair/replacement activities since the | |||
beginning of the last refueling outage and identify the system, weld number, and | |||
reference applicable documentation (e.g., NIS-2 forms with definitions of system and | |||
component acronyms). | |||
7. If reactor vessel weld examinations required by the ASME Code are scheduled to | |||
occur during the inspection period, provide a detailed description of the welds to be | |||
examined, and the extent of the planned examination. | |||
8. List with description of ISI-related issues such as piping degradation or damage | |||
(e.g., cracks, wall thinning, wear, microbiologically induced corrosion) or errors | |||
identified in piping examinations that have been entered into your corrective action | |||
system since the beginning of the last refueling outage. Also, include a list of | |||
corrective action records associated with foreign material introduced/identified in the | |||
reactor vessel or reactor coolant system since the beginning of the last refueling | |||
outage. In addition, include a list of corrective action records associated with reactor | |||
vessel and internals inspections since the beginning of the last refueling outage. | |||
9. Copy of any Title 10 of the Code of Federal Regulations, Part 21 reports applicable to | |||
your structures, systems, or components within the scope of Section XI of the ASME | |||
Code that have been identified since the beginning of the last refueling outage. | |||
10.Point of contact information (name and site number) for the Inservice Inspection | |||
Program, Aging Management Programs, Site Welding Engineer, and Reactor | |||
Internals Inspection Programs - Site and vendor leads. | |||
B. Onsite Information to Be Provided to the Inspector on the First Day of the | |||
Inspection (e.g., Following the Entrance Meeting). Please Provide Hard Copies | |||
(e.g., Paper Records) of the Following Documents: | |||
1. For welds selected by the inspector from A.1.b and A.6 above, provide copies of the | |||
following documents: | |||
a. Document of the weld number and location (e.g., system, train, branch); | |||
b. Document with a detail of the weld construction (e.g., drawing); | |||
c. Applicable portions of the Design Specification and applicable Code of | |||
construction for the weldment (e.g., B31.1 or ASME Section III); | |||
d. Applicable Code Edition and Addenda for weld procedure qualification; | |||
e. Applicable weld procedure specifications and completed weld data sheets used | |||
to fabricate the welds; | |||
2 | |||
BASELINE INSERVICE INSPECTION DOCUMENT REQUEST | |||
f. Copies of procedure qualification records supporting the weld procedure | |||
specifications; | |||
g. Copies of welders performance qualification records; | |||
h. Copies of mechanical test reports identified in the procedure qualification records | |||
above; | |||
i. Copies of the non-conformance reports for the selected welds; | |||
j. Access to radiographs and equipment to view radiographs of the selected welds; | |||
k. ASME Code Section XI repair replacement plan and reconciliation for | |||
replacement components/materials; | |||
l. Certified Material Test Reports for replacement pressure boundary materials; and | |||
m. Copies of the NDE required by the construction Code and the pre-service | |||
examination records required by the ASME Code Section XI for the selected | |||
welds. | |||
2. For the ISI-related corrective action issues selected by the inspector from Item A.8 | |||
above, provide a copy of the corrective actions and supporting documentation. | |||
3. For the NDE reports with relevant indications on Code Class 1 and 2 Systems | |||
selected by the inspector from Item A.5 above, provide a copy of the examination | |||
records and associated corrective action documents. | |||
4. Updated schedules for Item A.1 (including schedule showing contingency repair | |||
plans if available). | |||
5. Fabrication Drawings (D size) of the reactor vessel welds if any are to be examined | |||
during the outage. Also provide any drawings used by NDE vendors to locate these | |||
welds. | |||
6. Provide copies of the following standards at the onsite U.S. Nuclear Regulatory | |||
Commission inspection location for the duration of the inspection: | |||
a. Sections V, IX, and XI of the ASME Code with Editions applicable to the | |||
ISI Program and the Repair/Replacement Program; and | |||
b. Copy of the performance demonstration initiative (PDI) generic procedures with | |||
the latest applicable Revisions that support site qualified ultrasonic examination of | |||
piping welds and components (e.g., PDI-UT-1, PDI-UT-2, PDI-UT-3, | |||
PDI-UT-10 etc.). | |||
If you have questions regarding the information requested, please contact the lead inspector. | If you have questions regarding the information requested, please contact the lead inspector. | ||
3 | |||
}} | }} |
Latest revision as of 18:53, 18 November 2024
ML22033A167 | |
Person / Time | |
---|---|
Site: | Quad Cities |
Issue date: | 02/02/2022 |
From: | John Bozga NRC/RGN-III/DRS/EB1 |
To: | Rhoades D Constellation Energy Generation, Constellation Nuclear |
References | |
IR 2022001 | |
Download: ML22033A167 (6) | |
See also: IR 05000265/2022001
Text
Mr. David P. Rhoades
Senior Vice President
Constellation Energy Generation, LLC
President and Chief Nuclear Officer (CNO)
Constellation Nuclear
4300 Winfield Road
Warrenville, IL 60555
SUBJECT: QUAD CITIES NUCLEAR POWER STATION UNIT 2NOTIFICATION OF NRC
BASELINE INSPECTION AND REQUEST FOR INFORMATION; INSPECTION
REPORT 05000265/2022001
Dear Mr. Rhoades:
On March 21, 2022, the U.S. Nuclear Regulatory Commission (NRC) will begin the Baseline
Inservice Inspection Procedure 71111.08. This inspection is scheduled to be performed
March 21, 2022, through March 25, 2022.
