ML20069A928: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:'
              . ;                      ARKANSAS POWER & LIGHT COMPANY x
c iman Arkansas Nuclear One
  \                                DERGENCY PLAN PROCEDURE                                        FORM 1000 06A DIERGENCY ACTION LEVEL RESPONSE                  Page 1 of 2 g%c              1903.10 REv. 3 s      4 q        .
w' ll%mt g,                      nlL s, 9                    a                -
d5Y:"
i                                    J b.qa rl ij d jj d      ghp        I  ff    /((
4 , i                                                                      d                        -
RECORD OF CHANGES AND REVISIONS PAGE            REVISION CHANGE    PAGE        REVISION CHANGE      PAGE        REVISION CHANGE 1                  2              19              2                37              3 2                  2              20              3                38              2 3                  2              21              3                39              2 4                  2              22              3                40              3 5                  2              23              2                41              3 6                  2              24              2                42              3 7                  2              25              2                43              2 8                  2              26              2                44              2 9                  2              27              3                45              3 10                  3              28              3                46              3 11                  3              29              3                47              3 12                  3              30              2                48              2
(
13                  2              31 ,            2                49              2 14                  2              32              3                50              2 15                  2              33              3                51              3 l
16                  2              34              3                52              3 l
l 17                  2              35              2                53              3 18                  2              36              2                54              3 APPROVED BY:
* APPROVAL DATE 3!)C{'{nefe<, An enh' h/.- > -                                74.p(
                                          ''*^'"***'*                                        ~
8112220087 811215 DR ADOCK 05000
 
{'
ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One i
EIERCENCY PLAN PROCEDURE l FORM 1000.06A ew- '
EMERGENCY ACTION LEVEL RESPONSE                Page 2 of 2 9                    1903.10 REV. 3
                                            &      N RECORD OF CHANGES AND REVISIONS PAGE        REVISION CHANGE        PAGE        REVISION CHANGE    PAGE      REVISION CHANGE 55            3
;          36            3 57            3 58            3 59            3
!O i
60            3 61            3 O
APPROVED BY:
APPROVAL DATE
:'X>C4'%..(~.      .6s      .sr?X, ds, -
                                  <cem uu, mot m                              2_2cr- /
l
 
l PLANV M A NUAL SECTION:              P90CEDUREJWORK PLAN TIVLE:                                      NO.
I                FMERGENCY PLAN                                  EffERGENCY ACTION LEVEL RESPONSE                      1903.10 PAGE          10 of 61 ARKANSAS NUCLEAR ONE                                                atvisioN            3 DATE    7/16/81 CHANGE                DATE
                              , x. ..
            ~..,.  .
_ .p.
_                    ..a                                                                                                                                    . ~ .-- -
Cr                      i ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One                                                            ~~*            ~
mtL          EY.ERGENCT ACTICN LEVEL FISPONSE
            ;- h .                ~
l FCau ho.
1903.10B
[ ".a.                                                                                                                  REV. # 3      PC i 1.*NUSUAL EVE.NT                            Fase 1 of 2 SHIIT ADMINISTRATIVI ASSISTAST NOTIFICATION LIST AND RECCRD
          . -                                                                                                                        DATE
            . , .y
      ,i. C :. '                                                                                                                          INITIALS /TI E
          ;I                                            1. Complete as much of Form 1903. LCM, "EAL Notification'' as Rh                                                    available information and time allows.                                                                                  ^~
NOTE:        The order of notification may be rearratged as dictated by the situation with approval of the Shif t Operations
    ''      g';m          *"
Supe rvis o r. These groups should be contacted by the most                                egg - yg                      .fe, expedient means available (paging, contacting appropriate response center for relaying information, direct phone
                                  ,.                                  call, radio contact, etc.). The phone numbers (plant personnel) provided are for use if an individual is not onsite, the appropriate response center has not been manned, etc.
: 2. Provide the initial information on Form 1903.10M to the
                    .                                        following groups:                                                                                                            -
2.1 Duty Emergency Coordinator (a duty roster is maintained                            /
            ,~                                                      in the Shif t Supervisor's office; refer to Attachment 1
        ' f.-
for telephone numbers as necessary).
2.2  Nuclear Regulatory Cornission [ Hotline; or7.                    V                                                      -
                                                                                                                                                                              .' ' ,~.(.
                                                                                                                                                    /
(if the region office is contacted, request that this                                                                -
information be forwarded to the Bethesda Emergency
: 4. J.ry                  -
Operations Center)].                                                                                . .          .u.
2.3  Arkansas Department gf Health [V -    .
V (or contact                    /
the CES at.              cr via the CES radio channel and g                                                    request them to notify the Health Department)).                                                  .
                                                                                                                                                                                        .p.      7 2.4 Emergency Tease requiring imediate response only (refer M
to the individual attachment for call list if team per-sonnel are not currently on site):                                                                -            .
NOTE:        The following minimum information should be provided                                                                  ,
to the team leader: affected unit, EAL declared, appropriate plant conditions / parameters, required response.
2.4.1        Security Fersonnel (V'  .          V) or Evacuation                /
Team (Attachrent 2)
K&*                      j                                                                                                                                            .
r$N-.
* THE MATERI AL CCNTAINT.D WITHIN THE SYMBOLS ( ) IS FROPRIETARY
                                                                                                                                                                                .~- -
YJ                3                              ,    OR FRIVATE INTCRMATION.                                                                          .-- ---Sh, t,
S..
                                                                                                            ,                        e      *  .e  S
[Qj 1 %d4 - , {s.-hm'h* W.;;w 5C.hM!'' -
7'            .~.
:. N7    s.  -
r.: . = .'. h _::.-l.K . a h* '. A O S le' ,;;/ k i-e..$
 
5 PLANT M ANUAL SECTION:                  PROCEDURENVORK PLON TITLE:                                      NO:
                    ...                                            E::ERGENCY PLAN                              ' EMERGENCY ACTION LEVEL RESPONSE                          1903.10 PAGE          Al 01 D1 ARKANSAS NUCLEAR ONE                                                  aEvisioN CHANGE a DATE      < / A '< "
DATE
          .      .'Os.
                                    ,k ' . .
      .-v. .                .
M:u                  ,                                                                                                                                              .
                                                                                                                                                                                  ~.-a.,                    ..
4-                  C                                                  ARKANSAS POWER & LIGHT COMPANY
          ...                                                                                        Arkansas Nuclear One
                            ..e
      . - W.
                            *~
TITtL a'
EMERCENCY ACTIC' LEVEL RESPONSE                  l FORM NO.1903.10B MN.f3        PC f Page 2 of 2 DATE INITIALS / TIME
                                  ~
J'*~                                                    2.4.2      Fire Team (Attachment 3)                                        /
      %a                                                                                                                                                                                            ..
2.4.3      Medical Team (Attachment 4)                                    /
                                                                                                                                                                                            " ~ " ' '
          ~ . .
                              ~
2.4.4      Ra<'iation Team (Attachment 5)                                  /
JNbdJM                                                          2.5 Little Rock Control Center ( __                ; or contact                /
                                                                                                                                                                                      ;g,n                    -
either the OLS or the MSS Dispatch Center and request them to notify the LRCC).
* Fr          #
y
_..)
2.6 Ceneral Manager (9 ,_ __.___
                                                                                            .                                                      /
2.7 NRC Resident Inspectors (either one):                                      /
                                ~
V 2.7.1      W.D. Johnson /                    )V 2.7.2      L.J. Callan                      J
      .t        ,,_          .
c,rg.                ?
3-
: 3.              Provide updates, as necessary, to t'4e following groups:
1                            '
3.1 Duty Emergency Coordinator                                                                                              _ , ,
          .?.                                                                                                                                                                              .x.
3.2 Nuclear Regulatory Commission
    **T"'''                '"'I Arkansas Department of Ifealth 3.1                                                                                                          . . < , .
              ~                  '
3.4 Little Rock Control Center
* l
:h',$. !)I                                                      4. At the termination of the event, this form and other applicable                                        .
g" ',    ..
                                                                                                                                                                                                          ~ * ,
information should be turned over to the Duty Emergency Coordinator.
      .r; -
Shift Administrative Assistant                      - "
    ~$:.''
      ~
h                                            THE MATERIAL CONTAINED WITHIN THE SYMBOLS (y) 13 PROPRIETARY
                                                                                                                                                                                        -[ * ['.
r f'.'Q                                                                                                                                                                                      .
f ."_
                  ~'
                          ]''T                                    '
OR PRIVATE IhTORMATION.                                                                                                  ..
l ,                                                                                                                                                                                L .'.$.j ~n.
                                                                                                                                                                                        .                f
    &~:::                  i .. .a.              Y a: * $5 ':, .,- ,,c .                  z.--- . . , .        --
_y        _ :. . __u      _4. , _, ., _
 
I l
                                              .                      PLANT M AMUAL SECVION:                PROCEDURE / WORK PLAN TlVLE:                                  N O.
EMERGENCY PLAN                                        EMERGENCY ACTION LEVEL RESPONSE                  1903.10 F            I                                                                                    PAGE          12 of 61 s
ARKANSAS NUCLEAR ONE                                                  uwsma CHANGE 3 o^n DATE
                                                                                                                                                                            " tom
                                                  ~
                        .                                                                                                                                                  I g,g                        .,.9                              ,
i-~..~
      .c ..          ,          .  ..
ARKANSAS POWER & LIGHT COMPANY                                                                            ~
Arkansas Nuclear One N          EMERGENCY ACTION LIVEL RESPONSE
        ,                            ..                                                                                                l FOAM NO.1903.10C UN. f 3        FC f lihTSUAL EVENT                        Page 1 of 2 DL*TY EMERGENCY COORDINATOR NOTIFICATION LIST AND RECORD C ,+ -                    .                                                                                                          DATE
: q.  '
        ;,                                                                                                                                  INITIALS / TIME O''                              '
: l.      Notified that an Unusual Event Emergency Action Level has                        /
                    ..                                                been declared, based on the following conditions (List):
gy                          y                                                                                                                                            ^ ~L      ."^' 1 ^- ? &
Q              .+                                                                                                                                                            .
      ~
: 2.      If on-site, or if deemed necessary to report to site,                          /
record the time that the Shif t Operations Supervisor was relieved of Duty Emergency Coordinator responsibilities.
e, -,                          .                      3.      If a radiological release is involved:
                                    .                                3.1 Relieve the Shift Operations Supervisor of respon-                          /
          ,~                      _
sibilities for calculating the magnitude of radio-                                                              -
logical release.                                                                                          . " - .
1
: 4.      Provide updates to the following groups, as necessary:                                                            .
ep *} a                                                                                            -
i'*---
                                    }
4.1      General Manager ,                                                                                              .
4.2      NRC Resident Inspector (initially contacted)
    ..[;.,Q N
      ^-                        '-
4.2.1 y
                                                                                                                                  )y                                    '.M' .WM-YM @
W.D. Johnson [
        ~n:
4.2.2      L.J. Callan. '
                                                                                                                                )
: 5.        At the termination of the event, provide a verbal summary to:                                                                                                                                  -
5.1      Nuc{ ear Regulato p Commission (Hotline; or                i                                                  /
Y 5.2 Arkansas Department of Health''                                            /
      - T. ff                          -
                                                                                                                                                                            ~,
                                                                                                                                                                                      ..i'_",-
,      ' l,*?-i                      :i                                                                                                                                                      > '
l
        'u!"i        *-
                                      -'                                s      THE MATERIAL CONTAINED WITHIN THE SYMBOLS (y) IS FROTRIETARY
                                                                                                                                                                                ' ' ~ ~J t P ' 8?          L
, (                                                                            OR FRIVATE IhTORMATION.
1          -
l
                                                                          ,g  e e                                                                                          en    g
                          -  1                _E      '-e W. e*S'    *          % -                                                              *      '
 
            .x                              PLANT M ANUAL SECTION:                PROCEDURE / WORK PLAN TITLE:                                                              N O.
                                                                                                          ~
      ..C h                  I                EMERGENCY PLAN                                                  EMERGENCY ACTION LEVEL RESPOSSE                                    1903.10 20 01 61 b
PAGE ARKANSAS NUCLEAR ONE                                                                        aEwsioN CHANGE 3 oATE DATE
                                                                                                                                                                                </ to/"
    ,d  .
0.&.    .
y                    :;.                                                                                                        .
      .g..
gg. .                                                                                                                                                                              . ~..., n                    -
  .i                  .
ARKANSAS POWER & LIGHT COMPANY                                                                                                -.
Arkansas Nuclear One EMTRCENCY ACTION LEVEL RESPONSE                                l FORW NO-1903.10E
        .                                          Tiitt.
  ' W_
* M. ~.
c,Ii                                                                                                                  RIV. # 3          PC f Page 1 of 3
          ,    s..                                                                            ALERT
          ' *
* SHIIT ADMINISTRATIVE ASSISTANT
    , ; .                                                              NOTIFICATION LIST AND RECORD v%v
            -d                                                                                                                            DATE 3                                                                                                                                        INITIALS /T!ME                                    5
'$557.
: 1.      Coreplete as much of Form 1903.10M, "EAL Notification" as available information and time allows.
u..                    NOTE:          The order of notification may be rearranged as the sit-                                                              ,. _ _ _ .
NY
__m                  _.
uation dictates with approval of the Shif t Operations Supe rvis o r. These groups should be contacted by the most expedient means available (paging, contacting appro-M'                                      priate response center for relaying information, direct
                                                                                                                                                                                    ~
phone call, radio contact, etc.). The phone numbers (plant personnel) provided are for use if an individual is not onsite, the appropriate response center has not been manned, etc.
: 2. Provide the initial information on Form 1903.10M to the                                                                                  ~
following groups:                                                                                                                                    .
e.'g i! >
              ~
2.1 Duty Emergency Coordinator (a duty roster is maintained                                                    /
in the Shif t Supervisor's of fice; refer to Attachment 1
      ".-,                                          for telephone numbers as necessary).                                                                                                          ~~"
v
                                                                                                                                ^
Nuclear Regulatory Connission [ Hotline; or iV
                      ^
2.2                                                                                    __
                                                                                                                                                            /
gg -'                                              (if the region office is contacted, request that this                                                                              , ,        ,,
infcrmation be forwarded to the Bethesda Emergency
                  .                                Operations Center)).                                                                                                                              .
v 2*                                        2.3    Arkansas gepartment,      of Health [v.
                                                                                                                      ;.or contact                          /
4.id;;,
l                              the OES (      ~
or use the OES radio channel) and                                                            p .@) Me.*MfAM 9 request them to notify the Health Department).
      .->+.                                  2.4      Emergency Teams requiring immediate response (refer                                                                              ,
to the indicated attachment for call out list if                                                                                                        -
team personnel are not currently on site).
                                                                                                                ~
NOTE:            The following minimum information should be pro-vided to the team leader: affccted unit, EAL
(+;1ared, appropriate plant conditions / para-meters, required response and suggested pro-tective actions (if necessary).
      . .m
  *%..l,                                                                                                                                                                        :-              . .
t.VY./.
a.y
* 1
                                                  ' T1.E MATERIAL CONTAINED WITHIN THE SYMBOLS (g) IS PROPRIETARY                                                                        ~~' M                    2" (v                                                    OR PRIVATO INFORMATION.
a  g 8                              g            .g  .
e  9 -
e jQy -L.w.w . s. i . ~ W. . ..nz d!i:.
                                                                                    .3
__~      ' . 9 ::.~7.
 
h PLANT M ANUAL SECTION:              PROCEDURE / WORM PLAN TITLE:                                      NO:
            ,'                                              N RGENCY PLAN                                  Et!ERGENCY ACTION I.EVEL RESPONSE                          1903.10 PAGE          21 of 61 ARKANSAS t'.. CLEAR ONE                                                aEvisioN            3 oATE    7/io/8i CHANGE                  DATE r          -
                                            ~ - ., ; .
X k&y.y. "k                                                                                                                                                            w.~. ,
2 2-                ->
ARKANSAS POWER & LIGHT COMPANY                                                                  -          - -              -
Arkansas Nuclear One
          -M                    C-                                ME-        EMERGENCY ACTION LEVEL RESPONSE                    lroAMNO. 1903.10E
              ,.s.. . .
REV. # 3      PC #
Page 2 of 3
        - k *:                                                                                                                          DATE P
          / ;:. .'.                                                                                                                    INITIALS / TIME
            . [-'.'                                              2.4.1      Evacuation Team (Attachment 2)                                  /                                          .i
        -4.i tU                                                                                                                                                                s            d ...
2.4.2      Fire Team (Attachment 3)                                        /
          ~ ..
2.4.3      Medical Team (Attachment 4)                                      /
    .'' N I b3                                                    2.4.4      Radiation Team (Attachment 5)                                    /                    *T T ;-~                        7 5
  ,                                                        2.5 Operations Management (contact one of the following                            /
{              *R                                              individuals):                                                                                                  .- , ,-
2.5.1        8.A. Baker i                                                                                            .
V                                      'V
                        .                                        2.5.2        S.J.McWilliams\
          - . -                                                              V                                  V 2.5.3        L.A. Taylor                                                                                                  -
: . . .                                                                                                y
,      E^ T                                                2.6 Little Rock Control Center (y                    ; orc contact                /                                          -
i,.;j.                        ,                            either the OES or the MSS Dis' patch Center and request
          * .*                                                    them to notify the LRCC).
p.;,,.
              '~
2.7 E ergency Teams og requiring immediate response (refer                                                                , f,.
to the indicated attachment for call list if team                                                                      ,-
        . . .r                                                    personnel are not currently onsite):
      -wy d    .              .n                                                                                                                                                    .....:..
NOTE:      The following minimum information should be pro-                                                                  ,
i                                                                        vided to the team leader: affected unit, EAL l              .- ,              ._                                      declared, appropriate plant conditions / parameters,                                                        .
1
[VM:                    gi                                        time team placed "on call."                                                                M gay.jpg Jb: 9 2.7.1      Evacuation Team (Attachment 2)                                    /
2.7.2      Fire Team (Attachment 3)                                          /
2.7.3      Medical Team (Attachment 4)                                      /                                                      -
2.7.4      Radiation Team (Attachment 5)                                    /
      ' . , 4h ..[                                                                                                                                                  ...      . [AI 'i
* uh                                                                                                                                                                  -
                                  ?
                  #, ,t'' ".                                ,                                                                                                                . . , -
r THE .U TERIAL CONTAINED WITHIN THE SYMBOLS (p) IS PROPRIETARY                                          - -
                                                                                                                                                                                    .'6 t a i. Li .-
c                                                            OR PRIVATE INTORMATION.
                                                              .                    *                  .e
* e      -  .g    e
      . . ;,C...            ..
                              .a..,.  ..          .....:~...,.
                                                                . -;,.,- n,    - .n
                                                                                              .~ -  .; . . . . ..
                                                                                                                                                                    ~..
                                                                                                                                                                        .y
 
r i
                                              -                    PLANT M ANU AL SECTION:          PROCEDURE /WORR PLAN TITLE:                                    N O-uma
                  .                                                  EFERGENCY PLAN                              ErfERGENCY ACTION LEVEL RESPONSE                        1903.10
        "'                                                                                                                                PAGE          22 of bl
  \
ARKANSAS NUCLEAR ONE                                              TEvisioN CHANGE 3 DATE DATE 7/16/81 6
s , *?
caa                        .,
ARKANSAS POWER & LIGHT COMPANY CL                          -                                                            Arkansas Nuclear One                                                              -
        , , ~                        .
TITtt      EMERGENCY ACTION IIVEL RISPONmE              l FOPu aso. 1903.10E
              .~.                -;
    ',7*.:c-,                                                                                                                      REV. # 3        PC #
                                  ? ~
Page 3 of 3 DATE
        ~
INITIAI.S/ TIME
: v.        ,
                                                                                                              -y 2.8 Ceneral Manager y '. , .                                                  /
                -                                                  2.9 NRC Resident Inspectors (either one)                                      /                                                ,
s.> .
2.9.1      W.D. Johnson ;b'                )Y 2.9.2      L.J. Callan [                }
2.10 TOCC Liasion V                V r                                                                        2.10.1    L. V. Schempp J                                              /
l
: 3. Notify the Duty Emergency Coordinator that the initial                        /
notifications have been a:ade (inform him of any individuals that contact could not be made with).
: 4.      Provide updates to the following groups until relieved of this responsibility:                                                                                  .
4.1 Duty Emergency Coordinator
        ~ '
* 4.2 Nuclear Regulatory Commission                                                                            , '~
s
                                                                                                                                                                                ~
4.3 Arkansas Department of Health (unless otherwise                                                                -                -
directed)                                                                                                .
4.4 Little Rock Control Center (unless otherwise directed)
: 5. Unless required to report onsite, at the termination of the                    /
event, notify the individuals contacted in Step 2.7 above M,.N, N                                                              to secure from "on call" status.                                                        MH?MM                            OS
: 6.      At the termination of the event, this form and other ap-
        "&                                                          plicable information should be turned over to the Duty                                                      -
Emergency Coordinator.
Shift Administrative Assistant ElY ?j                                                                                                                                                              ...~.
* z
        $/2                          ~'
j                                  THE MATERI AL CONTAINED VITHIN THE SDiBOLS ( ) 15 FROFFIETARY
                      %i                                                ,  OR PRIVATE INFORMATION.                                                                              ;..,,          .,    .
              . -.                    *.          ..                  . ~              - - -            .
                                            ' s p . h ??. v n ai- n .*:.r.-A d W W -- u ~~ ~~ ~ ~'~':. -
f',ff-:
                                                                                                          ''-                -e...    . - 3 .': . a . '. ~ ;' h , . ' , ky.lL u.k
                                                                                                                                                                                                ....w
 
4 PLANT M ANU AL SECTION. PROCEDURE!WO AX PLAN TITLE:                    NO-EMERGENCY PLAN                      EMERGENCY ACTION LEVEL RESPONSE          1901.10 PAGE    27 of 61 (m  j      ARKANSAS NUCLEAR ONE                                  aEvision CHANGE 3 DATE  7/is/ai t
N_/                                                                            DATE 8.2.5        Emergency Response Team Leaders A. The Emergency Response Team Leaders or Alternates are notified by the Shift Administrative Assistant that a Site Emergency has been declared.
B. The Emergency Response Team Leader or Alternates shall call out and assemble the teams. The Team Leader or Alternate shall report to the Duty Emergency Coordi-nator when the team is assembled.
8.2.6        Incident Response Director A. The Incident Response Director is notified by the Little Rock Control Center that a Site Emergency has been declared.
B. The Incident Response Dicector shall report to the Emergency Control Center when notified that a Site Emergency has been declared.
C. The Incident Response Director shall activate the General Of fi< e portions of the Emergency Response
[''N                          Organization, as needed.
8.2.7        Recovery Manager A. The Recovery Manager is notified by the Shift Admin-istrative Assistant that a Site Emergency has been declared.
B. The Recovery Manager shall immediately report to the Onsite Technical Support Center when notified that a Site Emergency has been declared.
8.2.8        Operations Manager A. The Operations Manager is notified by the Shift Ad-ministrative Assistant that a Site Emergency has been declared.
i B. The Operations Manager shall immediately report to the Onsite Technical Support Center when notified that a Site Emergency has been declared.
8.2.9        Maintenance Manager A. The Maintenance Manager is notified by the Shift Ad-
, 7- 3                          ministrative Assistant that a Site Emergency has been l
I
(--)                          declared.
f
 
PLANT M ANUAL SECTION:    PROCEDUREN/ORK PLAN TITLE:                    NO-EMERGENCY PLAN F 1                                      EMERGENCY ACTION LEVEL RESPONSE PAGE 1903.10 _      t O                                                                          28 of 61                    I
\/
ARKANSAS NUCLEAR ONE                                aEvision CHANGE
                                                                              , oatE  7/ie/81 DATE B. The Maintenance Manager shall immediately report to the Onsite Technical Support Center when notified that a Site Emergency has been declared.
8.2.10      Operations Superintendents A. The Operations Superintendent are notified by the Shift Administrative Assistant that a Site Emergency has been declared.
B. The Operations Superintendents shall immediately re-port to the Control Rooms of their respective Units and inform the Onsite Technical Support Center of his presence in the Control Room.
8.2.11      Health Physics and Chemistry Superintendent A. The Health Physics and Chemistry Superintendent is notified by the Shift Administrative Assistant that a Site Emergency has been declared.
B. The Health Physics and Chemistry Superintendent shall immediately report to the Onsite Technical Support 0-                              Center when notified that a Site Emergency has been declared.
8.2.12      Nuclear and Engineering Support Superintendent A. The Nuclear and Engineering Support Superintendent is notified by the Shift Administrative Assistant that a Site Emergency has been declared.
B. The Nuclear and Engineering Support Superintendent shall immediately report to the Onsite Technical Support Center when netified that a Site Emergency has been declared.
U
 
PLANT M ANUAL SECTION:    PROCEDURENVORK PLAN TITLE:                      NO:
EMERGENCY PLAN                    EMERGENCY ACTION LEVEL RESPONSE            1903.10 1
l PAGE    29 of bl (V)              ARKANSAS NUCLEAR ONE                              aEvisioN    3 DATE    7/16/81 CHANGE          DATE 8.2.13      Maintenance Superintendents A. The Maintenance Superintendents are notified by the Shif t Administrative Assistant that a Site Emergency has been ueclared.
B. The Maintenance Superintendents shall immediately report to the Onsite Operational Support Center when notified that a Site Emergency has been declared.
8.3 Termination or Escalation of Emergency Action Level 8.3.1      The Site Emergency Emergency Action Level may be de-escalated to a lower Emergency Action Level or be terminated by recovery covery from the event.
8.3.2      The Site Emergency Emergency Action Level may be escalated to a General Emergency Emergency Action Level is the criteria of section 9.0 is met.
d.3.3      The Site Emergency Emergency Action Level may be closed out after being terminated by a briefing by the Incident Response 7- s                      Director to the appropriate offsite authorities.            A written
('' )                      summary of the event shall be transmitted to the NRC and ap-propriate offsite authorities.
8.4 Fo rms 8.4.1      The following forms describe the notifications and records to be made by the appropriate individuals for the Site Emergency Emergency Action Level. Date the form where indicated (if the date changes before the form is complete, indicate the new date on the appropriate initial / time line). As notifi-cations are completed, initials and time should be placed on the line in the right hand margin by each step. Other per-tinent data (e.g. person contacted) may also be noted adjacent to each step, as appropriate.
8.4.2      Form 1903.10G - Site Emergency Shift Operations Supervisor Notification List and Record.
8.4.3      Form 1903.1011 - Site Emergency Shift Administrative Assistant Notification List and Record.
8.4.4      Fcrm 1903.10I - Site Emergency Duty Emergency Coordinator Notification List and Record.
(-
V
 
m                          ,                      PLANT M ARU AL SECTION:                PROCEDURE /WORX PLAN TITLE:                                            NO:
emu
              .q.                        M                        FMFRCFVrv PLAN                                    F5frRGENCY ACTION T.EVEL RESPONSE                                  1901.10
            ' ^
* PAGE        32 of 61 d'-                              ARKANSAS NUCLEAR ONE                                                      aEvision CHANGE a oatE DATE 7/i6/ai
                  ,s              ..+.                        .
s'                  TL m.'              ..                                                                          .
              . i                                        ..
g                                                                                                                                                                              '
                                                                                                                                                                                          +,tse "%: " !
ARKANSAS POWER & LIGHT COMPANY                                                                                    '~~
                                                      &{                  MLL Arkansas Nuclear One EMERGENCY ACTION LEVEL RESPONSE                l FORM NO 1903.10H REV. #3        PC f
: w. .c
              *.i;-                                                                                                                                  Page 1 of 3 SITE EMERCENCT SHIFT AD*11N!STRATIVE ASSISTA.NT NOTIFICATION LIST AND RECORD
_                                                                                                                                    DATE Cp,                                                                                                                                        INITIALS / TIME
      .      .m..
      ^ # #'
                    ,                                    l.      Complete as much of Foris 1903.10M, "EAL Notification'* as                                                                                  5
                      .                                          available information and time allows.                                                                                                    . - , .
iW,2 NOTE:            The order of notification may be rearranged as the situation dictates with approval of the Shif t Oper-ations Supervisor. These groups should be contacted
        .. . ..                .                                          by the most expedient means available (paging, con-                                                O,g',                7 F                    W
  '@2f& 1                                                                  tacting appropriate response center for relaying information, direct phone call, radio contact, etc.).
-                                                                          The phone numbers (plant personnel) provided are
(                M                                                        for use if an individual is not onsite, the appro-priate response center has not been manned, etc.
: 2.      Provide the initial information on Form 1903.10M to the
                      .                                          following groups:
2.1 Duty Emergency Coordinator (a duty roster is maintained                                /                              -
                                                                                                                                                                                                            ~
          ..                                                                in the Shif t Supervisor's of fice; if not on-site, refer
                  ~-[ '                                                    to Attachment I for telephone numbers as necessary.
s.'4 W                                                                                                            g                9
            .T.;'t L                                              2.2 Nuclear Regulatory Commission (Hotline; or '                                          /                                              Q
            ' .- f '                                                      (if the region office is contacted, request that this
                                                                                                                                                                                                      .~ .,,.s.
i,,                                                  information be forwarded to the Bethesda Emergency                                                      .
operations Center)].
MAY                                                                                                                                                                                              '
                                                                                                                                                                                      ~                                '
NOTE:          If the Technical Operations Control Center has been activated, the Technical Operations Control Officer may be contacted in lieu of the Health Department.                                                                                                -
{; k                    ;
d @ W.*M M -W                                *N -
Nb "                                                          2.3      Arkansas gepartmeng cf Health [9. .
9
                                                                                                                            ; or contact                    /
the OES L                or use the OES radio channel) and request theim to notify the Health Department].                                                                  . .
2.4      Emergency Teams requiring immediate response (refer to the indicated attachment for call list if team personnel are not currently onsite).
NOTE:          The following minimum information should be pro-vided to the team leader: affected unit, EAL declared, appropriate plant conditions / parameters, required response and suggested protective actions
_.s.
(if necessary).                                                                                      .s
                                                                                                                                                                                      '              ,.M, *
                  ' $                                                                                                                                                                                  - ~
              ~i.'4                                                        THE MATERIAL CONTAINED WITHIN THE SYMBOLS (y) IS PROPRIETARY                                                          - -
t                k
* OR PRIVATE INFOR.'1ATION.
e                                  e.                .
                                                                                                            ,,J'                                        ,          ,  .          *9
* b,        , e
                                                                                                                                                                                                                          *O I * .,'  N $        "-  Y                          'N                                                      %m            a  1 n' .. s                      A**%-                                                  e b                    W'4-,.                                                    .                                  .
                                                                                                                                                                                                                              \
 
PLANV M ANUAL SECTION:              PROCEDUREAVORK PLAN VITLE:                                    N O.
                '            k                  EMTRGENCY PLAN                              EMERGENCY ACTION LEVEL RESPONSE                        1903.10 PAGE        33 of 61 ARKANSAS NUCLEAR ONE                                                TEvisiON CHANGE 3 DATE      7/i6/81 DATE
      * ."                      7
                ,v.          w    _
              ~
4s            .i                                                                                                                            , , . . _ ~
ARKANSAS POWER & LIGHT COMPANY 3'
Arkansas Nuclear One 3-.,
4                N              EERGENCY ACTION i.EVEL RESPONSE
                                                                                                                                                                ~ -
l FO"M '*0- 1903.10H REV. # 3          PC #
Page 2 of 3
          ..s DATE
              ,                                                                                                          INITIALS / TIME 2.4.1        Evacuation Team (Atta chment 2)                            /                                      r 2.4.2        Fire Team (Attachment 3)                                    /                                  t; .
2.4.3        Medical Team (Attachment 4)                                /
2.4.4        Radiation Team (Attachment 5)                              /
NOTE:          If the Emergency Control Center has been activated, the Incident Response Director
              %'T may be contacted in lieu of the Little Rock Control Center.
2.5 Little Rock Control Center (                :. or contact                  /
either the OES or the MSS Dispatch Center and request them to notify the LRCC).
l              ,,                              2.6 Emergency Teams ny requiring immediate response (refer to the indicated attachment for call list af team per-l                      ,
                ,.                                    sonnel are not currently ensite).
          ~~
NOTE:        The following minimum information sticuld be pro-                                                        *
        ~,
* vided to the team leader: affected unit, EAL                                                    fD declared, appropriate plant conditions /paranters.                                                    '
: e. 4            .                                    a  request to assembly the team onsite and suggested
                                                                                                                                                              ''          *~
protective actions (if necessary).
2.6.1        Evacuation Team (Attachment 2)                              /
M -G-s * .p,I    O 2.6.2        Fire Team (Attachment 3)                                    /              #9WWW                          G 2.6.3        Medical Team (Attachment 4)                                  /
        . n. . ,
2.6.4        Radiation Team (Attachment 5)                                /                                          .
NOTE:        If the Technical Support Center has been                                                                    -
activated, this center may be contacted in lieu of individual contacts.
(-j!j                                                                                                                                              * .;
U/C                                            THE MATERIAL CON 7AINED WITHIN THE SYMBOLS ( ) IS FROPRIETARY j        d '. i                                      CR FRIVATE INFORMATION.                                                                                            -
w ,.          . n
  \~
e                        -I    $ em  e- g        ,e  I -  ,2-
[
* a g          ,,,        *    ,        * ,      _                ,  ,        aP          %
 
NO:
* PLANT M ANUAL SECTION:              PROCEDUREAVORK PLAN TITLE-1903.10 DERGENCY PLAN                                    EMERGENCY ACTION LEVEL RESPONSE W
          . . -                                                                                                                      PAGE          34 of 61 F          _
revision        3 o^'e      7/16/81 ARKANSAS NUCLEAR ONE            -
CHANGE              D AT E
: m. . . .--                      ,
                                          ~ . .- . *
    ?h:h '
r                  .'w  .
: n.                                                                                                                                                        -.~.n,
:, .w a
      .J                                                                    ARKANSAS POWER & LIGHT COMPANY                                                                              ..
    " "                                                                                      Arkansas Nuclear One 1903.10H            {
    ."# % ..;                                                j TITtE.      E.YRGENCY ACTION LEVEL RESPONSE                  l FON NO.
NW. f 3        PC #
    ? '"                        '
Page 3 of 3 DATE a
y                                                                                                                                INITIALS / TIME
      . . ',J ,
L'                                          2.7 Technical Support Center Personnel (refer to Attach-                            /
                                                                                                                                                                                    .?
v;V'                                                        ment 6 for call list).                                                                                              m..
    .SUr?                                                  2.8    Operations Support Center Personnel (refer to Attach-                        /
      ~ - -                                                        ment 7 for call itst).
                                                                                                                                                /                    __ - .._                    %
2.9 Other Emergency Response Organizatica per onnel (refer                                                ~*                '~        "
N, ..&                      3                                  to Attachment 8 for call list).
NOTE:        If the Technical Support Center has been activated, e
this center may be requested to contact the Resident NRC Inspectors.
x
                                                                                                                                                /
2.10 h*RC Resident Inspectors (either one) 2.10.1 9W
                                                                                  .D. Johnson          -~_ )9                                                            -
                        .                                                                      /
2.10.2 V
L .J. Callan l    _. _ ,
                                                                                                                  )v ry c                                                                                                                            /
: 3. Notify the Duty Emergency Coordinator / Recovery Manager j : .:n
* that the initial notifications have been made (inform
                          .u .                                                                                                                                                          '
l him of any individuals that contact could not be made                                                          -
l
'                                                          with).                                                                                                                                        '
                  -                                  4. Provide updates to the following groups until relieved of
                    $"                                    respc.nsibility:
l                                                          4.1 Duty Emergency Coordinator / Recovery Manager 4.2 Nuclear Regulatory Commission MM'*NM-8 N k'r-4.3 Arkansas Department of Health or Technical Operations                                                        ..          .
Control Center (as directed).
4.4 Little Rock Control Center or Eme rgency Control Center                                                                            ,
(as directed).
: 5. At  the termination of the event, this form and other applicable information should be turned over to the Duty Emergency Coordinator / Recovery Manager.
Shif t Administrattve Assistant                      "-
                                                                                                                                                                                      " .V.*    ,
          ,g,7 -                                                                                                                                                                              -
            .Oi.W -                                                                                                                                                            , ~                  .
TIE MATERIAL CONTAINED WITHIN THE SYMBOLS ( ) IS FROPRIETARY OR FRIVATE lhTORMATION.
(..'((,        -
                                                                                                            ~~
                                                                                                                                                              ~ - * ^ YliiL'                    "' ~
                                                                                                                                    ?
                                                                                                  ' Is                      --
                                                                                                                                    ...''-~~
                                                                        -: nw a c. C'. ?- * .~ :...
            .$..*~:s C %D;. s -. - S., ? t -: ~N-  .
 
