XNUCLEAR REGULATORY COMMISSION WASHINGTON. D. C. 20555 September 16, 1992 TO:
All POWER REACTOR LICENSEES AND APPLICANTS FOR AN OPERATING LICENSE
SUBJECT:
OPERATOR LICENSING NATIONAL EXAMINATION SCHEDULE (GENERIC LETTER (92-06)
Purpose This generic letter (GL) provides the National Examination Schedule for Operator Licensing examinations at each facility for.FY 1993 and requests licensees to provide an update to its previous estimates of the number of candidates to be tested for fiscal years 1993-1996. These estimates will assist the Office of Nuclear Reactor Regulation in planning its resources.
Background
In GL 89-03, "Operator Licensing National Examination Schedule," March 24, 1989, the U. S. Nuclear Regulatory Commission (NRC) promulgated its first national examination schedule and requested licensees to provide estimates of the number of candidates requiring examination. In subsequent generic letters the NRC updated the schedule and requested updated projections of the number of candidates to be tested each year. To plan its resources for FY 93-96, the Office of Nuclear Reactor Regulation is requesting through this generic letter that you provide an update of the number of candidates you submitted in response to GL 91-12, "Operator Licensing National Examination Schedule,"
August 27, 1991.
Requested Actions Using the proposed format on NRC Form 536, "Operator Licensing Examination Data," included as Enclosure 1, please update (a) your estimate of the anticipated number of candidates to be examined during each site visit assigned to you, (b) your annual requalification examination schedule for FY 1993 through FY 1996, and (c) your estimate of the number of candidates that you expect will participate in the Generic Fundamental Examination Schedule for FY 1993. is the current revision of the National Examination Schedule.
9209110197
Generic Letter 92-06 Your updated schedules, to be voluntarily submitted, should be sent to Mr.
Robert M. Gallo, Chief, Operator Licensing Branch, OWFN-1OD22, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555, with a courtesy copy to the appropriate regional administrator within 30 days of receiving this letter.
The NRC regional offices will normally schedule examinations consistent with the enclosed examination schedule.
However, if the workload within a region or across the nation is excessive during a particular month, the NRC may need to adjust some designated examination dates to balance its resources.
For the month of June, schedule your examinations during the first and second weeks, since the NRC normally holds its examiner training activities during the third or fourth week. The NRC regional offices will coordinate shifting examination dates with training managers for those instances requiring changes to the requested examination schedules.
You should also be aware that the staff is considering an amendment to "Operators' Licenses," Part 55 of Title 10 of the Code of Federal Regulations (10 CFR Part 55) that may alter its approach for conducting requalification program evaluations.
In the next generic letter requesting updated examination schedules, the NRC will provide additional information about its attendant effects on the National Examination Schedule.
Burden Information This request is covered by Office of Management and Budget (OMB) Clearance Number 3150-0131, which expires August 31, 1995.
The estimated average burden is 2 person-hours for each owner's response, including the time required to assess the new recommendation, search data sources, gather and analyze the data, and prepare the required letters. Comments on the accuracy of this estimate and suggestions to reduce the burden may be directed to Ronald Minsk, Office of Information and Regulatory Affairs (3150-0131), NEOB-3019, Office of Management and Budget, Washington, D.C.
20503, and to the U.S. Nuclear Regulatory Commission, Information and Records Management Branch (mail stop MNBB-7714), Division of Information Support Services, Office of Information and Resources Management, Washington, D.C.
20555.
6
Generic Letter 92-06 We appreciate your assistance in this matter and invite you to address any questions concerning this generic letter to Mr. Gallo at (301)504-1031.
Sincerely, James G. Partlow Ass dciate Director for Projects Office of Nuclear Reactor Regulation
Enclosures:
- 1. NRC Form 536, "Operator Licensing Examination Data"
- 2. National Examination Schedule
- 3. List of Recently Issued NRC Generic Letters Technical
Contact:
R. Gallo, NRR (301)504-1031
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY ORB: NO. 3104131 PEXIRES:
3/31/I5 ESTIMATED BURDEN PER RESPONSE TO COMPLY WITH THIs INFORMATION COLLECTION REQUEST: 2 HOURS.
FORWARD OPERATOR LICENSING COMMENTS REGARDING BURDEN ESTIMATE TO THE INFORMATION AND RECORDS MANAGEMENT BRANCH (MNBB 7714), U.S. NUCLEAR EXAMINATION DATA REGULATORY COMMISSION, WASHINGTON, DC 20555-0001, AND TO THE PAPERWORK REDUCTION PRWECT p150-0131), OFFICE OF MANAGEMENT AND BUDGET. WASHINGTON, DC 20503.
