ML20125D513: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20125D513
| number = ML20125D513
| issue date = 12/09/1992
| issue date = 12/09/1992
| title = Discusses Util 920916 Ltr Providing Summary of Actions Completed for Response to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment
| title = Discusses Util Providing Summary of Actions Completed for Response to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment
| author name = Mcdonald D
| author name = Mcdonald D
| author affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| author affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = GL-89-13, TAC-M73978, TAC-M73979, NUDOCS 9212150235
| document report number = GL-89-13, TAC-M73978, TAC-M73979, NUDOCS 9212150235
| title reference date = 09-16-1992
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| page count = 4
| page count = 4
| project = TAC:M73978, TAC:M73979
| stage = Other
}}
}}


Line 25: Line 28:
==SUBJECT:==
==SUBJECT:==
GENERIC LETTER 89-13, "SEWICE WATER SYSTEM PROBLEMS AFFECTING SAFETY-RELATED LQUIPMENT" - CALVERT CLIFFS NUCLEAR POWER PLANT UNIT N05. 1 AND 2 (TAC N05. M73978 AND M73979)
GENERIC LETTER 89-13, "SEWICE WATER SYSTEM PROBLEMS AFFECTING SAFETY-RELATED LQUIPMENT" - CALVERT CLIFFS NUCLEAR POWER PLANT UNIT N05. 1 AND 2 (TAC N05. M73978 AND M73979)
By letter dated September 16, 1992, Baltimore Gas and Electric Company (BG&E) provided a summary of the actions corapleted for Unit 1 in response to Generic Letter 89-13. i.sa summary addresses each of the five recommended actions in the generic letter. You indicate that, with the exception of procedure upgrades, C1 remaining actions or equally effective alternative courses of action ha 8 aen implemented before startup from the Unit 1 1992 refueling outage. You noted that the baseline tests for the service water and component cooling water heat exchangers did not produce conclusive results and that additional test methods and procedures are being developed. The tests are scheduled to be performed during the Unit 1 spring 1994 refueling outage.
By {{letter dated|date=September 16, 1992|text=letter dated September 16, 1992}}, Baltimore Gas and Electric Company (BG&E) provided a summary of the actions corapleted for Unit 1 in response to Generic Letter 89-13. i.sa summary addresses each of the five recommended actions in the generic letter. You indicate that, with the exception of procedure upgrades, C1 remaining actions or equally effective alternative courses of action ha 8 aen implemented before startup from the Unit 1 1992 refueling outage. You noted that the baseline tests for the service water and component cooling water heat exchangers did not produce conclusive results and that additional test methods and procedures are being developed. The tests are scheduled to be performed during the Unit 1 spring 1994 refueling outage.
Appropriate plant conditions- and heat exchanger loads will be available during the outage. An interim program is currently in place which requires periodic inspection, maintenance, and cleaning of these heat exchanges iintil the baseline tests are completed.
Appropriate plant conditions- and heat exchanger loads will be available during the outage. An interim program is currently in place which requires periodic inspection, maintenance, and cleaning of these heat exchanges iintil the baseline tests are completed.
It is our understanding that, for Unit 2, all remaining actions with the exception of procedure upgrades will be implemented before startup from the Unit 21993 refueling outage.
It is our understanding that, for Unit 2, all remaining actions with the exception of procedure upgrades will be implemented before startup from the Unit 21993 refueling outage.

Latest revision as of 21:38, 22 September 2022

Discusses Util Providing Summary of Actions Completed for Response to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment
ML20125D513
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 12/09/1992
From: Mcdonald D
Office of Nuclear Reactor Regulation
To: Denton R
BALTIMORE GAS & ELECTRIC CO.
References
GL-89-13, TAC-M73978, TAC-M73979, NUDOCS 9212150235
Download: ML20125D513 (4)


Text

..

, gg nog [o,, UNITED STATES 8 a NUCLEAR REGULATORY COMMISSION

9j WASHINGTON,0. C. 20555 December 9, 1992 k *.... /

Docket No. 50-317 and 50-318 Mr. Robert E. Denton Vice President - Nuclear Energy Baltimore Gas & Electric Company Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, Maryland 20657-4702

Dear Mr. Denton:

SUBJECT:

GENERIC LETTER 89-13, "SEWICE WATER SYSTEM PROBLEMS AFFECTING SAFETY-RELATED LQUIPMENT" - CALVERT CLIFFS NUCLEAR POWER PLANT UNIT N05. 1 AND 2 (TAC N05. M73978 AND M73979)

By letter dated September 16, 1992, Baltimore Gas and Electric Company (BG&E) provided a summary of the actions corapleted for Unit 1 in response to Generic Letter 89-13. i.sa summary addresses each of the five recommended actions in the generic letter. You indicate that, with the exception of procedure upgrades, C1 remaining actions or equally effective alternative courses of action ha 8 aen implemented before startup from the Unit 1 1992 refueling outage. You noted that the baseline tests for the service water and component cooling water heat exchangers did not produce conclusive results and that additional test methods and procedures are being developed. The tests are scheduled to be performed during the Unit 1 spring 1994 refueling outage.