I m ANT MWuALSECTION.                F90CEDURE/ WORK PLAN TITLE:                                NO:
                        -EMERCENCY PLAN                              EMERGENCY ACTION LEVEL RESPONSE                    1903.10 PAGE 37 of 61 s
        \                ARKANSAS NUCLEAR ONE                                              aevision CHANGE 3 oATE DATE 7/i6/81 b
I m,,.-  -
ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One TITLE.
EHRGENCY AC*' ION LEVEL RE5NNSE          l '0" "O    190L 101 REV. # 3        PC #
Page 3 of 3 DATE INITIALS / TIME 9.4 Area Evacuation (if an Area Evacuation is deemed necessary, contact one of the followtr:q groups (call in the order indicated until contact is made):
9.4.1      Arkansas Department of Health or Technical Operations Control Center (as directed) 9.4.2      Arkansas Nuclear Planning & Response Program (968-7171) 9.4.3      ' Appropriate County Sheriff (Refer to Attach-ment 1, " Emergency Telephone Numbers ** for phone numbers) x      10.
When the following Emergency Pesponse Organizition persou a N                    arrive onsite, transfer the indicated responsibilities to them:
10.1 Recovery Manager (Assumes responsibility for direction _                /
of corrective and recovery actions) 10.2 Site Security Coordinator (Assumes responsibility for                    /
direction of Security / Evacuation Team personnel) 10.3 Emergency Services Coordinator,(Assumes responsibility                  /
for direction of the Fire and Medical Team personnel) 10.4 Health Physics & Chemistry Superintendent (Assumes re-                  /
sponsibility for direction of the Onsite Radiological Monitoring Section of the Emergency Radiation Team) 10.5 Technical Support Manager (Assumes responsibility for                  /
direction of the Offsite Radiological Monitoring Sec-tion of the Emergency Radiation Team and dose assess-
  "*~4 ment activities).
10.6 Inciuent Response Director (Assumes responsibilities                    /
for direction of the overall response to the incident).
: 11. When item (10) has been completed, turn over this notifi-cation.      List and record and other pertinent documents to the Recovery Manager.
: 12. At the ternination of the event, the following summaries shall be provided:
12.1 A verbal summary to:
12.1.1      Nuclear Regulatory Commission
                                                                                                        /
12.1.2      Arkansas Department of Health
                                                                                                        /
12.2 A written summary of the event (provided to the groups indicated in step 12.1).
V                                                                        Duty Emergency Coordinator
 
      . PLANT M ANUAL SECTION:    PROCEDURDWORK PLAN TITLE                    NO:
EMERGENCY PLAN                    EMERGENCY ACTION LEVEL RESPONSE        1903.10 PAGE    40 of 61 ARKANSAS NUCLEAR ONE                              aEvisiOu  3 oaTE  7/16/8i (oV)                                                        CHANGE        DATE B. The Emergency Response Team Leader or Alternates shall call tut and assemble the teams. The Team Leader or Alternate shall report to the Duty Emergency Coardinator when the team is assembled.
9.2.6        Incident Response Director A. The Incident Response Director is notified by the Little Rock Control Center that a General Emergency has been declared.
B. The Incident Response Director shall report to the Emergency Control Center when notified that a General Emergency has been declared.
C. The Incident Response Director shall activate the General Office portions of the Emergency Response Organization, as needed.
9.2.7      Recovery Manager A. The Recovery Manager is notified by the Shift Administrative Assistant that a General Emergency
("'}                        has been declared.
\. /
B. The Recovery Manager shall immediately report to the Onsite Technical Support Center when notified that a General Emergency has been declared.
9.2.8      Operations Manager A. The Operations Manager is notified by the Shift Admin-istrative Assistant that a General Emergency has been declared.
B. The Operations Manager shall immediately report to the Onsite Technical Support Center when notified that a General Emergency has been declared.
9.2.9      Maintenance Manager A. The Maintenance Manager is notified by the Shift Administrative Assistant that a Site Emergency has been declared.
B. The Maintenance Manager shall immediately report to the On-site Technical Support Center when notified that a Site Emergency has been declared.
V
 
PLANT M ANUAL SECTION:    PROCEDURE! WOR K PLAN TITLE-                  NO:
EMERGENCY PLAN                    EMERGENCY ACTION LEVEL RESPONSE        1903.10 PAGE    41 of 61
(.,l    '
ARKANSAS NUCLEAR ONE                                aevision  3 oarE  7/16/81 CHANGE      DATE 9.2.10      Operations Superintendents A. The Operations Superintendent are notified by the Shift Administrative Assistant that a General Emergency has been declared.
B. The Operations Superintendent shall immediately report to the Control Room of their respective units and inform the Onsite Technical Support Center of their presence in the Control Room.
9.2.11      Health Physics and Chemistry Superintendent A. The Health Physics and Chemistry Superintendent is notified by the Shift Administrative Assistant that a General Emergency has been declared.
B. The Health Physics and Chemistry Superintendent shall immediately report to the Onsite Technical Support Center when notified that a General Emergency has been declared.
r^x        9.2.12      Nuclear and Engineering Support Superintendent A. The Nuclear and Engineering Support Superiatendent is notified by the Shift Administrative Assistant that a General Emergency has been declared.
B. The Nuclear and Engineering Support Superintendent shall immediately report to the Onsite Technical Support Center when notified that a General Emergency has been declared.
f            9.2.13      Maintenance Superintendents l
l A. The Maintenance Superintendents are notified by the Shift Administrative Assistant that a General Emer-gency has been declared.
l
('')
v
 
PLANT M ANUAL SECTiON:    PROCEDUREAVORK PLAN TITLE-                    N O-EMERGENCY PLAN                    EMERGENCY ACTION LEVEL RESPONSE          1903.10
  ,_s                                                                  PAGE    42 of 61
(/)
  '-                ARKANSAS NUCLEAR ONE                                aevisiDu CHANGE 3 o*TE DATE 7/i6/81 B. The Maintenance Superintendents shall immediately report to the Onsite Operational Support Center when notified that a General Emergency has been declared.
9.3 Termination of Emergency Action Level 9.3.1      The General Emergency Emergencey Action Level may be de-escalated to a lower Emergency Action Level or be termi-nated by recovery from the event.
9.3.2      The Gcneral Emergency Emergency Action Level may be closed out af ter being terminated by a briefing by the Incident Response Director of the appropriate offsite authorities.
A written summacy of the event shall be transmitted to the NRC and appropriate offsite authorities.
9.4 Fo rms 9.4.1      The following forms describe the notifications and records to be made by the appropriate individuals for the General Emer-gency Emergency Action Level. Date the form where indicated (if the date changes before the form is complete, indicate
(~n                          the new date on the appropriate initial / time line). As noti-(_,)                        fications are completed, initials and time should be placed on the line in the right hand margin by each step. Other pertinent data (e.g. person contacted) may also be noted adjacent to each step, as appropriate.
9.4.2      Form 1903.10J - General Emergency Shift Operations Supervisor Notification List and Record.
9.4.3      Form 1903.10K - General Emergency Shift Administrative Assistant Notification List and Record.
9.4.4      Form 1903.10L - General Emergency Duty Emergency Coordinator Notification List and Record.
  /''N
\ \s._.sb I
 
NO;
:t                                PLANT M ANU AL KgION:                PROCEDURENVORK PLAN TITLE:
EMERGENCY ACTION LEVEL RESPONSE                    1903.10
        ..s 3            DIERGENCY PLAN
        '' '                                                                                                            PAGE          45 of of s                .
b'                    ARKANSAS NUCLEAR ONE                                              atmmN CHANGE 3 =TE DATE wm l                '&:  .(
          -.n                            -
s,              ,.
b
                                                                                                                                                            ,:e-  s . ,
    ;;rdEY                    :
ARKANSAS POWER & LIGHT COMPANY                                                              ~ ' "
                  ' ~ '
Arkansas Nuclear One l "* ~4 -
ME:          EMERCENCY ACTION LEVEL RESPONSE          lF0mNo. 1903.10K
    -'m}.                                                                                                            REV. 23        PC f l fL                    .
Page 1 of 3 GENERAT. EMERGENCY SHIFT ADMINISTRATIVE ASSISTANT i ; .$                                                                          NOTIFICATION LIST AND RECORD              DATE INITIALS / TIME
                'I i
          -g n
        , ['#                                  1. Complete as much of Form 1903.10M, **EAL Notification" as                                                        _,
        -;;; a;                                      available information and time allows.
NOTE:        The order of notification may be rearranged as the s ,.
situation dictates with approval of the Shif t Oper-ations Supervisor. These groups should be contacted by the most expedient means available (paging, con-                                    q        -
ygg, re
    ,;. g,gg                                                tactirs appropriate response center for relaying information, direct phone call, radio contact, etc.).
w,~ '                                    The phone numbers (plant personnel) provided are for use if an individual is not onsite, the appro-priate response center has not been manned, etc.
: 2. Provide the initial information on Form 1903.10M to the following groups:
            . '                                                                                                                          /                  .
2.1  Duty Emergency Coordinator (a duty roster is maintaind.,
cgy                                          in the Shif t Supervisor's of fice; if not on-site, refer                                                      -
to Attachment I for telephone numbers as necessary.
7
                  ,*                                        Nuclear Regulatory Commission (Hotline; or ,v '              .              /                        . . ..
l          .'y ,  ;
2.2 (if the region office is contacted, request that this                                                  -- . i'
                                                                                                                                                                          ~
information be forwarded to the Bethesda Emergency                                                        -
_[-                                                                                                                                      5 Operations Center)].
l'              .,.'.
NOTE:        If the Technical Operations Control Center has W-been activated, the Technical Operations Control Officer may be contacted in lieu of the Health                                          .
Department.                                                                      .,
!      . .lb*J-                                                                                          y a&M?$Wi-NiQ
[ - *%N,;s %,                                                                                              ; or contact                  /
                                    ,                2.3    Arkansas gepartment, of Health [y l
'                                                              the OES (          ' or use the OES radio channel) and request them to notify the Health Department).                                                                      -
2.4 Emergency Teams requiring iseediate response (refer to                                                                      .
the indicated attactunent for call list if team personnel l
are not currently onsite).
NOTE:        The following minimura information should be pro-l                                                                    vided to the team leader: affected unit, EAL declared, appropriate plant conditions / parameters, required response and suggested protective actions                                            , .
(if necessary).
            * *g.3;'
s TlE MATERIAL CONIAINED WITHIN THE SYMBOLS ( ) IS PROPRIETARY                                      ~~M'                    L
                          'f[:                            ,
OR PRIVATE IVf0RMATION.
: c. . ::~. s ,
                                                                    -c:wdnk -$[t-N. .NJ;.            '3...,,,        _ -. , - f.s 2.y , _ J {- _ 2..    'y. jf,g,.l.g. , y            -
[, *, g}        _ N :s                                                    . . .
 
PLANT M ANUAl.SECVION:            PROCEDURElWOR% PLAN TITLE-                                      NO:
                ..                        FMERCENCY PLAN                                EMERGENCY ACTION LEVEL RESPONSE                      1903.10
        "'                                                                                                      PAGE          46 of 61 ARKANSAS NUCLEAR ONE                                                aEvisiON        3 DaTE      7/16/81 CHANGE              DATE
          .u . -
g.a .                              _
                                                                                                                                                .. ~ .                      - ,
ARKANSAS POWER & LIGHT COMPANY                                                                    ' ~
          *-                                                          Arkansas Nuclear One TiTtt-        EMERCENCY ACTION LEVEL RESPONSE              l FOAM 880.1903.lCK D. J                                                                                                REV. #3        PC f Page 2 of 3
          -?                                                                                                  DATE
        ~
          -                                                                                                    INITIALS / TIME v .
          ..                                2.4.1        Evacuation Team (Attachment 2)                              /
2.6.2        Fire Team (Attachment 3)                                    /                                      : x._
              ...                            2.4.3        Medical Team (Attachment 4)                                  /
2.4.4        Radiation Team (Attachment 5)                                /
  %W&                                                                                                                                    % *=.. [^ . . e m'; =*                      W NOTE:        If the Ea'ergency Control Centet has been activated, the Incident Response Director
[              H~                                        may be contacted in lieu of the Little
'                                                          Rock Control Center.
7          V 2.5    Little Rock Control Center (                .; or contact                /
either the OES or the MSS Dispatch Cent'er and request them to notify the I.RCC).
2.6 Emergency Teams ng requiring immediate response (refer                                                '
                    '                          to the indicated attachment for call list if team per-sonnel are not currently onsite).
        ;3, NOTE:        The following minimum information should be pro-                                                                    -
        ..*                                          vided to the team leader: aff ected unit, EAL                                                        ,
declared, appropriate plant conditions /paraoters,
        ,y_                                          a request to assembly the team onsite and suggested
      *-'"'?                                        protective actions (if necessary).                                                                *                - -
2.6.1      Evacuation Team (Attachment 2)                                /
Mg                                          2.6.2      Fire Team (Attachment 3)                                      /                ..jy ,gg,y,                                p;s 2.6.3      Medical Team (Attachment 4)                                  /
2.6.4        Radiation Team (Attachment 5)                                /                                                          ,
NOTE:        If the Technical Support Center has been                                                                                    .
acti'.ated, this center may be contacted in lieu of individual contacts.
                                                                                                                                                                                    ~
  ~~
                -]. .:
THE MATERIAL CONTAINED VITHIN THE SYMBOLS ( ) IS PROPRIETARY
  , '"![f          *;
* OR PRIVATE IhTORMATION.                                                                                - - : :., * - ..
(
                                                                                      'S                            O          ..G e                                                                                                                *
        ;5,ce. G ; g l: Jk. A            .        5..:ar. .sk -;.%%:~;::g- :. ~              r. . , ...:
                                                                                              .            ,  a . .. .; .._ b        _.w,. ,x;; .f. . w .
 
PLANV M ANU AL SECTION:              PROCEDUREAVORK PLAN TlVLE:                                        N O.
                                      /            EMERGENCY PLAN                                EMERGENCY ACTION LEVEL RESPONSE                            1903.10 PAGE              47 01 bl ARKANSAS NUCLEAR ONE                                                m visi a              3 oATE    "le CHANGE                    DATE x;                  . . ,
                                                                                                                                                                ~. ,.n
                    -      "                                          ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One                                                              ' ~
                . ,            .                          TritL      E.'iERCENCY ACTION LEVEL IJSPONSE l ronu No 1903.10K 7,                                                                                                            REV. #3            FC #
Page 3 of 3 DATE INITIALS /T!ME 2.7    Technical Support Center Personnel (refer to Attach-                      /
ment 6 for call list).
2.8    Operations Support Center Personnel (refer to Attach-                      /
                                                                                                                                                                            ~
      .. .                                                ment 7 for call list).
                                    ,              2.9    Other Emergency Response Organization rersonnel (refer                    /
M g,q p                g                                  to Attacbment 8 for call list).                                                              *M*r4 -eyw                .ys.
NOTE:        If the Technical Support Center has been activated, this center may be requested to contact the Resident NRC Inspectors.
2.10 NRC Resident Inspectors (either one)                                          /
2.10.1      W.D. Johnson f                J 2.10.2      L.J. Callan                  I
: c. , .
  .,                                        3. Notify the Duty Emergency Coordinator / Recovery Manager                            /
that the initial notifications have been made (inform him of any individuals that contact could not be made with).                                                                                                                      s .
: 4. Provide updates to the following groups until relieved of v~-"r                14                        responsibility:                                                                                                          -*
4.1    Duty Emergency Coordinator / Recovery Manager
,gg                    j                          4.2    Nuclear Regulatory Commission p igcgj;.yg ::g 4.3    Arkansas Department of Health or Technical Operations
    ,,                                                    Control Center (as directed).
4.4    Little Rock Control Center or Emergency Control Center (as directed).                                                                                                          .
: 5. At the termination of the event, this form and other applicable information should be turned over to the Duty Emergency Coordinator / Recovery Manager.
      , . . ,                                                                                          Shift Administratave Assistant
            ,              .J,
* THE MATERIAL CONTAINED WITHIN THE SYMBOLS ( ) IS FRCI'RIETARY                                                      .
                                                  ,      OR TRIVATE INFORMATION.                                                                              --6..t-            ,.
\.
                          .              .      .    .**,                  s .        .
G - O.            %'.a.              .      <  o..-._;.r$2ET " h --* ~ Q .          ~?"                        ~,                                              'e~,
                                                                                                                              , _ _          ~~_..          '*
                                                                                                                                                          . . . C ,y,
 
PLANT MANUAL SECTION:                        PRCOEDif RElWORK PLAN TITLE:                                                N O-EE.RGENCY PLAN                                    EMERGENCY ACTION I.EVEL RESPONSE                                        1903.10 PAGE O                                                                                                                                          50A of bl k                                          ARKANSAS NUCLEAR ONE                                                                arv:sion CHANGE 3 oATE                7/inesi DATE
                . . _ ,      .            .                              ARKANSAS POWER & LIGHT COMPANY 4                                                Arkansas Nuclear One MtE EMEEGENCY ACT!CN LE'iEL (FAL) NOTIFICATICN                      j acmu ho    19 p ,13 F E'; o g    PC 9 Page 1 of 2 CAUTICN: NOTIFICATICNS TO TEE STATE OF AhXANSAS WILL REQUI?I LSE CF ALTEENTICATION TAELES (ITEM NLMPER 11).
This is (identify ycurself) at Arkansas Nuclear One with an Emergency Actica Level Nottfication Fepert. Ackna ledge when you are ready to proceed.
I.      () INITIAI.                          ( ) FCLL V-l'P NO.
: 2.      N/A
: 3. N/A
: 4. Date/ Time cf Declaratica CD tN O                JUet1
: 5. I' nit              ( ) One    ( ) Two
: 6. Class of EAL:
  -#^*                  WM                    ( ) A. BTSL'AL EiTNT                                                                                                    ' ' ' " ~ ' ' '"
( ) D. CENERAL E.*ERGENCY
( ) B. ALLET                                      ( ) E. NCNI
( ) C. SITE E."IRGENCY
                \
V                                      7. Conditions Fepiring EAL:
: 8. Areas Affected (Sectors /0istances):
: 9. Cnstte Situation:
A.        Pregnosis of Situation:                .
( ) Improving
( ) Ftable
( ) Legrading B.      General Pcpulation Prctective Actzons Fecomended:
( ) None
( ) Shelter
( ) Evacuation "I                                                                                                                                          " " "* " ~
C.        Icstitutionalized Protective Actions hecem ended:                                                                              ' '
( ) None                                                                                                        ,
( ) Shelter                                                                                                    .
( ) Evacuation D.        Radiation Monitoring Teams Activated:                                                                            ;
( ) Yes
( ) No E.        Eeergency Response Centers Activated:
( ) None
                              ,                      ( ) Tsc
( ) ECL
            '\
(G
            ~. .          .. ..    -
w --, - - - . .                            - - -      -    - - - , . - _ ,      .-    ,,w      9-        , . - , - ,              -          r - -- - - - - + -          ,y
 
PLANT MANUAL SECTION:          PROCEDURE / WORK PLAN TITLE:                                  NO:
      .. ..~
EMERGENCY PLAN            -
EMERGENCY ACTION LEVEL RESPONSE                            1901.10 PAGE          SOH of 61
(~'                                          ARKANSAS NUCLEAR ONE                                              arvisiOn          3 oATE  7/io/ai CHANGE              DATE ARKANSAS POWER & LIGHT COMPANY 4                                  Arkansas Nuclear One
: n.  ,    . . .
Mtf. E*'ERGENCY ACTION LEVEL (EAL) SOTIFICATION                      199 3,1 c.3 l FOAw ho.
REV. 7 3      I'C #
F. Local Assistance Requested:                                  IJRe 2 of 2
( ) Ftre
( ) Police
( ) Ambulance
( ) Other G. Evacuatten of Onsite Personnel:
( ) Yes
( ) No
( ) Some H. Other Emergency Response Acticas l'nderway:
: 10. Message sent Py:                                    /
NA".E                      PL51TliiN                    ...as. w w c yw
: 11. Message Authenticated By:        A B C D E F G H I J K L M N O (None) /
INDICATE ALFHAEETICAI.                        hESPCNSE CHARACTERS CHALLENGED                          Gli1N
: 12. Type of Pelease:
( ) None                              ( ) Airborne
( ) .'otential                        ( ) Waterborne
( ) Actual                            ( ) Surface Spill
: 13. Description of Released Material (Chemical & Physical form, Estimate of Equivalent Curies of I-131 & XE-133 Feleased, Release Rate (C1/sec).
Iodine / Noble Gas Ratio, etc):
: 14. A. Wind Direction: (From)
* B. Vind Spead:                              MPH
: 15. Temperature:                              *F
: 16. Form of Precipitation:
e%          awd                      17. Atmospheric Stability:
                                                                                                                                              . .w %w.u.:  um
: 18. Estimated Start /uuration Time of the Release:
i (START)                    (DLRATION)
: 19. Dose Rate at the Exclusion Area Boundary (0.65 miles):
mR/hr          ( ) Projected ( ) Child Thyroid
( ) Actual        ( ) khole Body
: 20. Projected Dose:
mR/hr    ( ) bhole Body      ( ) Child Thyroid      at                    miles
                  -._.,                  21. REMARKS:                                                                                                ,
I l
, O                                                                                                                                        i
(                          e  e e
 
PLANT M ANUAL SEC710N:  PROCEDUREAVOR% PLAN TITLE:                      NO:
EMERGENCY PLAN            EMERGENCY ACTION LEVEL RESPONSE              1903.10 PAGE      51 of bi ARKANSAS NUCLEAR ONE                              atvisioN CHANGE 3 oATE  7/i6/81 DATE ATTACIR!ENT 1 DUTY EMERGENCY COORDINATOR ROSTER / CALL LIST NAME                        BADGE              WORK            IIOME Basil Baker                    110 f
V                                                /                            V Tom Cogburn                      151 Early Ewing                      400 f
Jim McWilliams                  261 Jim O'Hanlon (Gen. Manager)      1 l
Dave Sne11ings                  398 Bob Terwilliger                  343 (DEC = Beeper Number 602) l l
l TIE MATERIAL CONTAINED WITi!IN TIE SYMBOLS ( ) IS PROPRIETARY OR PRIVATE INFORMATION.
l l
 
NO:
PLANT M ANU At SECTION:  PROCEDURElWORC1 FLAN TITLE:
1903.10 FWRCFNCY PT_AN              FffERGENCY ACTION LEVEL RESPONSE PAGE    52 of 61 aEvisioN  3 oATE    7/i6/81 ARKANSAS NUCLEAR ONE                                    CHANGE        DATE ATTACIDfENT 2 EMERGENCY EVACUATION TEAM ROSTER / CALL LIST WORK                  HOME BADGE TEAM LEADER:
                                                                                                  ,Y Y                              160 Jackie Crow ALTERNATE TEAM LEADERS:
k J. C. Garrett                395 i
Bruno Hampton                  404 I                                      V V                              258 Wes McDaniel i
MEMBERS:                                                                                          V I
i Mike Myers                    461 V
V                                120 John Beaty, Jr.                                                                            V V                                217 Roger Hooper                                                                                V V                              333 James Starr                                                                                7        .
i Barbara Wade                  1063 V
V                                168                    l Barbara Dunn                                            '                                  V VJim Vandergrift                354 V
V                                115                      :
Dennis Barton                                                                                V V                              268                      f J. Don Moore                                                                                7 V                              497 Jim Wilson                                              '                                V V                                153                        ;
Jim Constantin                                                                              0 V                                473 Ron Hargrove l
7 V                              319 Joe Simmons                                                                                  7 Ed wentz                      365 1
V                                196 Tracey Green                                                                                i V                                271 Ira Mosquito Joe Waid                      124 TIE MATERIAL CONTAINED WITHIN TIESE SYMBOLS ( ) IS PRIOPRIET OR PRIVATE INFORMATION.                                                                  _ _-
 
NO-PLANT MANUAL SECTION:  PROCEDURE / WORK PLAN TITLE:
EMERGENCY ACTION LEVEL RESPONSE                1903.10 EMERGENCY PLAN PAGE    53 of 61 aevisiON  3 oATc      7/16/81 ARKANSAS NUCLEAR ONE                              CHANGE        DATE ATTACHMENT 3 EMERGENCY FIRE TEAM ROSTER / CALL LIST BADGE                    WORK                  HOME TEAM LEADER:
V John Lamb                  449 ALTERNATE TEAM LEADERS:
V Jim Bob Jackson            228 V
Larry Munson              272 i
MEMBERS:
7 David Eichenberger        171
                                                                                          -        .'y Alex Smith                323 iV Charles May                255 Barry Waldron              418 V
Gary Kendrick              239 Tom Wilkins                372 Don Booker                116 Glenn Brooks              134 Kyle Jones                422 l
James Nichols              328 Chester Wetzel            477 Johnny Walker              362 Marion Hall                202 l
l}
l l
THE MATERIAL CONTAINED WITHIN THESE SYMBOLS ( ) IS PRIOPRIETARY l                    OR PRIVATE IhTOR&\ TION.
I
 
PLANT M ANUAL SECTION:  PROCECUREAVORK PLAN TITLE:                    NO:
EMERGENCY PLAN            EMERGENCY ACTION LEVEL RESPONSE            1903.10 PAGE    54 ot et 3                ARKANSAS NUCLEAR ONE                              Revision  3 cATE    7/t6/81 CHANGE        DATE ATTACHMENT 4 EMERGENCY MEDICAL TEAM ROSTER / CALL LIST BADGE                  WORK                  HOME TEAM LEADER:
Richard Gillespie          191 ALTER 3 ATE TEAM LEADERS:
Charles Adams              102 V
V                            139 Dennis Calloway MEMBERS:
Bob Jackson                406                                                    f i
Richard Moredock          1850 Alan McArthur              98 Steve Stork                336 Mike Hoyt                  222 114 S
Gerald Bartlett Albert Lane                243 Douglas Butler              137 Wayne Cheatham              148                                                      8 l
Shirman Yancy              498                                                      8 KaSandra Delph              165                                                      ?
Eileen Goulet              (192)
V Debbie Rodgers              285                                                        {V
                                                                                                      'V V                            269                                                        i Royce Moore Bill Bice                  144 Paul Ford                  1889                                                _[
( ) = Laminated Badge THE MATERrAL CONTAINED WITilIN THESE SYMBOLS ( ) IS PRIOPRIETARY OR PRIVATE INFORMATION.
 
N O-
              . PLANT M ANU AL SECTION:  PROCEDUREA*/ORK PLAN TITLE:
1903.10 EMERGENCY PLAN              EMERGENCY ACTION LEVEL RESPONSE PAGE      55 of 61 aEvisiON    3 oArE    7/16/81
        ,            ARKANSAS NUCLEAR ONE                              CHANGE  '
DATE ATTACIDfENT 5 EMERGENCY RADIATION TEAM ROSTER / CALL LIST WORK                  HOME BADGE TEAM LEADER:
V Matt Bolanis                88 ALTERNATE TEAM LEADERS:
                                                                                                    ?
Dale Wagner                360 V
Tom Nickels                332 9
Robert Green                195 V
Chuck Burchard              119                                                      l V
Atina Murray                274 MEMBERS V
V                            283                                                      l Roger Owings Jeff Garren                189 Ken Zelnick                382 V
Tim Smith                  327 Y
l Steve Fowler                183                                                      \
Y David Rebarchik            356 Charles Anderson            430 Maurice Ward                428 f                                                                                                          r i                y                            470 Wayne Wright l
Sarah Nettles              436                                                      [
l l
l THE MATERIAL CONTAINED WITHIN THESE SYMBOLS ( ) IS PRIOPRIETARY OR PRIVATE INFORMATION.
I i
 
i f
PLANT M ANUAL SECTION:    PROCEDURE / WORK PLAN TITLE:                    NO; EFERGENCY PLAN            EFERGENCY ACTION LEVEL RESPONSE              1903.10 PAGE    56 of 61 ARKANSAS NUCLEAR ONE                                RcvisioN CHANGE 3 DATE DATE vie /ai ATTACIDENT 6 TECHNICAL SUPPORT CENTER STAFF ROSTER / CALL LIST BADGE        WORK      HO?E                TSC J. P. O'Hanlon        1                                                                      )
E. L. Sanders        488 B. A. Baker          110 D. D. Snellings      110
                                        \              -
(,
(
TIE MATERIAL CONTAINED WITHIN TIESE SYMBOLS ( ) IS PRIOPRIETARY OR PRIVATE INFORMATION.
 
NO:
PLANT M ANU A1.SECV10N: PROCEDUREAVORt1 PLAN TITLE:
1903.10 EMERGENCY PLAN          EMERGENCY ACTION LEVEL RESPONSE
              '                                                  PAGE        57 of 61 atvisiON      3 oATE      7/16/8t ARKANSAS NUCLEAR ONE                            . CHANGE          D AT E.
ATTACHMENT 7 OPERATIONAL SUPPORT CENTER STAFF ROSTER / CALL LIST BADGE      WORK /OSC              HOME P. Jones              234 V. C. Pettus            286 W_'
H. R. Tucker            350 VT. H. Cogburn          151                                        lV 400                                        t E. C. Ewing                                                          :
V V                        88 M. J. Bolanis V
V                        179 G. L. Fiser V
T. C. Baker            112 V
j S.R. Lueders            345 J. B. Lamb              449 i
H. L. Hollis            215                                            i 7
M. K. Bishop            3152                        _
[,m-l ' .m ;
T'M 1
l l
i I
l 1
l TlfE MATERIAL CONTAINED WITIIIN THESE SYMBOLS ( ) IS PRIOPRIETARY l                OR PRIVATE INFORMATION.
I
                                                                                                    ,r . ,.
 
PLANT M ANUAL SECTION:      PROCEDUREAVORK PLAN TITLE:                                        NO:
EWRGENCY PLAN                    EMRCENCY ACTION 'eEVEL RESPONSE                            1903.10 PAGE      58 of 61 ARKANSAS NUCLEAR ONE                                                aevision CHANGE 2 o^rE DATE 7/16/81 T            .
ATTACHMENT 8 REMAINING EMERGENCY RESPONSE ORGANIZATION (PLANT STAFF) ROSTER / CALL LIST NAM _E BADGE                  WORK                    HOME
                                                                                  ~
L. W. Humphrey                410 7                                                                                                7                                    '
J. H. Montgomery              118 TIE MATERIAL CONTAINED WITHIN TIESE SYMBOLS ( ) IS PRIOPRIETARY OR PRIVATE INFORMATION.
. n.. . . . . ,.~    . .: ~ n  . . . . . .  . , - . . , , e .. n ; ew.~. , r.2. n. - . .g , r.. ....      :: c . .: ,1 -
                                                                                                                            -- - i :. , . - ~ ;u: . . 1.:
 
PLANT M ANUAt SECTION:    PROCEDUREAVORK PLAN TITLE:                        NO:
EMERGENCY PLAN            EMERGENCY ACTION LEVEL RESPONSE                1903.10 PAGE      59 of 61
~,                  ARKANSAS NUCLEAR ONE                              aEviSiON CHANGE 3 o*1E DATE 7/16/8I ATTACIDfENT 9                              Page 1 of 3 EMERGENCY TELEPIIONE NUMBERS (0UTSIDE ASSISTANCE)
NOTE: All area codes are 501 unless otherwise noted.
FEDERAL Corps of Engineers (Dardanelle)
Department of Energy (Radiological Emergency Assistance Team)
Nuclear Regulatory Commission (Directorate of Regulatory Operations, Region IV)
STATE Arkansas Nuclear Planning & Response Program (Russellville)
Arkansas State Department of IIcalth (Bureau of Environmental Health Services)
Arkansas State Police (Clarksville)
Office of Emergency Services (Conway)
LOCAL POPE:      Ambulance Service Sheriff's Department                                            ',
Emergency Services                                    (Office)
(Home)
YELL:      Sheriff's Department Emergency Services                                    (Home)
JOHNSON: Sheriff's Department Emergency Services                                    (Office)
(Home)
LOGAN:      Sherif f's Department Emergency Services                                    (Home)
TIIE MATERIAL CONTAINED WITl!IN Tl[ESE SYMBOLS ( ) IS PRIOPRIETARY OR PFIVATE INFOR&\ TION.
 
PLANT M ANUAL SECT!ON:    PROCEDUREANORK PLAN TITLE:                      N(h EERGENCY PLAN              EMERGENCY ACTION LEVEL RESPONSE                1903.10 PAGE    60 of 61 T
ARKANSAS NUCLEAR ONE                              aevision . 3 oATE CHANGE 7/16/81 DATE Page 2 of 3 LOCAL CONT.
RUSSELLVILLE: Millard Henry Clinic Russellville Fire Department St. Mary's Hospital Arkla Gas Company Missouri-Pacific Railway Co.
KARV ARKANSAS POWER & LIGHT ARKANSA3 NUCLEAR ONE:        Emergency Control Center Main Guard Station Unit One Control Room Unit Two Control Room LITTLE ROCK:              Vice Presiden                                (Office)
Seniop(W. Cavanaugh)g, Energy Supply                  (Home)
Direcgor, Nuclear gperations                          (Office)
(J. Griffin)                                  (Home)
Director, Tech ical & Enviponmental                  (Office)
Services  9(D. Rueter)                        (Home) l                            Direcgor, Fossi1 0perations                          (Office)
(D. Sikes)9                                  (Home) l                                                                                  (Office) l                            Vicegresident,(C. Kelly)Gorporate Communications      (Ifome) l                            Managgr, Corporgte Security                          (Office)  ,
!                                    (C. Dunn)                                    (Home)    j Little Rock Control Center RUSSELLVILLE: District Office:          E. Deaton                      (Office) 1 (Home) l l                                                  J. Lee                          (Office) l                                                                                  (Home)
W. Harris                      (Office)
(Home)
Emergency Control Office THE MATERIAL CONTAINED WITHIN THESE SYMBOLS ( ) IS PRIOPRIETARY OR PRIVATE INFORMATION.
l t
 
PLANT M ANUAL SECVION:                              PROCEDURE / WORK PLAN VITLE:                                  N O-FMFRGFNCY PLAN                                      FMFRGENCY ACTION LEVEL RESPONSE                            1903.10 PAGE    61 of 61 3                    ARKANSAS NUCLEAR ONE                                                                      atvisioN CHANGE 3 oATE DATE 7/16/a1 Page 3 of 3 OTHER AGENCIES BASCOCK & WILCOX:                                  Site Represcntative                    (T. Scott)          (Home)
Emergency Respon'se Center COMBUSTION ENGINEERING:
g(iteRepresentative A. B. McGregor)                                    (Home:
Emergency Response Center INSTITL'TE OF NUCLEAR POWER OPERATIONS NUCLEAR SAFETY ANALYSIS CENTER NUCLEAR ENERGY LIABILIfY PROPERTY INSURANCE ASSOCIATION s
THE MATERIAL CONTAINED WITHIN THESE SYMBOLS ( ) IS PROPRIETARY OR PRIVATE INFORMATION.
.                                                                                - --            _ _ . _      _                                      _l
 
ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One
      ,C)
        \ _,/
EMERGENCY PLAN                                        l FORM 1000 06A PERSONNEL EMERGENCY 1903.23    REV. 2 a,          g-w, remlet a py      *, /d                '
Q yQ T  I RECORD OF CHANGES AND REVISIONS PAGE  REVISION CHANGE    PAGE          REVISION CHANGE PAGE      REVISION CHANGE 1        2 2        2 3        2 4        2 5        2 6        2
(~
o}
APPROVED
                            %A                            r
{.
l                                                                              .
l
 
1 PLANT M ANUAL SECTION:    PROCEDURE / WORK PLAN TITLE:                          NO:
EMERGENCY PLAN            PERSONNEL EMF 5E_r;NCY                              1903.23 y
PAGE            1 of 5
(?sm, /
ARKANSAS NUCLEAR ONE                                aavisiON CHANGE 2 oaTE DATE 7/7/ai i
j 1.0 PURPOSE l
The purpose of this procedure is to provide guidance to ANO personnel                            l on how to respond to a personnel emergency. This emergency may be                                ,
medical or contamination-related medical.                                                        '
2.0 SCOPE This procedure outlines the general response to be taken during a person-nel emergency. It is not intended to give medical guidance for use during the emergency.
 
==3.0 REFERENCES==
 
3.1  References Used in Procedure Preparation:
3.1.1      Arkansas Nuclear One Emergency Plan 3.1.2      Red Cross First Aid Instruction Pamphlets 3.1.3      NCRP Report No. 39, " Basic Radiation Protection Criteria" 7- g                3.1.4      NCRP Report No. 65, " Management of Persons Accidently Con-t      i                        taminated with Radionuclides" s_ '
3.2  References Used in Conjunction with this Procedure:
3.2.1      1622.010, " Personnel Decontamination" 3.2.2      1903.33, "Re-Entry Guidelines" 3.2.3      1903.74, " Pope County Ambulance Service" 3.3  Related ANO Procedures:
3.3.1      1903.42, " Duties of the Emergency Medical Team" 3.3.2      1903.72,  "St. Mary's Hospital" 3.3.3      1903.73, "Millard-Henry Clinic" 4.0 DEFINITIONS 4.1  A serious injury that requires action specified in this procedure is defined as an injury to any person that has resulted in:
4.1.1      More than a momentary loss of consciousness.
/"'N                4.1.2      An actual or suspected fracture.
I w/
 
PLANT MANUAL SECTION:    PROCEDUREAVOR;( PLAN TITLE:                  NO:
EMERGENCY PLAN            PERSONNEL EMERGENCY                        1903.23 y
2 of 6 C'
(,_,                  ARKANSAS NUCLEAR ONE __                                PAG E2 o*TE aEvisiON          7/7/81
        .                                                                    CHANGE      DATE 4.1.3        A head injury.
4.1.4        An injury that may have damaged internal organs.
4.'.5        A serious burn.
4.1.o        Hemorrhaging.
4.1.7        Receipt of a large dose of radiation (i.e., greater than 50 R).
5.0  PRECAUTIONS 5.1  Personnel administering first aid to an injured person in a suspected or undefined radiation field should be joined by a Health Physics representative as soon as possible.
5.2 Entry into evacuated or high radiation areas for the purpose of attending to injured or contaminated individuals shall be in accordance with 1903.33, "Re-entry Guidelines".
5.3  If it is not clear that the individual can be moved without harm, 7-~3                he should not be moved until further help arrives, unless the in-dividual would be in danger of loss of life or limb.
tx_)'
5.4  Individuals who have suffered any of the conditions described in Section 4.0 should receive a medical examination prior to returning to work.
6.0  IMMEDIATE ACTIONS 6.1  In the event of a personnel emergency, personnel in the vicinity of the affected individual should:
6.1.1      Administer immediate first aid and attention. This attention should consist of:
A. Stopping bleeding by applying pressure.
,                                  B. Using resuscitation techniques.
C. Keeping the individual calm and comfortable until further help arrives.
6.1.2      Notify either unit's Shift Supervisor (prefered), the Safety & Fire Prevention Coordinator or the individuals Supervisor.
(''S                6.1.3      Remain available to provide information to the appropriate
(_)                              medical personnel.
_____a
 
s PLANT M ANUAL SECTION:    PROCEDUREAVORK PLAN TITLE:                      NO:
I              EMERGENCY PLAN            PERSONNEL EMERGENCY                          1903.23 d                ARKANSAS NUCLEAR ONE PAGE aevisiON 3 of 6 2 oATE  7/7/81 CHANGE          DATE 7.0 FOLLOW-UP ACTIONS 7.1 For any medical emergency, either unit's Shif t Operations Supervisor should be informed, if not previously done; periodic updates should be provided to the Shift Supervisor initially contacted.
7.2  The Shift Operations Supervisor shall direct appropriate medical assistance to the injured individual.        The following groups should be called upon (when on-site) to provide assistance:
NOTE:    These groups should be contacted by the most expedient means available (if the page is used, the announcement should be repeated several times).
7.2.1      Bechtel Nurse C 4 7.2.2      Emergency Medical Team.
7.2.3      Safety & Fire Prevention Coordinator \            1 NOTE: Basic First Aid Supplies are maintained in the following locations:
A. Unit 1 Controlled Access Exit Area (Health Physics).
B. Unit 2 Controlled Access Entrance Area (Health Physics).
C. Unit 1 Turbine Building, Elev. 354 South (Fire Locker).
D. Unit 2 Turbine Building, Elev. 354 North (Fire Locker).
E. Unit 1/2 Turbine Building Elev. 386 (Fire Locker).
7.3 When directed, the appropriate medical personnel onsite should respond to the location where the injured or contaminated individuals are located and:
7.3.1      Administer appropriate first            1sures.
7.3.2      Provide the Shift Supervisor with an assessment of the situation (to include further needs, if necessary).
7.3.3      Gather necessary information from the personnel initially on the scene (to include individual's name for future re-ference).
7.3.4      Obtain the injured person's security badge, dosimeters and TLD for further identification and dose determination.
l                    '
  \.
 