Experience has shown that this inspection is resource intensive both for the NRC inspector and
your staff. In order to minimize the impact to your onsite resources, and to ensure a productive
inspection for both sides, we have enclosed a request for documents needed for this inspection.
These documents have been divided into two groups.
The first group identifies information necessary to ensure that the inspector is adequately
prepared. The second group identifies the information the inspector will need upon arrival at the
site. It is important that all of these documents are up-to-date, and complete, in order to
minimize the number of additional documents requested during the preparation and/or the
onsite portions of the inspection.
We have discussed the schedule for inspection activities with your staff and understand that our
regulatory contact for this inspection will be Mr. R. Swart, of your organization. If there are any
questions about this inspection or the material requested, please contact the lead inspector
John V. Bozga at 630-829-9613.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, Control
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget Control
Number.February 2, 2022
D. Rhoades - 2 -
This letter and its enclosure will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,
Exemptions, Requests for Withholding.
Sincerely,
John V. Bozga, Senior Reactor Inspector
Engineering Branch 1
Division of Reactor Safety
Docket No. 50-265
License No. DPR-30
Enclosure:
Document Request for Baseline
Inservice Inspection
cc: Distribution via LISTSERV
Signed by Bozga, John
on 02/02/22
D. Rhoades - 3 -
Letter to David P. Rhoades from John V. Bozga dated February 2, 2022.
SUBJECT: QUAD CITIES NUCLEAR POWER STATION UNIT 2NOTIFICATION OF NRC
BASELINE INSPECTION AND REQUEST FOR INFORMATION; INSPECTION
REPORT 05000265/2022001
DISTRIBUTION:
RidsNrrDorlLpl3
RidsNrrPMQuadCities Resource
RidsNrrDroIrib Resource
DRPIII
DRSIII
ADAMS Accession Number: ML22033A167
Publicly Available Non-Publicly Available Sensitive Non-Sensitive
OFFICE RIII
NAME JBozga:mb
DATE 02/02/2022
OFFICIAL RECORD COPY
BASELINE INSERVICE INSPECTION DOCUMENT REQUEST
Inspection Report: 05000265/2022001
Inspection Dates: March 21, 2022 - March 25, 2022
Inspection Procedures:Inspection Procedure 71111-08, Inservice Inspection
Lead Inspector: John V. Bozga, DRS
630-829-9613
john.bozga@nrc.gov
A. Information for the In-Office Preparation Week
The following information (electronic copy) is requested by March 7, 2022, to facilitate
the selection of specific items that will be reviewed during the onsite inspection week.
The inspector will select specific items from the information requested below and request
a list of additional documents needed onsite to your staff. We request that the specific
items selected from the lists be available and ready for review on the first day of
inspection. If you have any questions regarding this information, please call the
inspector as soon as possible.
1. For the upcoming outage, a detailed schedule and description of:
a. Non-Destructive Examinations (NDEs) planned for Class 1 and 2 Systems and
containment, performed as part of your American Society of Mechanical
Engineers (ASME) Code Inservice Inspection (ISI) Program (include edition and
addenda of Code committed to), and NDEs planned for other systems performed
as part of a Risk-Informed ISI Program, or other augmented inspection programs
commitments, as part of an industry initiative; and
b. Welding on Code Class 1, 2, or 3 components. For each weld examination,
include the weld identification number, description of weld (component name),
category, class, type of exam and procedure number, and date of examination.