FACILITY NRC REGION A. PROPOSED OPERATOR UCENSING EXAMINATION SCHEDULE FY19_
FY19__
FY19 FY19_
(10101/
- 09/30/_j (10/01/
- 09/30/_j (10/01/
- 0/30/J (10/01/
-09/30/_j
- 1.
ASSIGNED DATE PER GENERIC LETTER GL89-03 NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - UMITED
- 2.
ASSIGNED DATE PER GENERIC LETTER GL89-03 NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - UMITED B. PROPOSED REQUALIFICATION EXAMINATION SCHEDULE FY 19_FY19 FY 19 FY19____
(10/01/
- 09/30/_J (10/01/_-09/30/_j (10/01/_-00/30/ _lJ (10/01/_-00/30/__
- 1. DATE (WEEK 1)
-2. DATE (WEEK 2
- 3. DATE {WEEK 3)
- 4. DATE (WEEK 4)
- 5. DATE (WEEK 5)
S. DATE WEEKS)
C. PROPOSED GENERIC FUNDAMENTAL EXAMINATION SCHEDULE FY OCTOBER 19 FEBRUARY 19 j JUNE 19 ESTIMATED NUMBER OF CANDIDATES
ENCLOSURE 2 Page 1 NATIONAL EXAMINATION SCHEDULE FACILITY OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP NAME ARKANSAS 1 X
X ARKANSAS 2 X
X BEAVER VALLEY 1 X
X BEAVER VALLEY 2 X
X BIG ROCK X
X BRAIDWOOD 1/2 X
X BROWNS FERRY 1/2/3 X
X BRUNSWICK 1/2 X
X BYRON 1/2 X
X CALLAWAY X
X CALVERT CLIFFS 1/2 X
X CATAWBA 1/2 X
X CLINTON X
X COMANCHE PEAK 1/2 X
X COOPER X
X CRYSTAL RIVER 3 X
X DAVIS-BESSE X
X DC COOK 1/2 X
X DIABLO CANYON 1/2 X
X DRESDEN 2/3 X
X.
DUANE ARNOLD X
X FARLEY 1/2 X
X FERMI 2 X
X FITZPATRICK X
X FORT CALHOUN X
X GINNA X
X GRAND GULF X.
X HADDAM NECK X
X HATCH 1/2 X
X HB ROBINSON X
X HOPE CREEK X
X INDIAN POINT 2 X
X INDIAN POINT 3 X
X KEWAUNEE X
X-LASALLE 1/2 X
X LIMERICK 1/2 X
X MAINE YANKEE X
X MCGUIRE 1/2 X
X MILLSTONE 1 X
X MILLSTONE 2 X
X MILLSTONE 3 X
X MONTICELLO X
X NINE MILE POINT 1 X
X NINE MILE POINT 2 X
X NORTH ANNA 1/2 X
X
ENCLOSURE 2 Page 2 NATIONAL EXAMINATION SCHEDULE FACILITY OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP NAME OCONEE 1/2/3 X
X OYSTER CREEK X
X PALISADES X
X PALO VERDE 1/2/3 X
X PEACH BOTTOM 2/3 X
X PERRY X
X PILGRIM X
X POINT BEACH 1/2 X
X PRAIRIE ISLAND 1/2 X
X QUAD CITIES 1/2 X
X RIVER BEND X
X SALEM 1/2 X
X SAN ONOFRE 1 X
X SAN ONOFRE 2/3 X
X SEABROOK 1/2 X
X SEQUOYAH 1/2 X
X SHEARON HARRIS X
X SOUTH TEXAS 1/2 X
X ST. LUCIE 1/2 X
X SURRY 1/2 X
SUSQUEHANNA 1/2 X
X THREE MILE ISLAND 1 X
X TROJAN X
X TURKEY POINT 3/4 X
X VC SUMMER X
X VERMONT YANKEE X
X VOGTLE 1/2 X
X WATERFORD 3 X
X WATTS BAR 1/2 X
X WNP 2 X
X WOLF CREEK X
X YANKEE ROWE X
X ZION 1/2 A
ENCLOSURE 3 LIST OF RECENTLY ISSUED GENERIC LETTERS Generic Letter No.
Date of Issuance SubJect 92-05 92-04 NRC WORKSHOP ON THE SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE (SALP) PROGRAM RESOLUTION OF THE ISSUES RELATED TO REACTOR VESSEL WATER LEVEL INSTRUMENTATION IN BWRs PURSUANT TO IOCFR50.54(F) 09/04/92 08/19/92 Issued To ALL HOLDERS OF OP OP LICENSES OR CONST. PERMITS FOR NUCLEAR PWR REACTORS ALL BWR LICENSEES FOF OPERATING REACTORS 90-02 SUPPLEMENT 1 87-02 SUPPLEMENT 1 ALTERNATIVE REQUIREMENTS FOR FUEL ASSEMBLIES IN THE DESIGN FEATURES SECTION OF TECHNICAL SPECIFICATIONS SAFETY EVALUATION REPORT NO. 2 ON SQUG GENERIC IMPLEMENTATION PROCEDURE, REVISION 2.