PLANT MANUAL SECTION:    PROCEDURE!WORZ PLAN TITLE:                        NO-J                      EMERGENCY PLAN          PERSONNEL EMERGENCY                            1903.23 I PAGE      4 of 6 ARKANSAS NUCLEAR ONE                                aevisiON CHANGE 2 o,.TE    7f7/81 DATE 7.4 If an individual is potentially contaminated, the following pre-cautionary measures should be taken (as allowed by the nature of the injury), as necessary:
NOTE: The Shif t Operations Supervisor shall ensure that a Health Physics representative is assigned to accompany the individual (s) both onsite and to offsite medical facilities, as necessary.
7.4.1      Take precautions (coverings, use of stretcher, etc.) to prevent the spread of contamination during movement and transport of the individual.
7.4.2      Move the individual to a " clean" area, as allowed by step 5.3.
7.4.3      Remove contaminated clothing.
7.4.4      Survey the individual for surface contamination.
NOTE: Contaminated wounds, eyes, etc., should be decontaminated by use of water only; wounds should be covered before and af ter decontamination efforts.
7.4.5      Decontaminate the affected areas removing as much transferable contamination as possible per 1622.010, " Personnel Decontamination".
7.4.6      Cover remaining contaminated areas.
NOTE: If an individual is potentially contaminated and requires transportation to an offsite medical facility, he should be initially transported to St. Mary's Hospital.
7.5 The Shif t Operations Supervisor may make arrangements for treatment based upon the assessment of a qualified medical individual.              If a qualified medical individual is not available, the following guidance is provided:
7.5.1      If the injured individual (s) requires attention from a doctor and are judged incapable of travel, the appropriate physicians should be called from Millard-Henry Clinic i                    i or St. Mary's Hospital \            _l, advised of the physical and radiological condition of the injured, and requested to come immediately to ANO. The Pope County Ambulance Service should also be contacted (refer to step 7.5.2).
7.5.2      If the injured individual (s) requires immediate attention from a doctor and are judged capable of travel, the Pope County Ambulance Service should be called at''.          -
advised of the physical and radiological condition of the~ injured and requested to come immediately to ANO.      If the situation requires the i                                              ambulance personnel to enter a potentially contaminated area, refer to 1903.74, " Pope County Ambulance Service" for further guidance.                                                            ,
l 1
_        _                            _                    I
 
PLANT M ANUAL SECTION:        PROCEDUREAVORK PLAN TITLE:                      NO:
EMERGENCY PLAN                PERSONNEL EMERGENCY                          1903.23 PAGE      5 of 6 ARKANSAS NUCLEAR ONE                                  aEvisioN CHANGE 2 DA1E  7/7/81 DATE E                    7.5.3        If the injured individual (s) do not require immediate attention from a doctor and are judged capable of travel, arrangements should be made to transport the individuals for further examination to Millard-Henry Clinic or St. Mary's Hospital.
7.5.4        If the injured individual or individual (s) attending to the injured individual are suspected of having received a radiation dose in excess of 50 R, arrangements should be made to transport those individuals to the University of Arkansas Medical Sciences Hospital in Little Rock for treatment, as necessary, after              -
examination at St. Mary's Hospital.
7.6 The Shif t Operations Supervisor should notify the Duty Guard Sergeant if off-site medical assistance has been requested to report onsite so that Security personnel may be ready to receive and escort the medical personnel.        (Routine access point - North Gate; routine receiving area -
Maintenance Facility Breezway, unless otherwise directed.)
7.7  If the injured individual is transported to a medical facility, the Shif t Operations Supervisor should call the appropriate medical facility and advise them, as known, of the number of individuals involved, a des-cription of the medical emergency and whether or not contamination is involved.
    ,                  7.7.1        MillardHenryClinicf                  ')
(                                                                            __
7.7.2        St. Mary's Hospital '                              ')
7.7.3        University of Arkansas Medical Sciences Hospital                    '
7.8 An escort, as indicated below, should accompany the injured individual (s) to provide any necessary information or assistance to the medical per-sonnel and provide periodic updates to the Shift Supervisor (or other individual, as directed).
7.8.1        If the individual is contaminated, a Health Physics represent-ative shall accompany.
1                      7.8.2        If the individual is not contaminated, one of the following l                                    individuals should accompany:
A.      Emergency Medical Team Member B.      Bechtel Nurse (If Bechtel personnel are involved)
C.      Safety and Fire Prevention Coordinator l
l l
1
: u.    - .
                        . ~ . m                    ...c.
                .                . . .; . - ,.m .        , .
                                                                . . .,. w  _,y ~. . :. -y,  -a..gm,    w -, - .
 
8 3
PLANT M ANUAL SECTION:    PROCEDURElWORK PLAN TITLE:                      NO:
EMERGENCY PLAN              PERSONNEL EMERGENCY                            1903.23 PAGE      o of 6 O'                  ARKANSAS NUCLEAR ONE                                aevisioN CHANGE 2 oATE  7/7f81 DATE D. An ANO Management Representative E. Any knowledgable member of the plant staff S.0 ATTACHMENTS AND FORMS None O
O
 
PLANT M ANU AL SECTION:    PROCEDUREMORX PLAN TiVLE:                            NO:
EMERGENCY PLAN              OIL SPILL PREVENTION CONTROL PROCEDURE        _
                                                    & COUNTERMEASURE PLAN                              1903.24 PAGE      14 of 17 ARKANSAS NUCLEAR ONE                                aavis>ON        1 DATE    5/9/81 CHANGE              DATE f
i Page 1 of 1 ATTACHMENT 2 Oil Spill Response Team Organization and Responsibilities The purpose of the ANO Oil Spill Response Team is to minimize the consequences of an oil spill upon the environment of Lake Dardanelle. The Oil Spill Response Team shall be activated per Section 4.4.3 of this procedure. Upon activation the team shall initiate action as described in Section 4.2 and Attachment 1 of this procedure. The Oil Spill Team leader shall be responsible for coor-dinating oil containment and clean up activities and reporting to the Technical Analysis Superintendent.                                                                          r Call List For Oil Spill Response Team NAME                      PHONE V                                      ''V Team Leader                          Charles Adams V                                          7 Alternate Team Leader                Dennis Calloway
(
V                                          V Alternate Team Leader                Tom Baker                              ,
i Members                              Gary Lipham V                                          V Tom Blakenship i
V                                        V Clyde Butts              !
Larry Greathouse V                                            V Al Morgan V                                            V Steve DeYoung i
Sid Hawkins Mike Hall k                THE MATERIAL CONTAINED WITHIN THE SYMBOLS (V) IS PROPRIETARY OR PRIVATE INFORMATION.
 
PLANT M AMU AL SECVION:            PROCEDURE / WORK PLAN YITLE:                                                NO:
                -                                EMERGENCY PLAN                      OIL SPILL PREVENTION CONTROL PROCEDURE                          & COUNTERMEASURE PLAN                                                    1903.24 PAGE          17 of 17 ARKANSAS NUCLEAR ONE                                                            atvisioN CHANGE o DATE DATE 3/4/81 4
3                  -
                .9
                                                                                                                                                                    . ~ ~; .~ e                      ,s-
: q.l. .-            .g                                                                                                                                                        .
ARKANSAS POWER & LIGHT COMPANY sm                                                                      Arkansas Nuclear One                                                                --~w                            *
                      ,                                TITtE. NOTIFICATION RECORD l Fomu No.      1903.24B
              -                                                                                                              MN. # 0        PC f                                      ,
        .7, 2J. -
                              ~
DATE/ TIME ZC-[-                                    AGENCY                        FERSON CONTACTED                        PHONE            CONTACTED
                  ,                        1;SCG National Response Center State Dept. Pollution Control                                          s c -                              & Ecology AP&L C&C Techr.ical Analysis        Dale L. Swindle Office                                                                                '."
Home AP&L G&C Technical Analysis          Edward L. Green      Office                                                    -
                                                                                                                                                                  - dh.'          -IN' N              .
    ~~-e f;.1.c,-            d                                                                      Hone              I l
                                                                                                                                                                  ?.*Ri&*S. T 5.;.
AP&L C&C Technical Analysis          Sharon R. Tilley Office Home t            .g.                                                                                                      (                                                          _ _
t            -
For information purposes, the following numbers are provided:
U.S. Coast Guard (Memphis)              -
24-Hour Emergency k1 EPA. Dallas
        .~yv ~-. . .
24-Hour Emergency
                                                                                                          \.
                                                                                                                                                                      . ,. ryr-N.
                                                                                                                                                                                        -Z.
7                                    ' --
Corps of Engineers                                      V[
Other Agencies Notified:
          -                                                                                                                            DATE/ TIME AGENCY                        PERSON CONTACTED                        PHONE            CONTACTED                                  ,ye,
                                                                                                                                                                                ..e,,.,
                                                                                                                                                                      .[, ."p.h,$.i j                  ,-_      a                                                                                                                                ,UTf4.M N M h-                          *3 I
          ..-    .                        Person Making Notification:
I l
I
                  ~
: r-
        - 5'                                          THE MATERIAL CONTAINED WITHIN THE SYMBOLS ( ) IS FRorRIETARY                                                                I"
                                                    . OR FRIVATE ISTORMATION.                                                                                                            . i' l
                                                                                        - :a - - - - -                                                                                  %
        ,g.) ,                    ..,.(_.      .
                                                        .    .\."  _ .
                                                                                                                                          *~~
                                                                                                                                                                    ,- f-                                .,
 
ARKANSAS POWER & LIGHT COMPANY
_h
                            .                                    Arkansas Nuclear One d 2/psmacvNCYPLAN                                                              l FOR'A 1000 06A x.y D/                        DUTIES OF THE EMERGENCY RADIATION TEA'1 h..g'N>                                  1903.43          REV. 3 J
                $hqi
          ', >~.g                                        .,                y                        o        I
                                                                                          . 3 ,r y abu m sJ m!3 y _r g g .
i .n., .        p c - ,:j .. n a n cl e                                {dg      a                                                  "
RECORD OF CHANGES AND REVISIONS PAGE          REVISION CHANGE                PAGE            R EVISION CHANGE  PAGE    REVISICN CHANGE 1                      3 2                      3 3                      3 4                      3 5                      3 o            6                      3 7                      3 8                      3 l
l I
O              -
          '"" M tb & s - 4 , #44s,                                                            ^~"pp w"
                                                  .n..-._                  -
i l
t
 
  -                                                                                                        s PLANT M ANUAL SECTION:  PROCEDURE / WORM PLAN TITLE:                    N O-EMERGENCY                DUTIES OF TliE EMERGENCY PLAN                    RADIATION TEAM                                1903.43 PAGE    1  of 8 ARKANSAS NUCLEAR ONE                                aevision  3 oAre  7/8/8i (ov)                                                                      ICHANGE      DATE 1.0  PURPOSE The purpose of this procedure is to provide guidance on the responsibilities and duties of the Emergency Radiation Team for emergency situations.
2.0  SCOPE This procedure is applicable to emergency situations involving Unit One and/or Unit Two.
 
==3.0  REFERENCES==
 
q 3.1  References Used in Procedure Preparation:
3.1.1      Arkansas Nuclear One Emergency Plan 3.2  References Used in Conjunction with this Procedure:
3.2.1      1903.10, " Emergency Action Level Response" 3.3  Related ANO Procedures:
3.3.1      1903.30, " Plant Evacuation"
(%
( ,)
3.3.2      1903.60, " Emergency Supplies and Equipment" 3.3.3      1904.02, " Magnitude of Release - Unit 1" 3.3.4      1904.03, " Aux. Bldg. Ventilation Exhaust Emergency Radiation Monitor" l                        3.3.5      2904.02, " Magnitude of Release - Unit 2" l
l            4.0  DEFINITIONS 4.1  Operational Support Center (OSC) - The ANO Administration Building; the Emergency Radiation Team assembly area should initially be the First Floor Classroom and adjoining office.      [Upon team assignments being made, the On-site Radiological Monitoring Section should continue to operate from this location (unless otherwise instructed); the Off-site Radiological Monitoring Section should operate from the Emer-gency Control Center (Technical Analysis Classroom)].
l l
4.2  Emergency Kit - A compilation of supplies and equipment for determination of radiological hazards; these kits are located in the general vicinity of the:  (1) Unit 1 Control Room, (2) First Floor Classroom (Admin. Bldg),
(3) Emergency Control Center (1st Floor), and (4) St. Mary's Hospital I                        (Emergency Room).
l
(    \
    \    !
x_ '
l l
1 I
l L
 
PLANT M ANUAL SECTION:    PROCEDUR EMORK PLAN TITLE:                      NO:
EMERGENCY                DUTIES OF THE EMERGENCY PLAN                      RADIATION TEAM                              1903.43 PAGE      2 of 8 O)
\._
ARKANSAS NUCLEAR ONE                              . aeviSiON CHANGE 3 DaTe  7/8/81 DATE 5.0 RESPONSIBILITIES 5.1  The Emergency Radiation Team Leader is responsible for coordinating the efforts to determine radiological hazards and for responding to Emergency Action Levels as described in this procedure.
5.2  The Emergency Radiation Alternate Team Leaders are responsible for assisting in coordinating the efforts to determine radiological hazards.
If the designated Team Leader is not available, then an Alternate Team Leader should assume the responsibilities of the Team Leader.
5.3  The Emergency Radiation Team is responsible for the following areas, as indicated:
5.3.1        The Onsite Radiological Monitoring Section is responsible for:
A. Determining onsite radiological hazards, conducting radiological surveys, monitoring and sampling.
B. Performing, in conjunction with the Emergency Medical Team, onsite rescue operations.
7-s                        C. Making initial and subsequent re-entries into
('' )                              plant areas that present a radiological hazard, as required.
5.3.2      The Offsite Radiological Monitoring Section is responsible for:
A. Determining off-site radiological hazards.
B. Conducting required off-site surveys, monitoring, and sampling.
6.0 NOTIFICATIONS 6.1  During routine work hours, the Emergency Radiation Team personnel on-site should be contacted by the most expedient means available.
6.2 After routine work hours, the Emergency Radiation Team personnel may be contacted as follows:
6.2.1      Refer to the roster / call list contained in Attachment 5 -
1903.10, " Emergency Action Level Response" as necessary.
6.2.2      Contact a Team Leader / Alternate Team Leader.
/~';
(v  !
 
              .      PLANT M ANUAL SECTION:    PROCEDUREMORK PLAN TITLE:                  N O-EMERGENCY                  DUTIES OF THE EMERGENCY PLAN                        RADIATION TEAM                            1903.43 PAGE    3 of a m                  ARKANSAS NUCLEAR ONE                              aevisioN CHANGE 3 o*1a  7/8/ai
{s    ,                                                                              DATE m-6.2.3        Provide the individual contacted with appropriate information and request them to ensure that contact is attempted with the remaining team personnel, as needed.
6.3 The following information should be provided to the notified Radiation Team personnel as indicated:
6.3.1        If team personnel are to respond to an Emergency Action Level that may or may not involve a radiological emergency, they should be provided the following information, as known:
A. Affected unit.
B. EAL declared.
C. Immediate response required.
D. Other information, as the situation dictates.
7.0  RADIOLOGICAL RESPONSE INSTRUCTIONS 7.1  If an immediate response is required, the Emergency Radiation Team should take the following actions:
p
(~)                7.1.1      Notified team personnel should report to their designated initial assembly area in the Operational Support Center.
7.1.2      The team leader shall assign personnel to the following sections (including designation of section leaders, as ne eded) to perform the indicated actions:
A. Onsite Radiological Monitoring Section (performs initial su rveys , sampling, and posting of applicabic onsite areas and accompanies other emergency response teams during initial entry and subsequent re-entries, as required).
B. Offsite Radiological Monitoring Section (performs initial surveys, sampling, and posting of applicable offsite areas, assists in collection of appropriate environmental samples and assists, as directed, the Arkansas Department of Health Radiological Response Team).
NOTE: Emergency hand-held radios may be obtained from the Main Guard Station upon request.
7.1.3      Each section should then report to their designated assembly area (as indicated in Section 4.0) to make ready the appropriate emergency kit equipment, as necessary.
  ,y
(    )
v l
 
PLANT M ANUAL SECTiON:    PROCEDURE / WORK PLAN TITLE:                      NO:
EMERGENCY                  DUTIES OF THE EMERGENCY PLAN                      RADIATION TEAM                                1903.43 PAGE      4 of 8 (7
  \_,/
ARKANSAb NUCLEAR ONE                                aevisiON CHANGE 3 oaTE    7/8/8i DATE 7.1.4      If not previously done, the team leader should contact the appropriate person in the current chain of command, per Attachment 1, to determine the current radiological re-sponse needs.
7.1.5      The Emergency Radiation Team should respond, as directed, to radiological incidents in accordance with the following emer-gency procedures, as appropriate:
NOTE:      Activation of the Emergency Plan does not supercede the use of routine Health Physics procedures unless it is specifically stated so.          Therefore, the guidance contained in the 1600/2600 series Technical Analysis Procedures should be followed.
A. 1903.30, " Plant Evacuation" B. 1903.33, "Re-entry Guidelines" C. 1903.76, " Arkansas Department of Health" D. 1904.02 (2904.02), " Magnitude of Release - Unit 1(2)"
(G'-~';        7.1.6      The team leader should provide a periodic update of the team's status to the appropriate individual, per Attachment 1.
7.1.7      After the initial team response, the Emergency Radiation Team should report as directed by the appropriate individual, per Attachment 1.
8.0 EMERGENCY ACTION LEVEL (EAL) RESPONSE GUIDELINES 8.1 Unusual Event No action is required by the Emergency Radiation Team unless the Unusual Event is declared as a result of a radiological incident.              In that case, refer to Section 7.0.
8.2 Alert If the emergency does not involve a radiological incident, the Emergency Radiation Team personnel shall be placed on " standby status" as long as the Alert EAL is in effect.
8.2.1      Notifications should be made in accordance with Section 6.0 of this procedure.
8.2.2      When onsite, the team leader should report to the Duty
(''
1,_)S Emergency Coordinator to obtain further instructions, as necessary.
l
 
PLANT MANUAt SECTION:    PROCEDUREAVORK PLAN TITLE:                    NO:
EMERGENCY                  DUTIES OF THE EMERGENCY PLAN                      RADIATION TEAM                            1903.43 PAGE    5 of 8 ARKANSAS NUCLEAR ONE                              invisioN CHANGE a Da1E  7/8/81 DATE i
s  j            8.3 Site Emergency / General Emergency NOTE:    The transition from an Alert to a Site / General Emergency activates the long-term Emergency Response Organization. Upon arrival on-site and an appropriate turnover from the Duty Emergency Coordinator, the following individuals will coordinate the actions of the in-dicated sections of the Emergency Radiation Team:
A. Onsite Monitoring & HP Supervisor (Onsite Radiological Monitor-ing Section)
B. Offsite Monitoring Supervisor (Offsite Radiological Monitoring Section) 8.3.1        Notifications should be made in accordance with Sectio 6.0 of this procedure.
8.3.2        If the emergency situation does not involve a radiological incident, the notified Emergency Radiation Team personnel shall report to their designated assembly area , provide team accountability results to the Technical Support Center, and await further instructions.
9.0  ATTACHMENTS AND FORMS
(''}
LJ 9.1 Attachment 1 - EAL Organizational Structure 9.2 Attachment 2 - Checklist (Team Leader) t
{
l t
S
    . , . _ _ _ , . . . . , _. m        .
                                                  ,  . - ..    ._    m.            _
                                                                                          .wm;          .
 
1 I
* 1
                                                                                                                  )
PLANT M ANU AL SECTION:    PROCEDURE / WORK PLAN TITLE:                          NO:
EMERGENCY                  DUTIES OF THE EMERGENCY ptAN                        RADIATION TEAM                                      1903.43 PAGE      6 of 8 C')
  \s ,-                ARKANSAS NUCLEAR ONE                                    aevisioN CHANGE 3 o*TE DATE 7/8/81 ATTACHMENT 1 EAL ORGANIZATIONAL STRUCTURE A. Initial Response Organization (Unusual Event, Alert EAL's, unless otherwise indicated).
l DEC l t
I i
Shift                                                            Emer.
Supervisor                                                        Radiation Team Leader Operations Staff I                            I Onsite                      Offsite Rad. Monit.                Rad. Monit.
Sect.                      Sect.
O V
B. Emergency Response Organization (Site / General Emergency EAL's, unless other-wise indicated).
Incident
 
===Response===
Director I
I                                                                      I Recovery                                                            Technical Manager                                                              Support l                                                                Manager HP & Chem.                                                                    I Supt                                                              Dose Assess.
l                                                                    Supv.
Onsite Monit.                                                                  }
                      & HP Supv                                                            Offsite Monit.
l                                                                  Supv.
Onsite Rad                                                                  l Monit Sect                                                          Offsite Rad Monit Sect
  /3 I      /
v 1
 
      . .            PLANT M ANUAL SECTION:  PROCEDURE / WORK PLAN TITLE:                    NO:
EMERGENCY                DUTIES OF THE EMERGENCY PLAN                      RADIATION TEAM                                1903.43 PAGE    7 01 8
  /~N
          .              ARKANSAS NUCLEAR ONE                              atvisiON CHANGE 3 DATE    7/8/81 DATE
    ._]
ATTACHMENT 2                              Page 1 of 2 CHECKLIST (TEAM LEADER)
The following items should be considered by the Emergency Radiation Team Leader, and action should be taken, as necessary:
1.0  Contact should be attempted with team members by the most expedient method available.
1.1 Arrangements should be made to re-initiate attempts to contact personnel that were not able to be contacted initially.
2.0  Personnel should be assigned to the Onsite and Offsite Radiological Monitoring Sections (This includes appointment of section leaders, as necessary).
3.0 Determine immediate response needs.
3.1 Offsite sampling points.
3.2 Onsite surveys, sample required.
3.3  Initial re-entries by other recrgency teams (Obtain approval from the
[,_)                Duty Emergency Coordinator /hece,ery Manager).
V 3.4 Equipment from routine stock that must be retrieved for use.
4.0  Monitor radiation levels, etc., in the activated Emergency Response Centers 4.1  Control Room 4.2 TSC/OSC 4.3 ECC 5.0 Establish contamination control points / measures for the appropriate response l                centers.
l l                5.1  Control Room 5.2 TSC/OSC 5.3 ECC 6.0  Issue emergency dosimetry / respiratory equipment, as necessary.
l
["%
v l
l
 
NO:
PLANT M ANUAL SECTiON:  PROCEDUREAVORK PLAN TITLE:
EMERGENCY                DUTIES OF THE EMERGENCY RADIATION TEAM                            1903.43 PLAN PAGE    8 ot 8 aEvision  3 o*TE  7/8/81 O'
\~s ARKANSAS NUCLEAR ONE                            CHANGE      DATE ATTACHMENT 2 Page 2 of 2 7.0  Be prepared to take the following actionc, as necessary:
7.1  Personnel / vehicle monitoring / decontamination at the Emergency Control Center (or as the situation dictates, including relocation of portal monitors, etc., as necessary).
7.2  Relocate the TLD reader to the Emergency Control Center (or as the situation dictates).
7.3    Relocate the SCBA air compressor to the Emergency Control Center (or as the situation dictates).
7.4  Determine additional equipment needs and make appropriate recommendations to management.
7.5  Set up a personnel shift schedule for an extended incident.
8.0  Provide periodic updates to the team personnel and management personnel.
-s                                                                                                            ,
m o
 
f
                    /M '.
ARKANSAS POWER & LIGHT COMPANY MB                                    Arkansas Nuclear One t
3
          )                        EMERGENCY PLAN                                              FORM 1000.06A DUTIES OF TIIE DIERGENCY RECOVERY TEMI 4.:                      1903.44    REV. 1 b            8 0!1tf0ijGlj C 3pi                    # /c f
[w4    PAGE RECORD OF CHANGES AND REVISIONS REVISION CHANGE      PAGE          REVISION CHANGE  PAGE    REVISION CHANGE 1        1 2      1 3      1 O
t 0                                                              .
                                            ....-.<...,                              g
 
PLANT M ANU AL SECTION:  PROCEDUREAVORX PLAN TITLE:                    NO:
DUTIES OF TIIE EMERGENCY PLAN            EMERGENCY RECOVERY TEAM                    1901.44 s
PAGE    1  of 3 (j                    ARKANSAS NUCLEAR ONE                              aevisioH  i care  7/27/8i CHANGE        DATE 1.0 PURPOSE The purpose of this procedure is to provide guidance on the responsi-bilities and duties of the Emergency Recovery Team for emergency situa-tions.
2.0 SCOPE This precedure is applicable to emergency situations involving Unit One and/or Unit Two.
 
==3.0 REFERENCES==
 
3.1    References used in Procedure Preparation:
3.1.1        Arkansas Nuclear One Emergency Plan 3.2    References to be used in Conjunction with this Procedure:
3.2.1        1903.33, "Re-Entry Guidelines" 3.3    Related ANO Procedures:
(,
  /~')N                3.3.1        1903.02, " Assignment of Plant Emergency Team Members" 3.3.2        1903.42, " Duties of the Emergency Medical Team" 4.0 DEFINITIONS 4.1    Operational Support Center (OSC) - the AN0 Administration Building; the Emergency Recovery Team should initially assemble in the 1st Floor Classroom unless otherwise directed.
5.0 RESPONSIBILITIES 5.1    The Emergency Recovery Team is responsibic for performing re-entry l
operations into evacuated areas involving the following situations:
l                      5.1.1        To ascertain that personnel who were in the affected area have been evacuated and, if necessary, search for unaccounted personnel.
5.1.2      To rescue any injured or trapped personnel from the affected area.
V l
l
 
PLANT M ANUAL SECTION:    PROCEDURE / WORK PLAN TITLE:                  NO:
DUTIES OF TIIE EMERCENCY pI.AN            E:fERGENCY RECOVERY TEAM                    1903.44 PAGE    2 of 3 O
O                  ARKANSAS NUCLEAR ONE                                aevision  i DatE  7/27/ai CHANGE      DATE          '
5.1.3      To perform operations which may decrease the effect of the emergency or hazardous condition.
5.1.4        To determine the nature and extent of the emergency and/or radiological conditions.
5.2 The Emergency Recovery Team Leader is responsible for coordinating the emergency actions of the Emergency Recovery Team.
6.0 PRECAUTIONS 6.1  Procedure 1903.33, "Re-entry Guidelines" shall be followed in regard to the measures to be taken to minimize exposure to re-entry personnel.
6.2 The Emergency Recovery Team must perform their duties in the safest ar.d most ef ficient manner possible while making every ef fort to mini-mize re-entry personnel exposure.
7.0 NOTIFICATIONS 7.1  The Emergency Recovery Team if formed, as required, for the existing emergency condition under the dircction of the Duty Emergency Coor-r~y            dinator/ Recovery Manager.
'~'
7.2 The team leader and team members shall be selected from personnel who have experience in health physics, first aid, operations or maintenance.
7.3  Personnel selected for the team should be notified by the most expedient method available of the location to which they shall report (this loca-tion should be the 1st Floor Classroom unless otherwise directed).
8.0 EMERGENCY RECOVERY TEAM INSTRUCTIONS 8.1  Immediate Actions 8.1.1        The Emergency Recovery Team Leader shall function under the direction of the Duty Emergency Coordinator / Recovery Manager.
A. Re-entry operations shall take place only on the authority of the Duty Emergency Coordinator / Recovery Manager.
B. The Emergency Recovery Team shall be briefed regarding the following subjects:
: 1. Duties and actions to perform.
('';                              2. Expected dose rates and stay times.
Li
 
PLANT MANUAL SE CTION:        PROCEDURElWORX PLAN TITLE;                        N O-DUTIES OF THE EFERGENCY PIAN                  EMERGENCY RECOVERY TEAM                          1901.44 PAGE          3 of 3 ARKANSAS NUCLEAR ONE                                    aevision CHANGE i DaTE    7/27fai DATE
(                                            3. Other information as applicable.
C.        The Emergency Recovery Team shall be accompanied by a member of the Emer;;ency Radiation Team during initial entry and subsequent re-entries into plant areas until radiation areas have been marked.
D.        If the situation required re-entry for the purpose of search and rescue, personnel from the Emergency Medical Team and Emergency Radiation Team shall be assigned to the Emergency Recovery Team.
8.1.2        The guidelines contained in 1903.33, "Re-entry Guidelines" shall be followed during re-entry operations.
8.2  Follow-Up Actions 8.2.1        The Emergency Recovery Team shall report and function as directed by the Duty Emergency Coordinator / Recovery Manager.
9.0 ATTACILMENTS ANI) FORMS None O
v 1
l l
l l
l l
l l
r~'s
_ -. . . . -              -.                .  . - . _ - .      - .      . ~ .. -
 
7                  ARKANSAS POWER & LIGHT COMPANY B
w Arkansas Nuclear One s                                DIERCENCY PLA'i                                                                                  FORM 1000 06A
                                    ..'                            D1ERGENCY RESPONSE ORGANIZATION                                              5 1903.50  REV. 3 4                                                                        U e RNs.
        .    .)                              RECORD OF CHANGES AND REVISIONS PAGE        REVISION CHANGE                          PAGE                      REVISION CHANGE    PAGE        REVISION CHANGE 1              3                                    19                          3 2              3                                    20                          3 3              3                                    21                          3 4                3 5              3 6              3 7              3 8              3 9              3 10              3 11              3 12              3 13              3                                                          ,
14              3 15              3 16              3            '
17              3 18              3 APPROVED BY: i APPROVAL DATE tT90 ?mht -h!            av.onu~                ?frw &, //b-                                  7 3/.6(
 
PLANT M ANU AL SECTION: PROCEDUR UWOR K PLAN TITLE:                    NO:
              ,            EMERGENCY PLAN            EMERGENCY RESPONSE ORGANIZATION              1903.50 y
PAGE    1  of 21 o                        ARKANSAS NUCLEAR ONE                            aevision  3 DATE  7/28/ai
()                                                                        CHANGE        DATE 1.0      PURPOSE The purpose of this procedure is to describe the division of responsibilities of the AP&L Emergency Response Organization (ERO). Portions of this augmented Emergency Response Organization may be activated for Unusual Events and Alerts.
The entire organization would be activated for Site and General Emergencies.
2.0    SCOPE This procedure is applicable to emergency situations involving Unit One and/or Unit Two.
 
==3.0    REFERENCES==
 
3.1    References Used in Procedure Preparation:
3.1.1      Arkansas Nuclear One Emergency Plan.
3.2 References Used in Conjunction with this Procedure:
None 3.3    Related ANO Procedures:
3.3.1        Procedure 1903.51, " Turnover of Responsibility to the
('~)'                              Emergency Response Organization".
  \s 4.0    DEFINITIONS 4.1    Emergency Response Organization (ERO) - The AP&L emergency response organization, composed of plant and General Office personnel, which is activated to augment the resources of the Initial Response Organiz-ation for more serious events. A diagram of this organization is shown in Attachment 1.
4.2    Initial Response Organization (IRO) - The emergency response organization, primarily composed of plant personnel, which must be able to report to
'                        the plant within 60 minutes of being notified. A diagram of this organi-zation is shown in Attachment 2. This organization is composed of the Operations Staff on duty, the Duty Emergency Coordinator, the Shif t Technical Advisor and the Plant Emergency Response Teams.
4.3  Onsite Technical Support Center - The location within the ANO Admini-stration Building equipped with instrumentation and communication systems and facilities useful in monitoring the course of an accident; this center is located in the 4th floor Planning & Scheduling area.
4.4  Onsite Operational Support Center - The ANO Administration Building; the normal work location for an individual is used as the reporting area  in this center with the following exceptions:
g i  i Q)
{
 
PLANT M ANUAL SECTION:    PROCEDURE / WORK PLAN TITLE:                      NO:
EMERGENCY PLAN              EMERGENCY RESPONSE ORGANIZATION                  1903.50 PAGE      2 of 21 O
k,,)                ARKANSAS NUCLEAR ONE                                  . atvisioN  3 oATE  7/28/81 CHANGE        DATE 4.4.1        Planning & Scheduling Supervisor - 4th floor conference room.
4.4.2      Radwaste Coordinator - individual's supervisor's office in the Administration Building.
4.4.3      Emergency Team Personnel.
A. Evacuation - (Material Management Personnel) Main Guard Station; (Training Personnel) Emergency Control Center B. Fire - 2nd floor conference room.
C. Medical - First Aid Room /2nd Floor Break Room.
D. Radiation - (Onsite Team) 1st floor classroom (and adjacent offices).
E. Recovery - same as 4.4.3.D.
4.5  Emergency Control Center (ECC) - a near-site facility located ap-proximately 0.65 miles northeast of the reactor buildings (the ANO
  ,_s              Training Facility).
l'    )
  ''  5.0  RESPONSIBILITIES NOTE:    Unless otherwise indicated, a position should be filled by ANO personnel bearing the same title.
5.1 The Emergency Response Organization is dividied into four areas of responsibility:      recovery, technical support; communications, and (non-technical) support. Recovery is directed by the Recovery Manager with advice and support from the Incident Response Director. Support of the Recovery Manager may be provided both onsite and offsite and is the responsibility of the Incident Response Director.
5.2 The Incident Response Director (IRD) is the individual responsible to Arkansas Power & Light corporate management for overall direction of the response to ar. incident. As such, he is responsible for assuring the continuity of resources (technical, administrative and material) required for continuous operations of the Emergency Response Organiza-tion for a protracted period. The Incident Response Director is the primary authority for the Company and must approve public information releases prepared by AP&L. In the absence of the Incident Response Director, the Technical Support Manager shall assume his duties.
This position should be filled by the Senior Vice President of Energy Supply.
O
!v!
 
