ML20199M087: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:c i | {{#Wiki_filter:c i | ||
OATE CONTROL OF CMC's | EROWN & ROOT, INC. | ||
COMPONENT SUPPORT | INSTRUCTION ISSUE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 8/20/81 1 of i DEI-9 1 | ||
APPROVED BY: | A TITLE: | ||
CONSTRUCTION PROJECT rp$$ER | ORIGINATOR: | ||
1.1 | A 8-/3 8 / | ||
2.0 | OATE CONTROL OF CMC's REVIEWED BY: | ||
m | |||
2.2 | ,mi | ||
-p J/'/7/8/ | |||
GENERATED FOR COMPONENT SUPPORT fj g' | |||
0 ATE HANGER PACKAGES | |||
(/ | |||
APPROVED BY: | |||
bWs | |||
[/AJ'/ | |||
CONSTRUCTION PROJECT rp$$ER TE 4 | |||
INDEXED | |||
==1.0 INTRODUCTION== | |||
The purpose of this procedure is to describe the distribution and control of CMC's affecting Component Support Hanger Packages. | |||
f 1.1 REFERENCE 2.0 ROC D 2.1 CMC's will be prepared by Site Engineering and Welding Engineering, as applicable, in accordance with Engineering | |||
-Instructions and issued directly to the Hanger Package or the BRH if the Hanger Package has not been prepared. The CMC number will be referenced on the Weld Data Card by the organization making the distribution. | |||
2.2 Copies of these CMC's wi-1.1 be distributed to the DCC for record purposes and will not be distributed to the BRH as such distribution and statusing is performed as in paragraph 2;1'. | |||
NOTEi".Due to the extensive changes made in issuing Revision 1, change bars normally appearing in the right margin have been omitted. | NOTEi".Due to the extensive changes made in issuing Revision 1, change bars normally appearing in the right margin have been omitted. | ||
./ | |||
e | -- 9 | ||
~ | |||
DE e | |||
$^ | |||
~ | |||
.}} | |||
Latest revision as of 03:44, 8 December 2024
| ML20199M087 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 08/20/1981 |
| From: | Tanya Hood, Scruggs C BROWN & ROOT, INC. (SUBS. OF HALLIBURTON CO.) |
| To: | |
| Shared Package | |
| ML18052B537 | List:
|
| References | |
| FOIA-85-59 DEI-9, NUDOCS 8607100097 | |
| Download: ML20199M087 (1) | |
Text
c i
EROWN & ROOT, INC.
INSTRUCTION ISSUE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 8/20/81 1 of i DEI-9 1
A TITLE:
ORIGINATOR:
A 8-/3 8 /
OATE CONTROL OF CMC's REVIEWED BY:
m
,mi
-p J/'/7/8/
GENERATED FOR COMPONENT SUPPORT fj g'
0 ATE HANGER PACKAGES
(/
APPROVED BY:
bWs
[/AJ'/
CONSTRUCTION PROJECT rp$$ER TE 4
INDEXED
1.0 INTRODUCTION
The purpose of this procedure is to describe the distribution and control of CMC's affecting Component Support Hanger Packages.
f 1.1 REFERENCE 2.0 ROC D 2.1 CMC's will be prepared by Site Engineering and Welding Engineering, as applicable, in accordance with Engineering
-Instructions and issued directly to the Hanger Package or the BRH if the Hanger Package has not been prepared. The CMC number will be referenced on the Weld Data Card by the organization making the distribution.
2.2 Copies of these CMC's wi-1.1 be distributed to the DCC for record purposes and will not be distributed to the BRH as such distribution and statusing is performed as in paragraph 2;1'.
NOTEi".Due to the extensive changes made in issuing Revision 1, change bars normally appearing in the right margin have been omitted.
./
-- 9
~
DE e
$^
~
.