07/31/92 05/22/92 ALL LWR LICENSEES AND APPLICANTS ALL USI A-46 LICENSEES WHO ARE SQUG MEMBERS 92-03 COMPILATION OF THE CURRENT LICENSING BASIS:
REQUEST FOR VOLUNTARY PARTICIPATION IN PILOT PROGRAM 03/19/92 ALL NUCLEAR POWER PLANT APPLICANTS AND LICENSEES 92-01 REVISION 1 REACTOR VESSEL STRUCTURAL INTEGRITY, 10CFR50.54(f) 3/06/92 ALL HOLDERS OF OP LICENSES OR CONST.
PERMITS FOR NUCLEAR PWR PLANTS (EXCEPT YANKEE ATOMIC FOR YANKEE NUC PWR STA.)
92-02.
RESOLUTION OF GENERIC ISSUE 79, UNANALYZED REACTOR VESSEL (PWR) THERMAL STRESS DURING NATURAL CONVECTION COOLDOWN 03/06/92 ALL HOLDERS LICENSES OF PERMITS FOR OF OP CONST.
PWRs 92-01 REACTOR VESSEL STRUCTURAL INTEGRITY, 10CFR50.54(f)
NOT ISSUED Revision Listed Above ALL HOLDERS OF OP LICENSES OR CONST.
PERMITS FOR NUCLEAR PWR PLANTS (EXCEPT YANKEE ATOMIC FOR YANKEE NUC PWR STA.)
Generic Letter 92-
- Code of Federal Regulations (10 CFR Part 55) that may alter its approach for conducting requalification program evaluations.
In the next generic letter requesting updated examination schedules, the NRC will provide additional information about its attendant effects on the National Examination Schedule.
Burden Information This request was previously covered by Office of Management and Budget (OMB)
Clearance Number 3150-0131, which expired March 31, 1992.
(A request for a clearance extension has been submitted to OMB.) The estimated average burden is 2 person-hours for each owner's response, including the time required to assess the new recommendation, search data sources, gather and analyze the data, and prepare the required letters.
Please send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the U.S. Nuclear Regulatory Commission, Information and Records Management Branch (mail stop MNBB-7714),
Division of Information Support Services, Office of Information Resources Management, Washington, D.C. 20555, and to the Paperwork Reduction Project (3150-0131), Office of Information and Regulatory Affairs, NEOB-3019, Office of Management and Budget, Washington, D.C. 20503.
We appreciate your assistance in this matter and invite you address any questions concerning this generic letter.
Sincerely, James G. Par ow Associate rector for Projects Office of uclear Reactor Regulation
Enclosures:
- 1. NRC Form 536, "Operator Licensing Examination Data"
- 2. National Examination Schedule
- 3. List of Recently Issued NRC Generic Letters Technical
Contact:
R. Gallo, NRR (301)504-1031 DISTRIBUTION:
Ce~ntral Files OLB RF PDR LVick WDean JCaldwell JClifford RGallo DMcC in CThomas JRoe WRussell JPartlow TMurley JMi aglia GMarcus
- See previous concurrence OFC OLB:DLPQ OLB:DLPQ 0 B:DLPQ OLB:DLPQ Tech:Editor NAME DMcCain LVick:rc ean RGallo JMain DATE 07/10/92* 07/10/92*
7/10/92*
07/15/92*
07/10/92*
OFC DDIR:DLPQ DIR:DLP OGCB:NRR ADT:NRR ADP:NRR NAME CThomas JRoe GMarcuscifM WRussell JPartlow DATE 07/17/92*
07/30 2*
9/ a/92 07/31/92*
/
/92
Generic Letter 9 2-Or We appreciate your assistance in this matter and invite you to address any questions concerning this generic letter to Mr. Gallo at (301)504-1031.