PLANT MANUAL SECTION:  PROCEDURE / WORK PLAN TITLE:                    NO-EMERGENCY PLAN            EMERGENCY RESPONSE ORGANIZATION                  1903.50 PAGE    3 of 2i fy ARKANSAS NUCLEAR ONE                              aEvision CHANGE 3 oaTE  7/28/81 DATE 5.3 Two assistants are assigned to the Incident Response Director. The Assistants to the Incident Response Director will perform duties assigned by the Incident Response Director and will be available to respond to questions from and provide advice to menibers of the Emer-gency Response Organization.        In addition, they are responsible for preparing and distributing periodic progress reports to the entire Emergency Response Organization in order to assure that each portion of the organization is working with current and consistent information.
The Assistants to the Incident Response Director also coordinate re-sponses to requests for information by non-AP&L groups (local, state, federal, other Utilities, etc.).        In the absence of the Incident Re-sponse Director and the Technical Support Manager, an Assistant to the Incident Response Director assumes the duties of the Incident Re-sponse Director.
These positions should be filled by the Director of Technical _ad Environmental Services and the Director of Fossil Operations.
5.4  The Recovery Manager assumes the duties of the Duty Emergency Coordi-nator and has authority to take any action he deems necessary to place the plant in a safe configuration. The Recovery Manager has the re-sponsibility for decisions regarding emergency operations at the plant.
In the absence of the IRD, the Technical Support Manager and the Assistants to the IRD, the Recovery Manager assumes the duties of
(-]        the Incident Response Director.
LJ The Operations Manager, the Maintenance Manager, the Maintenance Super-intendents, and their staffs report to the Recovery Manager to assist him in planning and directing corrective and recovery actions. The Emergency Recovery Team is assembled by the Recovery Manager and functions under his direction. In the absence of the Recovery Manager, the Operations Manager, the Maintenance Manager or the Operations Superintendent of the unaffected unit (in that order) assumes the duties of the Recovery Manager.
This position should be filled by the ANO General Manager.
5.5  The Operations Manager is responsible for assisting the Recovery Manager in planning and directing corrective or recovery actions.
In the absence of the Recovery Manager, the Operations Manager assumes the duties of the Recovery Manager.
5.6 The Maintenance Manager is responsible for assisting the Recovery Manager in planning and directing corrective or recovery actions.
In the absence of the Recovery Manager and tne Operations Manager, the Maintenance Manager assumes the duties of the Recovery Manager.
a
 
PLANT M ANUAL SECTION:  PROCEDUREA40RX PLAN TITLE:                  NO:
EMERGENCY PLAN            EMERGENCY RESPONSE ORGANIZATION              1903.50
  -s PAGE    4 of 21 Ii
  \I            ARKANSAS NUCLEAR ONE                            aEvisioN  3 DarE    7/28/81 CHANGE      DATE 5.7 The Maintenance Superintendents are responsible for necessary repairs and installation of plant equipment modifications and assistance in directing the Emergency Recovery Team.
5.8 The Planning and Scheduling Supervisor is responsible for coordinating the activities of plant personnel not assigned to specific teams.
5.9  The Operations Superintendent is the primary authority in the Control Room of his designated unit. He shall determine plant conditions, make recommendations and provide updates to the Recovery Manager.
In the absence of the Recovery Manager, Operations Manager, and the Maintenance Manager, the Operations Superintendent of the unaf fected unit shall assume the duties of the Recovery Manager.
5.10 The Shift Technical Advisor shall assist the Shift Operations Super-visor in the Control Room of the affected Unit to follos the course of the emergency and mitigate its consequences.
5.11 The Technical Support Manager is responsible for technical support activities. He is also responsible for coordinating AP&L off site radiological monitoring efforts with the Arkansas Department of Health and Nuclear Regulatory Commission. In the absence of the
("N        Incident Response Director, the Technical Support Manager assumes
( ,)      his duties.
This position should be filled by the Assistant Vice President of Nuclear Operations.
5.12 The Nuclear and Engineering Support Superintendent is responsible for providing advice on plant design and coordinating engineering ac-tivities in the areas of analysis, design modifications and system response.
This position should be filled by the ANO Engineering and Technical Support Manager.
5.13 The Health Physics and Chemistry Superintendent is responsible for supervising onsite health physics and chemistry activities. These activities include onsite radiological monitoring, decontamination, initial dose assessment calculations, initial magnitude of radio-logical release calculations, primary side chemistry control and sampling, and secondary side chemistry control and sampling.
This position should be filled by the AN0 Technical Analysis Super-intendent.
r~N
  ~._/
I
 
PLANT M ANUAL SECTION:  PROCEDURENVORX PLAN TITLE:                  NO:
EMERGENCY PLAN            EMERGENCY RESPONSE ORGANIZATION            1903.50 PAGE  5 o f 21 (s)
  *~/              ARKANSAS NUCLEAR ONE                            rowsi=  3 DATE  7/2af8i CHANGE      DATE 5.14 The Engineering Resources Coordinat_or is responsible for coordinating the engineering support of the Nuclear Steam Supply System vendors, Architect / Engineer, Middle South Services, other utilities, and con-sultants.
This position should be filled by the Director of Generation Engineer-ing.
5.15 The Licensing Coordinator is responsible for coordinating activities to respond to Nuclear Regulatory Commission requests.
This position should be filled by the Manager of Licensing.
5.16 The Nuclear Support Supervisor is responsible for coordinating activi-ties related to nuclear engineering and reactor physics.
This position should be filled by the ANO Plant Analysis Superintendent.
5.17 The Site Engineering Supervisor is responsible for coordinating engi-neering activities at the site.
This position should be filled by the Plant Engineering Superintendent, fw l    )    5.18 The Dose Assessment Supervisor is responsible for calculating magnitude
\~ /            of radiological releases and doses to individuals offsite.
This position should be filled by the Manager of Technical Aualysis.
5.19 The Onsite Monitoring and Health Physics Supervisor is responsible for monitoring onsite radioactivity levels, monitoring personnel exposures and directing Health Physics activities onsite. The Onsite Radiological Section of the Emergency Radiation Team reports to him following activation of the Emergency Response Organization.
This position should be filled by the ANO Health Physics Superintendent.
5.20 The Radiochemistry Supervisor is responsible for sampl:ng and analysis of primary plant coolant and liquid and gaseous radior.ctive wastes.
5.21 The Chemistry Supervisor is responsible for sampling and analysis of secondary plant fluid systems.
5.22 The Offsite Monitoring Supervisor is responsible for directing AP&L offsite radiological monitoring activities. This effort shall be supplemented by AP&L laboratory personnel from the Technical Analysis Section of the Technical and Environmental Services Department, located in Little Rock. The Offsite Radiological Monitoring Section of the Emergency Radiation Team reports to him following activation of the r~T            Emergency Response Organization.
t    }
v This position should be assigned by the Dose Assessment Supervisor from personnel in the Technical Analysis section of the Technical &
Environmental Services Department.
 
PLANT M ANUAL SECTION:      PROCEDUREN/ORK PLAN TITLE:                              NO:
EMERGENCY PLAN            EMERGENCY RESPONSE ORGANIZATION                          1903.50 PAGE    6 of 21 l n
()                                                                            ARKANSAS NUCLEAR ONE                            _aevision CHANGE 3 DATE            7/28/81 DATE 5.23 The Radwaste Coordinator is responsible for the packaging, transport-ing, and disposing of radioactive wastes.
5.24 The Support Superintendent is responsible for coordinating non-technical support. He reports directly to the Incident Response Director.
This position should be filled by the Director of Administrative Services and Project Support.
5.25 The Logistics and Procurement Coordinator is responsible for obtaining any additional facilities, equipment, supplies and transportation re-quired to support the Emergency Response Organization.
This position should be filled by the ANO Administrative Manager.
5.26 The Financial Services Coordinator is responsible for maintaining the payroll, and any other required financial assistance.
This position should be filled by the Manager of Financial Services.
5.27 The Office Services Coordinator is responsible for word processing, drafting, maintaining files and documentation in the Little Rock General Office.
(~  )
\_,/                                                                        This position should be filled by the Office Services Coordinator.
5.28 The Site Security Coordinator is responsible for controlling access to the plant and to the Emergency Control Center. He is responsible for personnel accountability within the exclusion area and at the Emergency Control Center. He shall also coordinate Arkansas Power &
Light security efforts with local law enforcement authorities. The Emergency Evacuation Team reports to him following activation of the Emergency Response Organization.
5.29 The Facilities Maintenance Coordinator is responsible for repairs and maintenance of the Emergency Control Center and of the equipment and facilities which have been brought in to promote recovery from the incident. He should work closely with the Logistics and Procurement Coordinator to obtain any materials or additional facilities requested of him.
This position should be filled by the ANO Plant Services Supervisor.
  -~
V
 
PLANT MANUAL SECTION:  PROCEDUREN/ORK PLAN TITLE:                    NO:
EMERGENCY PLAN            EMERGENCY RESPONSE ORGANIZATION            1903.50 PAGE    7 of 21 (7
  \s_/
ARKANSAS NUCLEAR ONE                            ^aevision CHANGE 3 o^1s  7/2s/81 DATE 5.30 The Emergency Services Coordinator is responsible for problems which are not immediately related to plant operations, such as a fire or medical emergency. The plant Emergency Fire and Emergency Medical Teams report to him following activation of the Emergency Response Organization. The Emergency Services Coordinator should work closely with the Recovery Manager.
                'Lis position should be filled by the ANO Safety and Fire Prevention Coordinator.
5.31 The Site Office Services Coordinator is responsible for documentation of decisions and events, as well as word processing, drafting, main-taining files, etc., onsite.
This position should be filled by the ANO Office Services Supervisor.
5.32 The Corporate Security Coordinator is responsible for security of the Arkansas Power & Light General Office and executives. He may also be required to implement security for AP&L community offices and for other plant sites.
This position shculd be filled by the Manager of Corporate Security.
(\ ')  5.33 The Communications Superintendent is responsible for releases of in-formation by Arkansas Power & Light. He should provide for recording discussions between the Incident Response Director and the Recovery Manager, the Nuclear Regulatory Commission, the Technical Support Manager, and the Support Superintendent. He shall then prepare in-formation from these discussions for release and obtain approval for release of any information from the Incident Response Directer.
The Communications Superintendent, as the media spokesman for Arkansas Power & Light shall then deliver this information to the Governmental Advisory Coordinator and Utility Advisory Supervisor, and then to the TV, radio, and press at interviews or conferences as scheduled by the Media Relations Coordinator. In the absence of the Communications Superintendent, the Media Relations Coordinator assumes his duties.
This position should be filled by the Vice President of Corporate Communications.
5.34 The Media Relations Coordinator is responsible for coordinating media requests for information or interviews, and for scheduling interviews, press conferences , etc. , for the Communications Super-intendent.
This position should be filled by the Assistant Manager of Communi-
  /' 'X        cations.
N~s l
l l
l l
L
 
PLANT MANUAL SECTION. PROCEDUREN/ORK PLAN TITLE:                    NO:
EMERGENCY PLAN          EMERGENCY RESPONSE ORGANIZATION              1903.50 PAGE    8 of 21 n)
(s,            ARKANSAS NUCLEAR ONE                            aevisioN CHANGE 3 DarE DATE 7/28/ai 5.35 The Utility Advisory Supervisor is responsible for releasing informa-tion to Arkansas Power & Light employees, other utilities, and utility information service organizations such as Atomic Industrial Forum, Electric Power Research Institute, Edison Electric Institute, and the Institute of Nuclear Power Operations.
This position should be filled by the designated Communications Editor.
5.36 The Governmental Advisory Coordinator is responsible for providing information to elected state and federal officials on a regular basis.
This position should be filled by the Director of State Governmental Affairs.
5.37 The Local Advisory Supervisor is responsible for assisting the Covern-mental Advisory Coordinator by informing the elected officials of the communities and counties in the area of the plant. He is also responsible for ensuring that a representative of the Arkansas Power
              & Light organization is available to each principal offsite govern-mental emergency operations center (e.g. County Emergency Operations Center) to provide assistance to the governmental groups.
I )        This position should be filled by the Russellville District Manager.
L/'
5.38 The Decision Secretary assists the Emergency Response Organi-zation in decision-making by summarizing alternatives and their consequences.
This position should be filled by the Director of Generation Technology.
5.39 The Planning and Scheduling Coordinator is responsible for pre-paring schedules to coordinate and track the progress of Emergency i
Response Organization activities in response to an incident.
This position should be assigned by the Support Superintendent.
5.40 The TOCC Liasion is responsible for providing assistance to the Technical Operations Control Center staff, as necessary.
l This position should be filled by the Manager of Quality Control.
i 1
l l (~'s l \s_/
1 l
 
PLANT MANUAL SECTION:    PROCEDURE / WORK PLAN TITLE:                      NO:
EMERGENCY PLAN              EMERGENCY RESPONSE ORGANIZATION                  1903.50 PAGE    9 of 21 (N-3                ARKANSAS NUCLEAR ONE                                aavision CHANGE 3 DATE    7/28/81 DATE
 
==6.0 DESCRIPTION==
 
6.1  Changes to the division of responsibilities of the Emergency Response Organization as described in Section 5.0 may be made as necessary at the time of an incident with the approval of the Incident Response Directer.
6.2  The locations from which the members of the Emergency Response Organi-zation are intended to normally function following an incident are identified in Attachment 3. The suggested communications flow plan is provided as Attachment 4.
6.3 A matrix of responsibilities of the Emergency Response Organization versus position is provided in Attachment 5.
7.0 ATTACIDIENTS AND FORMS 7.1  Attachment 1 - Emergency Response Organization 7.2 Attachment 2 - Initial Response Organization 7.3 Attachment 3 - Primary Locations of Emergency Response Organization Members (e%) w
      \
7.4 Attachment 4 - Communications Flow Plan 7.5 Attachment 5 - Responsibilities Matrix for the Emergency Response Organization.
i l
      )
l
 
A
  ..                                                                  i
                                                                                                                                                  \      '.                                                            a                    )
f f          f                                        I
(
* y a
                                                                                                                                                                                                                      . l'      ~,
F                                                    i          .6l-                                                                                y(,,
3                              #
                                                                  .h                                                                                    kl                                                              b    -
AP&L i
CORPORATE
                                                                                                                        ._ MAN A..G.E._ MENT.
M O
W, DECISION                              INCIDt3T~                          ASSISTANTS TO THE                                                    y                        z l                                                                                                                        RESPONSE
}
SECRETARJ DIRECTOR INCIDENT RESPONSE DIRECTOR
                                                                                                                                                                                                                                    .- J
                                                                                                                                                                                                                                    ,d
                                                                                                                                                                                                                                                /M {Z p            l se          T '%x            r T U ENING &
S CllE D . St TV .
                                ~
55ER ~
MANAGER
                                                                                                                        ~T UIINif Sl:PPORT                                              SUPPORT SUPT.
R              $Z ftANAGER                                                                                              O                  W      F x
OV                  *t2    $
_l_._.__                    _ I _._ _                        I ._                      . I                      _ . . _ . _ _
4          h              h OPERAI!ONS                    MAINT.                ._HP & CilEM.            NUCLEAR & ENGR.                      _ . _ COMMUNICATIONS l                              ._ PLANNING &                      M                          -
MA.N AG.E.. R              ._MA. N A G_ _E R _ SUPT.                      _ SUPPORT Sl'PT.                    _St P T.
l              -
SCHELULING                      $                          ..
g OiERATIONS                                                                                                                                                                                            O 2
: 1. & C.                                              NUCLEAR                    'I1EDIA                      ' LOW STICS 5~              FACILITIES                      *4 St PT.
                          ~
StPT.
                                                  ~'-
SUPPORT                      FELATI NS                      PROCUREMENT  --
MAINTENANCI                                                T SUPV.                        COORD                    :
                                                                                                                                                                    .-.CO_OR D .                COORD.                                                    b SHIFT                    ELECT.                  ONSITE                      SIIE                          UTILilY                        llNANCIAL                EMERGENCY                                          U Ol t RATIONS            MAINT.                  MONITOR &                    ENGINEERING                  ADVISORY                        SERVICES                SERVICES                                    r      b      O C
SUPV.
I SUPT.                    HP St:PV.                    St'PV.                        SUPV.                          COGRD.                    COURD.                                      N      $
M
                      ~
MECH.                    RADCHEM.                    ENGINEERING                  GOVT.                          Ott!CE                T TE OFFICE h      $O 3PERATORS      -
MAINT.                  SUPV.                        RESOURCES                    ADVISORY                      SERVICES                  SERVICES SUPT.                                                COORD.                        COORD.
                                                                                                                                                                                                                                                    ". A COURD.                    COORD.                                              x      T j                                                                                          O      m Slfit T ADMINISTRATIVE CIIEMISTRY St TV .
L!:ENSING COORD.
                                                                                                                                      !.OCA L ADVISORY plTE l SECURITY COkPORA1E SECURITY                                    7      $s O
Z
                          .__A.S. _S I_ST AN.T..
SUPV.                    ICOORD.                      -COORD.                                        M      $ Nm
_ _._ l . .          _ I __        -.__.!                                      o
                    . . _ _blII E T                                                                      DOSE                                                      PERSONNEL              SITE TECitNICAI EMERGENCY Q m    N %
ASSESSMEMT                                              ACCOUNTAHILITY            ACCESS      CONTPOL CENTEk                  > < O P ADVIFOR                                                                                S U P'.                                                  SUPV.                SUPV.        ACCESS SUPV.                    Z O N m o m
z    N RADWASTE                  OFFSITE                                                                                                                                    d
                                                                          ~
COORDINATOR                MONITORING o o S-_U_P E R V I SOR                                                                                                                  W      Z i
o O O
* w w N m m p
        ~
                                                                  'i                                                                                    -
7
                                                                                                                                                                                                                                            %              O w
3                                                                                  ,
o 3.,                                                                                                                                                  ',                  u      o CC    o
                                                                                                        ..s
                                                                                                          ,          .                                ,a>
                                                                                                                                                      ]                                                                                    N    W M.                          r          e t ' .I ,                                    ;                                                                                    cc    .
al.
      ,                                                                                                                                                                                                                ?
                                                                                                                                                                                                              .,                          -    g
            .. .          ,                                      ,R                .
i o
                                                    >G              .
(r. . .! ;        f, '
* E      ) * **
f                                          .                      .
                                                                                                                                                                                                                      \'
      ,                                                          }                      J.{t;        ',.      *
                                                                                                                                                    }.
 
i PLANT M ANUAL SECTiON:    PROCEDURElWORK PLAN TITLE:                    NO:
EMERGENCY PLAN            EMERGENCY RESPONSE ORGANIZATION              1903.50 e
PAGE    11 of 21 Og                ARKANSAS NUCLEAR ONE                            aevisiON  3 o*TE    7/28/81 CHANGE        DATE ATTACll'IENT 2 Initial Response Organization Duty Emergency l                              Coordinator i
l l
Shift                                Shift                          Emergency Technical                          Operations                        Response Advisor                            Supervisor                          Team O                                                                                Leaders Shift                              Operations                      Emergency Administrative                          SLaff                          Response Assistant                                                                Team
;                                                                                  Members I
i 1
                                              ------- Interface as appropriate
(  3 l    ]
 
PLANT M ANUAL SECTION:  PROCEDUREAVORK PLAN TITLE:                    NO:
EMERGENCY PI AN            EMERGENCY RESPONSE ORGANIZATION              1903.50
    ,- s PAGE      12 of 21 (di
    \                    ARKANSAS NUCLEAR ONE                              aevision CHANGE 3 DarE  7/28/81 DATE ATTACll'IENT 3                        Page 1 of 7 Primary Locations of Members of the Emergency Response Organization NOTE:      In the event the Onsite Technical Support Center or the Onsite Operations Support Center must be evacuated, personnel in these centers will be relocated to the Emergency Control Center.
5      5    $      d 5      5    e$ a$ $                t      x e    e      80 nd 30              $    SW
                                                              $~ $" W$ H $ $                      $ i~
                                                              $D $D E$ Ew$ $$ d$ $$d POSITION TITLE                              O$ 0$ $5 j $$5 EO N$ 0E$
Ops. Superintendent                                  X      X Shift ops. Supervisor                              X      X r~ 'si f
Shift Technical Advisor
* X      -
  'd        Shift Administrative Assistant                      X      X Operations Personnel                                X      X Recovery Manager                                                  X Maintenance Manager                                              X Operations Manager                                                X l          Tech. Support Manager                                                            X 1
HP & Chekistry Superintendent                                    X Nuclear & Engr. Support Superintendent                            X l
Dose Assessment Supervisor                                                      X Maintenance Superintendents                                              X Nuclear Support Supervisor                                              X Site Engineering Supervisor                                              X Onsite Monitoring & HP Supervisor                                        X Radchem. Supervisor                                                      X Chemistry Supervisor                                                    X Radwaste Coordinator                                                    X n        Emergency Services Coordinator                                          X
(      )
  \_/      Site Security Coordinator                                                X Site Office Services Coordinator                                        X
            *The Shift Technical Advisor functions in the Control Room of the affected Unit.
l
 
PLANT M ANUAL SECTION: PROCEDURE / WORK PLAN TITLE:                            NO:
EMERGENCY PLAN          EMERGENCY RESPONSE ORGANIZATION                        1903.50 PAGE        13 of 21 (gq                ARKANSAS NUCLEAR ONE                                aevision CHANGE 3 DATs      7/2s/81 DATE ATTACHMENT 3                                      Page 2 of 7 l
n' x    -x        x      w r      r          N    $N        N      d o      o        =z      x2        z      4        x o      o        uw      ww        w      w        w x
a x
a gu s
gu gv s    za o
a gg zw o-    om      we      wx      wo        <  >wo lh H iz      hH z-      mm      mm      mz a
ez x
amm az    oz      z=      zo      no    sw    orm FOSITION TITLE                            ua    va      oe      aw      wa    <a    vwo l
Recovery Team                                                                X Evacuation Team                                                              X Fire Team                                            ,
X Medical Team                                                                X f
    '~0nsite Radiological Monitoring                                              X Section of the Radiation Team Incident Response Director (IRD)                      !                              X Asst. to the Incident Response                                                      X Director Decision Secretary                                                                  X Support Superintendent                                                              X Communications Superintendent                                                        X Media Relations Coordinator                                                          X Governmental Advisory Coordinator                                                    X Local Advisory Coordinator                                                            X              X Offsite Monitoring Section of the Radiation Team                                                                        X Engineering Resources Coordinator                                                              X Licensing Coordinator                                                                          X Logistics & Procurement Coordinator                                                  X Corporate Security Coordinator                                                                X Financial Services Coordinator                                                                X Office Services Coordinator                                                                    X Facilities Maintenance Coordinator                                                  X p).,
'v  Utility Advisory Supervisor                                                                    X
 
PLANT M ANUAL SECTION:            PROCEDURE! WORK PLAN TITLE:                                    N O-EMERGENCY PLAN              EMERGENCY RESPONSE ORGANIZATION                                  1903.50
(~  '
PAGE            14 of 21 ARKANSAS NUCLEAR ONE                                      a Evisio n CHANGE 3 o*TE        7/28/81 DATE ATTACHMENT 3                                              Page 3 of 7 f
S.*A R      Y'                                                                                                                            ,          .Q rop =
        ' ' .                                                                                                                                              g .        ,m m
                                                                                                        -                *-<4a
: o. e  ~
f.
r
                                                                                                % ! 2 i :"
or
                                                                                                " ~: J
                                                                                                ;:,2                      ~ ~ ~ -                                                -
                                                                                                $hb i.
                                      =
                                      *{                                                                                                                                  .'y.
3                                                    '
t
          -sY [ ' -M                                                    ,
_,                                                _'*'7*-'?                                      .
* s E    !?:                  7 i.-.
4 a
zi*
                                                                    -a-
                                                                                        =
                                                                                                                                                                      *m e'    ,;;                  v                                                                              ~-
I                      6i
                                                            $5
                                                                    ;&Y ww-=s-
                *                                                                                                                                        * .                  y              ,
he g.
                                                                                                                                                          *5              .'A                .
m'      ' .-
                                                                                                                                                              . . . ~
R                                                                                .-
: b.                                                              -. $..          # #, *[ i*            '
c:
t  M
                                                                  =,                                                                                                    .% -
e.
:s E'                  ,,
      .                                                            1"                  E
    ~~*-**O -ti                                              1                        "
p,p: Mag M ,<.Q,'y                                    -
G.
                                                                                      't j                                                                              .._.,,.
I 7                  Ct I    2" OI 5
                                                                          .s 13
                                                                  %*    31                                                                                                        ~
              .                                                                                                                                                - tJ.
            ,                                                                                                                                          -f . .^' *                            , _
          $e a
                                                                                                                                                              *ph" g
                                                                                                                                                      .ed      W-                        g g
                                                                                                                                                                . /                        .
    ; M",#' 9/- -          . . _ .                  ..
                                                                                                                                  .,                _ , ,                Eb- ..-          "
 
k PLANT MANUAL SECTION:                                        PROCEDURE! WORK PLAN TITLE:                                                        NO:
                    ~
EMERGENCY PLAN                                                  EMERGENCY RESPONSE ORGANIZATION                                                  1903.50
[                    '                    """
PAGE          15 of 21
        ).
ARKANSAS NUCLEAR ONE                                                                                    TaEvision CHANGE 3 o^te            7/28/81 DATE i
ATTACifMENT 3                                                        Page 4 of 7 Is
                                                                                                                                                                          ;; o fi
      '+%e                                                                                                                                                          ,.  -
                                                                                                                                                                              *8 s ,e s,
                                                                                                                                                                                                                ~ - _ .
                                                                                                                                                                    !! 'i ',)
* i
        ,2:                                                              L                          l.
                                                                                                                                                                    !?H'.hder '.i j2 'jj !!!!
i e--M__ --6                                1 gM '                          a
                                                                                                                                                                    -}-
3 lj                ,          H
[
                                                                                                                                                                      ;    5-i 3        ,u m            ;-.~~ "
                                                                                                                                    >~                y Q. .
                    -                                                      e          k
                                                                                                                      .a i
l
_ =-              e                    p 7 hz a          t l
h-        /
3 *U*! ---              ,              ,
g,,s .
                                                                                                                                .-                      p h$,
sc W
                                                                                            . . .                                                "y    h I
_d:                    ,      lii                            h l 31; 33 r                                d'                              i
    %s                                                                        I
                                                                                                                ' I) hH]I y
w'-            , .r -e-.m
                                                                              }
N N
                                                                                        , ,                                    /                                                                                          -
l                f-2 h                      'G              t ja u                      ,      h                                  i y                s                                      ;                                                                      _
                                                                                        '                    I
                                                                                                                                  ~
j      %                                                        *
                                                                                                                                                                                                                                =
                                                                                )>                              I ?!              i                                                                          * - ' "-
                                ** =ce                                          4 [(, -.          e                g      Ed                                                                                                          -
                                                                              , i:1-- - ,- _-
l
_                                          y
                                                                                                '                                                                                                                                    .u
                                                                                                              <a                                            i                                                . . . . . _
                                                                                                                                                                                                            . . ' : i ..<            -
                                                                                        )t-                  .c __f
                                                                                                                                                                                                                                            <~
l                                                    w      -
k                y                            p                          <
                                                                                  ~ p f"                      A        --n                        p                                              .
                                                                                                                                                                                                              ~
f
_                                z                                      >l              3 g l' I,'                                                            "
f
      **"* a
* k._                        .
                                                                                                        ,              , a,                                                                - - .n w.u. n 9
y                          ll .
I                  U g                                                              )                                                                                    ''[
b, }                                  ((
                                                                                                                      ^
w s-      ts    a                                4 i    jh              i                                l g-                                  g l
A
                                                        .;                                              bl j      o. ;                                        I a
* J 3 ':
I                                          *
: m. ~
\                                                                                                                                                                                                                      ~
I                                                  l 1
f                                                      M                                                                                                      .,t?. . s
!,                                                          t                                                                    -                                          t                                    _
                                                                                                                                                                                                                #ew                        a
                                                                                                                                                                                                                ,'-                  .e
                          .wa    .              .m..,,                                                                                                                              -
_-'<2                        -;L
 
PLANT M ANUAL SECTION:                                                                        PROCEDURE / WORK PLAN TITLE:                                                      NO:
EMERGENCY PLAN                                                                                      EMERGENCY RESPONSE ORGANIZATION                                                  1903.50 J.~ :--                    .          . . . - .
PAGE        16 oi 21 O          -<            .
ARKANSAS NUCLEAR ONE                                                                                                                              aEvisioN CHANGE 3 oATE DATE 7/28/81 ATTACIDIENT 3                                                        Page 5 of 7 I
    %***~-w
                                                                                                                                                                                                                                ,          . . p . . .;- _
        - 4 %_ =l r                                                                                                                                                                                                                                  , N '. '      s e
I                                                                                                                                                                                    <t
                                                                                          .-_,_ - .                                                    ,                  11      ..  '.l p_-l, Es          i                4                l--b ?i.ma:l    !
j      ' - ~
                .                                                                                                            e                      *!                      fh i                                                          a                                                                                                                              -        .
l                                                                                $==N n              t=                a                                                              o      L    N,                    4 w=                    4                          i i
i x s s ~ :. ,=+e*
g                                        j            i                                                                i                              \
I
                                                                                                                                                                    ^
              \                                                    n g                                                                      ,
t,%x                                                                                      -
O                                                                                                                      e x                              ]
1 T        '
r-..-                                                  g
                  .                        ;                                ,                    / -c                              .
                                                                                                                                                        ,              y                ..
g      e
{
g                              ;,-i                                                                                    ,
e 4-nr                                                                        -
                                                                                                                                                                                                                                                                *7
                                                          ,                                                                                                                          y                                              -                  ..
                                          \/1 I                                                                                      - g
: 1.      s                            i i            y
                                                                                                                                                                                              /                                        ..        .
i..<.
:    /                              \                                                                        .
                                                                                                                                        \                                                                                                                    .c
                                                                  !, E , d,f                                                          ,.                            a              m. .
    " ' * ' ".            i                                        j  ,
                                                                                                                                't.                    .4{ ,                1.11N                                            V4 O:UNS94'St Y-1 m.                                                                    - -
                                                                                                                                                        )
                  -                                            C 4                                                              !                j                                                                          -
t, /l      .
                                                                                                                                        !        _      !    I                                                                                                  _
i    -
I      ,,
m,_        _ _ , .                                                g_-._ o -                ,
                                                                                          .....g J a
__J
                                                                                                                                                                                                                                                      ~ :5)c
                                                                                                                                                                                              .)                                                          .
      *            * ~          * ' me pt. *
                                                  -ee n      %
* 5    ,,,
f          .e                  f 1
__          _                                                                                                                                                                                                      J
 
PLANT M ANUAL SECTION:                                    PROCEDURElWORK PLAN TITLE:                                            NO:
      . ~
EMERGENCY PLAN                                                  EMERGENCY RESPONSE ORGANIZATION                                    1903.50
                              - ^ * " '
PAGE              17 of 21 f)1 N-                              ARKANSAS NUCLEAR ONE                                                                      - atviSion CHANGE 3 o^rE          7/2afsi DATE ATTACIIMENT 3                                          Page 6 of 7 t
  '* w                                                                                                            I; I                                        ,      , , . . . - .
p-      =
g
[! ', , 5 g                                                                        . .
:  r                                                          N'
                                          ~                                                                  :I :. . '
h                                        if  5. N
                                                                                                              ;< u !!
                                                                    ,f ,_          __
                                                                                                              -- -                    *  .a.
bM I                        .,
eJ n
M ti                u~                                          n
                                                      &,          -              =
                                                                  ,                            n f                                                  C                                    , - ~ . -
r                          Ip
                                                                  %y c                  l L
a
        -*DN3                          {        ,                    =g          ,                                                                        ,e_.          _
heya              mg 1          ,
                                                "d C ..                                                              .6
                                                                                  =
                                                                                                                                                                                              ' e' ma N
[                                l "
* D                              w
                                                                                                                                                                                                    ^
p< I-k
                                                                                  =
i                                                                                            .        > {                .
                                              .s                              . u .r g e-
                                                        .}              1 [5 ',;j      3 4h                                                                    -
2 3.,5c
                                                                                                                                                                            ~
A                                                                                                                              'L#    ..
z 3        3 e;      t                                                                                    . . ~
r            fl                                                                                          m                              -
                                                                    } J!. __ J!L.!_
                                                                  ,_s.                    _ _.                                                                    _          >
l                              .
: a.                                                                      ,.
                                                                                                                                                            '.-Me 5pG@ 4:5 *C.
g 7C J                              ~== ==            !                                                                                                                      '
                                )
P S            r      "D w e
I
                          ,                      52
        ,_                                                                                                                                                                  . _ 3 .,
q                                                                                                                                      ~
G ' ,,                      -                      "
                                                                                                                                                                                - w, G'M
* 7        ^---  -
 
PLANT MANijAL SECTION:                                          PROCEDUREAVORK PLAN TITLE:                                                            NO:
m-
:- a                    .
EMERGESCY PLAN                                                            EMERGENCY RESPONSE ORGANIZATION                                                  1903.50 p,        ggg f's ')              c-ARKANSAS NUCLEAR ONE                                                                                                    aEvisioN CHANGE 3 oATE          7/28/81 DATE ATTACHMENT 3                                                            Page 7 of 7
                . .          c
    , m, .
                                                                                                                                                                                                                .. - ~ -.
n
                    & (
s                                                                                                                                                      -t 4
1,
                                                                                            . 4  -- ,            gs                                        n t          .
                                                                                                                                                                                                                                              ~
h W.C),                      'N                        !! 5 :3                3
                                                                                                                                                                                  ~-
xN                nvn
                                  <                              c                    ,      ;_
a w y ~#
g      l                                    A                          M                          's x                                                                                          ...
_ _ _r - --- s. I, a : t o      o                                                      o  uw
                                  !                  8              l                                                j                              's
--Mw                            !
                                                                                                                    *                                  's                                                                                            .
i                  a                                                                            _.            -                                                                              _              wes.
8                                                    J
                                          =                            =j                                I                      3                                N Q..--
m
                        <          __        .._.l                      .
4 r#1                                              4 A
h                                            N j                                  4 l~ u~ :,
pA        >                                                                                                                                  + wwp-                                                  ~
                                                                                                                                                                                                                                          'b ^
O        M ___ :D:            %                                      0          Q                    RO'''WE"U                        Q                                                .
I d                                                ~ - - - - -
I i                                      ,
                                          <>      n                          I                          ,                              1 i              ,'
I                                                                  .        ;_ .:
l                                                      l                                                          ,/
a ,
i              ,        s                                          L *. - r 3. _
                                                                                                                                                                                                                              '. e
                                                                                                                                                          , ,/
cx
                                                                                                                              ~                          ,
y                                                                                                                          -
j
                                                                                                                                                                                                            ~        . _
                                                                            !        g                .
i Ij
* J              I
                                                                                                                                                                                                                        - - . c; il s <                  -
1 ll ji                I" - _1_                        "
                                                                                                                                    ._ =
1            c                                                  r---            i
: v. m%-gg 9                                  --- w w = ~
i
                                                                            '
* F*U rh&[dhdy,'d.g .YIi-O"                ,
i          j
              . s-                                                            .                    t            {      ,
: h.                                                                                                                                      -
m                        3 _ .___ _ _,
        '..      m
                                                                                                                                                                                                                                . J'
              **                                                                                                                                                                                                      ..,_~s r              .- .                                                                                                                                                                                                                  .
J
                                                                                                                                                                                                                        $%w                        ,,
                                                                                                                                                                                                                          )
    *            * '    'e* **..wp.                          ,,                  g                            _
b""..,',,
                                                                                                                                                                                                    ' ' 'i-.:-
* 7**
 
s PLANT MANUAL SECTION:              PROCEDURE! WORK PLAN TITLE:                                  N O-EMERGENCY PLAN                        EMERGENCY RESPONSE ORGANIZATION                                1903.50 j'                              '            ~"'"'
PAGE      19 ot 21
    --      )-                                  ARKANSAS NUCLEAR ONE                                                  aeviSioN CHANGE 3 oATE          7/28f81 DATE y.
          ~
ATTACIDfENT 4 COM'!UNICATIONS FLOW PL\N
    . wy.,            ,    .
            .1/                                                                                                                                              , ,., .-
              - i.
E''FRCFNCY CO'! TROL CENTFR Dose                                  Incident p Assess.                                  Response Supv.                                Director
    -@@eug                                            (ro)                                  (pt) vt - ' - " ' " " W
(                                                                              A v                                  < ~                                                  , 1.
: 1. Fie ld Me as ire =ent s
[radi                                                f OP'"
                                                                                                \  1. Information Reporting
(            2. Directicns                                      2. Plant Status 4 phone 1 3. Rad. Monit./ Met. Data                                                    !
                                          /                                                %
                                                                                                                                                              .            s    .
                                                                                                                                                  -          w. .
V                                                    V                                                        -
Rec ove ry          1TC1NICAL SJPPORT CFNTFR                                                        ~~
OFFSITE Mgr.
(pt)\                                                                                          - ,,          -'
FIELD        4            )    (ro)      \                                                                        I                        ' ' ,
TEAF.S (ro)                                  % Status Resp.                          _ _ _ _ Operations Indv.            Boards                Mgr. (pt)
A                                          A
    %,s                                                      J    g                                                                        .-fs.t    w& dig.. Q Mt closed \                                    #~h phone /                                  ! open j    1. Plant S tatus
                                                                  ,                                  I phone    2. Rad. Monit./ Met. Data N OTES -                                                                \
pt = phone talke r
(
to = radio operator V                                          V                -
vorn ten 3 i                                                            Resp.                                        Supt. (pt)
(                                                            Indv.
Y                                                                                                                                                            ,
,                                                            OFFRATIO?!AL                                        C D''T F O L
( [\, .                                                      51'PPORT rFNTFR                                    RWMM)                                            j  ,
                                                                                                                                                                  . ..s l
I
                                                                                                                                                              *s
    %>4.                1, t-
                                                                                                                                                                              .-d
: u.      __-~.-
 
PLANT M ANUAL SECTION:    PROCEDURE /WORX PLAN TITLE:                      NO:
EMERGENCY PLAN              EMERGENCY RESPONSE ORGANIZATION                  1903.50
  ,_s PAGE      20 of 21 (N/ )            ARKANSAS NUCLEAR ONE                                a avisio n CHANGE 3 oaTE    7/28/81 DATE ATTACHMENT 5                                Page 1 of 2 Responsibilities Matrix for the Emergency Response Organization ACTIVITY                                                      RESPONSIBILITY A. Command and Control
: 1. Overall                                              Incident Response Director
: 2. Corrective & Recovery Actions                        Recovery Manager
: 3. Offsite Radiological Monitoring                      Dose Assessment Supervisor
: 4. Engineering and Technital                            Technical Support Manager Support Activities
: 5. Non-technical Support Activities                      Support Superintendent
: 6. Communications                                        Communications Superinten-dent B. Warning and Evacuation
: 1. Onsite Radiological Monitoring                        Onsite Monitoring and Health Physics Supervisor
(~^x      2. Predicting Offsite Doses                              Dose Assessment Supervisor
( ')
3.
4.
Exclusion Area Evacuation Site Access Control Site Security Coordinator Site Security Coordinator
: 5. Notification of State and Local                      Incident Response Director Emergency Response Groups of Protective Action Recommendations
: 6. Liability Claims                                      Financial Services Coordinator C. Communications
: 1. Communications with the NRC                          Incident Response Director
: 2. Communications with State                            Incident Response Director Government Agencies
: 3. Communications with Local                            Local Advisory Supervisor Government elected officials
: 4. Communications with other                            Utility Advisory Supervisor Utilities, EPRI, EEI, INPO, etc.
: 5. Communications with the Media                        Media Relations Coordinator
: 6. Approval of Public Information                        Incident Response Director Releases
: 7. Communication with State and                          Governmental Advisory Federal elected officials                            Coordinator
,q
  ~~)
 
PLANT MANUAL SECTION:  PROCEDURE! WORK PLAN TITLE:                      NO:
EMERGENCY PLAN          EMERGENCY RESPONSE ORGANIZATION                  1903.50 PAGE      21 of 21 (m')
N''
ARKANSAS NUCLEAR ONE                            aEvision    3 o*TE    7/28/81 CHANGE        DATE ATTACllMENT 5 (cont.)                          Page 2 of 2 ACTIVITY                                                  RESPONSIBILITY D. Emergency Facilities
: 1. Procurement                                        Logistics & Procurement Coordinator
: 2. Maintenance                                        Facility Maintenance Coordinator
: 3. Access Control                                    Site Security Coordinator
: 4. Space Allocation                                  Support Superintendent E. Emergency Services
: 1. Fire Fighting                                      Emergency Services Coordinator
: 2. Medical Support                                    Emergency Services Coordinator F. Engineering Support 7
'( ,j)        1. Coordination with NSSS suppliers,                  Engineering Resources A/E's, vendors, consultants                        Coordinator
: 2. Onsite Engineering Support                        Site Engineering Supervisor
: 3. Nuclear Engineering and Analysis                  Nuclear Support Supervisor
: 4. General Office Engineering                        Engineering Resources Coordinator
: 5. Design Records                                    Site Office Services Coordinator G. Recovery and Corrective Actions
: 1. Planning                                          Recovery Manager
: 2. Equipment Manipulation                            Ops. Superintendent
: 3. Radwaste Handling                                  Radwaste Coordinator
: 4. Repairs                                            Maintenance Manager and Maintenance Superintendents
: 5. Radiological Exposure Control                      Onsite Monitoring and Health Physics Supervisor H. Chemistry and Sampling
: 1. Primary Side                                      Radiochemistry Supervisor
: 2. Secondary Side                                    Chemistry Supervisor p
    /
 
z            ARKANSAS POWER & LIGHT COMPANY e
              . M Elw 1                                    Arkansas Nuclear One EMERbNCYPLANPROCEDURE                                                                  FORM 10CO.06A TURNOVER OF RESPONSIBILITY TO THE EMERGENCY RESPONSE ORGANIZATION i                                    1903.51 REV. 1 RECORD OF CHANGES AND REVISIONS PAGE      REVISION CHANGE                  PAGE        REVISION CHANGE            PAGE          REVISION CHANGE 1            0 2            1 l
l O
              ^""BWoLs a cascs-      _ , , _ . _
                                                                                              ^""f*g5, N
 
    .n o .-
t d
f PLANT M ANUAL SECTION:    PROCEDURElWORK PLAN TITLE:                    NO:
EMERGENCY PLAN            TURNOVER OF RESPONSIBILITY TO THE PROCEDURE                  EMERGENCY RESPONSE ORGANIZATION          1903.51 c3                                                                        PAGE    2 of 2
(' ' ')                  ARKANSAS NUCLEAR ONE                              aevisiON CHANGE i DATE  7/i3/ai DATE 5.3 For Site Emergencies and General Emergencies, the Emergency Response Organization shall be activated in parallel with the Initial Response Organization.
5.4 When activated, Emergency Response Organization personnel that do not have an active role in the Initial Response Organization shall proceed to their pre-assigned locations and from there call the Technical Support Center for further instructions. The Duty Emergency Coordinator should assign an individual to record the ERO positions that have been reported.
5.5 On arrival, the Incident Response Director, the Technical Support Manager, the Recovery Manager, Site Security Coordinator, Emergency Services Coordinator and the HP and Chemistry Superintendent should report to the Duty Emergency Coordinator. The Duty Emergency Coordi-nator shall then tratsfer his duties to these individuals as follows:
5.5.1      The Incident Response Director assumes responsibility far the overall direction of the Emergency Response Organization.
5.5.2      The Recovery Manager assumes responsibility for direction of corrective and recovery actions. He also assumes overall
(~';                                direction of the response organization until the Incident
(_,/                                Response Director or one of his Assistants arrives.
5.5.3      The Site Security Coordinator assumes responsibility for direction of the Emergency Evacuation Team.
5.5.4      The Emergency Services Coordinator assumes responsibility for direction of the Emergency Fire and Medical Teams.
5.5.5      The HP & Chemistry Superintendent assumes responsibility for direction of the Onsite Radiological Monitoring Section of the Emergency Radiation Team.
5.5.6      The Technical Support Manager assumes responsibility for direction of the Offsite Radiological Monitoring Section of the Emergency Radiation Team and for dose assessment ac-tivities.
5.6 The Duty Emergency Coordinator retains the title of Duty Emergency Coordinator until the Incident Response Director, Technical Support Manager, Recovery Manager, Site Security Coordinator, Emergency Services Coordinator, and the HP and Chemistry Superintendent have reported on-site and assumed their responsibilities.          Once the Duty Emergency Co-ordinator has transferred his responsibilities to these individuals, he shall appraise the Recovery Manager of this and begin functioning
  -s                    under his position title in the Emergency Response Organization or l      1              as directed by the Recovery Manager.
\~)
6.0 ATTACHMENTS AND FORMS NONE
 
PLANT M ANUAL SECTION:  PROCEDURE / WORK PLAN TITLE:                    NO:
r        EMERGENCY PLAN            RUSSELLVILLE FIRE DEPARTMENT                    1903.70 I                                                            PAGE    2 of 2 ARKANSAS NUCLEAR ONE                              atvision CHANGE i oATE  6/23/8i DATE 5.3 The Russellville Fire Department may verify the authenticity of the request by calling the applicable Arkansas Nuclear One Control Room:
V 5.3.1      Unit One Vl V        V 5.3.2      Unit Two    /
5.4 On arriving, the Russellville Fire Department should report to the North Gate, unless otherwise instructed.
5.5 Notify Security that the Russellville Fire Department has been called and inform them of the proper access point. Security guards should meet the fire trucks and escort them through the plant gates and to the scene of the fire.
5.6 At the scene of the fire, the Russellville Fire Department shall coordinate its activities with the ANO Emergency Fire Team Leader.
In the absence of the Emergency Fire Team Leader, the Fire Department shall request and coordinate the support of other fire departments.
5.7  If the Russellville Fire Department and ANO personnel require further assistance to fight a fire, the Russellville Fire Department should request and coordinate the support of other fire departments.
  /
  \          5.8  If a fire occurs in a radiation area, ANO personnel trained in radiation protection shall be available to assist the fire-fighting personnel. Fire-figh:ers should follow the instructions given by these ANO personnel ior their protection.
6.0 ATTACHMENTS AND FORMS None l
l
[
l 1
l
  ,r              TIE MATERIAL CONTAINED WITHIN TIE SYMBOLS ( ) IS PROPRIETARY OR PRIVATE INFORMATION.
 