Appropriate plant conditions- and heat exchanger loads will be available during the outage. An interim program is currently in place which requires periodic inspection, maintenance, and cleaning of these heat exchanges iintil the baseline tests are completed.

It is our understanding that, for Unit 2, all remaining actions with the exception of procedure upgrades will be implemented before startup from the Unit 21993 refueling outage.

The necessary procedure upgrades for all the service water s*/ stems of both units will be completed as part of the BG&E's Procedure Update Project. The procedure upgrades will be completed subsequent to the perfonnance of the baseline tests discussed above ano will be implemented prior to the end of 1994. This schedule is consistent with the BG&E's prioritization process used in the procedure Upgrade Project.

U 000.2 .

c 9212150235 921209 1 PDR .ADOCK 05000317 -

0I P PDR

4 Mr. Robert E. Denton Calvert Cliffs Nuclear Power Plant Baltimore Gas & Electric Company Unit Nos. I and 2 cc:

Mr. Michael Moore, President Mr. Joseph H. Walter Caivert County Board of Engineering Division Commissioners Public Service Commission of 175 Main Street Maryland Prince Frederick, Maryland 20678 American Building 231 E. Baltimore Street D. A. Brune, Esquire Baltimore, Maryland 21202-3486 General Counsel Baltimore Gas and Electric Company Kristen A. Burter. Esquire P. O. Box 1475 Maryland People'!, Counsel Baltimore, Maryland 21203 American Building, 9th Floor 231 E. Baltimore Street Jay E. Silberg, Esquire %itimore, Maryland 21202 Shaw, Pittman, Potts and Trowt. ridge 2300 N Street, NW Fatricia T. Birnie, Esquire Washington, DC 20037 Co-Director Maryland Safe Energy Coalition Mr. G. L. Detter, Director, NRM P. O. Box 33111 Calycrt Cliffs Nuclear Powes Piant Baltimore, Maryland 21218 1650 Calvert Cliffs Parkway Lusby, Maryland 20657-47027 Resident Inspector c/o U.S. Nuclear Regulatory Commission P. O. Box 287 '

St. Leonard, Maryland 20685 Mr. Richard 1. McLean Administrator - Radioecology Department of Natural Resources 580 Taylor Avenue Tawes State Office Building 83 Annapolis, Maryland 21401 Regional Administrator, Region i U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 1940b

Mr. Robert E. Denton December 9, 1992 As a reminder, for those actions chosen .; interim or permanent alternatives to the reco unended actions of the generic letter, BG&E should document and retain in appropriate plant records a justificat';on that the heat removal requirements of the service water system are sati f'ed by use of the alternative program.

Sincerely, n . . .'. h Q

Daniel G. Mcdonald, Senior Project Manager Project Directorate I-l Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation cc: See next page

. . . ._ _~. _ _ . _ .- _ _ _ . . - __ _._-__

- Mr. Robert E. Denton December 9, 1992 As a reminder, for those' actions chosen as interim or permanent alternatives to the recommended actions of the generic letter, BG&E should document and' retain in appropriate plant records a justification that the heat removal ,

L requirements of the service water system are satisfied by use of the-alternative program.

F Sincerely, Original signed by:

Daniel G. Mcdonald, Senior Project Manager:

Project Directorate I-1 Division of Reactor Projects - I/II ,

Office of Nuclear Reactor Regulation cc: See next page l

Distribution:

l Docket" File: 00udinot AChu, 14/0/1 NRC & Local PDRs DMcDonald WLefave, 8/0/1 PDI-1 Reading CMcCracken, 8/D/1 SVarga OGC JCalvo ACR5 (10)

RAcapra Plant File CVogan CCowgill, RGN-I t

t PDI-1:LA PDI-1:PE PDI-1:PM 'SPLB/d8 / PDI-1:D CVogan M) 00ddidi[t:kmm DMcDonald CMcCIakke$ RACapra W if/ ? /92 /R/2/92 it /9/92 /h/*[/92 /I' /'f/92 ./ ' f ,

OFFICIAL RECORD COPY FILENAME: CC73978.LTR l