Sincerely, James G. Partlow Associate Director for Projects Office of Nuclear Reactor Regulation
Enclosures:
- 1. NRC Form 536, NOperator Licensing Examination Data"
- 2. National Examination Schedule
- 3. List of Recently Issued NRC Generic Letters Technical
Contact:
R. Gallo, NRR (301)504-1031 DISTRIBUTION:
Central Files JClifford JPartlow OLB RF RGal 1o TMurl ey PDR DMcCain JMiraglia LVick CThomas GMarcus WDean JRoe JCaldwell WRussell
- See OFC NAME DATE OFC NAME DATE previous OLB:DLPQ DMcCai n 07/10/92w DDIR:DL CThomas 07/17/9 concurrence OLB:DLPQ C
LVick:rc V
e 07/10/92*
C PQ DIR:DLPQ JRoe 2*
07/30/92*
ILB:DLPQ HDean D7/10/92*
OGCB:NRR GMarcus
/
/92 OLB:DLPQ RGallo 07/15/92*
ADT: NRR WRussell 07/31/92*
Tech: Editor JMain 07/10/92* _
I i4 /92
Generic Letter 92-assess the new recommendation, search data sources, ga er and analyze the data, and prepare the required letters.
Please se omments regarding this burden estimate or any other aspect of this col ion of information, including suggestions for reducing this burde,to the U.S. Nuclear Regulatory Commission, Information and Records Managem t Branch (mail stop MNBB-7714),
Division of Information Support Services, ffice of Information Resources Management, Washington, D.C. 20555, and o the Paperwork Reduction Project (3150-0131), Office of Information an egulatory Affairs, NEOB-3019, Office of Management and Budget, Washington D.C. 20503.
We appreciate your assistance in is matter and invite you to address any questions concerning this generi letter.
Sincerely, James G. Partlow Associate Director for Projects Office of Nuclear Reactor Regulation
Enclosures:
- 1. NRC Form 536, "Operat r Licensing Examination Data"
- 2. National Examination chedule
- 3. List of Recently Issu d NRC Generic Letters Technical
Contact:
R. Gall\\, NRR (301)50 1031 DISTRIBUTION:
Central Files OLB RF PDR LVick WDean JCaldwell JClifford RGallo DMcCain CThomas JRoe WRussell JPartlow TMurley Miraglia
- See previous concurrence OFC OLB:DLPQ OLB:DLPQ LB:DLPQ OLB:DLPQ Tech:Editor NAME DMcCain LVick:rc Dean RGallo JMain DATE 07/10/92* 07/10/92*
07/10/92*
07/15/92*
07/10/92*
OFC DDIR:DLPQ
.QU1JLP OGC:-NRR A D ADP:NRR NAME CThomas Jfe /
rcus WRussell JPartlow DATE 07/17/92*
9
/ /92 i/3 4/92
/ /92
Generic Letter 92-We appreciate your assistance in this matter and invite you to address any questions concerning this generic letter to Mr. Gallo at (301) 504-1031.
Enclosures:
- 1. NRC Form 5 Examinati
- 2. National E
- 3. List of Re Generic Technical Cont DISTRIBUTION:
Central Files JClifford JPartlow
- See previous OFC OLB:DLPQ NAME DMcCain DATE 07/10/92V Sincerely, James G. Partlow Associate Directo for Projects Office of Nucle Reactor Regulation 36, Operator Licensing on Data xamination Schedule cently Issued NRC Letters tact:
R. Gallo, NRR (301)504-1031 OLB R PDR LVick WDean JCaldwell RGal o DMcCain CThomas JRoe WRussell TMurley JMiraglia concurrence OLB:DLPQ LB:DLP@4L:
DLB:DLPQ Tech:Editor L/ick:rce/9
/Deant '"
/u
- Gal/9 JMa0 n
7 //o/92 11/9
/,/92 07/10/92*
OFC NAME DATE DIR:DLPQ JRoe
/
/92 OGCB:NRR CBerlinger
/ /92 ADT:NRR WRussell
/ /92 ADP:NRR JPartlow
/ /92
Generic Letter 92-We appreciate your assistance in this matter and invite you to address any questions concerning this generic letter to Mr. Gallo at (301) 504-1031.
Sincerely, James G. Partlow Associate Director for Projects Office of Nuclear Reactor Regulation
Enclosures:
- 1. NRC Form 536, Operator Licensing Examination Data
- 2. National Examination Schedule
- 3. List of Recently Issued NRC Generic Letters Technical
Contact:
R. Gallo, NRR (301)504-1031 DISTRIBUTION:
Central Files JClifford JPartlow OLB RF RGallo TMurley PDR DMcCain JMiragl ia LVick WDean CThomas JRoe JCaldwell WRussell OFC LPQ NAME NcCain DATEil /fD/92 OLB:DLPQ LVick:rc
/
/92 OLB:DLPQ WDean
/
/92 OLB:DLPQ RGallo
/
/92 Tech: Editor
/
/92 OFC NAME DATE DDIR:DLPQ CThomas
/
/92 DIR:DLPQ JRoe
/
/92 OGCB:NRR CBerlinger
/
/92 ADT:NRR WRussell
/
/92 ADP:NRR JPartlow
/
/92