  "7~
N                      PLANT MANLQL SECTiON-    PROCEDUREAVORK PLAN TITLE:                            NO:
A EMERGENCY PLAN          POPE COUNTY SHERIFF'S DEPARTMENT                    1903.71 PAGE      1 of 3
                                .                ARKA.NSAS NUCLEAR ONE                            REVISION    O DATE          8/18/80 CHANGE          DATE s
                                - 1.0  PURPOSE The purpose of thts procedufe is to provide guidance on the Eme egency Plan related response of t.he Pope County Sheriff's Department should their assistaace be required at Arkansas Nuclear One.
2.0  SCOPE This procedure applies to emergency situations involving evacuation requiring i "
assistaace from the Pope County Sheriff's Department.
 
==3.0 REFERENCES==
 
3.1 References Used in Procedure Preparation:
I"                                            3.1.1        State of Arkansas Emergency Operations Plan, Annex V - Arkansas Nuclear One Radiological Incident Response Plan.
              ~
3.1.2        Arkansas Nuclear One Emergency Plan.
3.1.3        Letter of Agreement between the Pope County Sheriff's Department and Arkansas Power & Light Company.
3.2 References Used in Conjunction with this Procedure:
None
                      .                3.3 Related AND Procedures:
None s
4.0 DEFINITIONS
                                              -None
    .                        .        5.0  INSTRUCTIONS 5.1    If the assistance of the Pope County Sheriff's Office is required at Arkansas Nuclear One (ANO), the Pope County Sheriff's Office should be called at\ .
                                                ~
or by means of the Sheriff's
                                          ,          radio (when installed). Provide them with a description of the assistance required.
5.2 The Pope County Sheriff's Department may verify the authenticity of the request by calling the applicable Arkansas Nuclear One Control Room by means of:
                                  .          5.2.1        Phone, or A. Unit One -
B. Unit Two    V_
7 5.2.2        Sheriff's Radio TIE MATERIAL. CONTAINED WITHIN TIE SYMBOLS ( ) IS PROPRIETARY 1,                                          OR' PRIVATE INFORMATION.
                                                                                  ...              ..      .  . . ~ . _ . , ~ . - - . . _ . _ . .
 
PLANT M ANUAt SECTION:  PROCEDURENJORK PLAN TITLE:                        NO:
EMERGENCY PLAN            ARKANSAS DEPARTIENT OF IEALTH                  1903.76 PAGE        1 of 2
( '-
ARKANSAS NUCLEAR ONE                              latvisioN CHANGE 1 Da1E    7/7/81 DATE 1.0 PURPOSE The purpose of this procedure is to provide guidance on the coordination of Arkansas Department of Health and Arkansas Nuclear One activities in the event of an Emergency Action Level (EAL) declaration at Arkansas Nuclear One.
2.0 SCOPE This procedure is applicable to emergency situations involving Unit One and/or Unit Two which meet Emergency Action Level criteria.
 
==3.0 REFERENCES==
 
3.1 References Used in Procedure Preparation:
3.1.1        State of Arkansas Emergency Operations Plan, Annex V -
Arkansas Nuclear One Radiological Incident Response Plan.
3.1.2        Arkansas Nuclear One Emergency Plan.
3.1.3        Letter of Agreement between the Arkansas Department of Health and Arkansas Power & Light Company.
3.2  References Used in Conjuction with this Procedure:
I None 3.3  Related ANO Procedures:
3.3.1        1903.10, " Emergency Action Level Response" 4.0 DEFINITIONS None l
l        5.0  INSTRUCTIONS 5.1  In the event of a situation at Arkansas Nuclear One (ANO) which meets the criteria of an Unusual Event, Alert, Site Emergency or General l
Emergency Emergency Action Level as described in the ANO Emergency l                    Plan, the Arkansas Department of Health will be contacted and
:                    provided with a description of the unusual or emergency situation.
Arkansas Department of Health /
V/              'V 5.1.1                                                            unless otherwise directed.                            *        ~~
5.1.2      Upon activation of the Technical Operations Control Center, follow-up notifications may be provided to this center, if so directed.
i                  THE MATERIAL CONTAINED WITHIN THE SYMBOLS ( ) IS PROPRIETARY OR PRIVATE INFORMATION.
 
PLANT M ANUAL SECTION:    PROCEDURE / WORK PLAN TITLE:                    NO:      l EMRGENCY PLAN                U.S. ARMY CORPS OF ENGINEERS                  1903.77 PAGE    1  of 2
    \
ARKANSAS NUCLEAR ONE                                aEvisioN CHANGE O oaTE    8/18/80 DATE 1.0 PURPOSE The purpose of this procedure is to provide guidance on the coordination of the U.S. Army Corps of Engineers Emergency Plan related activities in the event of an unusual or emergency situation at Arkansas Nuclear One.
2.0    SCOPE This procedure is applicable to emergency situations requiring assistance of the U.S. Army Corps of Engineers.
 
==3.0 REFERENCES==
 
3.1 References Used in Procedure Preparation:
3.1.1      State of Arkansas Emergency Operations Plan, Annex V - Arkansas Nuclear One Radiological Incident Response Plan.
3.1.2      Arkansas Nuclear One Emergency Plan.
3.1.3      Letter of Agreement between the U.S. Army Corps of Engineers and Arkansas Power & Light Company.
3.2 References Used in Conjunction with this Procedure:
None 3.3 Related ANO Procedures:
(
None 4.0 DEFINITIONS None 5.0  INSTRUCTIONS l            5.1 The U.S.
Nuclear    ArmyUnit One      (Corps Oneof iEngineers    has agreed to contact) grkansas s          ,
UnitTwo-5(([            in the following situations in order tnat appropriate actions may be l
taken:
l 5.1.1        Dardanelle Lake level increases above elevation 340 feet.
5.1.2        Dardanelle Lake level is projected to rise above elevation 340 feet.
5.1.3        Dardanelle Lake level must be drawn below elevation 335 feet.
5.2 Radiological Incident l                  5.2.1        Should an incident occur at Arkansas Nuclear One which re-l                              quires evacuation and control of access to the Arkansas l                              Nuclear One exclusion area, the Duty Einergency Coordinator j                              shall contact the U.S. Army Corps of Engineers to request l                    ,          that boat access to the portions of the Lake Dardanelle l (_                          within the exclusion area be controlled.
l                  THE MATERIAL CONTAINED WITHIN THE SYMBOLS ( ) IS PROPRIETARY l                  OR PRIVATE INFORMATION.
L}}

Latest revision as of 18:18, 28 August 2020

Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures 1903.10 Re Emergency Action Level response,1903.23 Re Personnel Emergency & 1903.50 Re Emergency Response Organization
ML20069A928
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 07/29/1981
From: Ohanlon J
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML20069A923 List:
References
PROC-810729, NUDOCS 8112220087
Download: ML20069A928 (100)


Text

'

. ; ARKANSAS POWER & LIGHT COMPANY x

c iman Arkansas Nuclear One

\ DERGENCY PLAN PROCEDURE FORM 1000 06A DIERGENCY ACTION LEVEL RESPONSE Page 1 of 2 g%c 1903.10 REv. 3 s 4 q .

w' ll%mt g, nlL s, 9 a -

d5Y:"

i J b.qa rl ij d jj d ghp I ff /((

4 , i d -

RECORD OF CHANGES AND REVISIONS PAGE REVISION CHANGE PAGE REVISION CHANGE PAGE REVISION CHANGE 1 2 19 2 37 3 2 2 20 3 38 2 3 2 21 3 39 2 4 2 22 3 40 3 5 2 23 2 41 3 6 2 24 2 42 3 7 2 25 2 43 2 8 2 26 2 44 2 9 2 27 3 45 3 10 3 28 3 46 3 11 3 29 3 47 3 12 3 30 2 48 2

(

13 2 31 , 2 49 2 14 2 32 3 50 2 15 2 33 3 51 3 l

16 2 34 3 52 3 l

l 17 2 35 2 53 3 18 2 36 2 54 3 APPROVED BY:

  • APPROVAL DATE 3!)C{'{nefe<, An enh' h/.- > - 74.p(

*^'"***'* ~

8112220087 811215 DR ADOCK 05000

{'

ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One i

EIERCENCY PLAN PROCEDURE l FORM 1000.06A ew- '

EMERGENCY ACTION LEVEL RESPONSE Page 2 of 2 9 1903.10 REV. 3

& N RECORD OF CHANGES AND REVISIONS PAGE REVISION CHANGE PAGE REVISION CHANGE PAGE REVISION CHANGE 55 3

36 3 57 3 58 3 59 3

!O i

60 3 61 3 O

APPROVED BY:

APPROVAL DATE

'X>C4'%..(~. .6s .sr?X, ds, -

<cem uu, mot m 2_2cr- /

l

l PLANV M A NUAL SECTION: P90CEDUREJWORK PLAN TIVLE: NO.

I FMERGENCY PLAN EffERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE 10 of 61 ARKANSAS NUCLEAR ONE atvisioN 3 DATE 7/16/81 CHANGE DATE

, x. ..

~..,. .

_ .p.

_ ..a . ~ .-- -

Cr i ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One ~~* ~

mtL EY.ERGENCT ACTICN LEVEL FISPONSE

- h . ~

l FCau ho.

1903.10B

[ ".a. REV. # 3 PC i 1.*NUSUAL EVE.NT Fase 1 of 2 SHIIT ADMINISTRATIVI ASSISTAST NOTIFICATION LIST AND RECCRD

. - DATE

. , .y

,i. C :. ' INITIALS /TI E

I 1. Complete as much of Form 1903. LCM, "EAL Notification as Rh available information and time allows. ^~

NOTE: The order of notification may be rearratged as dictated by the situation with approval of the Shif t Operations

g';m *"

Supe rvis o r. These groups should be contacted by the most egg - yg .fe, expedient means available (paging, contacting appropriate response center for relaying information, direct phone

,. call, radio contact, etc.). The phone numbers (plant personnel) provided are for use if an individual is not onsite, the appropriate response center has not been manned, etc.

2. Provide the initial information on Form 1903.10M to the

. following groups: -

2.1 Duty Emergency Coordinator (a duty roster is maintained /

,~ in the Shif t Supervisor's office; refer to Attachment 1

' f.-

for telephone numbers as necessary).

2.2 Nuclear Regulatory Cornission [ Hotline; or7. V -

.' ' ,~.(.

/

(if the region office is contacted, request that this -

information be forwarded to the Bethesda Emergency

4. J.ry -

Operations Center)]. . . .u.

2.3 Arkansas Department gf Health [V - .

V (or contact /

the CES at. cr via the CES radio channel and g request them to notify the Health Department)). .

.p. 7 2.4 Emergency Tease requiring imediate response only (refer M

to the individual attachment for call list if team per-sonnel are not currently on site): - .

NOTE: The following minimum information should be provided ,

to the team leader: affected unit, EAL declared, appropriate plant conditions / parameters, required response.

2.4.1 Security Fersonnel (V' . V) or Evacuation /

Team (Attachrent 2)

K&* j .

r$N-.

  • THE MATERI AL CCNTAINT.D WITHIN THE SYMBOLS ( ) IS FROPRIETARY

.~- -

YJ 3 , OR FRIVATE INTCRMATION. .-- ---Sh, t,

S..

, e * .e S

[Qj 1 %d4 - , {s.-hm'h* W.;;w 5C.hM! -

7' .~.

. N7 s. -

r.: . = .'. h _::.-l.K . a h* '. A O S le' ,;;/ k i-e..$

5 PLANT M ANUAL SECTION: PROCEDURENVORK PLON TITLE: NO:

... E::ERGENCY PLAN ' EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE Al 01 D1 ARKANSAS NUCLEAR ONE aEvisioN CHANGE a DATE < / A '< "

DATE

. .'Os.

,k ' . .

.-v. . .

M:u , .

~.-a., ..

4- C ARKANSAS POWER & LIGHT COMPANY

... Arkansas Nuclear One

..e

. - W.

  • ~

TITtL a'

EMERCENCY ACTIC' LEVEL RESPONSE l FORM NO.1903.10B MN.f3 PC f Page 2 of 2 DATE INITIALS / TIME

~

J'*~ 2.4.2 Fire Team (Attachment 3) /

%a ..

2.4.3 Medical Team (Attachment 4) /

" ~ " ' '

~ . .

~

2.4.4 Ra<'iation Team (Attachment 5) /

JNbdJM 2.5 Little Rock Control Center ( __  ; or contact /

g,n -

either the OLS or the MSS Dispatch Center and request them to notify the LRCC).

  • Fr #

y

_..)

2.6 Ceneral Manager (9 ,_ __.___

. /

2.7 NRC Resident Inspectors (either one): /

~

V 2.7.1 W.D. Johnson / )V 2.7.2 L.J. Callan J

.t ,,_ .

c,rg.  ?

3-

3. Provide updates, as necessary, to t'4e following groups:

1 '

3.1 Duty Emergency Coordinator _ , ,

.?. .x.

3.2 Nuclear Regulatory Commission

    • T" '"'I Arkansas Department of Ifealth 3.1 . . < , .

~ '

3.4 Little Rock Control Center

  • l
h',$. !)I 4. At the termination of the event, this form and other applicable .

g" ', ..

~ * ,

information should be turned over to the Duty Emergency Coordinator.

.r; -

Shift Administrative Assistant - "

~$:.

~

h THE MATERIAL CONTAINED WITHIN THE SYMBOLS (y) 13 PROPRIETARY

-[ * ['.

r f'.'Q .

f ."_

~'

]T '

OR PRIVATE IhTORMATION. ..

l , L .'.$.j ~n.

. f

&~::: i .. .a. Y a: * $5 ':, .,- ,,c . z.--- . . , . --

_y _ :. . __u _4. , _, ., _

I l

. PLANT M AMUAL SECVION: PROCEDURE / WORK PLAN TlVLE: N O.

EMERGENCY PLAN EMERGENCY ACTION LEVEL RESPONSE 1903.10 F I PAGE 12 of 61 s

ARKANSAS NUCLEAR ONE uwsma CHANGE 3 o^n DATE

" tom

~

. I g,g .,.9 ,

i-~..~

.c .. , . ..

ARKANSAS POWER & LIGHT COMPANY ~

Arkansas Nuclear One N EMERGENCY ACTION LIVEL RESPONSE

, .. l FOAM NO.1903.10C UN. f 3 FC f lihTSUAL EVENT Page 1 of 2 DL*TY EMERGENCY COORDINATOR NOTIFICATION LIST AND RECORD C ,+ - . DATE

q. '
, INITIALS / TIME O '
l. Notified that an Unusual Event Emergency Action Level has /

.. been declared, based on the following conditions (List):

gy y ^ ~L ."^' 1 ^- ? &

Q .+ .

~

2. If on-site, or if deemed necessary to report to site, /

record the time that the Shif t Operations Supervisor was relieved of Duty Emergency Coordinator responsibilities.

e, -, . 3. If a radiological release is involved:

. 3.1 Relieve the Shift Operations Supervisor of respon- /

,~ _

sibilities for calculating the magnitude of radio- -

logical release. . " - .

1

4. Provide updates to the following groups, as necessary: .

ep *} a -

i'*---

}

4.1 General Manager , .

4.2 NRC Resident Inspector (initially contacted)

..[;.,Q N

^- '-

4.2.1 y

)y '.M' .WM-YM @

W.D. Johnson [

~n:

4.2.2 L.J. Callan. '

)

5. At the termination of the event, provide a verbal summary to: -

5.1 Nuc{ ear Regulato p Commission (Hotline; or i /

Y 5.2 Arkansas Department of Health /

- T. ff -

~,

..i'_",-

, ' l,*?-i :i > '

l

'u!"i *-

-' s THE MATERIAL CONTAINED WITHIN THE SYMBOLS (y) IS FROTRIETARY

' ' ~ ~J t P ' 8? L

, ( OR FRIVATE IhTORMATION.

1 -

l

,g e e en g

- 1 _E '-e W. e*S' *  % - * '

.x PLANT M ANUAL SECTION: PROCEDURE / WORK PLAN TITLE: N O.

~

..C h I EMERGENCY PLAN EMERGENCY ACTION LEVEL RESPOSSE 1903.10 20 01 61 b

PAGE ARKANSAS NUCLEAR ONE aEwsioN CHANGE 3 oATE DATE

</ to/"

,d .

0.&. .

y  :;. .

.g..

gg. . . ~..., n -

.i .

ARKANSAS POWER & LIGHT COMPANY -.

Arkansas Nuclear One EMTRCENCY ACTION LEVEL RESPONSE l FORW NO-1903.10E

. Tiitt.

' W_

  • M. ~.

c,Ii RIV. # 3 PC f Page 1 of 3

, s.. ALERT

' *

  • SHIIT ADMINISTRATIVE ASSISTANT

, ; . NOTIFICATION LIST AND RECORD v%v

-d DATE 3 INITIALS /T!ME 5

'$557.

1. Coreplete as much of Form 1903.10M, "EAL Notification" as available information and time allows.

u.. NOTE: The order of notification may be rearranged as the sit- ,. _ _ _ .

NY

__m _.

uation dictates with approval of the Shif t Operations Supe rvis o r. These groups should be contacted by the most expedient means available (paging, contacting appro-M' priate response center for relaying information, direct

~

phone call, radio contact, etc.). The phone numbers (plant personnel) provided are for use if an individual is not onsite, the appropriate response center has not been manned, etc.

2. Provide the initial information on Form 1903.10M to the ~

following groups: .

e.'g i! >

~

2.1 Duty Emergency Coordinator (a duty roster is maintained /

in the Shif t Supervisor's of fice; refer to Attachment 1

".-, for telephone numbers as necessary). ~~"

v

^

Nuclear Regulatory Connission [ Hotline; or iV

^

2.2 __

/

gg -' (if the region office is contacted, request that this , , ,,

infcrmation be forwarded to the Bethesda Emergency

. Operations Center)). .

v 2* 2.3 Arkansas gepartment, of Health [v.

.or contact /

4.id;;,

l the OES ( ~

or use the OES radio channel) and p .@) Me.*MfAM 9 request them to notify the Health Department).

.->+. 2.4 Emergency Teams requiring immediate response (refer ,

to the indicated attachment for call out list if -

team personnel are not currently on site).

~

NOTE: The following minimum information should be pro-vided to the team leader: affccted unit, EAL

(+;1ared, appropriate plant conditions / para-meters, required response and suggested pro-tective actions (if necessary).

. .m

  • %..l,  :- . .

t.VY./.

a.y

  • 1

' T1.E MATERIAL CONTAINED WITHIN THE SYMBOLS (g) IS PROPRIETARY ~~' M 2" (v OR PRIVATO INFORMATION.

a g 8 g .g .

e 9 -

e jQy -L.w.w . s. i . ~ W. . ..nz d!i:.

.3

__~ ' . 9 ::.~7.

h PLANT M ANUAL SECTION: PROCEDURE / WORM PLAN TITLE: NO:

,' N RGENCY PLAN Et!ERGENCY ACTION I.EVEL RESPONSE 1903.10 PAGE 21 of 61 ARKANSAS t'.. CLEAR ONE aEvisioN 3 oATE 7/io/8i CHANGE DATE r -

~ - ., ; .

X k&y.y. "k w.~. ,

2 2- ->

ARKANSAS POWER & LIGHT COMPANY - - - -

Arkansas Nuclear One

-M C- ME- EMERGENCY ACTION LEVEL RESPONSE lroAMNO. 1903.10E

,.s.. . .

REV. # 3 PC #

Page 2 of 3

- k *: DATE P

/ ;:. .'. INITIALS / TIME

. [-'.' 2.4.1 Evacuation Team (Attachment 2) / .i

-4.i tU s d ...

2.4.2 Fire Team (Attachment 3) /

~ ..

2.4.3 Medical Team (Attachment 4) /

. N I b3 2.4.4 Radiation Team (Attachment 5) / *T T ;-~ 7 5

, 2.5 Operations Management (contact one of the following /

{ *R individuals): .- , ,-

2.5.1 8.A. Baker i .

V 'V

. 2.5.2 S.J.McWilliams\

- . - V V 2.5.3 L.A. Taylor -

. . . y

, E^ T 2.6 Little Rock Control Center (y  ; orc contact / -

i,.;j. , either the OES or the MSS Dis' patch Center and request

  • .* them to notify the LRCC).

p.;,,.

'~

2.7 E ergency Teams og requiring immediate response (refer , f,.

to the indicated attachment for call list if team ,-

. . .r personnel are not currently onsite):

-wy d . .n .....:..

NOTE: The following minimum information should be pro- ,

i vided to the team leader: affected unit, EAL l .- , ._ declared, appropriate plant conditions / parameters, .

1

[VM: gi time team placed "on call." M gay.jpg Jb: 9 2.7.1 Evacuation Team (Attachment 2) /

2.7.2 Fire Team (Attachment 3) /

2.7.3 Medical Team (Attachment 4) / -

2.7.4 Radiation Team (Attachment 5) /

' . , 4h ..[ ... . [AI 'i

  • uh -

?

  1. , ,t ". , . . , -

r THE .U TERIAL CONTAINED WITHIN THE SYMBOLS (p) IS PROPRIETARY - -

.'6 t a i. Li .-

c OR PRIVATE INTORMATION.

. * .e

  • e - .g e

. . ;,C... ..

.a..,. .. .....:~...,.

. -;,.,- n, - .n

.~ - .; . . . . ..

~..

.y

r i

- PLANT M ANU AL SECTION: PROCEDURE /WORR PLAN TITLE: N O-uma

. EFERGENCY PLAN ErfERGENCY ACTION LEVEL RESPONSE 1903.10

"' PAGE 22 of bl

\

ARKANSAS NUCLEAR ONE TEvisioN CHANGE 3 DATE DATE 7/16/81 6

s , *?

caa .,

ARKANSAS POWER & LIGHT COMPANY CL - Arkansas Nuclear One -

, , ~ .

TITtt EMERGENCY ACTION IIVEL RISPONmE l FOPu aso. 1903.10E

.~. -;

',7*.:c-, REV. # 3 PC #

? ~

Page 3 of 3 DATE

~

INITIAI.S/ TIME

v. ,

-y 2.8 Ceneral Manager y '. , . /

- 2.9 NRC Resident Inspectors (either one) / ,

s.> .

2.9.1 W.D. Johnson ;b' )Y 2.9.2 L.J. Callan [ }

2.10 TOCC Liasion V V r 2.10.1 L. V. Schempp J /

l

3. Notify the Duty Emergency Coordinator that the initial /

notifications have been a:ade (inform him of any individuals that contact could not be made with).

4. Provide updates to the following groups until relieved of this responsibility: .

4.1 Duty Emergency Coordinator

~ '

  • 4.2 Nuclear Regulatory Commission , '~

s

~

4.3 Arkansas Department of Health (unless otherwise - -

directed) .

4.4 Little Rock Control Center (unless otherwise directed)

5. Unless required to report onsite, at the termination of the /

event, notify the individuals contacted in Step 2.7 above M,.N, N to secure from "on call" status. MH?MM OS

6. At the termination of the event, this form and other ap-

"& plicable information should be turned over to the Duty -

Emergency Coordinator.

Shift Administrative Assistant ElY ?j ...~.

  • z

$/2 ~'

j THE MATERI AL CONTAINED VITHIN THE SDiBOLS ( ) 15 FROFFIETARY

%i , OR PRIVATE INFORMATION.  ;..,, ., .

. -. *. .. . ~ - - - .

' s p . h ??. v n ai- n .*:.r.-A d W W -- u ~~ ~~ ~ ~'~':. -

f',ff-:

- -e... . - 3 .': . a . '. ~ ;' h , . ' , ky.lL u.k

....w

4 PLANT M ANU AL SECTION. PROCEDURE!WO AX PLAN TITLE: NO-EMERGENCY PLAN EMERGENCY ACTION LEVEL RESPONSE 1901.10 PAGE 27 of 61 (m j ARKANSAS NUCLEAR ONE aEvision CHANGE 3 DATE 7/is/ai t

N_/ DATE 8.2.5 Emergency Response Team Leaders A. The Emergency Response Team Leaders or Alternates are notified by the Shift Administrative Assistant that a Site Emergency has been declared.

B. The Emergency Response Team Leader or Alternates shall call out and assemble the teams. The Team Leader or Alternate shall report to the Duty Emergency Coordi-nator when the team is assembled.

8.2.6 Incident Response Director A. The Incident Response Director is notified by the Little Rock Control Center that a Site Emergency has been declared.

B. The Incident Response Dicector shall report to the Emergency Control Center when notified that a Site Emergency has been declared.

C. The Incident Response Director shall activate the General Of fi< e portions of the Emergency Response

[N Organization, as needed.

8.2.7 Recovery Manager A. The Recovery Manager is notified by the Shift Admin-istrative Assistant that a Site Emergency has been declared.

B. The Recovery Manager shall immediately report to the Onsite Technical Support Center when notified that a Site Emergency has been declared.

8.2.8 Operations Manager A. The Operations Manager is notified by the Shift Ad-ministrative Assistant that a Site Emergency has been declared.

i B. The Operations Manager shall immediately report to the Onsite Technical Support Center when notified that a Site Emergency has been declared.

8.2.9 Maintenance Manager A. The Maintenance Manager is notified by the Shift Ad-

, 7- 3 ministrative Assistant that a Site Emergency has been l

I

(--) declared.

f

PLANT M ANUAL SECTION: PROCEDUREN/ORK PLAN TITLE: NO-EMERGENCY PLAN F 1 EMERGENCY ACTION LEVEL RESPONSE PAGE 1903.10 _ t O 28 of 61 I

\/

ARKANSAS NUCLEAR ONE aEvision CHANGE

, oatE 7/ie/81 DATE B. The Maintenance Manager shall immediately report to the Onsite Technical Support Center when notified that a Site Emergency has been declared.

8.2.10 Operations Superintendents A. The Operations Superintendent are notified by the Shift Administrative Assistant that a Site Emergency has been declared.

B. The Operations Superintendents shall immediately re-port to the Control Rooms of their respective Units and inform the Onsite Technical Support Center of his presence in the Control Room.

8.2.11 Health Physics and Chemistry Superintendent A. The Health Physics and Chemistry Superintendent is notified by the Shift Administrative Assistant that a Site Emergency has been declared.

B. The Health Physics and Chemistry Superintendent shall immediately report to the Onsite Technical Support 0- Center when notified that a Site Emergency has been declared.

8.2.12 Nuclear and Engineering Support Superintendent A. The Nuclear and Engineering Support Superintendent is notified by the Shift Administrative Assistant that a Site Emergency has been declared.

B. The Nuclear and Engineering Support Superintendent shall immediately report to the Onsite Technical Support Center when netified that a Site Emergency has been declared.

U

PLANT M ANUAL SECTION: PROCEDURENVORK PLAN TITLE: NO:

EMERGENCY PLAN EMERGENCY ACTION LEVEL RESPONSE 1903.10 1

l PAGE 29 of bl (V) ARKANSAS NUCLEAR ONE aEvisioN 3 DATE 7/16/81 CHANGE DATE 8.2.13 Maintenance Superintendents A. The Maintenance Superintendents are notified by the Shif t Administrative Assistant that a Site Emergency has been ueclared.

B. The Maintenance Superintendents shall immediately report to the Onsite Operational Support Center when notified that a Site Emergency has been declared.

8.3 Termination or Escalation of Emergency Action Level 8.3.1 The Site Emergency Emergency Action Level may be de-escalated to a lower Emergency Action Level or be terminated by recovery covery from the event.

8.3.2 The Site Emergency Emergency Action Level may be escalated to a General Emergency Emergency Action Level is the criteria of section 9.0 is met.

d.3.3 The Site Emergency Emergency Action Level may be closed out after being terminated by a briefing by the Incident Response 7- s Director to the appropriate offsite authorities. A written

( ) summary of the event shall be transmitted to the NRC and ap-propriate offsite authorities.

8.4 Fo rms 8.4.1 The following forms describe the notifications and records to be made by the appropriate individuals for the Site Emergency Emergency Action Level. Date the form where indicated (if the date changes before the form is complete, indicate the new date on the appropriate initial / time line). As notifi-cations are completed, initials and time should be placed on the line in the right hand margin by each step. Other per-tinent data (e.g. person contacted) may also be noted adjacent to each step, as appropriate.

8.4.2 Form 1903.10G - Site Emergency Shift Operations Supervisor Notification List and Record.

8.4.3 Form 1903.1011 - Site Emergency Shift Administrative Assistant Notification List and Record.

8.4.4 Fcrm 1903.10I - Site Emergency Duty Emergency Coordinator Notification List and Record.

(-

V

m , PLANT M ARU AL SECTION: PROCEDURE /WORX PLAN TITLE: NO:

emu

.q. M FMFRCFVrv PLAN F5frRGENCY ACTION T.EVEL RESPONSE 1901.10

' ^

  • PAGE 32 of 61 d'- ARKANSAS NUCLEAR ONE aEvision CHANGE a oatE DATE 7/i6/ai

,s ..+. .

s' TL m.' .. .

. i ..

g '

+,tse "%: " !

ARKANSAS POWER & LIGHT COMPANY '~~

&{ MLL Arkansas Nuclear One EMERGENCY ACTION LEVEL RESPONSE l FORM NO 1903.10H REV. #3 PC f

w. .c
  • .i;- Page 1 of 3 SITE EMERCENCT SHIFT AD*11N!STRATIVE ASSISTA.NT NOTIFICATION LIST AND RECORD

_ DATE Cp, INITIALS / TIME

. .m..

^ # #'

, l. Complete as much of Foris 1903.10M, "EAL Notification'* as 5

. available information and time allows. . - , .

iW,2 NOTE: The order of notification may be rearranged as the situation dictates with approval of the Shif t Oper-ations Supervisor. These groups should be contacted

.. . .. . by the most expedient means available (paging, con- O,g', 7 F W

'@2f& 1 tacting appropriate response center for relaying information, direct phone call, radio contact, etc.).

- The phone numbers (plant personnel) provided are

( M for use if an individual is not onsite, the appro-priate response center has not been manned, etc.

2. Provide the initial information on Form 1903.10M to the

. following groups:

2.1 Duty Emergency Coordinator (a duty roster is maintained / -

~

.. in the Shif t Supervisor's of fice; if not on-site, refer

~-[ ' to Attachment I for telephone numbers as necessary.

s.'4 W g 9

.T.;'t L 2.2 Nuclear Regulatory Commission (Hotline; or ' / Q

' .- f ' (if the region office is contacted, request that this

.~ .,,.s.

i,, information be forwarded to the Bethesda Emergency .

operations Center)].

MAY '

~ '

NOTE: If the Technical Operations Control Center has been activated, the Technical Operations Control Officer may be contacted in lieu of the Health Department. -

{; k  ;

d @ W.*M M -W *N -

Nb " 2.3 Arkansas gepartmeng cf Health [9. .

9

or contact /

the OES L or use the OES radio channel) and request theim to notify the Health Department]. . .

2.4 Emergency Teams requiring immediate response (refer to the indicated attachment for call list if team personnel are not currently onsite).

NOTE: The following minimum information should be pro-vided to the team leader: affected unit, EAL declared, appropriate plant conditions / parameters, required response and suggested protective actions

_.s.

(if necessary). .s

' ,.M, *

' $ - ~

~i.'4 THE MATERIAL CONTAINED WITHIN THE SYMBOLS (y) IS PROPRIETARY - -

t k

  • OR PRIVATE INFOR.'1ATION.

e e. .

,,J' , , . *9

  • b, , e
  • O I * .,' N $ "- Y 'N %m a 1 n' .. s A**%- e b W'4-,. . .

\

PLANV M ANUAL SECTION: PROCEDUREAVORK PLAN VITLE: N O.

' k EMTRGENCY PLAN EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE 33 of 61 ARKANSAS NUCLEAR ONE TEvisiON CHANGE 3 DATE 7/i6/81 DATE

  • ." 7

,v. w _

~

4s .i , , . . _ ~

ARKANSAS POWER & LIGHT COMPANY 3'

Arkansas Nuclear One 3-.,

4 N EERGENCY ACTION i.EVEL RESPONSE

~ -

l FO"M '*0- 1903.10H REV. # 3 PC #

Page 2 of 3

..s DATE

, INITIALS / TIME 2.4.1 Evacuation Team (Atta chment 2) / r 2.4.2 Fire Team (Attachment 3) / t; .

2.4.3 Medical Team (Attachment 4) /

2.4.4 Radiation Team (Attachment 5) /

NOTE: If the Emergency Control Center has been activated, the Incident Response Director

%'T may be contacted in lieu of the Little Rock Control Center.

