ML20214T421: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:--
{{#Wiki_filter:7,o 3
                              , . . .                7,o       3                   37                             . . .
37
                                                                                                                                ,1
,1 2
    -                          2           -
,._2.--
                                                ,._2.--         =- --              1                           s--            -
=-
                          .,    's                                                                                                                     I
1 s--
                  <                  o aa r e
's o aa r
[                 e,,
[
o UNITED STATES NUCLEAR REGULATORY COMMISSION
e,,
                          $                  e ,E                                             ftEGION V 0,                   g                                 1450 MARIA LANE. SUITE 210 WALNUT CREE K, CALIFORNIA 94596 j
UNITED STATES NUCLEAR REGULATORY COMMISSION e
                              % **..* ,d
o e,E ftEGION V 0,
      !                                                                                            cci 2               8 i
g 1450 MARIA LANE. SUITE 210 j
t MEMORANDUM TO:             D. C. Eisenhut, Division of Licensing Office of Nuclear Reactor Regulation
,d WALNUT CREE K, CALIFORNIA 94596 cci 2 8
      )                             FROM:                       T. W. Bishop, Director Division of Reactor Safety & Projects i
i t
MEMORANDUM TO:
D. C. Eisenhut, Division of Licensing Office of Nuclear Reactor Regulation
)
FROM:
T. W. Bishop, Director i
Division of Reactor Safety & Projects


==SUBJECT:==
==SUBJECT:==
DIABLO CANYON UNIT I HIGH-RANGE NOBLE GAS EFFLUENT MONITOR RE-29 (NUREG 0737, Item II.F.1, ATTACHMENT 1) SEISMIC DESIGN
DIABLO CANYON UNIT I HIGH-RANGE NOBLE GAS EFFLUENT MONITOR RE-29 (NUREG 0737, Item II.F.1, ATTACHMENT 1) SEISMIC DESIGN CRITERIA - REQUEST FOR TRANSFER OF LEAD RESPONSIBILITY -
      ;                                                          CRITERIA - REQUEST FOR TRANSFER OF LEAD RESPONSIBILITY -
j DOCKET No. 50-275
j                                                         DOCKET No. 50-275
)
      )
1 During a Special Inspection of the PASS during the week of June 18-22, 1984, it was noted by the inspector that the High-Range Noble Gas Accident Monitor i
1
      !                              During a Special Inspection of the PASS during the week of June 18-22, 1984, it was noted by the inspector that the High-Range Noble Gas Accident Monitor i
RE-29 did not appear to have been seismically mounted. The licensee performed a seismic analysis of this monitor as a result of the inspector's inquiry.
RE-29 did not appear to have been seismically mounted. The licensee performed a seismic analysis of this monitor as a result of the inspector's inquiry.
Region V received the enclosed PG&E IOM on October 1, 1984.
Region V received the enclosed PG&E IOM on October 1, 1984.
Based on discussions with the Radiation Protection Manager on October 1, 1984, Region V was informed that in view of the existing requirements they have no
Based on discussions with the Radiation Protection Manager on October 1, 1984, Region V was informed that in view of the existing requirements they have no intention to implement the recommendations described in the enclosure.
:                              intention to implement the recommendations described in the enclosure.
i We consider implementation of the recommendation to be reasonable, prudent and j,
i                             We consider implementation of the recommendation to be reasonable, prudent and of trivial cost. However, we are sensitive to the back-fitting concern and j,                            request you review this matter and advise us as to whether or not the present seismic capabilities are acceptable.
of trivial cost. However, we are sensitive to the back-fitting concern and request you review this matter and advise us as to whether or not the present seismic capabilities are acceptable.
Thank you for your consideration.
Thank you for your consideration.
                                                                                                                  ,[         ?U 4 [ T. W. Bis op, Director Division of Reactor Safety & Projects
,[
?U 4 [ T. W. Bis op, Director Division of Reactor Safety & Projects


==Enclosure:==
==Enclosure:==
Interoffice Memorandum Diablo Canyor Project
#058490 dtd 9/14/84 4
cc w/ encl:
G. Knighton, NRR l
H. Schierling, NRR R. Dodds, RV
/*
/
0706100250 870604 L
1 PDR FOIA HOLMES 86-197 PDR