2. A copy of the NDE procedures and welding procedures used to perform the activities
identified in A.1 (including NDE calibration and flaw characterization/sizing
procedures and Welding Procedure Qualification Records). For ultrasonic
examination procedures qualified in accordance with Appendix VIII of Section XI
of the ASME Code, provide documentation supporting the procedure qualification
(e.g., the Electric Power Research Institute performance demonstration qualification
summary sheets).
3. A copy of ASME Section XI, Code Relief Requests applicable to the examinations
identified in A.1.
4. A copy of the 10-year ISI Program showing those required exams scheduled to be
performed this outage, and those which have been completed.
Enclosure
BASELINE INSERVICE INSPECTION DOCUMENT REQUEST
5. A list identifying NDE reports (ultrasonic, radiography, magnetic particle, or dye
penetrant), which have identified relevant indications on Code Class 1 and 2
Systems since the beginning of the last refueling outage.
6. List with short description of the welds in Code Class 1, 2 and 3 Systems, which
have been fabricated due to component repair/replacement activities since the
beginning of the last refueling outage and identify the system, weld number, and
reference applicable documentation (e.g., NIS-2 forms with definitions of system and
component acronyms).
7. If reactor vessel weld examinations required by the ASME Code are scheduled to
occur during the inspection period, provide a detailed description of the welds to be
examined, and the extent of the planned examination.
8. List with description of ISI-related issues such as piping degradation or damage
(e.g., cracks, wall thinning, wear, microbiologically induced corrosion) or errors
identified in piping examinations that have been entered into your corrective action
system since the beginning of the last refueling outage. Also, include a list of
corrective action records associated with foreign material introduced/identified in the
reactor vessel or reactor coolant system since the beginning of the last refueling
outage. In addition, include a list of corrective action records associated with reactor
vessel and internals inspections since the beginning of the last refueling outage.
9. Copy of any Title 10 of the Code of Federal Regulations, Part 21 reports applicable to
your structures, systems, or components within the scope of Section XI of the ASME
Code that have been identified since the beginning of the last refueling outage.
10.Point of contact information (name and site number) for the Inservice Inspection
Program, Aging Management Programs, Site Welding Engineer, and Reactor
Internals Inspection Programs - Site and vendor leads.
B. Onsite Information to Be Provided to the Inspector on the First Day of the
Inspection (e.g., Following the Entrance Meeting). Please Provide Hard Copies
(e.g., Paper Records) of the Following Documents:
1. For welds selected by the inspector from A.1.b and A.6 above, provide copies of the
following documents:
a. Document of the weld number and location (e.g., system, train, branch);
b. Document with a detail of the weld construction (e.g., drawing);
c. Applicable portions of the Design Specification and applicable Code of
construction for the weldment (e.g., B31.1 or ASME Section III);
d. Applicable Code Edition and Addenda for weld procedure qualification;
e. Applicable weld procedure specifications and completed weld data sheets used
to fabricate the welds;
2
BASELINE INSERVICE INSPECTION DOCUMENT REQUEST
f. Copies of procedure qualification records supporting the weld procedure
specifications;
g. Copies of welders performance qualification records;
h. Copies of mechanical test reports identified in the procedure qualification records
above;
i. Copies of the non-conformance reports for the selected welds;
j. Access to radiographs and equipment to view radiographs of the selected welds;
k. ASME Code Section XI repair replacement plan and reconciliation for
replacement components/materials;
l. Certified Material Test Reports for replacement pressure boundary materials; and
m. Copies of the NDE required by the construction Code and the pre-service
examination records required by the ASME Code Section XI for the selected
2. For the ISI-related corrective action issues selected by the inspector from Item A.8
above, provide a copy of the corrective actions and supporting documentation.
3. For the NDE reports with relevant indications on Code Class 1 and 2 Systems
selected by the inspector from Item A.5 above, provide a copy of the examination
records and associated corrective action documents.
4. Updated schedules for Item A.1 (including schedule showing contingency repair
plans if available).
5. Fabrication Drawings (D size) of the reactor vessel welds if any are to be examined
during the outage. Also provide any drawings used by NDE vendors to locate these
6. Provide copies of the following standards at the onsite U.S. Nuclear Regulatory
Commission inspection location for the duration of the inspection:
a. Sections V, IX, and XI of the ASME Code with Editions applicable to the
ISI Program and the Repair/Replacement Program; and
b. Copy of the performance demonstration initiative (PDI) generic procedures with
the latest applicable Revisions that support site qualified ultrasonic examination of
piping welds and components (e.g., PDI-UT-1, PDI-UT-2, PDI-UT-3,
PDI-UT-10 etc.).
If you have questions regarding the information requested, please contact the lead inspector.
3