2.5 Little Rock Control Center (  :. or contact /

either the OES or the MSS Dispatch Center and request them to notify the LRCC).

l ,, 2.6 Emergency Teams ny requiring immediate response (refer to the indicated attachment for call list af team per-l ,

,. sonnel are not currently ensite).

~~

NOTE: The following minimum information sticuld be pro- *

~,

  • vided to the team leader: affected unit, EAL fD declared, appropriate plant conditions /paranters. '
e. 4 . a request to assembly the team onsite and suggested

*~

protective actions (if necessary).

2.6.1 Evacuation Team (Attachment 2) /

M -G-s * .p,I O 2.6.2 Fire Team (Attachment 3) / #9WWW G 2.6.3 Medical Team (Attachment 4) /

. n. . ,

2.6.4 Radiation Team (Attachment 5) / .

NOTE: If the Technical Support Center has been -

activated, this center may be contacted in lieu of individual contacts.

(-j!j * .;

U/C THE MATERIAL CON 7AINED WITHIN THE SYMBOLS ( ) IS FROPRIETARY j d '. i CR FRIVATE INFORMATION. -

w ,. . n

\~

e -I $ em e- g ,e I - ,2-

[

  • a g ,,, * , * , _ , , aP  %

NO:

  • PLANT M ANUAL SECTION: PROCEDUREAVORK PLAN TITLE-1903.10 DERGENCY PLAN EMERGENCY ACTION LEVEL RESPONSE W

. . - PAGE 34 of 61 F _

revision 3 o^'e 7/16/81 ARKANSAS NUCLEAR ONE -

CHANGE D AT E

m. . . .-- ,

~ . .- . *

?h:h '

r .'w .

n. -.~.n,
, .w a

.J ARKANSAS POWER & LIGHT COMPANY ..

" " Arkansas Nuclear One 1903.10H {

."# % ..; j TITtE. E.YRGENCY ACTION LEVEL RESPONSE l FON NO.

NW. f 3 PC #

? '" '

Page 3 of 3 DATE a

y INITIALS / TIME

. . ',J ,

L' 2.7 Technical Support Center Personnel (refer to Attach- /

.?

v;V' ment 6 for call list). m..

.SUr? 2.8 Operations Support Center Personnel (refer to Attach- /

~ - - ment 7 for call itst).

/ __ - .._  %

2.9 Other Emergency Response Organizatica per onnel (refer ~* '~ "

N, ..& 3 to Attachment 8 for call list).

NOTE: If the Technical Support Center has been activated, e

this center may be requested to contact the Resident NRC Inspectors.

x

/

2.10 h*RC Resident Inspectors (either one) 2.10.1 9W

.D. Johnson -~_ )9 -

. /

2.10.2 V

L .J. Callan l _. _ ,

)v ry c /

3. Notify the Duty Emergency Coordinator / Recovery Manager j : .:n
  • that the initial notifications have been made (inform

.u . '

l him of any individuals that contact could not be made -

l

' with). '

- 4. Provide updates to the following groups until relieved of

$" respc.nsibility:

l 4.1 Duty Emergency Coordinator / Recovery Manager 4.2 Nuclear Regulatory Commission MM'*NM-8 N k'r-4.3 Arkansas Department of Health or Technical Operations .. .

Control Center (as directed).

4.4 Little Rock Control Center or Eme rgency Control Center ,

(as directed).

5. At the termination of the event, this form and other applicable information should be turned over to the Duty Emergency Coordinator / Recovery Manager.

Shif t Administrattve Assistant "-

" .V.* ,

,g,7 - -

.Oi.W - , ~ .

TIE MATERIAL CONTAINED WITHIN THE SYMBOLS ( ) IS FROPRIETARY OR FRIVATE lhTORMATION.

(..'((, -

~~

~ - * ^ YliiL' "' ~

?

' Is --

...-~~

-: nw a c. C'. ?- * .~ :...

.$..*~:s C %D;. s -. - S., ? t -: ~N- .

I m ANT MWuALSECTION. F90CEDURE/ WORK PLAN TITLE: NO:

-EMERCENCY PLAN EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE 37 of 61 s

\ ARKANSAS NUCLEAR ONE aevision CHANGE 3 oATE DATE 7/i6/81 b

I m,,.- -

ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One TITLE.

EHRGENCY AC*' ION LEVEL RE5NNSE l '0" "O 190L 101 REV. # 3 PC #

Page 3 of 3 DATE INITIALS / TIME 9.4 Area Evacuation (if an Area Evacuation is deemed necessary, contact one of the followtr:q groups (call in the order indicated until contact is made):

9.4.1 Arkansas Department of Health or Technical Operations Control Center (as directed) 9.4.2 Arkansas Nuclear Planning & Response Program (968-7171) 9.4.3 ' Appropriate County Sheriff (Refer to Attach-ment 1, " Emergency Telephone Numbers ** for phone numbers) x 10.

When the following Emergency Pesponse Organizition persou a N arrive onsite, transfer the indicated responsibilities to them:

10.1 Recovery Manager (Assumes responsibility for direction _ /

of corrective and recovery actions) 10.2 Site Security Coordinator (Assumes responsibility for /

direction of Security / Evacuation Team personnel) 10.3 Emergency Services Coordinator,(Assumes responsibility /

for direction of the Fire and Medical Team personnel) 10.4 Health Physics & Chemistry Superintendent (Assumes re- /

sponsibility for direction of the Onsite Radiological Monitoring Section of the Emergency Radiation Team) 10.5 Technical Support Manager (Assumes responsibility for /

direction of the Offsite Radiological Monitoring Sec-tion of the Emergency Radiation Team and dose assess-

"*~4 ment activities).

10.6 Inciuent Response Director (Assumes responsibilities /

for direction of the overall response to the incident).

11. When item (10) has been completed, turn over this notifi-cation. List and record and other pertinent documents to the Recovery Manager.
12. At the ternination of the event, the following summaries shall be provided:

12.1 A verbal summary to:

12.1.1 Nuclear Regulatory Commission

/

12.1.2 Arkansas Department of Health

/

12.2 A written summary of the event (provided to the groups indicated in step 12.1).

V Duty Emergency Coordinator

. PLANT M ANUAL SECTION: PROCEDURDWORK PLAN TITLE NO:

EMERGENCY PLAN EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE 40 of 61 ARKANSAS NUCLEAR ONE aEvisiOu 3 oaTE 7/16/8i (oV) CHANGE DATE B. The Emergency Response Team Leader or Alternates shall call tut and assemble the teams. The Team Leader or Alternate shall report to the Duty Emergency Coardinator when the team is assembled.

9.2.6 Incident Response Director A. The Incident Response Director is notified by the Little Rock Control Center that a General Emergency has been declared.

B. The Incident Response Director shall report to the Emergency Control Center when notified that a General Emergency has been declared.

C. The Incident Response Director shall activate the General Office portions of the Emergency Response Organization, as needed.

9.2.7 Recovery Manager A. The Recovery Manager is notified by the Shift Administrative Assistant that a General Emergency

("'} has been declared.

\. /

B. The Recovery Manager shall immediately report to the Onsite Technical Support Center when notified that a General Emergency has been declared.

9.2.8 Operations Manager A. The Operations Manager is notified by the Shift Admin-istrative Assistant that a General Emergency has been declared.

B. The Operations Manager shall immediately report to the Onsite Technical Support Center when notified that a General Emergency has been declared.

9.2.9 Maintenance Manager A. The Maintenance Manager is notified by the Shift Administrative Assistant that a Site Emergency has been declared.

B. The Maintenance Manager shall immediately report to the On-site Technical Support Center when notified that a Site Emergency has been declared.

V

PLANT M ANUAL SECTION: PROCEDURE! WOR K PLAN TITLE- NO:

EMERGENCY PLAN EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE 41 of 61

(.,l '

ARKANSAS NUCLEAR ONE aevision 3 oarE 7/16/81 CHANGE DATE 9.2.10 Operations Superintendents A. The Operations Superintendent are notified by the Shift Administrative Assistant that a General Emergency has been declared.

B. The Operations Superintendent shall immediately report to the Control Room of their respective units and inform the Onsite Technical Support Center of their presence in the Control Room.

9.2.11 Health Physics and Chemistry Superintendent A. The Health Physics and Chemistry Superintendent is notified by the Shift Administrative Assistant that a General Emergency has been declared.

B. The Health Physics and Chemistry Superintendent shall immediately report to the Onsite Technical Support Center when notified that a General Emergency has been declared.

r^x 9.2.12 Nuclear and Engineering Support Superintendent A. The Nuclear and Engineering Support Superiatendent is notified by the Shift Administrative Assistant that a General Emergency has been declared.

B. The Nuclear and Engineering Support Superintendent shall immediately report to the Onsite Technical Support Center when notified that a General Emergency has been declared.

f 9.2.13 Maintenance Superintendents l

l A. The Maintenance Superintendents are notified by the Shift Administrative Assistant that a General Emer-gency has been declared.

l

()

v

PLANT M ANUAL SECTiON: PROCEDUREAVORK PLAN TITLE- N O-EMERGENCY PLAN EMERGENCY ACTION LEVEL RESPONSE 1903.10

,_s PAGE 42 of 61

(/)

'- ARKANSAS NUCLEAR ONE aevisiDu CHANGE 3 o*TE DATE 7/i6/81 B. The Maintenance Superintendents shall immediately report to the Onsite Operational Support Center when notified that a General Emergency has been declared.

9.3 Termination of Emergency Action Level 9.3.1 The General Emergency Emergencey Action Level may be de-escalated to a lower Emergency Action Level or be termi-nated by recovery from the event.

9.3.2 The Gcneral Emergency Emergency Action Level may be closed out af ter being terminated by a briefing by the Incident Response Director of the appropriate offsite authorities.

A written summacy of the event shall be transmitted to the NRC and appropriate offsite authorities.

9.4 Fo rms 9.4.1 The following forms describe the notifications and records to be made by the appropriate individuals for the General Emer-gency Emergency Action Level. Date the form where indicated (if the date changes before the form is complete, indicate

(~n the new date on the appropriate initial / time line). As noti-(_,) fications are completed, initials and time should be placed on the line in the right hand margin by each step. Other pertinent data (e.g. person contacted) may also be noted adjacent to each step, as appropriate.

9.4.2 Form 1903.10J - General Emergency Shift Operations Supervisor Notification List and Record.

9.4.3 Form 1903.10K - General Emergency Shift Administrative Assistant Notification List and Record.

9.4.4 Form 1903.10L - General Emergency Duty Emergency Coordinator Notification List and Record.

/N

\ \s._.sb I

NO;

t PLANT M ANU AL KgION: PROCEDURENVORK PLAN TITLE:

EMERGENCY ACTION LEVEL RESPONSE 1903.10

..s 3 DIERGENCY PLAN

' PAGE 45 of of s .

b' ARKANSAS NUCLEAR ONE atmmN CHANGE 3 =TE DATE wm l '&: .(

-.n -

s, ,.

b

,:e- s . ,

rdEY

ARKANSAS POWER & LIGHT COMPANY ~ ' "

' ~ '

Arkansas Nuclear One l "* ~4 -

ME: EMERCENCY ACTION LEVEL RESPONSE lF0mNo. 1903.10K

-'m}. REV. 23 PC f l fL .

Page 1 of 3 GENERAT. EMERGENCY SHIFT ADMINISTRATIVE ASSISTANT i ; .$ NOTIFICATION LIST AND RECORD DATE INITIALS / TIME

'I i

-g n

, ['# 1. Complete as much of Form 1903.10M, **EAL Notification" as _,

-;;; a; available information and time allows.

NOTE: The order of notification may be rearranged as the s ,.

situation dictates with approval of the Shif t Oper-ations Supervisor. These groups should be contacted by the most expedient means available (paging, con- q -

ygg, re

,;. g,gg tactirs appropriate response center for relaying information, direct phone call, radio contact, etc.).

w,~ ' The phone numbers (plant personnel) provided are for use if an individual is not onsite, the appro-priate response center has not been manned, etc.

2. Provide the initial information on Form 1903.10M to the following groups:

. ' / .

2.1 Duty Emergency Coordinator (a duty roster is maintaind.,

cgy in the Shif t Supervisor's of fice; if not on-site, refer -

to Attachment I for telephone numbers as necessary.

7

,* Nuclear Regulatory Commission (Hotline; or ,v ' . / . . ..

l .'y ,  ;

2.2 (if the region office is contacted, request that this -- . i'

~

information be forwarded to the Bethesda Emergency -

_[- 5 Operations Center)].

l' .,.'.

NOTE: If the Technical Operations Control Center has W-been activated, the Technical Operations Control Officer may be contacted in lieu of the Health .

Department. .,

! . .lb*J- y a&M?$Wi-NiQ

[ - *%N,;s %,  ; or contact /

, 2.3 Arkansas gepartment, of Health [y l

' the OES ( ' or use the OES radio channel) and request them to notify the Health Department). -

2.4 Emergency Teams requiring iseediate response (refer to .

the indicated attactunent for call list if team personnel l

are not currently onsite).

NOTE: The following minimura information should be pro-l vided to the team leader: affected unit, EAL declared, appropriate plant conditions / parameters, required response and suggested protective actions , .

(if necessary).

  • *g.3;'

s TlE MATERIAL CONIAINED WITHIN THE SYMBOLS ( ) IS PROPRIETARY ~~M' L

'f[: ,

OR PRIVATE IVf0RMATION.

c. . ::~. s ,

-c:wdnk -$[t-N. .NJ;. '3...,,, _ -. , - f.s 2.y , _ J {- _ 2.. 'y. jf,g,.l.g. , y -

[, *, g} _ N :s . . .

PLANT M ANUAl.SECVION: PROCEDURElWOR% PLAN TITLE- NO:

.. FMERCENCY PLAN EMERGENCY ACTION LEVEL RESPONSE 1903.10

"' PAGE 46 of 61 ARKANSAS NUCLEAR ONE aEvisiON 3 DaTE 7/16/81 CHANGE DATE

.u . -

g.a . _

.. ~ . - ,

ARKANSAS POWER & LIGHT COMPANY ' ~

  • - Arkansas Nuclear One TiTtt- EMERCENCY ACTION LEVEL RESPONSE l FOAM 880.1903.lCK D. J REV. #3 PC f Page 2 of 3

-? DATE

~

- INITIALS / TIME v .

.. 2.4.1 Evacuation Team (Attachment 2) /

2.6.2 Fire Team (Attachment 3) /  : x._

... 2.4.3 Medical Team (Attachment 4) /

2.4.4 Radiation Team (Attachment 5) /

%W&  % *=.. [^ . . e m'; =* W NOTE: If the Ea'ergency Control Centet has been activated, the Incident Response Director

[ H~ may be contacted in lieu of the Little

' Rock Control Center.

7 V 2.5 Little Rock Control Center ( .; or contact /

either the OES or the MSS Dispatch Cent'er and request them to notify the I.RCC).

2.6 Emergency Teams ng requiring immediate response (refer '

' to the indicated attachment for call list if team per-sonnel are not currently onsite).

3, NOTE
The following minimum information should be pro- -

..* vided to the team leader: aff ected unit, EAL ,

declared, appropriate plant conditions /paraoters,

,y_ a request to assembly the team onsite and suggested

  • -'"'? protective actions (if necessary). * - -

2.6.1 Evacuation Team (Attachment 2) /

Mg 2.6.2 Fire Team (Attachment 3) / ..jy ,gg,y, p;s 2.6.3 Medical Team (Attachment 4) /

2.6.4 Radiation Team (Attachment 5) / ,

NOTE: If the Technical Support Center has been .

acti'.ated, this center may be contacted in lieu of individual contacts.

~

~~

-]. .:

THE MATERIAL CONTAINED VITHIN THE SYMBOLS ( ) IS PROPRIETARY

, '"![f *;

  • OR PRIVATE IhTORMATION. - - : :., * - ..

(

'S O ..G e *

5,ce. G ; g l
Jk. A . 5..:ar. .sk -;.%%:~;::g- :. ~ r. . , ...:

. , a . .. .; .._ b _.w,. ,x;; .f. . w .

PLANV M ANU AL SECTION: PROCEDUREAVORK PLAN TlVLE: N O.

/ EMERGENCY PLAN EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE 47 01 bl ARKANSAS NUCLEAR ONE m visi a 3 oATE "le CHANGE DATE x; . . ,

~. ,.n

- " ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One ' ~

. , . TritL E.'iERCENCY ACTION LEVEL IJSPONSE l ronu No 1903.10K 7, REV. #3 FC #

Page 3 of 3 DATE INITIALS /T!ME 2.7 Technical Support Center Personnel (refer to Attach- /

ment 6 for call list).

2.8 Operations Support Center Personnel (refer to Attach- /

~

.. . ment 7 for call list).

, 2.9 Other Emergency Response Organization rersonnel (refer /

M g,q p g to Attacbment 8 for call list). *M*r4 -eyw .ys.

NOTE: If the Technical Support Center has been activated, this center may be requested to contact the Resident NRC Inspectors.

2.10 NRC Resident Inspectors (either one) /

2.10.1 W.D. Johnson f J 2.10.2 L.J. Callan I

c. , .

., 3. Notify the Duty Emergency Coordinator / Recovery Manager /

that the initial notifications have been made (inform him of any individuals that contact could not be made with). s .

4. Provide updates to the following groups until relieved of v~-"r 14 responsibility: -*

4.1 Duty Emergency Coordinator / Recovery Manager

,gg j 4.2 Nuclear Regulatory Commission p igcgj;.yg ::g 4.3 Arkansas Department of Health or Technical Operations

,, Control Center (as directed).

4.4 Little Rock Control Center or Emergency Control Center (as directed). .

5. At the termination of the event, this form and other applicable information should be turned over to the Duty Emergency Coordinator / Recovery Manager.

, . . , Shift Administratave Assistant

, .J,

  • THE MATERIAL CONTAINED WITHIN THE SYMBOLS ( ) IS FRCI'RIETARY .

, OR TRIVATE INFORMATION. --6..t- ,.

\.

. . . .**, s . .

G - O.  %'.a. . < o..-._;.r$2ET " h --* ~ Q . ~?" ~, 'e~,

, _ _ ~~_.. '*

. . . C ,y,

PLANT MANUAL SECTION: PRCOEDif RElWORK PLAN TITLE: N O-EE.RGENCY PLAN EMERGENCY ACTION I.EVEL RESPONSE 1903.10 PAGE O 50A of bl k ARKANSAS NUCLEAR ONE arv:sion CHANGE 3 oATE 7/inesi DATE

. . _ , . . ARKANSAS POWER & LIGHT COMPANY 4 Arkansas Nuclear One MtE EMEEGENCY ACT!CN LE'iEL (FAL) NOTIFICATICN j acmu ho 19 p ,13 F E'; o g PC 9 Page 1 of 2 CAUTICN: NOTIFICATICNS TO TEE STATE OF AhXANSAS WILL REQUI?I LSE CF ALTEENTICATION TAELES (ITEM NLMPER 11).

This is (identify ycurself) at Arkansas Nuclear One with an Emergency Actica Level Nottfication Fepert. Ackna ledge when you are ready to proceed.

I. () INITIAI. ( ) FCLL V-l'P NO.

2. N/A
3. N/A
4. Date/ Time cf Declaratica CD tN O JUet1
5. I' nit ( ) One ( ) Two
6. Class of EAL:

-#^* WM ( ) A. BTSL'AL EiTNT ' ' ' " ~ ' ' '"

( ) D. CENERAL E.*ERGENCY

( ) B. ALLET ( ) E. NCNI

( ) C. SITE E."IRGENCY

\

V 7. Conditions Fepiring EAL:

8. Areas Affected (Sectors /0istances):
9. Cnstte Situation:

A. Pregnosis of Situation: .

( ) Improving

( ) Ftable

( ) Legrading B. General Pcpulation Prctective Actzons Fecomended:

( ) None

( ) Shelter

( ) Evacuation "I " " "* " ~

C. Icstitutionalized Protective Actions hecem ended: ' '

( ) None ,

( ) Shelter .

( ) Evacuation D. Radiation Monitoring Teams Activated:  ;

( ) Yes

( ) No E. Eeergency Response Centers Activated:

( ) None

, ( ) Tsc

( ) ECL

'\

(G

~. . .. .. -

w --, - - - . . - - - - - - - , . - _ , .- ,,w 9- , . - , - , - r - -- - - - - + - ,y

PLANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

.. ..~

EMERGENCY PLAN -

EMERGENCY ACTION LEVEL RESPONSE 1901.10 PAGE SOH of 61

(~' ARKANSAS NUCLEAR ONE arvisiOn 3 oATE 7/io/ai CHANGE DATE ARKANSAS POWER & LIGHT COMPANY 4 Arkansas Nuclear One

n. , . . .

Mtf. E*'ERGENCY ACTION LEVEL (EAL) SOTIFICATION 199 3,1 c.3 l FOAw ho.

REV. 7 3 I'C #

F. Local Assistance Requested: IJRe 2 of 2

( ) Ftre

( ) Police

( ) Ambulance

( ) Other G. Evacuatten of Onsite Personnel:

( ) Yes

( ) No

( ) Some H. Other Emergency Response Acticas l'nderway:

10. Message sent Py: /

NA".E PL51TliiN ...as. w w c yw

11. Message Authenticated By: A B C D E F G H I J K L M N O (None) /

INDICATE ALFHAEETICAI. hESPCNSE CHARACTERS CHALLENGED Gli1N

12. Type of Pelease:

( ) None ( ) Airborne

( ) .'otential ( ) Waterborne

( ) Actual ( ) Surface Spill

13. Description of Released Material (Chemical & Physical form, Estimate of Equivalent Curies of I-131 & XE-133 Feleased, Release Rate (C1/sec).

Iodine / Noble Gas Ratio, etc):

14. A. Wind Direction: (From)
  • B. Vind Spead: MPH
15. Temperature: *F
16. Form of Precipitation:

e% awd 17. Atmospheric Stability:

. .w %w.u.: um

18. Estimated Start /uuration Time of the Release:

i (START) (DLRATION)

19. Dose Rate at the Exclusion Area Boundary (0.65 miles):

mR/hr ( ) Projected ( ) Child Thyroid

( ) Actual ( ) khole Body

20. Projected Dose:

mR/hr ( ) bhole Body ( ) Child Thyroid at miles

-._., 21. REMARKS: ,

I l

, O i

( e e e

PLANT M ANUAL SEC710N: PROCEDUREAVOR% PLAN TITLE: NO:

EMERGENCY PLAN EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE 51 of bi ARKANSAS NUCLEAR ONE atvisioN CHANGE 3 oATE 7/i6/81 DATE ATTACIR!ENT 1 DUTY EMERGENCY COORDINATOR ROSTER / CALL LIST NAME BADGE WORK IIOME Basil Baker 110 f

V / V Tom Cogburn 151 Early Ewing 400 f

Jim McWilliams 261 Jim O'Hanlon (Gen. Manager) 1 l

Dave Sne11ings 398 Bob Terwilliger 343 (DEC = Beeper Number 602) l l

l TIE MATERIAL CONTAINED WITi!IN TIE SYMBOLS ( ) IS PROPRIETARY OR PRIVATE INFORMATION.

l l

NO:

PLANT M ANU At SECTION: PROCEDURElWORC1 FLAN TITLE:

1903.10 FWRCFNCY PT_AN FffERGENCY ACTION LEVEL RESPONSE PAGE 52 of 61 aEvisioN 3 oATE 7/i6/81 ARKANSAS NUCLEAR ONE CHANGE DATE ATTACIDfENT 2 EMERGENCY EVACUATION TEAM ROSTER / CALL LIST WORK HOME BADGE TEAM LEADER:

,Y Y 160 Jackie Crow ALTERNATE TEAM LEADERS:

k J. C. Garrett 395 i

Bruno Hampton 404 I V V 258 Wes McDaniel i

MEMBERS: V I

i Mike Myers 461 V

V 120 John Beaty, Jr. V V 217 Roger Hooper V V 333 James Starr 7 .

i Barbara Wade 1063 V

V 168 l Barbara Dunn ' V VJim Vandergrift 354 V

V 115  :

Dennis Barton V V 268 f J. Don Moore 7 V 497 Jim Wilson ' V V 153  ;

Jim Constantin 0 V 473 Ron Hargrove l

7 V 319 Joe Simmons 7 Ed wentz 365 1

V 196 Tracey Green i V 271 Ira Mosquito Joe Waid 124 TIE MATERIAL CONTAINED WITHIN TIESE SYMBOLS ( ) IS PRIOPRIET OR PRIVATE INFORMATION. _ _-

NO-PLANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE:

EMERGENCY ACTION LEVEL RESPONSE 1903.10 EMERGENCY PLAN PAGE 53 of 61 aevisiON 3 oATc 7/16/81 ARKANSAS NUCLEAR ONE CHANGE DATE ATTACHMENT 3 EMERGENCY FIRE TEAM ROSTER / CALL LIST BADGE WORK HOME TEAM LEADER:

V John Lamb 449 ALTERNATE TEAM LEADERS:

V Jim Bob Jackson 228 V

Larry Munson 272 i

MEMBERS:

7 David Eichenberger 171

- .'y Alex Smith 323 iV Charles May 255 Barry Waldron 418 V

Gary Kendrick 239 Tom Wilkins 372 Don Booker 116 Glenn Brooks 134 Kyle Jones 422 l

James Nichols 328 Chester Wetzel 477 Johnny Walker 362 Marion Hall 202 l

l}

l l

THE MATERIAL CONTAINED WITHIN THESE SYMBOLS ( ) IS PRIOPRIETARY l OR PRIVATE IhTOR&\ TION.

I

PLANT M ANUAL SECTION: PROCECUREAVORK PLAN TITLE: NO:

EMERGENCY PLAN EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE 54 ot et 3 ARKANSAS NUCLEAR ONE Revision 3 cATE 7/t6/81 CHANGE DATE ATTACHMENT 4 EMERGENCY MEDICAL TEAM ROSTER / CALL LIST BADGE WORK HOME TEAM LEADER:

Richard Gillespie 191 ALTER 3 ATE TEAM LEADERS:

Charles Adams 102 V

V 139 Dennis Calloway MEMBERS:

Bob Jackson 406 f i

Richard Moredock 1850 Alan McArthur 98 Steve Stork 336 Mike Hoyt 222 114 S

Gerald Bartlett Albert Lane 243 Douglas Butler 137 Wayne Cheatham 148 8 l

Shirman Yancy 498 8 KaSandra Delph 165  ?

Eileen Goulet (192)

V Debbie Rodgers 285 {V

'V V 269 i Royce Moore Bill Bice 144 Paul Ford 1889 _[

( ) = Laminated Badge THE MATERrAL CONTAINED WITilIN THESE SYMBOLS ( ) IS PRIOPRIETARY OR PRIVATE INFORMATION.

N O-

. PLANT M ANU AL SECTION: PROCEDUREA*/ORK PLAN TITLE:

1903.10 EMERGENCY PLAN EMERGENCY ACTION LEVEL RESPONSE PAGE 55 of 61 aEvisiON 3 oArE 7/16/81

, ARKANSAS NUCLEAR ONE CHANGE '

DATE ATTACIDfENT 5 EMERGENCY RADIATION TEAM ROSTER / CALL LIST WORK HOME BADGE TEAM LEADER:

V Matt Bolanis 88 ALTERNATE TEAM LEADERS:

?

Dale Wagner 360 V

Tom Nickels 332 9

Robert Green 195 V

Chuck Burchard 119 l V

Atina Murray 274 MEMBERS V

V 283 l Roger Owings Jeff Garren 189 Ken Zelnick 382 V

Tim Smith 327 Y

l Steve Fowler 183 \

Y David Rebarchik 356 Charles Anderson 430 Maurice Ward 428 f r i y 470 Wayne Wright l

Sarah Nettles 436 [

l l

l THE MATERIAL CONTAINED WITHIN THESE SYMBOLS ( ) IS PRIOPRIETARY OR PRIVATE INFORMATION.

I i

i f

PLANT M ANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO; EFERGENCY PLAN EFERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE 56 of 61 ARKANSAS NUCLEAR ONE RcvisioN CHANGE 3 DATE DATE vie /ai ATTACIDENT 6 TECHNICAL SUPPORT CENTER STAFF ROSTER / CALL LIST BADGE WORK HO?E TSC J. P. O'Hanlon 1 )

E. L. Sanders 488 B. A. Baker 110 D. D. Snellings 110

\ -

(,

(

TIE MATERIAL CONTAINED WITHIN TIESE SYMBOLS ( ) IS PRIOPRIETARY OR PRIVATE INFORMATION.

NO:

PLANT M ANU A1.SECV10N: PROCEDUREAVORt1 PLAN TITLE:

1903.10 EMERGENCY PLAN EMERGENCY ACTION LEVEL RESPONSE

' PAGE 57 of 61 atvisiON 3 oATE 7/16/8t ARKANSAS NUCLEAR ONE . CHANGE D AT E.

ATTACHMENT 7 OPERATIONAL SUPPORT CENTER STAFF ROSTER / CALL LIST BADGE WORK /OSC HOME P. Jones 234 V. C. Pettus 286 W_'

H. R. Tucker 350 VT. H. Cogburn 151 lV 400 t E. C. Ewing  :

V V 88 M. J. Bolanis V

V 179 G. L. Fiser V

T. C. Baker 112 V

j S.R. Lueders 345 J. B. Lamb 449 i

H. L. Hollis 215 i 7

M. K. Bishop 3152 _

[,m-l ' .m ;

T'M 1

l l

i I

l 1

l TlfE MATERIAL CONTAINED WITIIIN THESE SYMBOLS ( ) IS PRIOPRIETARY l OR PRIVATE INFORMATION.

I

,r . ,.

PLANT M ANUAL SECTION: PROCEDUREAVORK PLAN TITLE: NO:

EWRGENCY PLAN EMRCENCY ACTION 'eEVEL RESPONSE 1903.10 PAGE 58 of 61 ARKANSAS NUCLEAR ONE aevision CHANGE 2 o^rE DATE 7/16/81 T .

ATTACHMENT 8 REMAINING EMERGENCY RESPONSE ORGANIZATION (PLANT STAFF) ROSTER / CALL LIST NAM _E BADGE WORK HOME

~

L. W. Humphrey 410 7 7 '

J. H. Montgomery 118 TIE MATERIAL CONTAINED WITHIN TIESE SYMBOLS ( ) IS PRIOPRIETARY OR PRIVATE INFORMATION.

. n.. . . . . ,.~ . .: ~ n . . . . . . . , - . . , , e .. n ; ew.~. , r.2. n. - . .g , r.. ....  :: c . .: ,1 -

-- - i :. , . - ~ ;u: . . 1.:

PLANT M ANUAt SECTION: PROCEDUREAVORK PLAN TITLE: NO:

EMERGENCY PLAN EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE 59 of 61

~, ARKANSAS NUCLEAR ONE aEviSiON CHANGE 3 o*1E DATE 7/16/8I ATTACIDfENT 9 Page 1 of 3 EMERGENCY TELEPIIONE NUMBERS (0UTSIDE ASSISTANCE)

NOTE: All area codes are 501 unless otherwise noted.

FEDERAL Corps of Engineers (Dardanelle)

Department of Energy (Radiological Emergency Assistance Team)

Nuclear Regulatory Commission (Directorate of Regulatory Operations, Region IV)

STATE Arkansas Nuclear Planning & Response Program (Russellville)

Arkansas State Department of IIcalth (Bureau of Environmental Health Services)

Arkansas State Police (Clarksville)

Office of Emergency Services (Conway)

LOCAL POPE: Ambulance Service Sheriff's Department ',

Emergency Services (Office)

(Home)

YELL: Sheriff's Department Emergency Services (Home)

JOHNSON: Sheriff's Department Emergency Services (Office)

(Home)

LOGAN: Sherif f's Department Emergency Services (Home)

TIIE MATERIAL CONTAINED WITl!IN Tl[ESE SYMBOLS ( ) IS PRIOPRIETARY OR PFIVATE INFOR&\ TION.

PLANT M ANUAL SECT!ON: PROCEDUREANORK PLAN TITLE: N(h EERGENCY PLAN EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE 60 of 61 T

ARKANSAS NUCLEAR ONE aevision . 3 oATE CHANGE 7/16/81 DATE Page 2 of 3 LOCAL CONT.

RUSSELLVILLE: Millard Henry Clinic Russellville Fire Department St. Mary's Hospital Arkla Gas Company Missouri-Pacific Railway Co.

KARV ARKANSAS POWER & LIGHT ARKANSA3 NUCLEAR ONE: Emergency Control Center Main Guard Station Unit One Control Room Unit Two Control Room LITTLE ROCK: Vice Presiden (Office)

Seniop(W. Cavanaugh)g, Energy Supply (Home)

Direcgor, Nuclear gperations (Office)

(J. Griffin) (Home)

Director, Tech ical & Enviponmental (Office)

Services 9(D. Rueter) (Home) l Direcgor, Fossi1 0perations (Office)

(D. Sikes)9 (Home) l (Office) l Vicegresident,(C. Kelly)Gorporate Communications (Ifome) l Managgr, Corporgte Security (Office) ,

! (C. Dunn) (Home) j Little Rock Control Center RUSSELLVILLE: District Office: E. Deaton (Office) 1 (Home) l l J. Lee (Office) l (Home)

W. Harris (Office)

(Home)

Emergency Control Office THE MATERIAL CONTAINED WITHIN THESE SYMBOLS ( ) IS PRIOPRIETARY OR PRIVATE INFORMATION.

l t

PLANT M ANUAL SECVION: PROCEDURE / WORK PLAN VITLE: N O-FMFRGFNCY PLAN FMFRGENCY ACTION LEVEL RESPONSE 1903.10 PAGE 61 of 61 3 ARKANSAS NUCLEAR ONE atvisioN CHANGE 3 oATE DATE 7/16/a1 Page 3 of 3 OTHER AGENCIES BASCOCK & WILCOX: Site Represcntative (T. Scott) (Home)

Emergency Respon'se Center COMBUSTION ENGINEERING:

g(iteRepresentative A. B. McGregor) (Home:

Emergency Response Center INSTITL'TE OF NUCLEAR POWER OPERATIONS NUCLEAR SAFETY ANALYSIS CENTER NUCLEAR ENERGY LIABILIfY PROPERTY INSURANCE ASSOCIATION s

THE MATERIAL CONTAINED WITHIN THESE SYMBOLS ( ) IS PROPRIETARY OR PRIVATE INFORMATION.

. - -- _ _ . _ _ _l

ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One

,C)

\ _,/

EMERGENCY PLAN l FORM 1000 06A PERSONNEL EMERGENCY 1903.23 REV. 2 a, g-w, remlet a py *, /d '

Q yQ T I RECORD OF CHANGES AND REVISIONS PAGE REVISION CHANGE PAGE REVISION CHANGE PAGE REVISION CHANGE 1 2 2 2 3 2 4 2 5 2 6 2

(~

o}

APPROVED

%A r

{.

l .

l

1 PLANT M ANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

EMERGENCY PLAN PERSONNEL EMF 5E_r;NCY 1903.23 y

PAGE 1 of 5

(?sm, /

ARKANSAS NUCLEAR ONE aavisiON CHANGE 2 oaTE DATE 7/7/ai i

j 1.0 PURPOSE l

The purpose of this procedure is to provide guidance to ANO personnel l on how to respond to a personnel emergency. This emergency may be ,

medical or contamination-related medical. '

2.0 SCOPE This procedure outlines the general response to be taken during a person-nel emergency. It is not intended to give medical guidance for use during the emergency.

3.0 REFERENCES

3.1 References Used in Procedure Preparation:

3.1.1 Arkansas Nuclear One Emergency Plan 3.1.2 Red Cross First Aid Instruction Pamphlets 3.1.3 NCRP Report No. 39, " Basic Radiation Protection Criteria" 7- g 3.1.4 NCRP Report No. 65, " Management of Persons Accidently Con-t i taminated with Radionuclides" s_ '

3.2 References Used in Conjunction with this Procedure:

3.2.1 1622.010, " Personnel Decontamination" 3.2.2 1903.33, "Re-Entry Guidelines" 3.2.3 1903.74, " Pope County Ambulance Service" 3.3 Related ANO Procedures:

3.3.1 1903.42, " Duties of the Emergency Medical Team" 3.3.2 1903.72, "St. Mary's Hospital" 3.3.3 1903.73, "Millard-Henry Clinic" 4.0 DEFINITIONS 4.1 A serious injury that requires action specified in this procedure is defined as an injury to any person that has resulted in:

4.1.1 More than a momentary loss of consciousness.

/"'N 4.1.2 An actual or suspected fracture.

I w/

PLANT MANUAL SECTION: PROCEDUREAVOR;( PLAN TITLE: NO:

EMERGENCY PLAN PERSONNEL EMERGENCY 1903.23 y

2 of 6 C'

(,_, ARKANSAS NUCLEAR ONE __ PAG E2 o*TE aEvisiON 7/7/81

. CHANGE DATE 4.1.3 A head injury.

4.1.4 An injury that may have damaged internal organs.

4.'.5 A serious burn.

4.1.o Hemorrhaging.

4.1.7 Receipt of a large dose of radiation (i.e., greater than 50 R).

5.0 PRECAUTIONS 5.1 Personnel administering first aid to an injured person in a suspected or undefined radiation field should be joined by a Health Physics representative as soon as possible.

5.2 Entry into evacuated or high radiation areas for the purpose of attending to injured or contaminated individuals shall be in accordance with 1903.33, "Re-entry Guidelines".

5.3 If it is not clear that the individual can be moved without harm, 7-~3 he should not be moved until further help arrives, unless the in-dividual would be in danger of loss of life or limb.

tx_)'

5.4 Individuals who have suffered any of the conditions described in Section 4.0 should receive a medical examination prior to returning to work.

6.0 IMMEDIATE ACTIONS 6.1 In the event of a personnel emergency, personnel in the vicinity of the affected individual should:

6.1.1 Administer immediate first aid and attention. This attention should consist of:

A. Stopping bleeding by applying pressure.

, B. Using resuscitation techniques.