Interoffice Memorandum Diablo Canyor Project 4
~.
                                      #058490 dtd 9/14/84 cc w/ encl:
0G8490
G. Knighton, NRR l                              H. Schierling, NRR R. Dodds, RV
~
                                                                                                                                            /*
.ua ::,
                                                                                                                                        /
INTEROFFICE MEMORANDUM q
0706100250 870604                                                                                                  1 L PDR          FOIA HOLMES 86-197                      PDR
Diablo CanyonProjectm -,.. n x
 
~
                                              ..            ~.                                ,_              -
e
                ~
. PACIFIC GAS AND ELECTRIC COMPANY
                                                                                        .ua :: ,                                     0G8490
\\
      .                INTEROFFICE MEMORANDUM
"BECHTEL POWER CORPORATION 1
          ~
To R. C. Thornberry/ Attn: R. Patterson o.t.
q                      Diablo CanyonProjectm -, .. n x e
Septamb r 14, 1984
  ,'                                                                                . PACIFIC GAS AND ELECTRIC COMPANY
: 3. B. Hoch/G. H. Peore Fa. No.
  \                                                                                 "BECHTEL POWER CORPORATION                             .
52.19 From j
1 To       R. C. Thornberry/ Attn: R. Patterson                 o.t.       Septamb r 14, 1984 From      3. B. Hoch/G. H. Peore                               Fa. No. 52.19 j                   m         Management - DCP                                     sg          RE Seismic Evaluation i                                                                                                                           DCPP
m Management - DCP RE Seismic Evaluation sg i
  +
DCPP 45/10/B29 B-0881
At        45/10/B29       g,,,,,       B-0881 CHEM & RAO P90T I
+
                                                                                                              . ,sva onc                 Ja< tv WAO SJFB                      aE
g,,,,,
                                                                                                                , , ser    SEP. 2 41984. as LW -
CHEM & RAO P90T At I
RNG HWCF                   M ho i
,sva onc Ja< tv aE SEP. 2 41984. LW WAO SJFB as -
i REFERDJCE: 104 from J. C. Carroll to J. B. Hoch/ Attn dated August 20, 1984 Chren 4056610 G. Q Q re
,, ser RNG HWCF M ho i
                                                                                                                .a rumu . nm
REFERDJCE: 104 from J. C. Carroll to J. B. Hoch/ Attn G. Q Q re
((
((
l                                                                                                           C & RP FILE RETURN TC
i dated August 20, 1984 Chren 4056610
  .l                       t'e n radiaticn nonitor RE-29 is ncn-class 1 equipment mounted on a steel a                       platform at EL 140 within Area L.         The seismic design basis for this
.a rumu. nm l
  }                       equi;z,ent -as in accordance with UBC Zcne 4 requirements (Horizontal l                       acceleraticn - 0.2 g).
C & RP FILE RETURN TC
                          'Ihe seismic capability of the monitor's present anchorage is as follows:
.l t'e n radiaticn nonitor RE-29 is ncn-class 1 equipment mounted on a steel a
platform at EL 140 within Area L.
The seismic design basis for this
}
equi;z,ent -as in accordance with UBC Zcne 4 requirements (Horizontal l
acceleraticn - 0.2 g).
'Ihe seismic capability of the monitor's present anchorage is as follows:
(I) Horizontal & Vertical Seismic acceleraticn acting simultaneously (a) 0.6 g based cn AISC allcwable stress (b) 1.0 g based cn yield stres' i of'the materials.
(I) Horizontal & Vertical Seismic acceleraticn acting simultaneously (a) 0.6 g based cn AISC allcwable stress (b) 1.0 g based cn yield stres' i of'the materials.
                          'Ihe above capacities are based cn         7 as is" configuratico in which it was noted that toth drill and tap screws are not effective in transferrirg the loads to the platform. 'Ibe seismic capacity of the anchorage would be enhanced if either of the follcwing (a-)-oc-(b) is taken:
7
'Ihe above capacities are based cn as is" configuratico in which it was noted that toth drill and tap screws are not effective in transferrirg the loads to the platform. 'Ibe seismic capacity of the anchorage would be enhanced if either of the follcwing (a-)-oc-(b) is taken:
(a) Replace toth drill ard tap screws with regular A325 tolts with nuts.
(a) Replace toth drill ard tap screws with regular A325 tolts with nuts.
i (b) Provide 1/4" fillet weld (4 inches long) between 3/4" plate and W4X13 supporting mamb r of the same side as drill and tap screws.
i (b) Provide 1/4" fillet weld (4 inches long) between 3/4" plate and W4X13 supporting mamb r of the same side as drill and tap screws.
    ;                    'Ihe enhanced capacities will bes (II) Horizcntal & Vertical Seis=ic Acceleraticns acting sin:ultaneously (a) 1.7 g based cm AISC allowable stress (b) 3.4 g based cn yield stress of materials SEP 2 01984
'Ihe enhanced capacities will bes (II) Horizcntal & Vertical Seis=ic Acceleraticns acting sin:ultaneously (a) 1.7 g based cm AISC allowable stress (b) 3.4 g based cn yield stress of materials SEP 2 01984
: r.                                                             .--            -
 