C. Keeping the individual calm and comfortable until further help arrives.

6.1.2 Notify either unit's Shift Supervisor (prefered), the Safety & Fire Prevention Coordinator or the individuals Supervisor.

(S 6.1.3 Remain available to provide information to the appropriate

(_) medical personnel.

_____a

s PLANT M ANUAL SECTION: PROCEDUREAVORK PLAN TITLE: NO:

I EMERGENCY PLAN PERSONNEL EMERGENCY 1903.23 d ARKANSAS NUCLEAR ONE PAGE aevisiON 3 of 6 2 oATE 7/7/81 CHANGE DATE 7.0 FOLLOW-UP ACTIONS 7.1 For any medical emergency, either unit's Shif t Operations Supervisor should be informed, if not previously done; periodic updates should be provided to the Shift Supervisor initially contacted.

7.2 The Shift Operations Supervisor shall direct appropriate medical assistance to the injured individual. The following groups should be called upon (when on-site) to provide assistance:

NOTE: These groups should be contacted by the most expedient means available (if the page is used, the announcement should be repeated several times).

7.2.1 Bechtel Nurse C 4 7.2.2 Emergency Medical Team.

7.2.3 Safety & Fire Prevention Coordinator \ 1 NOTE: Basic First Aid Supplies are maintained in the following locations:

A. Unit 1 Controlled Access Exit Area (Health Physics).

B. Unit 2 Controlled Access Entrance Area (Health Physics).

C. Unit 1 Turbine Building, Elev. 354 South (Fire Locker).

D. Unit 2 Turbine Building, Elev. 354 North (Fire Locker).

E. Unit 1/2 Turbine Building Elev. 386 (Fire Locker).

7.3 When directed, the appropriate medical personnel onsite should respond to the location where the injured or contaminated individuals are located and:

7.3.1 Administer appropriate first 1sures.

7.3.2 Provide the Shift Supervisor with an assessment of the situation (to include further needs, if necessary).

7.3.3 Gather necessary information from the personnel initially on the scene (to include individual's name for future re-ference).

7.3.4 Obtain the injured person's security badge, dosimeters and TLD for further identification and dose determination.

l '

\.

PLANT MANUAL SECTION: PROCEDURE!WORZ PLAN TITLE: NO-J EMERGENCY PLAN PERSONNEL EMERGENCY 1903.23 I PAGE 4 of 6 ARKANSAS NUCLEAR ONE aevisiON CHANGE 2 o,.TE 7f7/81 DATE 7.4 If an individual is potentially contaminated, the following pre-cautionary measures should be taken (as allowed by the nature of the injury), as necessary:

NOTE: The Shif t Operations Supervisor shall ensure that a Health Physics representative is assigned to accompany the individual (s) both onsite and to offsite medical facilities, as necessary.

7.4.1 Take precautions (coverings, use of stretcher, etc.) to prevent the spread of contamination during movement and transport of the individual.

7.4.2 Move the individual to a " clean" area, as allowed by step 5.3.

7.4.3 Remove contaminated clothing.

7.4.4 Survey the individual for surface contamination.

NOTE: Contaminated wounds, eyes, etc., should be decontaminated by use of water only; wounds should be covered before and af ter decontamination efforts.

7.4.5 Decontaminate the affected areas removing as much transferable contamination as possible per 1622.010, " Personnel Decontamination".

7.4.6 Cover remaining contaminated areas.

NOTE: If an individual is potentially contaminated and requires transportation to an offsite medical facility, he should be initially transported to St. Mary's Hospital.

7.5 The Shif t Operations Supervisor may make arrangements for treatment based upon the assessment of a qualified medical individual. If a qualified medical individual is not available, the following guidance is provided:

7.5.1 If the injured individual (s) requires attention from a doctor and are judged incapable of travel, the appropriate physicians should be called from Millard-Henry Clinic i i or St. Mary's Hospital \ _l, advised of the physical and radiological condition of the injured, and requested to come immediately to ANO. The Pope County Ambulance Service should also be contacted (refer to step 7.5.2).

7.5.2 If the injured individual (s) requires immediate attention from a doctor and are judged capable of travel, the Pope County Ambulance Service should be called at. -

advised of the physical and radiological condition of the~ injured and requested to come immediately to ANO. If the situation requires the i ambulance personnel to enter a potentially contaminated area, refer to 1903.74, " Pope County Ambulance Service" for further guidance. ,

l 1

_ _ _ I

PLANT M ANUAL SECTION: PROCEDUREAVORK PLAN TITLE: NO:

EMERGENCY PLAN PERSONNEL EMERGENCY 1903.23 PAGE 5 of 6 ARKANSAS NUCLEAR ONE aEvisioN CHANGE 2 DA1E 7/7/81 DATE E 7.5.3 If the injured individual (s) do not require immediate attention from a doctor and are judged capable of travel, arrangements should be made to transport the individuals for further examination to Millard-Henry Clinic or St. Mary's Hospital.

7.5.4 If the injured individual or individual (s) attending to the injured individual are suspected of having received a radiation dose in excess of 50 R, arrangements should be made to transport those individuals to the University of Arkansas Medical Sciences Hospital in Little Rock for treatment, as necessary, after -

examination at St. Mary's Hospital.

7.6 The Shif t Operations Supervisor should notify the Duty Guard Sergeant if off-site medical assistance has been requested to report onsite so that Security personnel may be ready to receive and escort the medical personnel. (Routine access point - North Gate; routine receiving area -

Maintenance Facility Breezway, unless otherwise directed.)

7.7 If the injured individual is transported to a medical facility, the Shif t Operations Supervisor should call the appropriate medical facility and advise them, as known, of the number of individuals involved, a des-cription of the medical emergency and whether or not contamination is involved.

, 7.7.1 MillardHenryClinicf ')

( __

7.7.2 St. Mary's Hospital ' ')

7.7.3 University of Arkansas Medical Sciences Hospital '

7.8 An escort, as indicated below, should accompany the injured individual (s) to provide any necessary information or assistance to the medical per-sonnel and provide periodic updates to the Shift Supervisor (or other individual, as directed).

7.8.1 If the individual is contaminated, a Health Physics represent-ative shall accompany.

1 7.8.2 If the individual is not contaminated, one of the following l individuals should accompany:

A. Emergency Medical Team Member B. Bechtel Nurse (If Bechtel personnel are involved)

C. Safety and Fire Prevention Coordinator l

l l

1

u. - .

. ~ . m ...c.

. . . .; . - ,.m . , .

. . .,. w _,y ~. . :. -y, -a..gm, w -, - .

8 3

PLANT M ANUAL SECTION: PROCEDURElWORK PLAN TITLE: NO:

EMERGENCY PLAN PERSONNEL EMERGENCY 1903.23 PAGE o of 6 O' ARKANSAS NUCLEAR ONE aevisioN CHANGE 2 oATE 7/7f81 DATE D. An ANO Management Representative E. Any knowledgable member of the plant staff S.0 ATTACHMENTS AND FORMS None O

O

PLANT M ANU AL SECTION: PROCEDUREMORX PLAN TiVLE: NO:

EMERGENCY PLAN OIL SPILL PREVENTION CONTROL PROCEDURE _

& COUNTERMEASURE PLAN 1903.24 PAGE 14 of 17 ARKANSAS NUCLEAR ONE aavis>ON 1 DATE 5/9/81 CHANGE DATE f

i Page 1 of 1 ATTACHMENT 2 Oil Spill Response Team Organization and Responsibilities The purpose of the ANO Oil Spill Response Team is to minimize the consequences of an oil spill upon the environment of Lake Dardanelle. The Oil Spill Response Team shall be activated per Section 4.4.3 of this procedure. Upon activation the team shall initiate action as described in Section 4.2 and Attachment 1 of this procedure. The Oil Spill Team leader shall be responsible for coor-dinating oil containment and clean up activities and reporting to the Technical Analysis Superintendent. r Call List For Oil Spill Response Team NAME PHONE V V Team Leader Charles Adams V 7 Alternate Team Leader Dennis Calloway

(

V V Alternate Team Leader Tom Baker ,

i Members Gary Lipham V V Tom Blakenship i

V V Clyde Butts  !

Larry Greathouse V V Al Morgan V V Steve DeYoung i

Sid Hawkins Mike Hall k THE MATERIAL CONTAINED WITHIN THE SYMBOLS (V) IS PROPRIETARY OR PRIVATE INFORMATION.

PLANT M AMU AL SECVION: PROCEDURE / WORK PLAN YITLE: NO:

- EMERGENCY PLAN OIL SPILL PREVENTION CONTROL PROCEDURE & COUNTERMEASURE PLAN 1903.24 PAGE 17 of 17 ARKANSAS NUCLEAR ONE atvisioN CHANGE o DATE DATE 3/4/81 4

3 -

.9

. ~ ~; .~ e ,s-

q.l. .- .g .

ARKANSAS POWER & LIGHT COMPANY sm Arkansas Nuclear One --~w *

, TITtE. NOTIFICATION RECORD l Fomu No. 1903.24B

- MN. # 0 PC f ,

.7, 2J. -

~

DATE/ TIME ZC-[- AGENCY FERSON CONTACTED PHONE CONTACTED

, 1;SCG National Response Center State Dept. Pollution Control s c - & Ecology AP&L C&C Techr.ical Analysis Dale L. Swindle Office '."

Home AP&L G&C Technical Analysis Edward L. Green Office -

- dh.' -IN' N .

~~-e f;.1.c,- d Hone I l

?.*Ri&*S. T 5.;.

AP&L C&C Technical Analysis Sharon R. Tilley Office Home t .g. ( _ _

t -

For information purposes, the following numbers are provided:

U.S. Coast Guard (Memphis) -

24-Hour Emergency k1 EPA. Dallas

.~yv ~-. . .

24-Hour Emergency

\.

. ,. ryr-N.

-Z.

7 ' --

Corps of Engineers V[

Other Agencies Notified:

- DATE/ TIME AGENCY PERSON CONTACTED PHONE CONTACTED ,ye,

..e,,.,

.[, ."p.h,$.i j ,-_ a ,UTf4.M N M h- *3 I

..- . Person Making Notification:

I l

I

~

r-

- 5' THE MATERIAL CONTAINED WITHIN THE SYMBOLS ( ) IS FRorRIETARY I"

. OR FRIVATE ISTORMATION. . i' l

- :a - - - - -  %

,g.) , ..,.(_. .

. .\." _ .

  • ~~

,- f- .,

ARKANSAS POWER & LIGHT COMPANY

_h

. Arkansas Nuclear One d 2/psmacvNCYPLAN l FOR'A 1000 06A x.y D/ DUTIES OF THE EMERGENCY RADIATION TEA'1 h..g'N> 1903.43 REV. 3 J

$hqi

', >~.g ., y o I

. 3 ,r y abu m sJ m!3 y _r g g .

i .n., . p c - ,:j .. n a n cl e {dg a "

RECORD OF CHANGES AND REVISIONS PAGE REVISION CHANGE PAGE R EVISION CHANGE PAGE REVISICN CHANGE 1 3 2 3 3 3 4 3 5 3 o 6 3 7 3 8 3 l

l I

O -

'"" M tb & s - 4 , #44s, ^~"pp w"

.n..-._ -

i l

t

- s PLANT M ANUAL SECTION: PROCEDURE / WORM PLAN TITLE: N O-EMERGENCY DUTIES OF TliE EMERGENCY PLAN RADIATION TEAM 1903.43 PAGE 1 of 8 ARKANSAS NUCLEAR ONE aevision 3 oAre 7/8/8i (ov) ICHANGE DATE 1.0 PURPOSE The purpose of this procedure is to provide guidance on the responsibilities and duties of the Emergency Radiation Team for emergency situations.

2.0 SCOPE This procedure is applicable to emergency situations involving Unit One and/or Unit Two.

3.0 REFERENCES

q 3.1 References Used in Procedure Preparation:

3.1.1 Arkansas Nuclear One Emergency Plan 3.2 References Used in Conjunction with this Procedure:

3.2.1 1903.10, " Emergency Action Level Response" 3.3 Related ANO Procedures:

3.3.1 1903.30, " Plant Evacuation"

(%

( ,)

3.3.2 1903.60, " Emergency Supplies and Equipment" 3.3.3 1904.02, " Magnitude of Release - Unit 1" 3.3.4 1904.03, " Aux. Bldg. Ventilation Exhaust Emergency Radiation Monitor" l 3.3.5 2904.02, " Magnitude of Release - Unit 2" l

l 4.0 DEFINITIONS 4.1 Operational Support Center (OSC) - The ANO Administration Building; the Emergency Radiation Team assembly area should initially be the First Floor Classroom and adjoining office. [Upon team assignments being made, the On-site Radiological Monitoring Section should continue to operate from this location (unless otherwise instructed); the Off-site Radiological Monitoring Section should operate from the Emer-gency Control Center (Technical Analysis Classroom)].

l l

4.2 Emergency Kit - A compilation of supplies and equipment for determination of radiological hazards; these kits are located in the general vicinity of the: (1) Unit 1 Control Room, (2) First Floor Classroom (Admin. Bldg),

(3) Emergency Control Center (1st Floor), and (4) St. Mary's Hospital I (Emergency Room).

l

( \

\  !

x_ '

l l

1 I

l L

PLANT M ANUAL SECTION: PROCEDUR EMORK PLAN TITLE: NO:

EMERGENCY DUTIES OF THE EMERGENCY PLAN RADIATION TEAM 1903.43 PAGE 2 of 8 O)

\._

ARKANSAS NUCLEAR ONE . aeviSiON CHANGE 3 DaTe 7/8/81 DATE 5.0 RESPONSIBILITIES 5.1 The Emergency Radiation Team Leader is responsible for coordinating the efforts to determine radiological hazards and for responding to Emergency Action Levels as described in this procedure.

5.2 The Emergency Radiation Alternate Team Leaders are responsible for assisting in coordinating the efforts to determine radiological hazards.

If the designated Team Leader is not available, then an Alternate Team Leader should assume the responsibilities of the Team Leader.

5.3 The Emergency Radiation Team is responsible for the following areas, as indicated:

5.3.1 The Onsite Radiological Monitoring Section is responsible for:

A. Determining onsite radiological hazards, conducting radiological surveys, monitoring and sampling.

B. Performing, in conjunction with the Emergency Medical Team, onsite rescue operations.

7-s C. Making initial and subsequent re-entries into

( ) plant areas that present a radiological hazard, as required.

5.3.2 The Offsite Radiological Monitoring Section is responsible for:

A. Determining off-site radiological hazards.

B. Conducting required off-site surveys, monitoring, and sampling.

6.0 NOTIFICATIONS 6.1 During routine work hours, the Emergency Radiation Team personnel on-site should be contacted by the most expedient means available.

6.2 After routine work hours, the Emergency Radiation Team personnel may be contacted as follows:

6.2.1 Refer to the roster / call list contained in Attachment 5 -

1903.10, " Emergency Action Level Response" as necessary.

6.2.2 Contact a Team Leader / Alternate Team Leader.

/~';

(v  !

. PLANT M ANUAL SECTION: PROCEDUREMORK PLAN TITLE: N O-EMERGENCY DUTIES OF THE EMERGENCY PLAN RADIATION TEAM 1903.43 PAGE 3 of a m ARKANSAS NUCLEAR ONE aevisioN CHANGE 3 o*1a 7/8/ai

{s , DATE m-6.2.3 Provide the individual contacted with appropriate information and request them to ensure that contact is attempted with the remaining team personnel, as needed.

6.3 The following information should be provided to the notified Radiation Team personnel as indicated:

6.3.1 If team personnel are to respond to an Emergency Action Level that may or may not involve a radiological emergency, they should be provided the following information, as known:

A. Affected unit.

B. EAL declared.

C. Immediate response required.

D. Other information, as the situation dictates.

7.0 RADIOLOGICAL RESPONSE INSTRUCTIONS 7.1 If an immediate response is required, the Emergency Radiation Team should take the following actions:

p

(~) 7.1.1 Notified team personnel should report to their designated initial assembly area in the Operational Support Center.

7.1.2 The team leader shall assign personnel to the following sections (including designation of section leaders, as ne eded) to perform the indicated actions:

A. Onsite Radiological Monitoring Section (performs initial su rveys , sampling, and posting of applicabic onsite areas and accompanies other emergency response teams during initial entry and subsequent re-entries, as required).

B. Offsite Radiological Monitoring Section (performs initial surveys, sampling, and posting of applicable offsite areas, assists in collection of appropriate environmental samples and assists, as directed, the Arkansas Department of Health Radiological Response Team).

NOTE: Emergency hand-held radios may be obtained from the Main Guard Station upon request.

7.1.3 Each section should then report to their designated assembly area (as indicated in Section 4.0) to make ready the appropriate emergency kit equipment, as necessary.

,y

( )

v l

PLANT M ANUAL SECTiON: PROCEDURE / WORK PLAN TITLE: NO:

EMERGENCY DUTIES OF THE EMERGENCY PLAN RADIATION TEAM 1903.43 PAGE 4 of 8 (7

\_,/

ARKANSAb NUCLEAR ONE aevisiON CHANGE 3 oaTE 7/8/8i DATE 7.1.4 If not previously done, the team leader should contact the appropriate person in the current chain of command, per Attachment 1, to determine the current radiological re-sponse needs.

7.1.5 The Emergency Radiation Team should respond, as directed, to radiological incidents in accordance with the following emer-gency procedures, as appropriate:

NOTE: Activation of the Emergency Plan does not supercede the use of routine Health Physics procedures unless it is specifically stated so. Therefore, the guidance contained in the 1600/2600 series Technical Analysis Procedures should be followed.

A. 1903.30, " Plant Evacuation" B. 1903.33, "Re-entry Guidelines" C. 1903.76, " Arkansas Department of Health" D. 1904.02 (2904.02), " Magnitude of Release - Unit 1(2)"

(G'-~'; 7.1.6 The team leader should provide a periodic update of the team's status to the appropriate individual, per Attachment 1.

7.1.7 After the initial team response, the Emergency Radiation Team should report as directed by the appropriate individual, per Attachment 1.

8.0 EMERGENCY ACTION LEVEL (EAL) RESPONSE GUIDELINES 8.1 Unusual Event No action is required by the Emergency Radiation Team unless the Unusual Event is declared as a result of a radiological incident. In that case, refer to Section 7.0.

8.2 Alert If the emergency does not involve a radiological incident, the Emergency Radiation Team personnel shall be placed on " standby status" as long as the Alert EAL is in effect.

8.2.1 Notifications should be made in accordance with Section 6.0 of this procedure.

8.2.2 When onsite, the team leader should report to the Duty

(

1,_)S Emergency Coordinator to obtain further instructions, as necessary.

l

PLANT MANUAt SECTION: PROCEDUREAVORK PLAN TITLE: NO:

EMERGENCY DUTIES OF THE EMERGENCY PLAN RADIATION TEAM 1903.43 PAGE 5 of 8 ARKANSAS NUCLEAR ONE invisioN CHANGE a Da1E 7/8/81 DATE i

s j 8.3 Site Emergency / General Emergency NOTE: The transition from an Alert to a Site / General Emergency activates the long-term Emergency Response Organization. Upon arrival on-site and an appropriate turnover from the Duty Emergency Coordinator, the following individuals will coordinate the actions of the in-dicated sections of the Emergency Radiation Team:

A. Onsite Monitoring & HP Supervisor (Onsite Radiological Monitor-ing Section)

B. Offsite Monitoring Supervisor (Offsite Radiological Monitoring Section) 8.3.1 Notifications should be made in accordance with Sectio 6.0 of this procedure.

8.3.2 If the emergency situation does not involve a radiological incident, the notified Emergency Radiation Team personnel shall report to their designated assembly area , provide team accountability results to the Technical Support Center, and await further instructions.

9.0 ATTACHMENTS AND FORMS

(}

LJ 9.1 Attachment 1 - EAL Organizational Structure 9.2 Attachment 2 - Checklist (Team Leader) t

{

l t

S

. , . _ _ _ , . . . . , _. m .

, . - .. ._ m. _

.wm; .

1 I

  • 1

)

PLANT M ANU AL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

EMERGENCY DUTIES OF THE EMERGENCY ptAN RADIATION TEAM 1903.43 PAGE 6 of 8 C')

\s ,- ARKANSAS NUCLEAR ONE aevisioN CHANGE 3 o*TE DATE 7/8/81 ATTACHMENT 1 EAL ORGANIZATIONAL STRUCTURE A. Initial Response Organization (Unusual Event, Alert EAL's, unless otherwise indicated).

l DEC l t

I i

Shift Emer.

Supervisor Radiation Team Leader Operations Staff I I Onsite Offsite Rad. Monit. Rad. Monit.

Sect. Sect.

O V

B. Emergency Response Organization (Site / General Emergency EAL's, unless other-wise indicated).

Incident

Response

Director I

I I Recovery Technical Manager Support l Manager HP & Chem. I Supt Dose Assess.

l Supv.

Onsite Monit. }

& HP Supv Offsite Monit.

l Supv.

Onsite Rad l Monit Sect Offsite Rad Monit Sect

/3 I /

v 1

. . PLANT M ANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

EMERGENCY DUTIES OF THE EMERGENCY PLAN RADIATION TEAM 1903.43 PAGE 7 01 8

/~N

. ARKANSAS NUCLEAR ONE atvisiON CHANGE 3 DATE 7/8/81 DATE

._]

ATTACHMENT 2 Page 1 of 2 CHECKLIST (TEAM LEADER)

The following items should be considered by the Emergency Radiation Team Leader, and action should be taken, as necessary:

1.0 Contact should be attempted with team members by the most expedient method available.

1.1 Arrangements should be made to re-initiate attempts to contact personnel that were not able to be contacted initially.

2.0 Personnel should be assigned to the Onsite and Offsite Radiological Monitoring Sections (This includes appointment of section leaders, as necessary).

3.0 Determine immediate response needs.

3.1 Offsite sampling points.

3.2 Onsite surveys, sample required.

3.3 Initial re-entries by other recrgency teams (Obtain approval from the

[,_) Duty Emergency Coordinator /hece,ery Manager).

V 3.4 Equipment from routine stock that must be retrieved for use.

4.0 Monitor radiation levels, etc., in the activated Emergency Response Centers 4.1 Control Room 4.2 TSC/OSC 4.3 ECC 5.0 Establish contamination control points / measures for the appropriate response l centers.

l l 5.1 Control Room 5.2 TSC/OSC 5.3 ECC 6.0 Issue emergency dosimetry / respiratory equipment, as necessary.

l

["%

v l

l

NO:

PLANT M ANUAL SECTiON: PROCEDUREAVORK PLAN TITLE:

EMERGENCY DUTIES OF THE EMERGENCY RADIATION TEAM 1903.43 PLAN PAGE 8 ot 8 aEvision 3 o*TE 7/8/81 O'

\~s ARKANSAS NUCLEAR ONE CHANGE DATE ATTACHMENT 2 Page 2 of 2 7.0 Be prepared to take the following actionc, as necessary:

7.1 Personnel / vehicle monitoring / decontamination at the Emergency Control Center (or as the situation dictates, including relocation of portal monitors, etc., as necessary).

7.2 Relocate the TLD reader to the Emergency Control Center (or as the situation dictates).

7.3 Relocate the SCBA air compressor to the Emergency Control Center (or as the situation dictates).

7.4 Determine additional equipment needs and make appropriate recommendations to management.

7.5 Set up a personnel shift schedule for an extended incident.

8.0 Provide periodic updates to the team personnel and management personnel.

-s ,

m o

f

/M '.

ARKANSAS POWER & LIGHT COMPANY MB Arkansas Nuclear One t

3

) EMERGENCY PLAN FORM 1000.06A DUTIES OF TIIE DIERGENCY RECOVERY TEMI 4.: 1903.44 REV. 1 b 8 0!1tf0ijGlj C 3pi # /c f

[w4 PAGE RECORD OF CHANGES AND REVISIONS REVISION CHANGE PAGE REVISION CHANGE PAGE REVISION CHANGE 1 1 2 1 3 1 O

t 0 .

....-.<..., g

PLANT M ANU AL SECTION: PROCEDUREAVORX PLAN TITLE: NO:

DUTIES OF TIIE EMERGENCY PLAN EMERGENCY RECOVERY TEAM 1901.44 s

PAGE 1 of 3 (j ARKANSAS NUCLEAR ONE aevisioH i care 7/27/8i CHANGE DATE 1.0 PURPOSE The purpose of this procedure is to provide guidance on the responsi-bilities and duties of the Emergency Recovery Team for emergency situa-tions.

2.0 SCOPE This precedure is applicable to emergency situations involving Unit One and/or Unit Two.

3.0 REFERENCES

3.1 References used in Procedure Preparation:

3.1.1 Arkansas Nuclear One Emergency Plan 3.2 References to be used in Conjunction with this Procedure:

3.2.1 1903.33, "Re-Entry Guidelines" 3.3 Related ANO Procedures:

(,

/~')N 3.3.1 1903.02, " Assignment of Plant Emergency Team Members" 3.3.2 1903.42, " Duties of the Emergency Medical Team" 4.0 DEFINITIONS 4.1 Operational Support Center (OSC) - the AN0 Administration Building; the Emergency Recovery Team should initially assemble in the 1st Floor Classroom unless otherwise directed.

5.0 RESPONSIBILITIES 5.1 The Emergency Recovery Team is responsibic for performing re-entry l

operations into evacuated areas involving the following situations:

l 5.1.1 To ascertain that personnel who were in the affected area have been evacuated and, if necessary, search for unaccounted personnel.

5.1.2 To rescue any injured or trapped personnel from the affected area.

V l

l

PLANT M ANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

DUTIES OF TIIE EMERCENCY pI.AN E:fERGENCY RECOVERY TEAM 1903.44 PAGE 2 of 3 O

O ARKANSAS NUCLEAR ONE aevision i DatE 7/27/ai CHANGE DATE '

5.1.3 To perform operations which may decrease the effect of the emergency or hazardous condition.

5.1.4 To determine the nature and extent of the emergency and/or radiological conditions.

5.2 The Emergency Recovery Team Leader is responsible for coordinating the emergency actions of the Emergency Recovery Team.

6.0 PRECAUTIONS 6.1 Procedure 1903.33, "Re-entry Guidelines" shall be followed in regard to the measures to be taken to minimize exposure to re-entry personnel.

6.2 The Emergency Recovery Team must perform their duties in the safest ar.d most ef ficient manner possible while making every ef fort to mini-mize re-entry personnel exposure.

7.0 NOTIFICATIONS 7.1 The Emergency Recovery Team if formed, as required, for the existing emergency condition under the dircction of the Duty Emergency Coor-r~y dinator/ Recovery Manager.

'~'

7.2 The team leader and team members shall be selected from personnel who have experience in health physics, first aid, operations or maintenance.

7.3 Personnel selected for the team should be notified by the most expedient method available of the location to which they shall report (this loca-tion should be the 1st Floor Classroom unless otherwise directed).

8.0 EMERGENCY RECOVERY TEAM INSTRUCTIONS 8.1 Immediate Actions 8.1.1 The Emergency Recovery Team Leader shall function under the direction of the Duty Emergency Coordinator / Recovery Manager.

A. Re-entry operations shall take place only on the authority of the Duty Emergency Coordinator / Recovery Manager.

B. The Emergency Recovery Team shall be briefed regarding the following subjects:

1. Duties and actions to perform.

(; 2. Expected dose rates and stay times.

Li

PLANT MANUAL SE CTION: PROCEDURElWORX PLAN TITLE; N O-DUTIES OF THE EFERGENCY PIAN EMERGENCY RECOVERY TEAM 1901.44 PAGE 3 of 3 ARKANSAS NUCLEAR ONE aevision CHANGE i DaTE 7/27fai DATE

( 3. Other information as applicable.

C. The Emergency Recovery Team shall be accompanied by a member of the Emer;;ency Radiation Team during initial entry and subsequent re-entries into plant areas until radiation areas have been marked.

D. If the situation required re-entry for the purpose of search and rescue, personnel from the Emergency Medical Team and Emergency Radiation Team shall be assigned to the Emergency Recovery Team.

8.1.2 The guidelines contained in 1903.33, "Re-entry Guidelines" shall be followed during re-entry operations.

8.2 Follow-Up Actions 8.2.1 The Emergency Recovery Team shall report and function as directed by the Duty Emergency Coordinator / Recovery Manager.

9.0 ATTACILMENTS ANI) FORMS None O

v 1

l l

l l

l l

l l

r~'s

_ -. . . . - -. . . - . _ - . - . . ~ .. -

7 ARKANSAS POWER & LIGHT COMPANY B

w Arkansas Nuclear One s DIERCENCY PLA'i FORM 1000 06A

..' D1ERGENCY RESPONSE ORGANIZATION 5 1903.50 REV. 3 4 U e RNs.

. .) RECORD OF CHANGES AND REVISIONS PAGE REVISION CHANGE PAGE REVISION CHANGE PAGE REVISION CHANGE 1 3 19 3 2 3 20 3 3 3 21 3 4 3 5 3 6 3 7 3 8 3 9 3 10 3 11 3 12 3 13 3 ,

14 3 15 3 16 3 '

17 3 18 3 APPROVED BY: i APPROVAL DATE tT90 ?mht -h! av.onu~ ?frw &, //b- 7 3/.6(

PLANT M ANU AL SECTION: PROCEDUR UWOR K PLAN TITLE: NO:

, EMERGENCY PLAN EMERGENCY RESPONSE ORGANIZATION 1903.50 y

PAGE 1 of 21 o ARKANSAS NUCLEAR ONE aevision 3 DATE 7/28/ai

() CHANGE DATE 1.0 PURPOSE The purpose of this procedure is to describe the division of responsibilities of the AP&L Emergency Response Organization (ERO). Portions of this augmented Emergency Response Organization may be activated for Unusual Events and Alerts.

The entire organization would be activated for Site and General Emergencies.

2.0 SCOPE This procedure is applicable to emergency situations involving Unit One and/or Unit Two.

3.0 REFERENCES

3.1 References Used in Procedure Preparation:

3.1.1 Arkansas Nuclear One Emergency Plan.

3.2 References Used in Conjunction with this Procedure:

None 3.3 Related ANO Procedures:

3.3.1 Procedure 1903.51, " Turnover of Responsibility to the

('~)' Emergency Response Organization".

\s 4.0 DEFINITIONS 4.1 Emergency Response Organization (ERO) - The AP&L emergency response organization, composed of plant and General Office personnel, which is activated to augment the resources of the Initial Response Organiz-ation for more serious events. A diagram of this organization is shown in Attachment 1.

4.2 Initial Response Organization (IRO) - The emergency response organization, primarily composed of plant personnel, which must be able to report to

' the plant within 60 minutes of being notified. A diagram of this organi-zation is shown in Attachment 2. This organization is composed of the Operations Staff on duty, the Duty Emergency Coordinator, the Shif t Technical Advisor and the Plant Emergency Response Teams.

4.3 Onsite Technical Support Center - The location within the ANO Admini-stration Building equipped with instrumentation and communication systems and facilities useful in monitoring the course of an accident; this center is located in the 4th floor Planning & Scheduling area.

4.4 Onsite Operational Support Center - The ANO Administration Building; the normal work location for an individual is used as the reporting area in this center with the following exceptions:

g i i Q)

{

PLANT M ANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

EMERGENCY PLAN EMERGENCY RESPONSE ORGANIZATION 1903.50 PAGE 2 of 21 O

k,,) ARKANSAS NUCLEAR ONE . atvisioN 3 oATE 7/28/81 CHANGE DATE 4.4.1 Planning & Scheduling Supervisor - 4th floor conference room.

4.4.2 Radwaste Coordinator - individual's supervisor's office in the Administration Building.

4.4.3 Emergency Team Personnel.

A. Evacuation - (Material Management Personnel) Main Guard Station; (Training Personnel) Emergency Control Center B. Fire - 2nd floor conference room.

C. Medical - First Aid Room /2nd Floor Break Room.

D. Radiation - (Onsite Team) 1st floor classroom (and adjacent offices).

E. Recovery - same as 4.4.3.D.

4.5 Emergency Control Center (ECC) - a near-site facility located ap-proximately 0.65 miles northeast of the reactor buildings (the ANO

,_s Training Facility).

l' )

5.0 RESPONSIBILITIES NOTE: Unless otherwise indicated, a position should be filled by ANO personnel bearing the same title.

5.1 The Emergency Response Organization is dividied into four areas of responsibility: recovery, technical support; communications, and (non-technical) support. Recovery is directed by the Recovery Manager with advice and support from the Incident Response Director. Support of the Recovery Manager may be provided both onsite and offsite and is the responsibility of the Incident Response Director.

5.2 The Incident Response Director (IRD) is the individual responsible to Arkansas Power & Light corporate management for overall direction of the response to ar. incident. As such, he is responsible for assuring the continuity of resources (technical, administrative and material) required for continuous operations of the Emergency Response Organiza-tion for a protracted period. The Incident Response Director is the primary authority for the Company and must approve public information releases prepared by AP&L. In the absence of the Incident Response Director, the Technical Support Manager shall assume his duties.

This position should be filled by the Senior Vice President of Energy Supply.

O

!v!

PLANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO-EMERGENCY PLAN EMERGENCY RESPONSE ORGANIZATION 1903.50 PAGE 3 of 2i fy ARKANSAS NUCLEAR ONE aEvision CHANGE 3 oaTE 7/28/81 DATE 5.3 Two assistants are assigned to the Incident Response Director. The Assistants to the Incident Response Director will perform duties assigned by the Incident Response Director and will be available to respond to questions from and provide advice to menibers of the Emer-gency Response Organization. In addition, they are responsible for preparing and distributing periodic progress reports to the entire Emergency Response Organization in order to assure that each portion of the organization is working with current and consistent information.

The Assistants to the Incident Response Director also coordinate re-sponses to requests for information by non-AP&L groups (local, state, federal, other Utilities, etc.). In the absence of the Incident Re-sponse Director and the Technical Support Manager, an Assistant to the Incident Response Director assumes the duties of the Incident Re-sponse Director.

These positions should be filled by the Director of Technical _ad Environmental Services and the Director of Fossil Operations.

5.4 The Recovery Manager assumes the duties of the Duty Emergency Coordi-nator and has authority to take any action he deems necessary to place the plant in a safe configuration. The Recovery Manager has the re-sponsibility for decisions regarding emergency operations at the plant.

In the absence of the IRD, the Technical Support Manager and the Assistants to the IRD, the Recovery Manager assumes the duties of

(-] the Incident Response Director.

LJ The Operations Manager, the Maintenance Manager, the Maintenance Super-intendents, and their staffs report to the Recovery Manager to assist him in planning and directing corrective and recovery actions. The Emergency Recovery Team is assembled by the Recovery Manager and functions under his direction. In the absence of the Recovery Manager, the Operations Manager, the Maintenance Manager or the Operations Superintendent of the unaffected unit (in that order) assumes the duties of the Recovery Manager.

This position should be filled by the ANO General Manager.

5.5 The Operations Manager is responsible for assisting the Recovery Manager in planning and directing corrective or recovery actions.

In the absence of the Recovery Manager, the Operations Manager assumes the duties of the Recovery Manager.

5.6 The Maintenance Manager is responsible for assisting the Recovery Manager in planning and directing corrective or recovery actions.

In the absence of the Recovery Manager and tne Operations Manager, the Maintenance Manager assumes the duties of the Recovery Manager.

a

PLANT M ANUAL SECTION: PROCEDUREA40RX PLAN TITLE: NO:

EMERGENCY PLAN EMERGENCY RESPONSE ORGANIZATION 1903.50

-s PAGE 4 of 21 Ii

\I ARKANSAS NUCLEAR ONE aEvisioN 3 DarE 7/28/81 CHANGE DATE 5.7 The Maintenance Superintendents are responsible for necessary repairs and installation of plant equipment modifications and assistance in directing the Emergency Recovery Team.

5.8 The Planning and Scheduling Supervisor is responsible for coordinating the activities of plant personnel not assigned to specific teams.

5.9 The Operations Superintendent is the primary authority in the Control Room of his designated unit. He shall determine plant conditions, make recommendations and provide updates to the Recovery Manager.

In the absence of the Recovery Manager, Operations Manager, and the Maintenance Manager, the Operations Superintendent of the unaf fected unit shall assume the duties of the Recovery Manager.

5.10 The Shift Technical Advisor shall assist the Shift Operations Super-visor in the Control Room of the affected Unit to follos the course of the emergency and mitigate its consequences.

5.11 The Technical Support Manager is responsible for technical support activities. He is also responsible for coordinating AP&L off site radiological monitoring efforts with the Arkansas Department of Health and Nuclear Regulatory Commission. In the absence of the

("N Incident Response Director, the Technical Support Manager assumes

( ,) his duties.

This position should be filled by the Assistant Vice President of Nuclear Operations.

5.12 The Nuclear and Engineering Support Superintendent is responsible for providing advice on plant design and coordinating engineering ac-tivities in the areas of analysis, design modifications and system response.

This position should be filled by the ANO Engineering and Technical Support Manager.

5.13 The Health Physics and Chemistry Superintendent is responsible for supervising onsite health physics and chemistry activities. These activities include onsite radiological monitoring, decontamination, initial dose assessment calculations, initial magnitude of radio-logical release calculations, primary side chemistry control and sampling, and secondary side chemistry control and sampling.

This position should be filled by the AN0 Technical Analysis Super-intendent.

r~N

~._/

I

PLANT M ANUAL SECTION: PROCEDURENVORX PLAN TITLE: NO:

EMERGENCY PLAN EMERGENCY RESPONSE ORGANIZATION 1903.50 PAGE 5 o f 21 (s)

  • ~/ ARKANSAS NUCLEAR ONE rowsi= 3 DATE 7/2af8i CHANGE DATE 5.14 The Engineering Resources Coordinat_or is responsible for coordinating the engineering support of the Nuclear Steam Supply System vendors, Architect / Engineer, Middle South Services, other utilities, and con-sultants.

This position should be filled by the Director of Generation Engineer-ing.

5.15 The Licensing Coordinator is responsible for coordinating activities to respond to Nuclear Regulatory Commission requests.

This position should be filled by the Manager of Licensing.

5.16 The Nuclear Support Supervisor is responsible for coordinating activi-ties related to nuclear engineering and reactor physics.

This position should be filled by the ANO Plant Analysis Superintendent.

5.17 The Site Engineering Supervisor is responsible for coordinating engi-neering activities at the site.

This position should be filled by the Plant Engineering Superintendent, fw l ) 5.18 The Dose Assessment Supervisor is responsible for calculating magnitude

\~ / of radiological releases and doses to individuals offsite.

This position should be filled by the Manager of Technical Aualysis.

5.19 The Onsite Monitoring and Health Physics Supervisor is responsible for monitoring onsite radioactivity levels, monitoring personnel exposures and directing Health Physics activities onsite. The Onsite Radiological Section of the Emergency Radiation Team reports to him following activation of the Emergency Response Organization.

This position should be filled by the ANO Health Physics Superintendent.

5.20 The Radiochemistry Supervisor is responsible for sampl:ng and analysis of primary plant coolant and liquid and gaseous radior.ctive wastes.

5.21 The Chemistry Supervisor is responsible for sampling and analysis of secondary plant fluid systems.

5.22 The Offsite Monitoring Supervisor is responsible for directing AP&L offsite radiological monitoring activities. This effort shall be supplemented by AP&L laboratory personnel from the Technical Analysis Section of the Technical and Environmental Services Department, located in Little Rock. The Offsite Radiological Monitoring Section of the Emergency Radiation Team reports to him following activation of the r~T Emergency Response Organization.

t }

v This position should be assigned by the Dose Assessment Supervisor from personnel in the Technical Analysis section of the Technical &

Environmental Services Department.

PLANT M ANUAL SECTION: PROCEDUREN/ORK PLAN TITLE: NO:

EMERGENCY PLAN EMERGENCY RESPONSE ORGANIZATION 1903.50 PAGE 6 of 21 l n

() ARKANSAS NUCLEAR ONE _aevision CHANGE 3 DATE 7/28/81 DATE 5.23 The Radwaste Coordinator is responsible for the packaging, transport-ing, and disposing of radioactive wastes.

5.24 The Support Superintendent is responsible for coordinating non-technical support. He reports directly to the Incident Response Director.

This position should be filled by the Director of Administrative Services and Project Support.

5.25 The Logistics and Procurement Coordinator is responsible for obtaining any additional facilities, equipment, supplies and transportation re-quired to support the Emergency Response Organization.

This position should be filled by the ANO Administrative Manager.

5.26 The Financial Services Coordinator is responsible for maintaining the payroll, and any other required financial assistance.

This position should be filled by the Manager of Financial Services.

5.27 The Office Services Coordinator is responsible for word processing, drafting, maintaining files and documentation in the Little Rock General Office.

(~ )

\_,/ This position should be filled by the Office Services Coordinator.

5.28 The Site Security Coordinator is responsible for controlling access to the plant and to the Emergency Control Center. He is responsible for personnel accountability within the exclusion area and at the Emergency Control Center. He shall also coordinate Arkansas Power &

Light security efforts with local law enforcement authorities. The Emergency Evacuation Team reports to him following activation of the Emergency Response Organization.

5.29 The Facilities Maintenance Coordinator is responsible for repairs and maintenance of the Emergency Control Center and of the equipment and facilities which have been brought in to promote recovery from the incident. He should work closely with the Logistics and Procurement Coordinator to obtain any materials or additional facilities requested of him.

This position should be filled by the ANO Plant Services Supervisor.

-~

V

PLANT MANUAL SECTION: PROCEDUREN/ORK PLAN TITLE: NO:

EMERGENCY PLAN EMERGENCY RESPONSE ORGANIZATION 1903.50 PAGE 7 of 21 (7

\s_/

ARKANSAS NUCLEAR ONE ^aevision CHANGE 3 o^1s 7/2s/81 DATE 5.30 The Emergency Services Coordinator is responsible for problems which are not immediately related to plant operations, such as a fire or medical emergency. The plant Emergency Fire and Emergency Medical Teams report to him following activation of the Emergency Response Organization. The Emergency Services Coordinator should work closely with the Recovery Manager.

'Lis position should be filled by the ANO Safety and Fire Prevention Coordinator.

5.31 The Site Office Services Coordinator is responsible for documentation of decisions and events, as well as word processing, drafting, main-taining files, etc., onsite.

This position should be filled by the ANO Office Services Supervisor.

5.32 The Corporate Security Coordinator is responsible for security of the Arkansas Power & Light General Office and executives. He may also be required to implement security for AP&L community offices and for other plant sites.

This position shculd be filled by the Manager of Corporate Security.

(\ ') 5.33 The Communications Superintendent is responsible for releases of in-formation by Arkansas Power & Light. He should provide for recording discussions between the Incident Response Director and the Recovery Manager, the Nuclear Regulatory Commission, the Technical Support Manager, and the Support Superintendent. He shall then prepare in-formation from these discussions for release and obtain approval for release of any information from the Incident Response Directer.

The Communications Superintendent, as the media spokesman for Arkansas Power & Light shall then deliver this information to the Governmental Advisory Coordinator and Utility Advisory Supervisor, and then to the TV, radio, and press at interviews or conferences as scheduled by the Media Relations Coordinator. In the absence of the Communications Superintendent, the Media Relations Coordinator assumes his duties.

This position should be filled by the Vice President of Corporate Communications.

5.34 The Media Relations Coordinator is responsible for coordinating media requests for information or interviews, and for scheduling interviews, press conferences , etc. , for the Communications Super-intendent.

This position should be filled by the Assistant Manager of Communi-

/' 'X cations.

N~s l

l l

l l

L

PLANT MANUAL SECTION. PROCEDUREN/ORK PLAN TITLE: NO:

EMERGENCY PLAN EMERGENCY RESPONSE ORGANIZATION 1903.50 PAGE 8 of 21 n)

(s, ARKANSAS NUCLEAR ONE aevisioN CHANGE 3 DarE DATE 7/28/ai 5.35 The Utility Advisory Supervisor is responsible for releasing informa-tion to Arkansas Power & Light employees, other utilities, and utility information service organizations such as Atomic Industrial Forum, Electric Power Research Institute, Edison Electric Institute, and the Institute of Nuclear Power Operations.

This position should be filled by the designated Communications Editor.

5.36 The Governmental Advisory Coordinator is responsible for providing information to elected state and federal officials on a regular basis.

This position should be filled by the Director of State Governmental Affairs.

5.37 The Local Advisory Supervisor is responsible for assisting the Covern-mental Advisory Coordinator by informing the elected officials of the communities and counties in the area of the plant. He is also responsible for ensuring that a representative of the Arkansas Power

& Light organization is available to each principal offsite govern-mental emergency operations center (e.g. County Emergency Operations Center) to provide assistance to the governmental groups.

I ) This position should be filled by the Russellville District Manager.

L/'

5.38 The Decision Secretary assists the Emergency Response Organi-zation in decision-making by summarizing alternatives and their consequences.

This position should be filled by the Director of Generation Technology.

5.39 The Planning and Scheduling Coordinator is responsible for pre-paring schedules to coordinate and track the progress of Emergency i

Response Organization activities in response to an incident.

This position should be assigned by the Support Superintendent.

5.40 The TOCC Liasion is responsible for providing assistance to the Technical Operations Control Center staff, as necessary.

l This position should be filled by the Manager of Quality Control.

i 1

l l (~'s l \s_/

1 l

PLANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

EMERGENCY PLAN EMERGENCY RESPONSE ORGANIZATION 1903.50 PAGE 9 of 21 (N-3 ARKANSAS NUCLEAR ONE aavision CHANGE 3 DATE 7/28/81 DATE

6.0 DESCRIPTION

6.1 Changes to the division of responsibilities of the Emergency Response Organization as described in Section 5.0 may be made as necessary at the time of an incident with the approval of the Incident Response Directer.

6.2 The locations from which the members of the Emergency Response Organi-zation are intended to normally function following an incident are identified in Attachment 3. The suggested communications flow plan is provided as Attachment 4.

6.3 A matrix of responsibilities of the Emergency Response Organization versus position is provided in Attachment 5.

7.0 ATTACIDIENTS AND FORMS 7.1 Attachment 1 - Emergency Response Organization 7.2 Attachment 2 - Initial Response Organization 7.3 Attachment 3 - Primary Locations of Emergency Response Organization Members (e%) w

\

7.4 Attachment 4 - Communications Flow Plan 7.5 Attachment 5 - Responsibilities Matrix for the Emergency Response Organization.

i l

)

l

A

.. i

\ '. a )

f f f I

(

  • y a

. l' ~,

F i .6l- y(,,

3 #

.h kl b -

AP&L i

CORPORATE

._ MAN A..G.E._ MENT.

M O

W, DECISION INCIDt3T~ ASSISTANTS TO THE y z l RESPONSE

}

SECRETARJ DIRECTOR INCIDENT RESPONSE DIRECTOR

.- J

,d

/M {Z p l se T '%x r T U ENING &

S CllE D . St TV .

~

55ER ~

MANAGER

~T UIINif Sl:PPORT SUPPORT SUPT.

R $Z ftANAGER O W F x

OV *t2 $

_l_._.__ _ I _._ _ I ._ . I _ . . _ . _ _

4 h h OPERAI!ONS MAINT. ._HP & CilEM. NUCLEAR & ENGR. _ . _ COMMUNICATIONS l ._ PLANNING & M -

MA.N AG.E.. R ._MA. N A G_ _E R _ SUPT. _ SUPPORT Sl'PT. _St P T.

l -

SCHELULING $ ..

g OiERATIONS O 2

1. & C. NUCLEAR 'I1EDIA ' LOW STICS 5~ FACILITIES *4 St PT.

~

StPT.

~'-

SUPPORT FELATI NS PROCUREMENT --

MAINTENANCI T SUPV. COORD  :

.-.CO_OR D . COORD. b SHIFT ELECT. ONSITE SIIE UTILilY llNANCIAL EMERGENCY U Ol t RATIONS MAINT. MONITOR & ENGINEERING ADVISORY SERVICES SERVICES r b O C

SUPV.

I SUPT. HP St:PV. St'PV. SUPV. COGRD. COURD. N $

M

~

MECH. RADCHEM. ENGINEERING GOVT. Ott!CE T TE OFFICE h $O 3PERATORS -

MAINT. SUPV. RESOURCES ADVISORY SERVICES SERVICES SUPT. COORD. COORD.

". A COURD. COORD. x T j O m Slfit T ADMINISTRATIVE CIIEMISTRY St TV .

L!:ENSING COORD.

!.OCA L ADVISORY plTE l SECURITY COkPORA1E SECURITY 7 $s O

Z

.__A.S. _S I_ST AN.T..

SUPV. ICOORD. -COORD. M $ Nm

_ _._ l . . _ I __ -.__.! o

. . _ _blII E T DOSE PERSONNEL SITE TECitNICAI EMERGENCY Q m N %

ASSESSMEMT ACCOUNTAHILITY ACCESS CONTPOL CENTEk > < O P ADVIFOR S U P'. SUPV. SUPV. ACCESS SUPV. Z O N m o m

z N RADWASTE OFFSITE d

~

COORDINATOR MONITORING o o S-_U_P E R V I SOR W Z i

o O O

  • w w N m m p

~

'i -

7

% O w

3 ,

o 3., ', u o CC o

..s

, . ,a>

] N W M. r e t ' .I ,  ; cc .

al.

,  ?

., - g

.. . , ,R .

i o

>G .

(r. . .! ; f, '

  • E ) * **

f . .

\'

, } J.{t; ',. *

}.

i PLANT M ANUAL SECTiON: PROCEDURElWORK PLAN TITLE: NO:

EMERGENCY PLAN EMERGENCY RESPONSE ORGANIZATION 1903.50 e

PAGE 11 of 21 Og ARKANSAS NUCLEAR ONE aevisiON 3 o*TE 7/28/81 CHANGE DATE ATTACll'IENT 2 Initial Response Organization Duty Emergency l Coordinator i

l l

Shift Shift Emergency Technical Operations Response Advisor Supervisor Team O Leaders Shift Operations Emergency Administrative SLaff Response Assistant Team

Members I

i 1


Interface as appropriate

( 3 l ]

PLANT M ANUAL SECTION: PROCEDUREAVORK PLAN TITLE: NO:

EMERGENCY PI AN EMERGENCY RESPONSE ORGANIZATION 1903.50

,- s PAGE 12 of 21 (di

\ ARKANSAS NUCLEAR ONE aevision CHANGE 3 DarE 7/28/81 DATE ATTACll'IENT 3 Page 1 of 7 Primary Locations of Members of the Emergency Response Organization NOTE: In the event the Onsite Technical Support Center or the Onsite Operations Support Center must be evacuated, personnel in these centers will be relocated to the Emergency Control Center.

5 5 $ d 5 5 e$ a$ $ t x e e 80 nd 30 $ SW

$~ $" W$ H $ $ $ i~

$D $D E$ Ew$ $$ d$ $$d POSITION TITLE O$ 0$ $5 j $$5 EO N$ 0E$

Ops. Superintendent X X Shift ops. Supervisor X X r~ 'si f

Shift Technical Advisor

  • X -

'd Shift Administrative Assistant X X Operations Personnel X X Recovery Manager X Maintenance Manager X Operations Manager X l Tech. Support Manager X 1

HP & Chekistry Superintendent X Nuclear & Engr. Support Superintendent X l

Dose Assessment Supervisor X Maintenance Superintendents X Nuclear Support Supervisor X Site Engineering Supervisor X Onsite Monitoring & HP Supervisor X Radchem. Supervisor X Chemistry Supervisor X Radwaste Coordinator X n Emergency Services Coordinator X

( )

\_/ Site Security Coordinator X Site Office Services Coordinator X

  • The Shift Technical Advisor functions in the Control Room of the affected Unit.

l

PLANT M ANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

EMERGENCY PLAN EMERGENCY RESPONSE ORGANIZATION 1903.50 PAGE 13 of 21 (gq ARKANSAS NUCLEAR ONE aevision CHANGE 3 DATs 7/2s/81 DATE ATTACHMENT 3 Page 2 of 7 l

n' x -x x w r r N $N N d o o =z x2 z 4 x o o uw ww w w w x

a x

a gu s

gu gv s za o

a gg zw o- om we wx wo < >wo lh H iz hH z- mm mm mz a

ez x

amm az oz z= zo no sw orm FOSITION TITLE ua va oe aw wa <a vwo l

Recovery Team X Evacuation Team X Fire Team ,

X Medical Team X f

'~0nsite Radiological Monitoring X Section of the Radiation Team Incident Response Director (IRD)  ! X Asst. to the Incident Response X Director Decision Secretary X Support Superintendent X Communications Superintendent X Media Relations Coordinator X Governmental Advisory Coordinator X Local Advisory Coordinator X X Offsite Monitoring Section of the Radiation Team X Engineering Resources Coordinator X Licensing Coordinator X Logistics & Procurement Coordinator X Corporate Security Coordinator X Financial Services Coordinator X Office Services Coordinator X Facilities Maintenance Coordinator X p).,

'v Utility Advisory Supervisor X

PLANT M ANUAL SECTION: PROCEDURE! WORK PLAN TITLE: N O-EMERGENCY PLAN EMERGENCY RESPONSE ORGANIZATION 1903.50

(~ '

PAGE 14 of 21 ARKANSAS NUCLEAR ONE a Evisio n CHANGE 3 o*TE 7/28/81 DATE ATTACHMENT 3 Page 3 of 7 f

S.*A R Y' , .Q rop =

' ' . g . ,m m

- *-<4a

o. e ~

f.

r

% ! 2 i :"

or

" ~: J

,2 ~ ~ ~ - -

$hb i.

=

  • { .'y.

3 '

t

-sY [ ' -M ,

_, _'*'7*-'? .

  • s E  !?: 7 i.-.

4 a

zi*

-a-

=

  • m e' ,;; v ~-

I 6i

$5

&Y ww-=s-
  • * . y ,

he g.

  • 5 .'A .

m' ' .-

. . . ~

R .-

b. -. $.. # #, *[ i* '

c:

t M

=, .% -

e.

s E' ,,

. 1" E

~~*-**O -ti 1 "

p,p: Mag M ,<.Q,'y -

G.

't j .._.,,.

I 7 Ct I 2" OI 5

.s 13

%* 31 ~

. - tJ.

, -f . .^' * , _

$e a

  • ph" g

.ed W- g g

. / .

M",#' 9/- - . . _ . ..

., _ , , Eb- ..- "

k PLANT MANUAL SECTION: PROCEDURE! WORK PLAN TITLE: NO:

~

EMERGENCY PLAN EMERGENCY RESPONSE ORGANIZATION 1903.50

[ ' """

PAGE 15 of 21

).

ARKANSAS NUCLEAR ONE TaEvision CHANGE 3 o^te 7/28/81 DATE i

ATTACifMENT 3 Page 4 of 7 Is

o fi

'+%e ,. -

  • 8 s ,e s,

~ - _ .

!! 'i ',)

  • i

,2: L l.

!?H'.hder '.i j2 'jj !!!!

i e--M__ --6 1 gM ' a

-}-

3 lj , H

[

5-i 3 ,u m  ;-.~~ "

>~ y Q. .

- e k

.a i

l

_ =- e p 7 hz a t l

h- /

3 *U*! --- , ,

g,,s .

.- p h$,

sc W

. . . "y h I

_d: , lii h l 31; 33 r d' i

%s I

' I) hH]I y

w'- , .r -e-.m

}

N N

, , / -

l f-2 h 'G t ja u , h i y s  ; _

' I

~

j  % *

=

)> I ?! i * - ' "-

    • =ce 4 [(, -. e g Ed -

, i:1-- - ,- _-

l

_ y

' .u

<a i . . . . . _

. . ' : i ..< -

)t- .c __f

<~

l w -

k y p <

~ p f" A --n p .

~

f

_ z >l 3 g l' I,' "

f

    • "* a
  • k._ .

, , a, - - .n w.u. n 9

y ll .

I U g ) [

b, } ((

^

w s- ts a 4 i jh i l g- g l

A

.; bl j o. ; I a

  • J 3 ':

I *

m. ~

\ ~

I l 1

f M .,t?. . s

!, t - t _

  1. ew a

,'- .e

.wa . .m..,, -

_-'<2 -;L

PLANT M ANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

EMERGENCY PLAN EMERGENCY RESPONSE ORGANIZATION 1903.50 J.~ :-- . . . . - .

PAGE 16 oi 21 O -< .

ARKANSAS NUCLEAR ONE aEvisioN CHANGE 3 oATE DATE 7/28/81 ATTACIDIENT 3 Page 5 of 7 I

%***~-w

, . . p . . .;- _

- 4 %_ =l r , N '. ' s e

I <t

.-_,_ - . , 11 .. '.l p_-l, Es i 4 l--b ?i.ma:l  !

j ' - ~

. e *! fh i a - .

l $==N n t= a o L N, 4 w= 4 i i

i x s s ~ :. ,=+e*

g j i i \

I

^

\ n g ,

t,%x -

O e x ]

1 T '

r-..- g

.  ; , / -c .

, y ..

g e

{

g  ;,-i ,

e 4-nr -

  • 7

, y - ..

\/1 I - g

1. s i i y

/ .. .

i..<.

/ \ .

\ .c

!, E , d,f ,. a m. .

" ' * ' ". i j ,

't. .4{ , 1.11N V4 O:UNS94'St Y-1 m. - -

)

- C 4  ! j -

t, /l .

! _  ! I _

i -

I ,,

m,_ _ _ , . g_-._ o - ,

.....g J a

__J

~ :5)c

.) .

  • * ~ * ' me pt. *

-ee n  %

  • 5 ,,,

f .e f 1

__ _ J

PLANT M ANUAL SECTION: PROCEDURElWORK PLAN TITLE: NO:

. ~

EMERGENCY PLAN EMERGENCY RESPONSE ORGANIZATION 1903.50

- ^ * " '

PAGE 17 of 21 f)1 N- ARKANSAS NUCLEAR ONE - atviSion CHANGE 3 o^rE 7/2afsi DATE ATTACIIMENT 3 Page 6 of 7 t

'* w I; I , , , . . . - .

p- =

g

[! ', , 5 g . .

r N'

~ :I :. . '

h if 5. N

< u !!

,f ,_ __

-- - * .a.

bM I .,

eJ n

M ti u~ n

&, - =

, n f C , - ~ . -

r Ip

%y c l L

a

-*DN3 { , =g , ,e_. _

heya mg 1 ,

"d C .. .6

=

' e' ma N

[ l "

  • D w

^

p< I-k

=

i . > { .

.s . u .r g e-

.} 1 [5 ',;j 3 4h -

2 3.,5c

~

A 'L# ..

z 3 3 e; t . . ~

r fl m -

} J!. __ J!L.!_

,_s. _ _. _ >

l .

a. ,.

'.-Me 5pG@ 4:5 *C.

g 7C J ~== ==  ! '

)

P S r "D w e

I

, 52

,_ . _ 3 .,

q ~

G ' ,, - "

- w, G'M

  • 7 ^--- -

PLANT MANijAL SECTION: PROCEDUREAVORK PLAN TITLE: NO:

m-

- a .

EMERGESCY PLAN EMERGENCY RESPONSE ORGANIZATION 1903.50 p, ggg f's ') c-ARKANSAS NUCLEAR ONE aEvisioN CHANGE 3 oATE 7/28/81 DATE ATTACHMENT 3 Page 7 of 7

. . c

, m, .

.. - ~ -.

n

& (

s -t 4

1,

. 4 -- , gs n t .

~

h W.C), 'N  !! 5 :3 3

~-

xN nvn

< c , ;_

a w y ~#

g l A M 's x ...

_ _ _r - --- s. I, a : t o o o uw

! 8 l j 's

--Mw  !

  • 's .

i a _. - _ wes.

8 J

= =j I 3 N Q..--

m

< __ .._.l .

4 r#1 4 A

h N j 4 l~ u~ :,

pA > + wwp- ~

'b ^

O M ___ :D:  % 0 Q ROWE"U Q .

I d ~ - - - - -

I i ,

<> n I , 1 i ,'

I . ;_ .:

l l ,/

a ,

i , s L *. - r 3. _

'. e

, ,/

cx

~ ,

y -

j

~ . _

! g .

i Ij

  • J I

- - . c; il s < -

1 ll ji I" - _1_ "

._ =

1 c r--- i

v. m%-gg 9 --- w w = ~

i

'

  • F*U rh&[dhdy,'d.g .YIi-O" ,

i j

. s- . t { ,

h. -

m 3 _ .___ _ _,

'.. m

. J'

    • ..,_~s r .- . .

J

$%w ,,

)

  • * ' 'e* **..wp. ,, g _

b""..,',,

' ' 'i-.:-

  • 7**

s PLANT MANUAL SECTION: PROCEDURE! WORK PLAN TITLE: N O-EMERGENCY PLAN EMERGENCY RESPONSE ORGANIZATION 1903.50 j' ' ~"'"'

PAGE 19 ot 21

-- )- ARKANSAS NUCLEAR ONE aeviSioN CHANGE 3 oATE 7/28f81 DATE y.

~

ATTACIDfENT 4 COM'!UNICATIONS FLOW PL\N

. wy., , .

.1/ , ,., .-

- i.

EFRCFNCY CO'! TROL CENTFR Dose Incident p Assess. Response Supv. Director

-@@eug (ro) (pt) vt - ' - " ' " " W

( A v < ~ , 1.

1. Fie ld Me as ire =ent s

[radi f OP'"

\ 1. Information Reporting

( 2. Directicns 2. Plant Status 4 phone 1 3. Rad. Monit./ Met. Data  !

/  %

. s .

- w. .

V V -

Rec ove ry 1TC1NICAL SJPPORT CFNTFR ~~

OFFSITE Mgr.

(pt)\ - ,, -'

FIELD 4 ) (ro) \ I ' ' ,

TEAF.S (ro)  % Status Resp. _ _ _ _ Operations Indv. Boards Mgr. (pt)

A A

%,s J g .-fs.t w& dig.. Q Mt closed \ #~h phone /  ! open j 1. Plant S tatus

, I phone 2. Rad. Monit./ Met. Data N OTES - \

pt = phone talke r

(

to = radio operator V V -

vorn ten 3 i Resp. Supt. (pt)

( Indv.

Y ,

, OFFRATIO?!AL C DT F O L

( [\, . 51'PPORT rFNTFR RWMM) j ,

. ..s l

I

  • s

%>4. 1, t-

.-d

u. __-~.-

PLANT M ANUAL SECTION: PROCEDURE /WORX PLAN TITLE: NO:

EMERGENCY PLAN EMERGENCY RESPONSE ORGANIZATION 1903.50

,_s PAGE 20 of 21 (N/ ) ARKANSAS NUCLEAR ONE a avisio n CHANGE 3 oaTE 7/28/81 DATE ATTACHMENT 5 Page 1 of 2 Responsibilities Matrix for the Emergency Response Organization ACTIVITY RESPONSIBILITY A. Command and Control

1. Overall Incident Response Director
2. Corrective & Recovery Actions Recovery Manager
3. Offsite Radiological Monitoring Dose Assessment Supervisor
4. Engineering and Technital Technical Support Manager Support Activities
5. Non-technical Support Activities Support Superintendent
6. Communications Communications Superinten-dent B. Warning and Evacuation
1. Onsite Radiological Monitoring Onsite Monitoring and Health Physics Supervisor

(~^x 2. Predicting Offsite Doses Dose Assessment Supervisor

( ')

3.

4.

Exclusion Area Evacuation Site Access Control Site Security Coordinator Site Security Coordinator

5. Notification of State and Local Incident Response Director Emergency Response Groups of Protective Action Recommendations
6. Liability Claims Financial Services Coordinator C. Communications
1. Communications with the NRC Incident Response Director
2. Communications with State Incident Response Director Government Agencies
3. Communications with Local Local Advisory Supervisor Government elected officials
4. Communications with other Utility Advisory Supervisor Utilities, EPRI, EEI, INPO, etc.
5. Communications with the Media Media Relations Coordinator
6. Approval of Public Information Incident Response Director Releases
7. Communication with State and Governmental Advisory Federal elected officials Coordinator

,q

~~)

PLANT MANUAL SECTION: PROCEDURE! WORK PLAN TITLE: NO:

EMERGENCY PLAN EMERGENCY RESPONSE ORGANIZATION 1903.50 PAGE 21 of 21 (m')

N

ARKANSAS NUCLEAR ONE aEvision 3 o*TE 7/28/81 CHANGE DATE ATTACllMENT 5 (cont.) Page 2 of 2 ACTIVITY RESPONSIBILITY D. Emergency Facilities

1. Procurement Logistics & Procurement Coordinator
2. Maintenance Facility Maintenance Coordinator
3. Access Control Site Security Coordinator
4. Space Allocation Support Superintendent E. Emergency Services
1. Fire Fighting Emergency Services Coordinator
2. Medical Support Emergency Services Coordinator F. Engineering Support 7

'( ,j) 1. Coordination with NSSS suppliers, Engineering Resources A/E's, vendors, consultants Coordinator

2. Onsite Engineering Support Site Engineering Supervisor
3. Nuclear Engineering and Analysis Nuclear Support Supervisor
4. General Office Engineering Engineering Resources Coordinator
5. Design Records Site Office Services Coordinator G. Recovery and Corrective Actions
1. Planning Recovery Manager
2. Equipment Manipulation Ops. Superintendent
3. Radwaste Handling Radwaste Coordinator
4. Repairs Maintenance Manager and Maintenance Superintendents
5. Radiological Exposure Control Onsite Monitoring and Health Physics Supervisor H. Chemistry and Sampling
1. Primary Side Radiochemistry Supervisor
2. Secondary Side Chemistry Supervisor p

/

z ARKANSAS POWER & LIGHT COMPANY e

. M Elw 1 Arkansas Nuclear One EMERbNCYPLANPROCEDURE FORM 10CO.06A TURNOVER OF RESPONSIBILITY TO THE EMERGENCY RESPONSE ORGANIZATION i 1903.51 REV. 1 RECORD OF CHANGES AND REVISIONS PAGE REVISION CHANGE PAGE REVISION CHANGE PAGE REVISION CHANGE 1 0 2 1 l

l O

^""BWoLs a cascs- _ , , _ . _

^""f*g5, N

.n o .-

t d

f PLANT M ANUAL SECTION: PROCEDURElWORK PLAN TITLE: NO:

EMERGENCY PLAN TURNOVER OF RESPONSIBILITY TO THE PROCEDURE EMERGENCY RESPONSE ORGANIZATION 1903.51 c3 PAGE 2 of 2

(' ' ') ARKANSAS NUCLEAR ONE aevisiON CHANGE i DATE 7/i3/ai DATE 5.3 For Site Emergencies and General Emergencies, the Emergency Response Organization shall be activated in parallel with the Initial Response Organization.

5.4 When activated, Emergency Response Organization personnel that do not have an active role in the Initial Response Organization shall proceed to their pre-assigned locations and from there call the Technical Support Center for further instructions. The Duty Emergency Coordinator should assign an individual to record the ERO positions that have been reported.

5.5 On arrival, the Incident Response Director, the Technical Support Manager, the Recovery Manager, Site Security Coordinator, Emergency Services Coordinator and the HP and Chemistry Superintendent should report to the Duty Emergency Coordinator. The Duty Emergency Coordi-nator shall then tratsfer his duties to these individuals as follows:

5.5.1 The Incident Response Director assumes responsibility far the overall direction of the Emergency Response Organization.

5.5.2 The Recovery Manager assumes responsibility for direction of corrective and recovery actions. He also assumes overall

(~'; direction of the response organization until the Incident

(_,/ Response Director or one of his Assistants arrives.

5.5.3 The Site Security Coordinator assumes responsibility for direction of the Emergency Evacuation Team.

5.5.4 The Emergency Services Coordinator assumes responsibility for direction of the Emergency Fire and Medical Teams.

5.5.5 The HP & Chemistry Superintendent assumes responsibility for direction of the Onsite Radiological Monitoring Section of the Emergency Radiation Team.

5.5.6 The Technical Support Manager assumes responsibility for direction of the Offsite Radiological Monitoring Section of the Emergency Radiation Team and for dose assessment ac-tivities.

5.6 The Duty Emergency Coordinator retains the title of Duty Emergency Coordinator until the Incident Response Director, Technical Support Manager, Recovery Manager, Site Security Coordinator, Emergency Services Coordinator, and the HP and Chemistry Superintendent have reported on-site and assumed their responsibilities. Once the Duty Emergency Co-ordinator has transferred his responsibilities to these individuals, he shall appraise the Recovery Manager of this and begin functioning

-s under his position title in the Emergency Response Organization or l 1 as directed by the Recovery Manager.

\~)

6.0 ATTACHMENTS AND FORMS NONE

PLANT M ANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

r EMERGENCY PLAN RUSSELLVILLE FIRE DEPARTMENT 1903.70 I PAGE 2 of 2 ARKANSAS NUCLEAR ONE atvision CHANGE i oATE 6/23/8i DATE 5.3 The Russellville Fire Department may verify the authenticity of the request by calling the applicable Arkansas Nuclear One Control Room:

V 5.3.1 Unit One Vl V V 5.3.2 Unit Two /

5.4 On arriving, the Russellville Fire Department should report to the North Gate, unless otherwise instructed.

5.5 Notify Security that the Russellville Fire Department has been called and inform them of the proper access point. Security guards should meet the fire trucks and escort them through the plant gates and to the scene of the fire.

5.6 At the scene of the fire, the Russellville Fire Department shall coordinate its activities with the ANO Emergency Fire Team Leader.

In the absence of the Emergency Fire Team Leader, the Fire Department shall request and coordinate the support of other fire departments.

5.7 If the Russellville Fire Department and ANO personnel require further assistance to fight a fire, the Russellville Fire Department should request and coordinate the support of other fire departments.

/

\ 5.8 If a fire occurs in a radiation area, ANO personnel trained in radiation protection shall be available to assist the fire-fighting personnel. Fire-figh:ers should follow the instructions given by these ANO personnel ior their protection.

6.0 ATTACHMENTS AND FORMS None l

l

[

l 1

l

,r TIE MATERIAL CONTAINED WITHIN TIE SYMBOLS ( ) IS PROPRIETARY OR PRIVATE INFORMATION.

"7~

N PLANT MANLQL SECTiON- PROCEDUREAVORK PLAN TITLE: NO:

A EMERGENCY PLAN POPE COUNTY SHERIFF'S DEPARTMENT 1903.71 PAGE 1 of 3

. ARKA.NSAS NUCLEAR ONE REVISION O DATE 8/18/80 CHANGE DATE s

- 1.0 PURPOSE The purpose of thts procedufe is to provide guidance on the Eme egency Plan related response of t.he Pope County Sheriff's Department should their assistaace be required at Arkansas Nuclear One.

2.0 SCOPE This procedure applies to emergency situations involving evacuation requiring i "

assistaace from the Pope County Sheriff's Department.

3.0 REFERENCES

3.1 References Used in Procedure Preparation:

I" 3.1.1 State of Arkansas Emergency Operations Plan, Annex V - Arkansas Nuclear One Radiological Incident Response Plan.

~

3.1.2 Arkansas Nuclear One Emergency Plan.

3.1.3 Letter of Agreement between the Pope County Sheriff's Department and Arkansas Power & Light Company.

3.2 References Used in Conjunction with this Procedure:

None

. 3.3 Related AND Procedures:

None s

4.0 DEFINITIONS

-None

. . 5.0 INSTRUCTIONS 5.1 If the assistance of the Pope County Sheriff's Office is required at Arkansas Nuclear One (ANO), the Pope County Sheriff's Office should be called at\ .

~

or by means of the Sheriff's

, radio (when installed). Provide them with a description of the assistance required.

5.2 The Pope County Sheriff's Department may verify the authenticity of the request by calling the applicable Arkansas Nuclear One Control Room by means of:

. 5.2.1 Phone, or A. Unit One -

B. Unit Two V_

7 5.2.2 Sheriff's Radio TIE MATERIAL. CONTAINED WITHIN TIE SYMBOLS ( ) IS PROPRIETARY 1, OR' PRIVATE INFORMATION.

... .. . . . ~ . _ . , ~ . - - . . _ . _ . .

PLANT M ANUAt SECTION: PROCEDURENJORK PLAN TITLE: NO:

EMERGENCY PLAN ARKANSAS DEPARTIENT OF IEALTH 1903.76 PAGE 1 of 2

( '-

ARKANSAS NUCLEAR ONE latvisioN CHANGE 1 Da1E 7/7/81 DATE 1.0 PURPOSE The purpose of this procedure is to provide guidance on the coordination of Arkansas Department of Health and Arkansas Nuclear One activities in the event of an Emergency Action Level (EAL) declaration at Arkansas Nuclear One.

2.0 SCOPE This procedure is applicable to emergency situations involving Unit One and/or Unit Two which meet Emergency Action Level criteria.

3.0 REFERENCES

3.1 References Used in Procedure Preparation:

3.1.1 State of Arkansas Emergency Operations Plan, Annex V -

Arkansas Nuclear One Radiological Incident Response Plan.

3.1.2 Arkansas Nuclear One Emergency Plan.

3.1.3 Letter of Agreement between the Arkansas Department of Health and Arkansas Power & Light Company.

3.2 References Used in Conjuction with this Procedure:

I None 3.3 Related ANO Procedures:

3.3.1 1903.10, " Emergency Action Level Response" 4.0 DEFINITIONS None l

l 5.0 INSTRUCTIONS 5.1 In the event of a situation at Arkansas Nuclear One (ANO) which meets the criteria of an Unusual Event, Alert, Site Emergency or General l

Emergency Emergency Action Level as described in the ANO Emergency l Plan, the Arkansas Department of Health will be contacted and

provided with a description of the unusual or emergency situation.

Arkansas Department of Health /

V/ 'V 5.1.1 unless otherwise directed. * ~~

5.1.2 Upon activation of the Technical Operations Control Center, follow-up notifications may be provided to this center, if so directed.

i THE MATERIAL CONTAINED WITHIN THE SYMBOLS ( ) IS PROPRIETARY OR PRIVATE INFORMATION.

PLANT M ANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO: l EMRGENCY PLAN U.S. ARMY CORPS OF ENGINEERS 1903.77 PAGE 1 of 2

\

ARKANSAS NUCLEAR ONE aEvisioN CHANGE O oaTE 8/18/80 DATE 1.0 PURPOSE The purpose of this procedure is to provide guidance on the coordination of the U.S. Army Corps of Engineers Emergency Plan related activities in the event of an unusual or emergency situation at Arkansas Nuclear One.

2.0 SCOPE This procedure is applicable to emergency situations requiring assistance of the U.S. Army Corps of Engineers.

3.0 REFERENCES

3.1 References Used in Procedure Preparation:

3.1.1 State of Arkansas Emergency Operations Plan, Annex V - Arkansas Nuclear One Radiological Incident Response Plan.

3.1.2 Arkansas Nuclear One Emergency Plan.

3.1.3 Letter of Agreement between the U.S. Army Corps of Engineers and Arkansas Power & Light Company.

3.2 References Used in Conjunction with this Procedure:

None 3.3 Related ANO Procedures:

(

None 4.0 DEFINITIONS None 5.0 INSTRUCTIONS l 5.1 The U.S.

Nuclear ArmyUnit One (Corps Oneof iEngineers has agreed to contact) grkansas s ,

UnitTwo-5(([ in the following situations in order tnat appropriate actions may be l

taken:

l 5.1.1 Dardanelle Lake level increases above elevation 340 feet.

5.1.2 Dardanelle Lake level is projected to rise above elevation 340 feet.

5.1.3 Dardanelle Lake level must be drawn below elevation 335 feet.

5.2 Radiological Incident l 5.2.1 Should an incident occur at Arkansas Nuclear One which re-l quires evacuation and control of access to the Arkansas l Nuclear One exclusion area, the Duty Einergency Coordinator j shall contact the U.S. Army Corps of Engineers to request l , that boat access to the portions of the Lake Dardanelle l (_ within the exclusion area be controlled.

l THE MATERIAL CONTAINED WITHIN THE SYMBOLS ( ) IS PROPRIETARY l OR PRIVATE INFORMATION.

L