                                                                                          .- -                    v.                                             .---
r.
_ 3-R.C. 'Ihornberry/Attna R. Patterscm                                                       Septa ber 14, 1984               i 058490
v.
                                        ~ If a dynamic analysis is performed, the seismic forcra inposed on the ntnitor during the three seismic events considered for class 1, structures will be Morizcntal                   Vertical                           Earthquake 1                                           acaleration                 acceleration                       Event
_ 3-R.C. 'Ihornberry/Attna R. Patterscm Septa ber 14, 1984 i
                                        .a)           0.65 g                     0.13 g                           DE f
058490
    -)                                   b)           1.30 g                     0.27 g                           DDE c)           2.3 g                     0.52 g                           HOSGRI
~ If a dynamic analysis is performed, the seismic forcra inposed on the ntnitor during the three seismic events considered for class 1, structures will be Morizcntal Vertical Earthquake 1
                                        '1herefore if the monitor's anchorage is modified per above h.;endations, the enhanced capacity wx21d exceed the seismic denand inposed by DE, DDE l                                 and Hosgri earthquake events.                                                      .
acaleration acceleration Event
.a) 0.65 g 0.13 g DE f
-)
b) 1.30 g 0.27 g DDE c) 2.3 g 0.52 g HOSGRI
'1herefore if the monitor's anchorage is modified per above h.;endations, the enhanced capacity wx21d exceed the seismic denand inposed by DE, DDE l
and Hosgri earthquake events.
I i
I i
                                        '1his is a caplete response to the above referenced ICH.
'1his is a caplete response to the above referenced ICH.
i 1
i 1
I
I J. B.
      ,                                                                                            J. B.
3 vitten sponse Required: No m/
3                                 vitten         sponse Required: No
c.c. J.C. Carroll 77/1435 W.H. White 45/26/A31 J.V. Boots DCPP N.O. Shah 45/26/C36 R.J. ftDevitt 77/1467 R.A. Bitting 45/9/D16 G.R. Kast 77/1435 l
      !                                        . m/
l t
c.c. J.C. Carroll             77/1435             W.H. White                   45/26/A31 J.V. Boots           DCPP               N.O. Shah                     45/26/C36 R.J. ftDevitt 77/1467                     R.A. Bitting                 45/9/D16 G.R. Kast             77/1435 l
l t       .
l
l
[023/05]                     -
[023/05]
        . . . - . . - . .- . - .            .      . , . . . -          . . - -      .-      .      - . . - .              . .                        .}}
.}}

Latest revision as of 00:26, 4 December 2024

Requests Transfer of Lead Responsibility Re Licensee Failure to Seismically Mount high-range Noble Gas Effluent Monitor Noted During Insp on 840618-22
ML20214T421
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 10/02/1984
From: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML20213E738 List:
References
FOIA-86-197, TASK-2.F.1, TASK-TM NUDOCS 8706100258
Download: ML20214T421 (3)


Text

7,o 3

37

,1 2

,._2.--

=-

1 s--

's o aa r

[

e,,

UNITED STATES NUCLEAR REGULATORY COMMISSION e

o e,E ftEGION V 0,

g 1450 MARIA LANE. SUITE 210 j

,d WALNUT CREE K, CALIFORNIA 94596 cci 2 8

i t

MEMORANDUM TO:

D. C. Eisenhut, Division of Licensing Office of Nuclear Reactor Regulation

)

FROM:

T. W. Bishop, Director i

Division of Reactor Safety & Projects

SUBJECT:

DIABLO CANYON UNIT I HIGH-RANGE NOBLE GAS EFFLUENT MONITOR RE-29 (NUREG 0737, Item II.F.1, ATTACHMENT 1) SEISMIC DESIGN CRITERIA - REQUEST FOR TRANSFER OF LEAD RESPONSIBILITY -

j DOCKET No. 50-275

)

1 During a Special Inspection of the PASS during the week of June 18-22, 1984, it was noted by the inspector that the High-Range Noble Gas Accident Monitor i

RE-29 did not appear to have been seismically mounted. The licensee performed a seismic analysis of this monitor as a result of the inspector's inquiry.

Region V received the enclosed PG&E IOM on October 1, 1984.

Based on discussions with the Radiation Protection Manager on October 1, 1984, Region V was informed that in view of the existing requirements they have no intention to implement the recommendations described in the enclosure.

i We consider implementation of the recommendation to be reasonable, prudent and j,

of trivial cost. However, we are sensitive to the back-fitting concern and request you review this matter and advise us as to whether or not the present seismic capabilities are acceptable.

Thank you for your consideration.

,[

?U 4 [ T. W. Bis op, Director Division of Reactor Safety & Projects

Enclosure:

Interoffice Memorandum Diablo Canyor Project

  1. 058490 dtd 9/14/84 4

cc w/ encl:

G. Knighton, NRR l

H. Schierling, NRR R. Dodds, RV

/*

/

0706100250 870604 L

1 PDR FOIA HOLMES86-197 PDR

~.

0G8490

~

.ua ::,

INTEROFFICE MEMORANDUM q

Diablo CanyonProjectm -,.. n x

~

e

. PACIFIC GAS AND ELECTRIC COMPANY

\\

"BECHTEL POWER CORPORATION 1

To R. C. Thornberry/ Attn: R. Patterson o.t.

Septamb r 14, 1984

3. B. Hoch/G. H. Peore Fa. No.

52.19 From j

m Management - DCP RE Seismic Evaluation sg i

DCPP 45/10/B29 B-0881

+

g,,,,,

CHEM & RAO P90T At I

,sva onc Ja< tv aE SEP. 2 41984. LW WAO SJFB as -

,, ser RNG HWCF M ho i

REFERDJCE: 104 from J. C. Carroll to J. B. Hoch/ Attn G. Q Q re

((

i dated August 20, 1984 Chren 4056610

.a rumu. nm l

C & RP FILE RETURN TC

.l t'e n radiaticn nonitor RE-29 is ncn-class 1 equipment mounted on a steel a

platform at EL 140 within Area L.

The seismic design basis for this

}

equi;z,ent -as in accordance with UBC Zcne 4 requirements (Horizontal l

acceleraticn - 0.2 g).

'Ihe seismic capability of the monitor's present anchorage is as follows:

(I) Horizontal & Vertical Seismic acceleraticn acting simultaneously (a) 0.6 g based cn AISC allcwable stress (b) 1.0 g based cn yield stres' i of'the materials.

7

'Ihe above capacities are based cn as is" configuratico in which it was noted that toth drill and tap screws are not effective in transferrirg the loads to the platform. 'Ibe seismic capacity of the anchorage would be enhanced if either of the follcwing (a-)-oc-(b) is taken:

(a) Replace toth drill ard tap screws with regular A325 tolts with nuts.

i (b) Provide 1/4" fillet weld (4 inches long) between 3/4" plate and W4X13 supporting mamb r of the same side as drill and tap screws.

'Ihe enhanced capacities will bes (II) Horizcntal & Vertical Seis=ic Acceleraticns acting sin:ultaneously (a) 1.7 g based cm AISC allowable stress (b) 3.4 g based cn yield stress of materials SEP 2 01984

r.

v.

_ 3-R.C. 'Ihornberry/Attna R. Patterscm Septa ber 14, 1984 i

058490

~ If a dynamic analysis is performed, the seismic forcra inposed on the ntnitor during the three seismic events considered for class 1, structures will be Morizcntal Vertical Earthquake 1

acaleration acceleration Event

.a) 0.65 g 0.13 g DE f

-)

b) 1.30 g 0.27 g DDE c) 2.3 g 0.52 g HOSGRI

'1herefore if the monitor's anchorage is modified per above h.;endations, the enhanced capacity wx21d exceed the seismic denand inposed by DE, DDE l

and Hosgri earthquake events.

I i

'1his is a caplete response to the above referenced ICH.

i 1

I J. B.

3 vitten sponse Required: No m/

c.c. J.C. Carroll 77/1435 W.H. White 45/26/A31 J.V. Boots DCPP N.O. Shah 45/26/C36 R.J. ftDevitt 77/1467 R.A. Bitting 45/9/D16 G.R. Kast 77/1435 l

l t

l

[023/05]

.